DZ24A/1007/WEB
Granted‘Red Zone’ temporary surface car park, and Blocks F1-F3, ‘The Campus’, Cherrywood Avenue,, Cherrywood (Glebe Townland), Co. Dublin, Dublin 18
‘Red Zone’ temporary surface car park, and Blocks F1-F3, ‘The Campus’, Cherrywood Avenue,, Cherrywood (Glebe Townland), Co. Dublin, Dublin 18
The Red Zone temporary car park is being reconfigured and reduced in size to make way for new residential development nearby. Up to 226 basement parking spaces at The Campus blocks will be reallocated to serve the new homes. The remaining temporary surface car park will continue operating for another 5 years.
The existing temporary car park of 740 spaces will be reduced to approximately 398 spaces, with new layout, access routes and drainage arrangements to match the adjacent residential development. Bus drop-off and motorcycle parking areas will be included. The 226 basement spaces at The Campus will be made available as temporary parking to support residential uses while new HIE office blocks are built.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.