DZ24A/1030/WEB
GrantedIn the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18
In the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18
An amendment to the existing permitted development to add 59 new homes by raising four residential blocks by 1–2 storeys each, creating a total of 158 units across the site.
The 59 new units comprise 3 studios, 19 one-bed and 37 two-bed homes. The existing 99 permitted units undergo minor layout and facade changes. All four blocks (A, B, C, D) increase in height, now ranging from 4 to 5 storeys.
Car parking reduces from 155 to 133 spaces (4 at surface level, 129 basement). Bicycle parking increases from 175 to 267 spaces (220 long-stay, 45 short-stay, 2 cargo). The site connects to Luas Green Line to the west.
Basement level reconfigured to optimise drainage and SuDS (sustainable drainage) design. Landscaping redesigned with new courtyard pavilions, increased communal open space, and revised planting and boundary treatments. Temporary crèche facility omitted.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.