DZ24A/1030/WEB
GrantedIn the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18
In the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18
An expansion of an existing residential scheme with 59 additional homes, achieved by adding one extra storey to most blocks. The development sits between the Luas green line and Tully Vale Road in Cherrywood.
The new 59 units comprise 3 studios, 19 one-bed, and 37 two-bed homes. Together with the previously approved 99 units, the total scheme now contains 158 homes. Buildings range from 4 to 5 storeys.
133 car parking spaces are provided (4 at surface level, 129 basement). Bicycle parking has increased significantly to 267 spaces (220 long-stay, 45 short-stay, 2 cargo). The site has direct access to the Luas green line.
Sustainable drainage (SuDS) systems have been redesigned. Landscaping improvements include expanded communal open space, new courtyard pavilions for refuse storage, and revised planting and boundaries.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.