DZ20A/0585
Refusedon a site in the Townlands of Laughanstown and Cherrywood, Dublin 18
on a site in the Townlands of Laughanstown and Cherrywood, Dublin 18
A temporary marketing suite to showcase the Cherrywood development, consisting of 3 small buildings arranged around a landscaped courtyard within Development Area 8 - Tully.
Two 1-storey buildings and one 2-storey building will be arranged around a courtyard. A covered walkway approximately 3.5–3.7m high will link the buildings. The suite covers approximately 304.4 sq.m of floor space.
A new vehicular entrance from Gun and Drum Hill Road will serve 8 car parking spaces. The development will also use existing permitted roads (Gun and Drum Hill Road, Castle Street, Bishop Street, and Cherrywood Avenue) for wider site access.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.