DZ16A/0995
RefusedLaughanstown and Tiknick, Shankill, Co. Dublin
Laughanstown and Tiknick, Shankill, Co. Dublin
The Electricity Supply Board wants to keep two high-voltage power lines in operation for another five years beyond their original ten-year permission. These lines carry electricity through the Cherrywood area and have been in place since 2006.
The development comprises two overhead lines spanning approximately 1.79 km total. The first line (0.79 km) runs from Laughanstown to Cherrywood substation and includes two wooden poles (about 19 metres high) and three lattice steel masts (about 17.5 metres high). The second line (1.10 km) extends from Tiknick to Cherrywood substation and includes three wooden poles and four lattice steel masts.