DZ21A/1017
GrantedTownlands of Laughanstown, Glebe, and Cherrywood, Dublin 18, (also Co Dublin)
Townlands of Laughanstown, Glebe, and Cherrywood, Dublin 18, (also Co Dublin)
The development builds 1.6 kilometres of new roads and infrastructure to link different parts of Cherrywood and connect to the wider area. It includes footpaths, cycle lanes, a pocket park, and essential services like water, drainage, and telecoms.
The site protects two ancient monuments: a wedge tomb and a cairn (Bronze Age stone mound). A 0.7-hectare pocket park will be created around them with landscaping and retaining walls to preserve them for future generations.
The new Beckett Road includes a 42-metre underpass beneath the Wyattville Link Road to allow traffic to flow smoothly. New footpaths, cycle lanes, and pedestrian crossings will be added throughout.
Surface water drainage infrastructure manages rainwater runoff, with a temporary holding tank and connections to the existing network. Hard and soft landscaping, including trees and planted areas, will improve the public realm.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.