D08A/0687
RefusedCherrywood Science & Technology Park, Loughlinstown, Co. Dublin
Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin
The existing Block D building will be demolished and replaced with a 5-storey mixed-use building. The new building will contain office space, retail on the ground floor, and basement car parking.
4 storeys of offices will sit above a ground floor with an office entrance and a 1,005 sq.m retail unit. An ESB sub-station and switch room will be located on the ground floor.
A double basement will provide 77 car parking spaces, bicycle parking, and refuse areas. Access is via the existing car park ramp to the Block AD basement.
The building is 5 storeys tall with a total of 5,925 sq.m of floor space. Balconies are included on the south, west and north elevations at the fourth floor level.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.