D08A/0687
RefusedCherrywood Science & Technology Park, Loughlinstown, Co. Dublin
Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin
The existing 3-storey Block D will be demolished and replaced with a 5-storey mixed-use building containing offices, retail, and basement parking.
The ground floor includes a 1,005 sq.m retail unit and an office entrance lobby. Four storeys of offices sit above, with a total building floor area of 5,925 sq.m.
A double basement level will provide 77 car parking spaces, bicycle parking, and refuse areas. Access is via the existing car park under Block D1.
The building rises to 5 storeys with balconies on the south, west, and north sides at fourth-floor level. Roof-mounted mechanical plant is screened with louvres.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.