D08A/0687
RefusedCherrywood Science & Technology Park, Loughlinstown, Co. Dublin
Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin
The three-storey Block D building will be demolished and replaced with a new 5-storey mixed-use development containing offices, retail, and underground parking.
The ground floor includes an office entrance lobby and a 1,005 sq.m retail unit. Four storeys of office space sit above, with balconies on the south, west, and north sides of the top floor.
A double basement beneath the building will hold 77 car parking spaces, accessed via the existing ramp to Block AD's basement car park. Bicycle parking and refuse areas are also included in the basement.
The building has a total gross floor area of 5,925 sq.m across 5 storeys. Roof-mounted mechanical plant will be screened with louvres.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.