D08A/0687
RefusedCherrywood Science & Technology Park, Loughlinstown, Co. Dublin
Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin
The existing three-storey Block D will be demolished and replaced with a five-storey mixed-use building containing office and retail space.
The ground floor includes a 1,005 sq.m retail unit and an office entrance lobby. Four storeys of offices sit above, with a total building floor area of 5,925 sq.m.
A double basement will provide 77 car parking spaces, bicycle parking, and vehicle access via the existing ramp to Block AD's basement car park. Refuse and plant areas are also located below ground.
The building rises five storeys with balconies on the south, west, and north elevations on the fourth floor. Roof-mounted mechanical plant will be screened with louvres.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.