D08A/0687
RefusedCherrywood Science & Technology Park, Loughlinstown, Co. Dublin
Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin
The existing 3-storey mixed-use building (Block D) will be demolished and replaced with a new 5-storey building for office and retail use.
Ground floor contains a 1,005 sq.m retail unit and office entrance lobby. The upper 4 storeys provide office space. Total building floor area is 5,925 sq.m.
The development includes a double basement with 77 car parking spaces accessed via the existing car park ramp to Block AD. Bicycle parking and refuse areas are also provided in the basement.
The building rises to 5 storeys with balconies on the south, west and north elevations at the fourth floor level. Roof-mounted plant equipment will be screened with louvres.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.