D04A/1012
RefusedCherrywood/Glebe, (ED Rathmichael), Wyvattville Link Road, Co. Dublin.
Cherrywood/Glebe, (ED Rathmichael), Wyvattville Link Road, Co. Dublin.
Land shaping, drainage infrastructure, and soil management works to prepare the Cherrywood site for future development. Earthworks fill will be retained on 1.5 hectares of the main site, and topsoil will be stored temporarily at a separate Laughanstown site.
The main site covers 8.6 hectares with access via the N11 at Wyattville Road. Topsoil storage is located on 5.1 hectares at Laughanstown, accessed via Tullylane accommodation overbridge.
Drainage systems will be installed to manage water on the site. An Environmental Impact Statement will accompany this application to assess effects on the local area.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.