D11A/0127
GrantedCarrickmines Substation, Barrington Tower, Brennanstown Road, Cabinteely, Dublin 18
Carrickmines Substation, Barrington Tower, Brennanstown Road, Cabinteely, Dublin 18
Retention permission is sought for an electrical substation and ESB room already built to support the new Luas Green Line (Line B1) tramway extension serving Cherrywood and surrounding areas.
The substation is a single-storey concrete structure with a floor area of 218 sq.m. It is enclosed by a metal and timber fence, with a hard-surfaced service compound for maintenance access.
This electrical substation is essential infrastructure for the Luas Green Line extension, which will provide tram access to Cherrywood and connect the wider area to Dublin's public transport network.
The application includes surface water drainage and associated site works to manage rainwater run-off from the substation compound.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.