DZ22A/0820
GrantedTownlands of Laughanstown, Brennanstown and Cherrywood,, Dublin 18
Townlands of Laughanstown, Brennanstown and Cherrywood,, Dublin 18
This is a minor revision to an already-approved residential development. The developer is changing the design of 12 houses to different house types, and altering roof treatments on 3 duplex blocks.
The development contains 168 dwelling units in total. 12 houses fronting Tully Road are being changed to different house types already approved within the wider scheme (for example, some 2-storey houses becoming single-storey, or vice versa). The 3 duplex blocks will have solid roofs instead of glazed ones over shared corridors, which raises their parapet height slightly but does not change the overall building height.
The site covers 9.68 hectares in the Tully development area, bounded by Castle Street to the west, Gun and Drum Hill Road to the north, and Lehaunstown Lane to the south. The development is part of the Cherrywood Planning Scheme 2014.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.