DZ16A/0597
GrantedLands (c.1.87 ha) in the townland of Laughanstown, Dublin 18
Lands (c.1.87 ha) in the townland of Laughanstown, Dublin 18
A gas infrastructure facility to operate and maintain gas pipelines serving the wider area, with a new access road from Lehaunstown Lane.
The site will contain 2 structures: a regulator skid (48.75 sq.m, up to 3.2 metres high) and a boiler/instrumentation kiosk (48.1 sq.m, up to 3.9 metres high). Underground pipework, 2 floodlights (9 metres high) and security fencing (2.4 metres high) are also included.
A new 601-metre access route will connect from the existing Lehaunstown Lane/M50 overbridge. About 345 metres of this route falls outside the Cherrywood planning area.
Landscaping is proposed for the 1.87-hectare site, with associated groundworks. Approximately 1.2 hectares of the total site lies outside the Cherrywood Strategic Development Zone boundary.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.