DZ22A/0820
GrantedTownlands of Laughanstown, Brennanstown and Cherrywood,, Dublin 18
Townlands of Laughanstown, Brennanstown and Cherrywood,, Dublin 18
This application seeks approval for minor revisions to the already-permitted residential development in the Tully area of Cherrywood. The development remains 168 dwelling units in total.
12 house units fronting Tully Road are being changed to different house types already approved within the scheme (including B3w, B4aw, B4w, C4w, and C5w types). The development also includes 3 apartment blocks with duplex units, where roof treatments over shared corridors are changing from glazed to solid surfaces, raising the roof edge slightly—though overall building height remains unchanged.
The site covers 9.68 hectares, bounded by Castle Street to the west, Tully Park to the east, Gun and Drum Hill Road to the north, and Lehaunstown Lane to the south.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.