DZ18A/0458
Grantedon lands (c.0.74 HA) in the townland of Laughanstown, Dublin 18 (Development Area 8 - Tully)
on lands (c.0.74 HA) in the townland of Laughanstown, Dublin 18 (Development Area 8 - Tully)
A new primary school building will be constructed on a plot identified in the Cherrywood Planning Scheme, south west of Tully Park.
The school will have 24 classrooms, a special needs unit with 2 additional classrooms, a general purpose hall, library, resource room, teaching support rooms, and staff areas. External play areas and landscaping are included.
The building will be 2–3 storeys with a gross floor area of 4,510 sq.m, situated on a 0.74-hectare site.
The school will be accessed from Castle Street via a new local road currently under construction. 20 car parking spaces and 192 cycle parking spaces are provided. Minor changes to the road layout, parking set-down, and bus set-down areas are proposed.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.