D04A/1012
RefusedCherrywood/Glebe, (ED Rathmichael), Wyvattville Link Road, Co. Dublin.
Cherrywood/Glebe, (ED Rathmichael), Wyvattville Link Road, Co. Dublin.
Site preparation works including land shaping, drainage infrastructure, and temporary storage of excavated soil across two locations in the Cherrywood area.
The main 8.6 hectare site will be shaped and drained, with 1.5 hectares of earthwork fill retained on-site. Approximately 5.1 hectares at Laughanstown will be used for temporary topsoil storage. An Environmental Impact Statement will be submitted with the application to assess potential effects.
The main site will be accessed via the N11 at Wyattville Road. The storage site will be accessed from Tullylane accommodation overbridge.