DZ22A/0403
RefusedTownlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18
Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18
This is a minor revision to an already-approved residential scheme. The development remains 168 homes, but 12 houses fronting Tully Road are being swapped for different house types already permitted elsewhere in the scheme. Roof treatments over shared corridors in 3 duplex blocks are also being changed from glazed to solid, raising parapet heights slightly.
The scheme contains 168 dwellings across houses and duplexes. The changes involve switching 12 houses to alternative designs (B4aw, C4w, C5w, B3w, and B4w types) that are already approved elsewhere in the wider Cherrywood masterplan. No additional units are being added.
The site covers 9.68 hectares bounded by Castle Street (west), Tully Park and future development lands (east), Gun and Drum Hill Road (north), and Lehaunstown Lane (south). The overall heights of the duplex blocks remain unchanged despite the roof modifications.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.