D11A/0127
GrantedCarrickmines Substation, Barrington Tower, Brennanstown Road, Cabinteely, Dublin 18
Carrickmines Substation, Barrington Tower, Brennanstown Road, Cabinteely, Dublin 18
The developer is seeking permission to retain (keep) a single-storey concrete building and fenced service compound that has been built to house electrical equipment for the new Luas Green Line extension serving Cherrywood and the wider area.
The 218 sq.m building contains an electrical substation and ESB (Electricity Supply Board) control room. It is surrounded by a metal and timber fence, with a hard-surfaced service area for maintenance access.
The site includes surface water drainage and associated ground works to manage water run-off from the substation compound.
This facility is part of critical infrastructure for the Luas B1 tramway extension, which will provide a new public transport link to Cherrywood.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.