D04A/1012
RefusedCherrywood/Glebe, (ED Rathmichael), Wyvattville Link Road, Co. Dublin.
Cherrywood/Glebe, (ED Rathmichael), Wyvattville Link Road, Co. Dublin.
Preparation works for the Cherrywood development, including land shaping, drainage installation, and temporary storage of soil and earthwork materials across two connected sites.
The main site (8.6 hectares) will be reshaped and drained. Part of it (1.5 hectares) will retain earthwork fill. A separate storage site (5.1 hectares) at Laughanstown will temporarily hold topsoil during construction. An Environmental Impact Statement will accompany the application.
Access to the main site is from the N11 at Wyattville Road. The storage site is accessed via Tullylane accommodation overbridge.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.