# Planning application D06A/1497 > Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin, Cherrywood, Dún Laoghaire–Rathdown. Granted (14 Dec 2006). - **Reference:** D06A/1497 - **Address:** Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin - **Status:** Granted (14 Dec 2006) - **Decision:** GRANT PERMISSION - **Application type:** Permission - **Applicant:** Cherrywood Science & Technology Park - **Lodged:** 19 Oct 2006 - **Decided:** 14 Dec 2006 - **Location (lat, lng):** 53.241476, -6.140705 ## Proposal Construction of a four storey office building to be known as Block G2 with a gross office floor area of 11,461 sq.m. fronting the distributor road at Cherrywood Science and Technology Park, roof mounted mechanical plant in an area screened off with louvers; over two level basement car park with gross floor area of 7007 sq.m. comprising 218 spaces, 109 spaces on each deck, forming an extension to the existing car park under Block G under construction and accessed by the previously approved vehicular ramp (D06A/0015 to the lower level of the Block G car park and through the Block G car park; ESB sub station ancillary hard and soft landscaping around building. ## In plain English Builds a new four-storey office building, Block G2, over a two-level car park at Cherrywood Business Park. - **11,461** sq.m offices - **218** car spaces - **4** storeys ### What's planned A new four-storey office building fronting the distributor road, with screened rooftop plant and an ESB substation. ### Commercial Provides **11,461** sq.m of office space. ### Transport A **2**-level basement car park (**7,007** sq.m) holds **218** cars, **109** per deck. It extends the Block G car park and is reached through it. ### Environment Hard and soft landscaping around the building. _This summary was written by AI from the proposal text. Check the council record before relying on it._ ## Conditions ### Condition 1 The development to be carried out in its entirety in accordance with the plans, particulars and specifications lodged with the application, save as may be required by the other conditions attached hereto. REASON: To ensure that the development shall be in accordance with the permission and that effective control be maintained. ### Condition 5 That the water supply and drainage arrangements, including the disposal of surface water, be in accordance with the requirements of the County Council. REASON: In the interest of public health. ### Condition 6 Adequate storage shall be provided for Waste Disposal and Recycling facilities on site to the satisfaction of the Environmental Services Department. REASON: In the interest of public health and the proper planning and sustainable development of the area. ### Condition 7 That no advertising sign or structure be erected except those, which are exempted development, without prior grant of permission from the Planning Authority. REASON: In the interest of the proper planning and sustainable development of the area. ### Condition 8 Adequate provision is to be made to facilitate access to, and the use of the development, buildings, facilities and services by disabled persons. The minimum requirements to be provided shall be as set out in 'Access for the Disabled - Minimum Design Criteria' published by the National Rehabilitation Board. REASON: In the interest of safety and amenity. ### Condition 16 That a financial contribution shall be paid by the proposer to the Council towards the cost of the extension of Luas Line B from the Sandyford Depot to Cherrywood, namely Luas Line B1. This contribution to be paid prior to the commencement of the development or in such other manner as may otherwise be agreed with the Planning Authority. The rate of contribution payable shall be that pertaining to the particular year in which implementation of the Planning Permission is commenced. The Supplementary Development Contribution Scheme provides for an annual increase in the levels of contribution payable, as outlined in the scheme, by a factor of 5% compound interest per annum. The levels of contribution will be reviewed annually on the 13th of January of each year during which the scheme is in force to take account of the aforementioned increase. The rate of contribution payable in respect of this development, at current contribution rates, is € 354,667.23, and is subject to increase as outlined above. It should be noted that contributions assessed in accordance with the Supplementary Development Contribution Scheme cannot be appealed to An Bord Pleanala unless the applicant considers the levy referred to in this condition has not been properly applied in accordance with the terms of the Scheme. REASONS FOR CONTRIBUTIONS: To part finance the extension of the Luas Line B1 from Sandyford Depot to Cherrywood, as provided for in the Supplementary Development Contribution Scheme adopted by the Council of Dunlaoghaire-Rathdown on the 13th of January, 2003. ### Condition 2 That all necessary measures be taken by the contractor to prevent the spillage or deposit of clay, rubble or other debris on adjoining roads during the course of the works. REASON: To protect the amenities of the area. ### Condition 3 That all public services to the proposed development, including electrical, telephone cables and equipment be located underground throughout the entire site. REASON: In the interest of amenity. ### Condition 4 A specification and layout for public lighting shall be submitted to the Planning Authority and agreed in writing before development commences. Public lighting shall be available and operational as each house is occupied. The specification and layout shall comply with the standard as set out in the latest edition of the Council's Development Works in Residential and Industrial Estates or as otherwise agreed by the Planning Authority. REASON: To ensure a satisfactory standard of public lighting. ### Condition 12 The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of € 599,101.92 , with any outstanding balance being updated at the 1st of January each year during the life of the scheme in accordance with annual changes in the Wholesale Price Index - Building and Construction (Capital Goods) published by the Central Statistics Office, to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Water & Drainage Public Infrastructure and Facilities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dun Laoghaire Rathdown County Council on the 21/01/2004. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Water & Drainage Public Infrastructure and Facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. ### Condition 13 The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of € 816,285.60, with any outstanding balance being updated at the 1st of January each year during the life of the scheme in accordance with annual changes in the Wholesale Price Index - Building and Construction (Capital Goods) published by the Central Statistics Office, to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dun Laoghaire Rathdown County Council on the 21/01/2004. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. ### Condition 14 The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of € 677,960.28, with any outstanding balance being updated at the 1st of January each year during the life of the scheme in accordance with annual changes in the Wholesale Price Index - Building and Construction (Capital Goods) published by the Central Statistics Office, to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Parks & Community Public Infrastructure, Facilities and Amenities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dun Laoghaire Rathdown County Council on the 21/01/2004. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Parks & Community Public Infrastructure, Facilities and Amenities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. ### Condition 15 This development shall not be carried out without prior agreement, in writing, between the Applicant and the Planning Authority relating to the payment of development contributions. REASON: Investment by Dun Laoghaire-Rathdown County Council in Local Authority works has facilitated and will facilitate the proposed development. It is considered appropriate and reasonable that the developer should contribute to the cost of same. ### Condition 9 The applicant shall agree with the Planning Authority the area around Block G2 to be taken in charge, prior to the occupation of the building. Reason: In the interests of proper planning and sustainable development of the area. ### Condition 10 The applicant shall agree with the Planning Authority the pedestrian routes from the Brides Glen Road prior to the occupation of the building. Reason: In the interests of good pedestrian permeability. ### Condition 11 The location and design of pubic lighting surrounding Block G2, including the space between Blocks G1 and G2, shall be agreed with the Planning Authority prior to the occupation of Block G2. Reason: In the interests of safety and security. ## Nearby applications - [DZ20A/0611](https://cherrywoodplans.com/application/DZ20A-0611.md): Site of approximately 4,730 sq m at Building 11, (formerly known as Block G2), Cherrywood Business Park, Cherrywood, Co. Dublin, D18 DH50. Granted (19 Oct 2020). Expands the day hospital in Building 11, Cherrywood Business Park, to 1,220 sq.m. - [DZ18A/1131](https://cherrywoodplans.com/application/DZ18A-1131.md): Site of approx. 4,730 sqm at Building 11 (formerly known as Block G2), Cherrywood Business Park, Cherrywood, Dublin D18 DH50. Granted (5 Feb 2019). Turns part of the ground floor of Building 11 at Cherrywood Business Park into a 922 sq.m day hospital. - [DZ17A/0649](https://cherrywoodplans.com/application/DZ17A-0649.md): Block G2, Cherrywood Business Park, Cherrywood, Co Dublin. Granted (8 Sep 2017). Adds louvred screening around rooftop plant on Block G2, Cherrywood Business Park. - [DZ16A/0935](https://cherrywoodplans.com/application/DZ16A-0935.md): Block G2, Cherrywood Business Park, Cherrywood, Co. Dublin. Granted (17 Feb 2017). Adds landscaping, a drop-off area and a sign at Block G2, Cherrywood Business Park, and keeps three glass canopies. - [DZ16A/0124](https://cherrywoodplans.com/application/DZ16A-0124.md): Cherrywood Business Park (to west of Block G2 and south of Block G and G2), Cherrywood, Loughlinstown, Co Dublin. Granted (21 Apr 2016). Seeks to keep a temporary access road to the Blocks G and G2 car park at Cherrywood Business Park for 7 years. - [D09A/0804](https://cherrywoodplans.com/application/D09A-0804.md): Cherrywood Science & Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (14 Jan 2010). Permission to keep changes at Blocks G and G2, Cherrywood Science & Technology Park, including a larger basement car park. - [D07A/0229](https://cherrywoodplans.com/application/D07A-0229.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.. Granted (28 May 2007). Adds a temporary vehicle ramp to the basement car park serving Blocks G and G2 at Cherrywood Business Park. - [DZ19A/0577](https://cherrywoodplans.com/application/DZ19A-0577.md): Cherrywood Avenue South adjacent to Building 11, formally known as Building G2, Cherrywood Business Park, Loughlinstown, Dublin, D18 DH50. Granted (23 Jan 2020). A new loading bay on Cherrywood Avenue South beside Building 11 in Cherrywood Business Park. - [DZ17A/0731](https://cherrywoodplans.com/application/DZ17A-0731.md): G3 (west of Block G2), Cherrywood Business Park, Cherrywood, Loughlinstown, Co Dublin (within the Cherrywood Strategic Development Zone (SDZ) and subject to the Cherrywood Planning Scheme 2014). Granted (26 Jan 2018). Builds a new four-storey office building, G3, on Cherrywood Avenue in Cherrywood Business Park. - [DZ21A/0818](https://cherrywoodplans.com/application/DZ21A-0818.md): Site of approximately 0.43 ha at Building 10 (formerly known as Block G), Cherrywood Business Park, Cherrywood, Co. Dublin, D18 T3Y1. Granted (24 Feb 2022). New plant enclosures, flue stacks and doors at Building 10 in Cherrywood Business Park. - [DZ24A/0485/WEB](https://cherrywoodplans.com/application/DZ24A-0485-WEB.md): Site Known as Block G3, Cherrywood Business Park, Cherrywood, Loughlinstown, Co. Dublin. Granted (19 Dec 2024). A 4-storey science and technology office building with labs on Block G3, Cherrywood Business Park. - [D03A/0479](https://cherrywoodplans.com/application/D03A-0479.md): ESB, Plot M, Cherrywood Science And Technology Park, Wyatville Link Road. Granted (14 Jul 2003). Seeks to keep an ESB 38 kV line mast already installed at Cherrywood Business Park. - [D06A/1475](https://cherrywoodplans.com/application/D06A-1475.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (20 Dec 2006). Enlarges the approved Block G office building by filling in a front recess and extending the penthouse, adding 502 sq.m. - [D06A/0015](https://cherrywoodplans.com/application/D06A-0015.md): Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (1 Mar 2006). Adds an extra floor to the approved Block G office building at Cherrywood Business Park, taking it from three to four storeys. - [D05A/0219](https://cherrywoodplans.com/application/D05A-0219.md): Cherrywood Science & Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (9 Nov 2005). Changes the approved Block G office building with a two-level underground car park and a larger floor area. - [D10A/0701](https://cherrywoodplans.com/application/D10A-0701.md): Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (24 May 2011). A 197-space surface park and ride car park beside the Brides Glen Luas stop. - [D02A/0430](https://cherrywoodplans.com/application/D02A-0430.md): Cherrywood Science & Technology Park,, Cherrywood, Loughlinstown, Co. Dublin.. Granted (10 Jul 2002). Allows five permitted science and technology buildings at Cherrywood Business Park to be used instead for office-based industry. - [D04A/0232](https://cherrywoodplans.com/application/D04A-0232.md): Block H, Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (23 Apr 2004). Puts up a lit corporate logo sign at Block H, Cherrywood Business Park. - [D08B/0452](https://cherrywoodplans.com/application/D08B-0452.md): Heather Hill, Cherrywood Road, Loughlinstown, Co. Dublin. Granted (7 Aug 2008). Extends a house at Heather Hill, Cherrywood Road, with single and two-storey additions. - [D22A/1019](https://cherrywoodplans.com/application/D22A-1019.md): Old Glebe House, Brides Glen Road, Shankill, Dublin 18, D18Y7H7. Refused or withdrawn (22 Feb 2023). Builds two four-bedroom houses in the lower grounds of the Old Glebe on Brides Glen Road. - [D24A/0037](https://cherrywoodplans.com/application/D24A-0037.md): The Old Glebe House, Brides Glen Road, Shankill, Dublin 18, D18Y7H7. Granted (11 Mar 2024). Changes to an approved extension at The Old Glebe House, Brides Glen Road, enlarging the ground floor from 83 to 103 sq.m. - [D23A/0820](https://cherrywoodplans.com/application/D23A-0820.md): The Old Glebe House, Brides Glen Road, Shankill, Dublin 18, D18Y7H7. Refused or withdrawn (15 Jan 2024). Changes to an approved extension at The Old Glebe House, Brides Glen Road, enlarging the ground floor from 83 to 103 sq.m. - [D23A/0392](https://cherrywoodplans.com/application/D23A-0392.md): The Old Glebe House, Brides Glen Road, Shankill, Dublin 18, D18Y7H7--a protected structure.. Granted (1 Nov 2023). Two new 4-bedroom, two-storey houses in the lower grounds of The Old Glebe House, Brides Glen Road. - [D02A/0508](https://cherrywoodplans.com/application/D02A-0508.md): Building H, Cherrywood Science & Technology Park,, Cherrywood, Loughlinstown, Co. Dublin.. Granted (22 Jul 2002). Adds 15 parking spaces to the car park serving Building H at Cherrywood Business Park. - [D13A/0534](https://cherrywoodplans.com/application/D13A-0534.md): Old Glebe House, Brides Glen Road, Townland Glebe (Rathmichael),Dublin 18. Granted (11 Feb 2014). Replaces a single-storey annex on Old Glebe House, a protected structure, with a new single-storey extension. - [D22A/0964](https://cherrywoodplans.com/application/D22A-0964.md): The Old Glebe, Brides Glen Road, Dublin 18, D18Y7H7. Granted (4 Apr 2023). Alters Old Glebe House, a protected structure, and extends its coach house from one to three bedrooms. - [D19A/0277](https://cherrywoodplans.com/application/D19A-0277.md): Old Glebe House, Brides Glen Road, Rathmichael, Dublin 18. Refused or withdrawn (19 Jun 2019). Builds three detached three-storey houses within the grounds of Old Glebe House, a protected structure, on Brides Glen Road. - [D07A/1243](https://cherrywoodplans.com/application/D07A-1243.md): Glencarrig, Rathmichael, Co. Dublin. Granted (25 Oct 2007). Amends an earlier permission at Glencarrig to redesign one house and add a tenth five-bedroom house. - [D07A/0597](https://cherrywoodplans.com/application/D07A-0597.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.(Blocks F and G),. Refused or withdrawn (12 Jun 2007). Three office buildings of 4 to 7 storeys at Cherrywood Science & Technology Park, with a 612-space basement car park. - [DZ18A/0854](https://cherrywoodplans.com/application/DZ18A-0854.md): site (c.2.62 HA) at Cherrywood Business Park, Cherrywood Avenue, Cherrywood, Co. Dublin (also Dublin 18) (lands to the south and west of Blocks G and G2, south of Cherrywood Avenue). Granted (31 Oct 2018). Builds a three-pond drainage system with a walking and cycling route south of Cherrywood Avenue. - [DZ19A/1021](https://cherrywoodplans.com/application/DZ19A-1021.md): Blocks F1, F2 and F3 (3no. office blocks under construction) at Cherrywood Business Park, Cherrywood, Co Dublin (also Dublin 18). Refused or withdrawn (5 Feb 2020). Allows up to 229 spaces in the basement car park of office Blocks F1–F3 to be used for temporary parking for 7 years. - [DZ18A/1104](https://cherrywoodplans.com/application/DZ18A-1104.md): Lands (c.2.57ha) Cherrywood Business Park (lands including & adjoining former Block F, part of existing Block G (basement level -1 only) & lands to rear Blocks G & G2, Cherrywood, Co Dublin (also Dublin 18). Site is within Development Area 6A Brides Glen. Granted (29 Jan 2019). Builds office Block F3 and expands the shared basement car park to 658 spaces, with a new linear park, at Cherrywood Business Park. - [D08A/0035](https://cherrywoodplans.com/application/D08A-0035.md): Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (26 Jun 2008). A 4–5 storey office building (Building F) and new road at Cherrywood Science & Technology Park, with 289 basement car spaces. - [D02A/0660](https://cherrywoodplans.com/application/D02A-0660.md): Clanart, Cherrywoood Road, Loughlinstown, Dublin 18.. Granted (20 Aug 2002). Seeks permission to keep part of an existing single-storey bungalow on Cherrywood Road. - [DZ19A/0186](https://cherrywoodplans.com/application/DZ19A-0186.md): c. 1.676 ha at Cherrywood Business Park (lands including former Block F), Cherrywood, Co. Dublin (also Dublin 18). Granted (9 May 2019). Adds landscaped roof terraces to permitted office Blocks F1 and F2 at Cherrywood Business Park. - [DZ17A/0122](https://cherrywoodplans.com/application/DZ17A-0122.md): Lands (c.1.6284 ha) at Cherrywood Business Park (lands including former Block F), Cherrywood, Co Dublin (also Dublin 18). Granted (7 Feb 2018). Builds two five-storey office blocks, F1 and F2, over an existing basement car park at Cherrywood Business Park. - [D16A/0361](https://cherrywoodplans.com/application/D16A-0361.md): The Orchard, Cherrywood Road, Loughlinstown, Co. Dublin. Granted (12 Sep 2016). Builds two new two-storey houses beside an existing home at The Orchard, Cherrywood Road. - [D15B/0171](https://cherrywoodplans.com/application/D15B-0171.md): Clanart, Cherrywood Road, Loughlinstown, Dublin 18. Granted (10 Jul 2015). Rebuilds and extends a single-storey house at Clanart, Cherrywood Road, with a new raised roof. - [DZ23A/0242](https://cherrywoodplans.com/application/DZ23A-0242.md): Townland of Cherrywood Dublin 18 The site is located in the Cherrywood Planning Scheme and forms part of the south eastern porti. Granted (7 Jun 2023). Changes to the permitted basement at Town Centre 3 so it can later connect to the wider TC3 basement. - [DZ21A/0785](https://cherrywoodplans.com/application/DZ21A-0785.md): c.0.95 ha townland, Cherrywood, Dublin 18 (also Co. Dublin). Granted (30 Mar 2022). An office building of up to 8 storeys with ground-floor cafés at the corner of Town Centre 3, beside the Bride's Glen Luas stop. - [D09A/0501](https://cherrywoodplans.com/application/D09A-0501.md): Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Refused or withdrawn (3 Sep 2009). 112 apartments, offices and shops in three buildings of 5–6 storeys at Cherrywood Science & Technology Park. - [D06A/0116](https://cherrywoodplans.com/application/D06A-0116.md): Glencarraig, Rathmichael, Co. Dublin. Granted (18 Aug 2006). 19 homes and a new access road linking Brides Glen Road to Cherrywood Science & Technology Park at Glencarraig. - [D05A/1083](https://cherrywoodplans.com/application/D05A-1083.md): Glencarrig (site At), Rathmichael, Co. Dublin. Refused or withdrawn (12 Oct 2005). Builds 73 apartments in two blocks at Glencarrig, with a new road and cycle route from Brides Glen Road to Cherrywood Business Park. - [D22A/0079](https://cherrywoodplans.com/application/D22A-0079.md): Cherrywood Lodge, Brides Glen Road, Shankill, Dublin 18. Granted (30 Mar 2022). Converting and extending an outbuilding at Cherrywood Lodge, Brides Glen Road, into a new single-storey home. - [DZ22A/0681](https://cherrywoodplans.com/application/DZ22A-0681.md): Cherrywood Avenue, (Adjoining Cherrywood Business Park), Cherrywood, Dublin 18. Granted (28 Jun 2023). A 5-storey block of 70 apartments on Cherrywood Avenue, beside Cherrywood Business Park. - [D13A/0292](https://cherrywoodplans.com/application/D13A-0292.md): Site at Glencarrig, Brides Glen Road, Rathmichael, Co. Dublin. Granted (1 Aug 2013). Amends the earlier Glencarrig permission with a revised design for 10 five-bedroom detached houses. - [D22A/0353](https://cherrywoodplans.com/application/D22A-0353.md): Cherrywood House, Cherrywood Road, Shankill, Dublin 18 (A Protected Structure). Granted (15 Sep 2022). Restores and upgrades Cherrywood House, a protected structure, replacing its 20th-century flat-roofed extensions. - [DZ26A/0001/WEB](https://cherrywoodplans.com/application/DZ26A-0001-WEB.md): Cherrywood Avenue, (Adjoining Cherrywood Business Park), Cherrywood, Dublin 18. Granted (29 Jun 2026). Amends a permitted apartment scheme on Cherrywood Avenue to go from 67 to 70 apartments, with more parking. - [DZ25A/0983/WEB](https://cherrywoodplans.com/application/DZ25A-0983-WEB.md): Cherrywood Avenue ( adjoining Cherrywood Business Park), Cherrywood, Dublin 18. Refused or withdrawn (22 Dec 2025). Amends a permitted apartment scheme on Cherrywood Avenue to go from 67 to 70 apartments, with more parking. - [DZ21A/0029](https://cherrywoodplans.com/application/DZ21A-0029.md): Site of approximately 1,094 sq m at Building 8 (formerly known as Block E), Cherrywood Business Park, Cherrywood, Co. Dublin, c. Granted (29 Apr 2021). Rebuilds the front entrance of Building 8 at Cherrywood Business Park with a slightly larger lobby. - [DZ24A/0366/WEB](https://cherrywoodplans.com/application/DZ24A-0366-WEB.md): Building 8, Cherrywood Business Park, Dublin 18, D18W319. Granted (17 Jul 2024). Adds tenant signage and a wayfinding totem at Building 8, Cherrywood Business Park. - [DZ23A/0283](https://cherrywoodplans.com/application/DZ23A-0283.md): Building 8, Cherrywood Business Park, Cherrywood, Loughlinstown, Co. Dublin, D18 W319. Granted (11 Aug 2023). Turns Building 8 at Cherrywood Business Park from offices into a private medical clinic. - [DZ17A/0171](https://cherrywoodplans.com/application/DZ17A-0171.md): Cherrywood Business Park, Cherrywood, Dublin 18. Granted (21 Apr 2017). Seeks to keep the existing entrance and wayfinding signs at Cherrywood Business Park. - [DZ20A/0052](https://cherrywoodplans.com/application/DZ20A-0052.md): 1.86 ha in the townlands of Cherrywood, Dublin 18 (also Co. Dublin)--TC3. Granted (13 Apr 2021). A mixed-use block at Town Centre 3 with an 8-storey office building and 198 build-to-rent apartments. - [DZ19A/0808](https://cherrywoodplans.com/application/DZ19A-0808.md): Cherrywood Business Park, Cherrywood & Loughlinstown, Co. Dublin, (Also Dublin 18). Granted (17 Dec 2019). Installs a small gas pressure regulator building in Cherrywood Business Park. - [DZ19A/0647](https://cherrywoodplans.com/application/DZ19A-0647.md): Cherrywood Business Park, Cherrywood & Loughlinstown, Co. Dublin, (Also Dublin 18). Refused or withdrawn (18 Sep 2019). Installs a small gas pressure regulator building in Cherrywood Business Park. - [DZ19A/0523](https://cherrywoodplans.com/application/DZ19A-0523.md): Cherrywood Business Park, Cherrywood & Loughlinstown, Co. Dublin, (Also Dublin 18). Refused or withdrawn (23 Aug 2019). Installs a small gas pressure regulator building in Cherrywood Business Park. - [D07A/1770](https://cherrywoodplans.com/application/D07A-1770.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin.. Refused or withdrawn (28 Jan 2008). Builds a multi-storey car park with 1,081 spaces and 10 ground-floor shops at Cherrywood Business Park. - [D06A/0911](https://cherrywoodplans.com/application/D06A-0911.md): Block D, Cherrywood Science & Technology Park, Cherrywood, Loughlinstown, Co. Dublin. Granted (23 Aug 2006). Makes internal changes to the Block D office building, enclosing its entrance and adding a fire escape stairs. - [DZ22A/1025](https://cherrywoodplans.com/application/DZ22A-1025.md): Cherrywood Avenue, Lands within the townlands of Glebe and Cherrywood, Dublin 18. Granted (2 Nov 2023). Builds 44 homes, houses and two-level units, off Cherrywood Avenue. - [D08A/0687](https://cherrywoodplans.com/application/D08A-0687.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Refused or withdrawn (7 Aug 2008). Replacing Block D with a 5-storey office building with a large ground-floor shop at Cherrywood Science & Technology Park. - [DZ16A/0530](https://cherrywoodplans.com/application/DZ16A-0530.md): Units 2 & 4 Building 7 (previously 'Block D'), Cherrywood Business Park, Cherrywood, Loughlinstown, Co Dublin. Granted (9 Sep 2016). Changes two vacant units in Building 7, Cherrywood Business Park, into medical and dental use. - [D05A/1672](https://cherrywoodplans.com/application/D05A-1672.md): Block D, Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (13 Feb 2006). Makes small changes to Block D, enlarging a ground-floor shop and trimming the offices. - [DZ25A/0066/WEB](https://cherrywoodplans.com/application/DZ25A-0066-WEB.md): Building 7 The Campus, Cherrywood Avenue, Cherrywood (Glebe Townland), Co Dublin, Dublin 18, D18T8Y6. Granted (20 Mar 2025). Part of Building 7 at The Campus changes from offices to medical and dental use. - [D06A/0630](https://cherrywoodplans.com/application/D06A-0630.md): Spar Retail Unit, Block D, Cherrywood Science & Technology Park, Loughlinstown, Dublin 18. Granted (12 Jul 2006). An off-licence counter added to the Spar shop in Block D of Cherrywood Science & Technology Park. - [D21B/0118](https://cherrywoodplans.com/application/D21B-0118.md): Saint Michael's Lodge, Cherrywod Road, Shankill, Dublin 18, D18F7AR. Granted (16 Jul 2021). Seeks to keep a rear dormer window at Saint Michael's Lodge, Cherrywood Road. - [D05A/0419](https://cherrywoodplans.com/application/D05A-0419.md): Block D, Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (26 Oct 2005). Extends the existing Block D building at Cherrywood Business Park, adding 790 sq.m of shop and office space. - [D07A/0604](https://cherrywoodplans.com/application/D07A-0604.md): Cherrywood Science Technology Park,(Block D1), Loughlinstown, Co. Dublin.. Granted (2 Apr 2008). Replacing a crèche with a 4-storey office building and restaurant (Block D1) at Cherrywood Science & Technology Park. - [D08A/1062](https://cherrywoodplans.com/application/D08A-1062.md): Unit 6, Block C, The Facilities Building, Cherrywood, Co. Dublin. Granted (13 Nov 2008). Adds lit signage to the front of Unit 6, Block C, at Cherrywood Business Park. - [D11B/0364](https://cherrywoodplans.com/application/D11B-0364.md): 105, Cherrywood Road, Loughlinstown, Co. Dublin. Granted (12 Jan 2012). Adds a single-storey extension to the rear and side of a house at 105 Cherrywood Road. - [D08A/0762](https://cherrywoodplans.com/application/D08A-0762.md): Unit 6, Block C, The Facilities Building, Cherrywood, Co. Dublin. Refused or withdrawn (25 Aug 2008). Adds lit signage to the front of Unit 6, Block C, at Cherrywood Business Park. - [D08A/0952](https://cherrywoodplans.com/application/D08A-0952.md): Cherrywood Science & Technology Park,(Block D1), Cherrywood, Loughlinstown, Co. Dublin. Refused or withdrawn (15 Oct 2008). Design changes to the approved Block D1 office building at Cherrywood Science & Technology Park. - [DZ22A/0591](https://cherrywoodplans.com/application/DZ22A-0591.md): C. 3.71 in the Townland of Cherrywood, Block Town Centre 3 (TC3), Dublin 18. Granted (20 Jun 2023). 418 build-to-rent apartments in four blocks of up to 5 storeys at Town Centre 3, with shops, cafés and community space. - [DZ16A/0816](https://cherrywoodplans.com/application/DZ16A-0816.md): Unit 4 Building 5 (previously Block C), Cherrywood Business Park, Cherrywood, Dublin 18. Granted (10 Jan 2017). Changes a vacant shop unit in Cherrywood Business Park into a bank with an ATM. - [D07A/0233](https://cherrywoodplans.com/application/D07A-0233.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.. Granted (27 Aug 2007). Extends and reworks the approved Block C leisure building, adding a double-height swimming pool hall. - [D06A/0268](https://cherrywoodplans.com/application/D06A-0268.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (16 Jun 2006). Builds a four-storey leisure and retail building (Block C) with a fitness centre and 25-metre pool at Cherrywood Business Park. - [D05A/1715](https://cherrywoodplans.com/application/D05A-1715.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Refused or withdrawn (12 Jan 2006). Builds a four-storey leisure and retail building (Block C) with a fitness centre and 20-metre pool at Cherrywood Business Park. - [D08A/0121](https://cherrywoodplans.com/application/D08A-0121.md): Block C, Cherrywood Science And Technology Park, Cherrywood, Loughlinstown, Co. Dublin. Granted (24 Jun 2008). Seeks to keep an extension to the Block C facilities building and sets out options for a front loading bay. - [D07A/1607](https://cherrywoodplans.com/application/D07A-1607.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.. Refused or withdrawn (24 Jan 2008). The top floor of Block C at Cherrywood Science & Technology Park changes from recreation use to offices. - [D07A/1503](https://cherrywoodplans.com/application/D07A-1503.md): Block C, Cherrywood Science And Technology Park, Cherrywood, Loughlinstown, Co. Dublin. Refused or withdrawn (18 Dec 2007). Keeping a 52 sq.m ground-floor extension and shopfronts at Block C, Cherrywood Science & Technology Park. - [DZ23A/0508](https://cherrywoodplans.com/application/DZ23A-0508.md): Unit 3 and Unit 1, Building 5, Cherrywood Business Park, Cherrywood, Loughlinstown, Co Dublin. Granted (22 Sep 2023). Two units in Building 5, Cherrywood Business Park, become a dental clinic and a café. - [DZ16A/0123](https://cherrywoodplans.com/application/DZ16A-0123.md): Units 1 & 2 Block C, Cherrywood Business Park, Cherrywood, Loughlinstown, Co Dublin. Granted (21 Apr 2016). Reconfigures two ground-floor shop units in Block C and turns one into a café/restaurant. - [DZ14A/0596](https://cherrywoodplans.com/application/DZ14A-0596.md): Unit 1 , Block C, Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co Dublin. Granted (11 Dec 2014). Changes Shop Unit 1 in Block C, Cherrywood Business Park, into a dental clinic. - [D09A/0146](https://cherrywoodplans.com/application/D09A-0146.md): Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (23 Apr 2009). Fills in atrium spaces in Building AA at Cherrywood Business Park, adding 269 sq.m and 5 parking spaces. - [D06A/0289](https://cherrywoodplans.com/application/D06A-0289.md): 107, Cherrywood Road, Loughlinstown, Dublin 18. Granted (26 Sep 2006). Builds a new five-bedroom, two-storey detached house beside 107 Cherrywood Road. - [D06A/0065](https://cherrywoodplans.com/application/D06A-0065.md): 107 Cherrywood Road, Cherrywood, Loughlinstown, Co. Dublin.. Refused or withdrawn (23 Feb 2006). Builds a new five-bedroom, two-storey detached house beside 107 Cherrywood Road. - [D02A/0424](https://cherrywoodplans.com/application/D02A-0424.md): Cherrywood Science & Technology Park,, Cherrywood, Loughlinstown, Co. Dublin.. Granted (10 Jul 2002). Allows two permitted three-storey science and technology buildings, AA and AB, to be used instead for office-based industry. - [DZ16A/0535](https://cherrywoodplans.com/application/DZ16A-0535.md): Hibernia House, Cherrywood Business Park, Loughlinstown, Dublin 18. Granted (9 Sep 2016). Puts up two high-level lit 'evros' signs on Hibernia House, Cherrywood Business Park. - [DZ19A/0255](https://cherrywoodplans.com/application/DZ19A-0255.md): Cherrywood Business Park (lands including & adjoining Bldgs 2-5 & 7 & basement level under Buildings 3, 4 & 5, Pond 4 & part of the linear park), Cherrywood, Co Dublin .. Granted (3 Dec 2019). Upgrades the public spaces of Cherrywood Business Park with raised meeting pods, a large canopy, a sunken garden and linear park improvements. - [DZ24A/1007/WEB](https://cherrywoodplans.com/application/DZ24A-1007-WEB.md): ‘Red Zone’ temporary surface car park, and Blocks F1-F3, ‘The Campus’, Cherrywood Avenue,, Cherrywood (Glebe Townland), Co. Dublin, Dublin 18. Granted (18 Feb 2025). Shrinking the temporary Red Zone car park on Cherrywood Avenue to about 398 spaces for another 5 years, and opening 226 basement spaces at The Campus. - [DZ22A/0728](https://cherrywoodplans.com/application/DZ22A-0728.md): Red Zone car park, Cherrywood Avenue, Cherrywood (Glebe Townland), Co Dublin/Dublin 18. Granted (14 Mar 2023). Keeping the temporary Red Zone surface car park for about 740 cars on Cherrywood Avenue for another 5 years. - [DZ25A/0543/WEB](https://cherrywoodplans.com/application/DZ25A-0543-WEB.md): Dlr Properties Limited, Hibernia House, Cherrywood Business Park, Dublin 18, D18E440. Granted (28 Aug 2025). Hibernia House in Cherrywood Business Park changes from offices to a medical centre with a pharmacy. - [DZ20A/0477](https://cherrywoodplans.com/application/DZ20A-0477.md): Blocks F1,F2 & F3 (3no. office blocks under construction), Cherrywood Business Park, Cherrywood, Co. Dublin (also Dublin 18) & at the temporary surface car park at Cherrywood (Glebe Townland) Co. Dublin (also Dublin 18). Granted (28 Aug 2020). Allows up to 229 spaces in the basement car park of office Blocks F1–F3 to be used for temporary parking for 7 years. - [DZ17A/0417](https://cherrywoodplans.com/application/DZ17A-0417.md): Cherrywood Glebe Townland, Co Dublin ( Dublin 18) (Lands within Dev Area 6-Bride's Glen-bounded by M50 west, Cherrywood Ave & undeveloped lands to north undeveloped lands & Glencarrig res. estate east & res prop. & undev. lands off Brides Glen to south. Granted (7 Nov 2017). Uses land off Cherrywood Avenue as a temporary car park for about 740 cars for 5 years. - [DZ17A/0326](https://cherrywoodplans.com/application/DZ17A-0326.md): Cherrywood, Glebe Townland, Co Dublin (Also Dublin 18) (Lands within Dev Area 7-Macnebury-bounded by M50 to west, Cherrywood Ave & undeveloped lands to north, undeveloped lands & Glencarrig res. estate to east & undeveloped lands off Brides Glen to south. Refused or withdrawn (26 Apr 2017). Uses land off Cherrywood Avenue as a temporary car park for about 740 cars for 5 years. - [D07A/0654](https://cherrywoodplans.com/application/D07A-0654.md): Block AD, Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin.. Granted (6 Jul 2007). Signs and a refuse store for the crèche in Block AD, Cherrywood Science & Technology Park. - [D06A/1722](https://cherrywoodplans.com/application/D06A-1722.md): Block AD, Cherrywood Science & Technology, Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (26 Jan 2007). Part of Block AD in Cherrywood Science & Technology Park changes from offices to a 952 sq.m crèche. - [DZ17A/0061](https://cherrywoodplans.com/application/DZ17A-0061.md): Building 4 (previously Block AD), Cherrywood Business Park, Cherrywood, Dublin 18. Granted (16 Mar 2017). Turns 1,035 sq.m of vacant office space in Building 4, Cherrywood Business Park, into a medical research laboratory. - [DZ19A/1022](https://cherrywoodplans.com/application/DZ19A-1022.md): On a site of 0.625ha, Dell Technologies, Block AB, Cherrywood Business Park, Cherrywood, Dublin 18. Granted (25 Feb 2020). Replaces two lit signs on the Dell Technologies building, Block AB, Cherrywood Business Park. - [DZ17A/0466](https://cherrywoodplans.com/application/DZ17A-0466.md): Block AB of CHerrywood, Science and Technology Park, Loughlinstown, Dublin 18. Granted (13 Jul 2017). Replaces signs at Block AB, Cherrywood Business Park, with two lit wall signs and a totem sign. - [D04A/1012](https://cherrywoodplans.com/application/D04A-1012.md): Cherrywood/Glebe, (ED Rathmichael), Wyvattville Link Road, Co. Dublin.. Refused or withdrawn (9 May 2005). Reshapes and drains an 8.6-hectare site at Cherrywood/Glebe and stores topsoil on a further 5.1 hectares at Laughanstown. - [D03A/0626](https://cherrywoodplans.com/application/D03A-0626.md): Cherrywood Science & Technology Park, Cherrywood Business Park 1, Cherrywood, Loughlinstown, Co. Dublin. Granted (22 Sep 2003). A new office building of three storeys plus penthouse at Cherrywood Science & Technology Park, with 350 basement car spaces. - [DZ17A/0862](https://cherrywoodplans.com/application/DZ17A-0862.md): Lands (17.01ha) in the townlands of Cherrywood, Dublin 18. Granted (29 May 2018). The original Cherrywood Town Centre permission: 15 blocks with 1,269 homes, shops, offices, two hotels and a library, plus Grand Parade. - [D05A/0232](https://cherrywoodplans.com/application/D05A-0232.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.. Granted (20 Apr 2005). Adds two windows to the west side of the approved third floor of the Block AC office building. - [D04A/1361](https://cherrywoodplans.com/application/D04A-1361.md): Cherrywood Science & Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (12 Jan 2005). Extends the approved third floor of the Block AC office building over two terraces and moves all rooftop plant onto the roof. - [D04A/0335](https://cherrywoodplans.com/application/D04A-0335.md): Cherrywood Science & Technology Park,, Cherrywood, Loughlinstown, Co. Dublin.. Granted (26 May 2004). Builds a new office building of three storeys plus a penthouse over a basement car park at Cherrywood Business Park. - [D04A/0915](https://cherrywoodplans.com/application/D04A-0915.md): Block AC, Cherrywood Business Park, Loughlinstown, Co. Dublin.. Granted (10 Nov 2004). Enlarges the approved link between office Blocks AC and AB, adding 990 sq.m of floor space. - [D06A/1660](https://cherrywoodplans.com/application/D06A-1660.md): Park One, Cherrywood Science And Technology Park, Loughlinstown, Co. Dublin.. Granted (6 Mar 2007). Completes the distributor road through Park One at Cherrywood Business Park, letting overhead power lines go underground. - [D05A/1057](https://cherrywoodplans.com/application/D05A-1057.md): Blocks AB/AC, Cherrywood Science & Technology Park, Cherrywood, Co. Dublin. Granted (10 Oct 2005). Adds emergency exit doors and a screened rooftop plant room to office Blocks AB and AC. - [D13A/0117](https://cherrywoodplans.com/application/D13A-0117.md): Block AB Cherrywood Science & Technology Park, Loughlinstown, Dublin 18. Granted (8 May 2013). Puts up two lit Dell logo signs on Block AB at Cherrywood Business Park. - [DZ23A/0573](https://cherrywoodplans.com/application/DZ23A-0573.md): Lands (c. 17.03 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (19 Oct 2023). Amends the Cherrywood Town Centre permission to add 4 apartments in Blocks F2 and F3, bringing plot TC4 to 524 homes. - [DZ20A/0824](https://cherrywoodplans.com/application/DZ20A-0824.md): Lands (c. 17.01 ha), in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (11 Jan 2021). Changes the windows, balconies and frontage of Town Centre Block F2 on Cherrywood Avenue and Central Avenue. - [DZ19A/0148](https://cherrywoodplans.com/application/DZ19A-0148.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (24 Apr 2019). Amends Town Centre plot TC2 to add 47 apartments, taking Blocks C1 and C2 from 384 to 431 homes. - [D08A/0961](https://cherrywoodplans.com/application/D08A-0961.md): 6, Cherrywood Road North, Loughlinstown, Co. Dublin. Refused or withdrawn (15 Oct 2008). Seeks to keep the walls and piers at the front entrance of a house on Cherrywood Road North. - [DZ18A/1178](https://cherrywoodplans.com/application/DZ18A-1178.md): 2.2 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (17 Apr 2019). Amends Town Centre plot TC2 to add one apartment, expand retail and resident amenity space, and move the crèche. - [D04A/1211](https://cherrywoodplans.com/application/D04A-1211.md): Cherrywood Road Bus Stop, (opposite Lucent), Loughlinstown, Co. Dublin. Refused or withdrawn (29 Jun 2005). Installs a steel and glass bus shelter with two lit advertising panels on Cherrywood Road. - [DZ19A/1024](https://cherrywoodplans.com/application/DZ19A-1024.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (9 Sep 2020). Amends the Cherrywood Town Centre plan to shrink the basement under Blocks A1–A3 and reassign parking. - [DZ20A/0002](https://cherrywoodplans.com/application/DZ20A-0002.md): Lands (c.17.01ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (9 Sep 2020). Makes minor changes to electrical rooms and landscaping in Town Centre Blocks F1 and F3. - [DZ19A/0458](https://cherrywoodplans.com/application/DZ19A-0458.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (19 Jun 2020). Major redesign of Cherrywood Town Centre plot TC1, adding two supermarkets, an 11-screen cinema and much more retail space. - [DZ23A/0423](https://cherrywoodplans.com/application/DZ23A-0423.md): On lands (c.17.03 a) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (Also Co. Dublin). Granted (10 Aug 2023). Amends the Cherrywood Town Centre permission to add two 2-bed apartments to Block A1. - [DZ22A/0690](https://cherrywoodplans.com/application/DZ22A-0690.md): Townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (12 May 2023). Facade and balcony design changes to Cherrywood Town Centre apartment Blocks A1, A2 and A3. - [DZ22A/0747](https://cherrywoodplans.com/application/DZ22A-0747.md): Townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (30 Mar 2023). Changes of use and merging of units in Town Centre Blocks C1 and C2 to create a larger 723 sq.m shop with off-licence. - [DZ22A/0846](https://cherrywoodplans.com/application/DZ22A-0846.md): Lands (c. 17.03 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (22 Dec 2022). Removes a planned viewing platform at Block F1 in Cherrywood Town Centre, replacing it with a glass balustrade. - [DZ22A/0138](https://cherrywoodplans.com/application/DZ22A-0138.md): (c. 17.03ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (30 Aug 2022). Minor changes of use between shop and restaurant-type units in Town Centre Blocks C1 and C2, and a slightly larger crèche. - [DZ21A/0807](https://cherrywoodplans.com/application/DZ21A-0807.md): Lands (c. 17.03 ha), in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (8 Jul 2022). Amends the Cherrywood Town Centre permission to cut residential parking from 1,363 to 1,169 spaces and add 41 car-sharing spaces. - [DZ21A/0713](https://cherrywoodplans.com/application/DZ21A-0713.md): Lands (c. 17.01 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (3 Oct 2021). Design changes to the three apartment blocks A1–A3 in Cherrywood Town Centre, including taller windows and smaller roof terrace. - [D08A/0443](https://cherrywoodplans.com/application/D08A-0443.md): 12, Cherrywood Park, Loughlinstown, Dublin 18. Granted (17 Jul 2008). Builds a new detached dormer bungalow beside 12 Cherrywood Park. - [D04A/0924](https://cherrywoodplans.com/application/D04A-0924.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (25 Aug 2005). A gateway office building of 6 storeys rising to 10 at one end, with a bar and café, on the Wyattville Link Road at Cherrywood Science & Technology Park. - [DZ22A/0342](https://cherrywoodplans.com/application/DZ22A-0342.md): Building 3, (formerly known as Block AC), Cherrywood Business Park, Cherrywood, Dublin 18, D18TF72. Refused or withdrawn (27 Mar 2023). New design for the north facade of Building 3 in Cherrywood Business Park. - [D06A/1972](https://cherrywoodplans.com/application/D06A-1972.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Refused or withdrawn (20 Feb 2007). Builds a new eight-storey office building with a café/bar, linked to Block AC on the Wyattville Link Road. - [D07A/0779](https://cherrywoodplans.com/application/D07A-0779.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin.. Refused or withdrawn (3 Mar 2008). A five-to-eight-storey office building with a café at Cherrywood Science & Technology Park. - [D07A/0620](https://cherrywoodplans.com/application/D07A-0620.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.. Refused or withdrawn (1 Jun 2007). Builds a new five-to-eight-storey office building with a café, linked to Block AC at Cherrywood Business Park. ## Links - [This page on CherrywoodPlans](https://cherrywoodplans.com/application/D06A-1497) - [Council record, documents and conditions (DLR planning portal)](https://planning.agileapplications.ie/dunlaoghaire/application-details/42241) - [All Cherrywood applications](https://cherrywoodplans.com/applications.md) _Source: Dún Laoghaire–Rathdown County Council planning data, refreshed daily. CherrywoodPlans is an independent site, not run by the council._