# Planning application D07A/0161 > Barrington Tower, Brennanstown Road, Cabinteely, Dublin 18, Cherrywood, Dún Laoghaire–Rathdown. Granted (23 Jan 2008). - **Reference:** D07A/0161 - **Address:** Barrington Tower, Brennanstown Road, Cabinteely, Dublin 18 - **Status:** Granted (23 Jan 2008) - **Decision:** GRANT PERMISSION - **Application type:** Permission - **Applicant:** Bill Doyle - **Lodged:** 18 Dec 2007 - **Decided:** 23 Jan 2008 - **Appeal (An Coimisiún Pleanála):** PL06D.227861, GRANT PERMISSION - **Appeal decided:** 19 Sep 2008 - **Location (lat, lng):** 53.253841, -6.163184 ## Proposal Total of 158 no. dwellings; 25 no. detached houses (9 no. three storey five bed units; 15 no. three storey four bed units, 1 no. single storey two bed unties, the above includes 2 no. houses with attached single storey garages); 12 no. semi-detached houses ( 4 no. three storey four bed units and 8 no. three storey three bed units with integrated garages; 6 no. terraced houses (3 no. three storey four bed units and 3 no. three storey three bed units with integrated garages). 109 no. apartments and 2 no. community rooms ( c. total 70 sq.m in area) within a five storey building, incorporating fifth floor set back in four interconnecting blocks, and consisting of 100 no. two bed apartments, 6 no. three bed apartments, 3 no. one bed apartments (Block A to D), 6 no. apartments to be provided within a single three storey block (3 no. three bed duplexes) and 3 bed no. two bed apartments), (a total of 115 apartments to be provided). Vehicular access will be provided via two new entrances onto Brennanstown Road, one of which will serve 1 no. of the aforementioned dwellings and the existing Barrington Tower dwelling, the other serving 157 spaces shall be provided within basement carparkign area over two levels directly beneath Blocks A to D. Permission is also sought for a c. 955 metre long foul sewer from subject site to Lambourne Wood along Brennanstown Road. This application also provides for demolition of a habitable dwelling. Permission is also sought for for 1 ESB substation, refuses and cycle storage; hard and soft landscaping including a tennis court (c. 261 esq. in total area); boundary treatments and all other site and development works. All proposed works to take place at Barrington Tower (A Protected Structure), Brennanstown Road, on a site of approx. 3.5 ha on lands abounded generally to the North by Brennanstown Road, to the west by Brennanstown Vale housing development, to the east by a laneway accessing a Quaker burial ground to the south by the woodlands on either side of Loughlinstown River and the embankment of the former Harcourt Street Railway Line (no. development works are proposed to Barrington Tower itself) [a dwelling] as part of this planning application). ## In plain English 158 homes, mostly apartments in a 5-storey building plus houses, in the grounds of Barrington Tower on Brennanstown Road. - **158** homes - **157** car parking spaces - **5** storeys max - **3.5** hectare site ### What's planned A residential development on about **3.5** hectares, including demolition of one house. ### Residential **115** apartments (mostly two-bed) and **43** detached, semi-detached and terraced houses, plus **2** community rooms of about **70** sq.m in total. ### Transport **157** spaces in a two-level basement, two new entrances onto Brennanstown Road, and a **955**m foul sewer to Lambourne Wood. ### Heritage Barrington Tower is a protected structure (a legally protected historic building). No works are proposed to the tower itself. ### Community A tennis court and landscaping. _This summary was written by AI from the proposal text. Check the council record before relying on it._ ## Conditions ### Condition 5 That the area shown as open space be levelled, soiled and seeded and landscaped to the satisfaction of the County Council and to be available for use by residents on the completion of their dwellings. REASON: In the interest of the proper planning and sustainable development of the area. ### Condition 7 That the drainage arrangements, including the disposal of surface water, be in accordance with the requirements of the County Council. REASON: In the interest of public health. ### Condition 8 An acceptable naming and numbering scheme shall be submitted for the written agreement of the Planning Authority prior to the commencement of development or the erection of any advertising hoardings on site. In this regard, the use of street names reflecting local place names or local history would be acceptable. REASON: In the interest of orderly development. ### Condition 9 Adequate storage shall be provided for Waste Disposal and Recycling facilities on site to the satisfaction of the Environmental Services Department. REASON: In the interest of public health and the proper planning and sustainable development of the area. ### Condition 10 That no advertising sign or structure be erected except those, which are exempted development, without prior grant of permission from the Planning Authority. REASON: In the interest of the proper planning and sustainable development of the area. ### Condition 11 Adequate provision is to be made to facilitate access to, and the use of the development, buildings, facilities and services by disabled persons. The minimum requirements to be provided shall be as set out in 'Access for the Disabled - Minimum Design Criteria' published by the National Rehabilitation Board. REASON: In the interest of safety and amenity. ### Condition 12 Prior to commencement of development, the developer shall comply with the Dun Laoghaire Rathdown County Council Housing Strategy, drawn up in accordance with Part V, Section 96(4) of the Planning & Development Act, 2000, as amended by Section 3 of the Planning & Development (Amendment) Act, 2002, and in accordance with agreement to be reached with the County Council Housing Department unless the developer shall have applied for and been granted an exemption certificate under Section 97 of the Planning and Development Act, 2000, as amended. REASON: To comply with the County Council Housing Strategy & Part V of the Planning & Development Act, 2000, as amended by Section 3 of the Planning & Development (Amendment) Act, 2002. ### Condition 1 The development to be carried out in its entirety in accordance with the plans, particulars and specifications lodged with the application, as amended by Additional Information received on 25/9/07 and clarification of additional information received on 18/ 12 /2007 save as may be required by the other conditions attached hereto. REASON: To ensure that the development shall be in accordance with the permission and that effective control be maintained. ### Condition 20 That the requirements of the Roads Department be ascertained and complied with in the development. REASON: To comply with the requirements of the Roads Department. ### Condition 6 (a) All trees which are shown on lodged plans to be retained shall be protected by a stout timber fence, 1.5 metres high, and enclosing at least the area covered by the branch spread of the trees. The fence shall be erected before the commencement of any site works, and shall be maintained throughout the entire construction period. (b) No development works of any kind shall take place within the fenced-off area. In particular, the parking of vehicles, location of site huts, storage compounds or topsoil heaps, storage of oil and chemicals, and lighting of fires, is prohibited. REASON: To protect the sylvan character of the site. ### Condition 13 The proposed communal open spaces, grouped carparking areas, all external elevations and access roads within the site shall be retained in private ownership and maintained by a properly constituted Management Company. Membership of this Company shall be compulsory for all purchasers of property on the development. Confirmation that this Company has been set up shall be submitted to the Planning Authority prior to the occupation of the first residential unit. REASON: To ensure a proper standard of residential development and maintenance of communal facilities. ### Condition 14 All planting, seeding and other landscaping works shown on lodged plans shall be carried out in the first planting season following the occupation of houses on the site. Any trees or plants which within a period of five years from the completion of the development die, are removed, or become seriously damaged or diseased, shall be replaced in the next planting season with others of similar size and species, unless the Planning Authority gives its written consent to any variation. REASON: In the interest of visual amenity. ### Condition 2 That the requirements of the Principal Environmental Health Officer be ascertained and strictly adhered to in the development. REASON: In the interest of health. ### Condition 16 Water supply arrangements shall be in accordance with the requirements of Dun Laoghaire Rathdown County Council's Water Department. REASON: In the interest of public health and amenity. ### Condition 17 That each apartment/house be used as a single dwelling unit. REASON: To prevent unauthorised development. ### Condition 18 All submissions in compliance required by the above conditions shall be submitted at the same time for consideration together by the Planning Authority. REASON: In the interest of orderly development. ### Condition 19 That a financial contribution shall be paid by the proposer to the Council towards the cost of the extension of Luas Line B from the Sandyford Depot to Cherrywood, namely Luas Line B1. This contribution to be paid prior to the commencement of the development or in such other manner as may otherwise be agreed with the Planning Authority. The rate of contribution payable shall be that pertaining to the particular year in which implementation of the Planning Permission is commenced. The Supplementary Development Contribution Scheme provides for an annual increase in the levels of contribution payable, as outlined in the scheme, by a factor of 5% compound interest per annum. The levels of contribution will be reviewed annually on the 13th of January of each year during which the scheme is in force to take account of the aforementioned increase. The rate of contribution payable in respect of this development, at current contribution rates, is € 1,180,559 and is subject to increase as outlined above. It should be noted that contributions assessed in accordance with the Supplementary Development Contribution Scheme cannot be appealed to An Bord Pleanala unless the applicant considers the levy referred to in this condition has not been properly applied in accordance with the terms of the Scheme. REASONS FOR CONTRIBUTIONS: To part finance the extension of the Luas Line B1 from Sandyford Depot to Cherrywood, as provided for in the Supplementary Development Contribution Scheme adopted by the Council of Dunlaoghaire-Rathdown on the 13th of January, 2003. ### Condition 27 No development on foot of this permission shall commence until security for the provision and satisfactory completion of services (including roads, footpaths, open spaces, public lighting, sewers, watermains and drains) in accordance with the Plans and particulars lodged with the application, has been given by:- a) Lodgement with the Council of an approved Insurance Company Bond in the sum of € 572,900 which shall be kept in force by the Developer until such time as Roads, Open Spaces, Car Parks, Sewers, Watermains and Drains are completed to the satisfaction of the Council OR/... b) Lodgement with the Council of a Cash Sum of € 355,600 to be applied by the Council at its absolute discretion if such services are not duly provided to its satisfaction on the provision and completion of such services to standard specifications. OR/... c) Lodgement with the Planning Authority of a Letter of Guarantee by any body approved by the Planning Authority for the purpose in respect of the proposed development in accordance with the guarantee scheme agreed with the Planning Authority and such lodgement in any case has been acknowledged in writing by the Council. REASON: To ensure that a ready sanction may be available to the Council to induce the provision of services and prevent disamenity in the development. ### Condition 3 That all necessary measures be taken by the contractor to prevent the spillage or deposit of clay, rubble or other debris on adjoining roads during the course of the works. REASON: To protect the amenities of the area. ### Condition 4 That all public services to the proposed development, including electrical, telephone cables and equipment be located underground throughout the entire site. REASON: In the interest of amenity. ### Condition 23 The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of € 634,087.23 , with any outstanding balance being updated at the 1st of January each year during the life of the scheme in accordance with annual changes in the Wholesale Price Index - Building and Construction (Capital Goods) published by the Central Statistics Office, to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Water & Drainage Public Infrastructure and Facilities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dun Laoghaire Rathdown County Council on the 21/01/2004. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Water & Drainage Public Infrastructure and Facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. ### Condition 24 The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of € 888,199.97 , with any outstanding balance being updated at the 1st of January each year during the life of the scheme in accordance with annual changes in the Wholesale Price Index - Building and Construction (Capital Goods) published by the Central Statistics Office, to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dun Laoghaire Rathdown County Council on the 21/01/2004. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. ### Condition 25 The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of € 754,016.76 , with any outstanding balance being updated at the 1st of January each year during the life of the scheme in accordance with annual changes in the Wholesale Price Index - Building and Construction (Capital Goods) published by the Central Statistics Office, to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Parks & Community Public Infrastructure, Facilities and Amenities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dun Laoghaire Rathdown County Council on the 21/01/2004. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Parks & Community Public Infrastructure, Facilities and Amenities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. ### Condition 26 This development shall not be carried out without prior agreement, in writing, between the Applicant and the Planning Authority relating to the payment of development contributions. REASON: Investment by Dun Laoghaire-Rathdown County Council in Local Authority works has facilitated and will facilitate the proposed development. It is considered appropriate and reasonable that the developer should contribute to the cost of same. ### Condition 28 That the proposed formal pedestrian right of way from the Brennanstown road to the LUAS station platform as shown on drawing 05-50-AI.101/111 shall be fully accessible at all times to the public in perpetuity. Reason: In the interest of pedestrian accessibility and permeability to the LUAS station. ### Condition 37 Notwithstanding the details submitted with the application, prior to commencement of development, details of the materials, colours, and textures of the external finishes to the driveway and road surface shall be submitted to the Conservation Officer for agreement. Samples of materials to be used shall be made available on site for inspection by the planning authority. Prior to commencement of development the applicant shall submit a detailed method statement and revised drawing for the construction of the front boundary wall by an experienced stonemason, taking into account the method of construction, style, capping and materials of original demesne walls in the vicinity. Reason: In the interest of visual amenity and the protection of the sylvan character. ### Condition 38 Barrington's Tower shall not be used as a site office during the course of the development works. Reason: In the interest of the conservation of the architectural heritage. ### Condition 29 That cyclists shall be allowed to fully access the roadway through the site to access the LUAS station from Brennanstown road at all times in perpetuity as proposed in Clarification submission on drawing 05-50-AI-101 received on 18.12.07. Reason; In the interest of accessibility an d permeability of the LUAS to cyclists. ### Condition 30 The Applicant shall at his expense undertake an Independent Accessibility Assessment of his proposed roadworks (roads, footpaths, cycletracks etc) within the site (a) prior to construction and (b) on completion of these works and submit each of these to the Planning Authority. All works identified in these audits shall be undertaken unless an exception is agreed with the Planning Authority in writing. All Independent Auditors to be approved by the Planning Authority. Reason: In the interest of the proper planning and sustainable development of the area. ### Condition 31 Prior to commencement of construction the Applicant shall at his expense provide a Mobility Management Plan (M.M.P.)separately for the Construction Phase and for the Residential Use. Guidance on such for residential developments is given in the UK Dept of Transport's document entitled "Making residential travel plans work- guidelines for new development". These MMP's shall be assessed by an Independent Auditor, who shall be acceptable to the Planning Authority, and shall where possible make reference to existing successful local examples and proposals for continuing monitoring and report to the Council. These MMP's shall where possible include for financial incentives/subsidies to use modes of transport other than the private car such as walking, cycling and public transport. Reason: In the interest of the proper planning and sustainable development of the area. ### Condition 32 The Applicant shall make a financial contribution under Section 48 2 (c) of the Planning & Development Act 2000 in the amount of €900,000 towards the cost of the works in Section A Brennanstown/Carrickmines Junction to Brennanstown House including the mini-roundabout at Lehaunstown Lane: * A series of speed ramps - 15No. * Speed tables at the junctions with Carrickmines Wood and Brennanstown Vale * Mini roundabouts at the junctions with Lehaunstown Lane and the proposed Barrington Tower development * A signalised two-way shuttle system of approximately 250m length along the very narrow section of road between the area near the Egyptian Embassy entrance and the 90 degree bend near to the entrance to Glendruid House, complete with new combined footpath/cycletrack and linked traffic signals at the 3 No. residential accesses over this section. * Provision of a signalised pedestrian/cyclist crossing in the vicinity of the mini-roundabout at the proposed Barrington Tower development entrance * Ancilliary works (street lighting, signing, lining, adjustments to footpaths and drainage, etc) (excluding the costs of the signalised two-way shuttle system) and the various design and other fees. This contribution shall be made 6 months prior to the commencement of works on the site to allow for the required upgrade of the Brennanstown road that will facilitate this development. Reason:To allow for the required upgrade of the Brennanstown road that will facilitate this development. ### Condition 33 The proposed roundabout at the entrance to the development shall tie into/accommodate the existing entrances on the opposite side of Brennanstown Road. Any necessary minor adjustments to the development access to facilitate this shall be agreed with the Planning Department at the detailed design stage prior to the commencement of construction and shall be at the expense of the Applicant. Reason: In the interest of the proper planning and sustainable development of the area. ### Condition 34 Access and egress to and from the site for construction traffic shall be via the Brennanstown/Carrickmines Junction, and construction traffic shall not be permitted to travel on Brennanstown Road to the east of the proposed development. Reason: In the interest of the proper planning and sustainable development of the area ### Condition 35 A construction traffic management plan shall be prepared and agreed in writing with the Planning Authority in respect of the development works. Amongst other things, it shall indicate measures to avoid, reduce or mitigate nuisance due to noise, dust or dirt including road/gulley cleaning measures for a distance of 500metres from the site entrance, and shall provide details for the provision of all construction related parking on the site. Reason: In the interest of the proper planning and sustainable development of the area ### Condition 36 The Applicant shall at his expense provide for set-down parking on either side of the entrance on the lands proposed to be ceded by the Applicant in front of his site boundary, including appropriate signing and lining and all to the agreement of the Planning Authority prior to construction.Revised drawing and details shall be submitted to and agreed with the Planning Department by way of compliance prior to the commencement of development. Reason: To provide set down area for the public to access the LUAS station. ### Condition 15 To ensure the protection of trees within the site, the developer is required to implement all the recommendations pertaining to the tree retention as outlined within the submitted tree survey, Arboricultural Implication assessment and Arboricultural Method Statement dated September 2007. The developer is required to retain the services of its Arboricultural consultant throughout the life of the site development works to ensure the protection of all trees listed for retention. A completion certificate is to be signed off by the Arborist when all works are completed and in line with the submitted original landscape drawings. Reason: In the interest of visual amenity. ### Condition 21 The hours of construction works on the development site shall be restricted to between 0730 to 1900 hours, Monday to Friday inclusive and 0730 to 1500 hours on Saturdays. No work shall take place on Sundays and public holidays. REASON: In the interests of residential amenity. ### Condition 22 The applicant shall ensure that suitable facilities for vehicle cleansing and wheel washing, to the satisfaction of the Area Engineer, are provided on site. The applicant shall ensure that adequate on-site car parking facilities, to the satisfaction of Dun Laoghaire Rathdown County Council, are made available for site workers during the course of construction. The applicant shall maintain all footpaths and roads effected by the development works in a safe and tidy condition to the satisfaction of the Area Engineer. REASON: In the interests of the amenity, safety and maintenance of adjoining roads and footpaths ## Nearby applications - [ABP31328122](https://cherrywoodplans.com/application/ABP31328122.md): site of c.3.81 ha at Winterbrook and Barrington Tower, Brennanstown Road, Dublin 18. Refused or withdrawn (12 Sep 2024). Builds 534 build-to-rent apartments in 8 blocks of up to 10 storeys at Winterbrook and Barrington Tower, restoring the tower itself. - [D11A/0127](https://cherrywoodplans.com/application/D11A-0127.md): Carrickmines Substation, Barrington Tower, Brennanstown Road, Cabinteely, Dublin 18. Granted (29 Nov 2011). Seeks to keep an electrical substation built to power the Luas Green Line extension near Brennanstown Road. - [D10A/0104](https://cherrywoodplans.com/application/D10A-0104.md): Carrickmines Substation Barringtontowers, Brennanstown Road, Carrickmines, Co. Dublin. Refused or withdrawn (15 Apr 2010). Seeks to keep an electrical substation built to power the Luas Green Line extension near Brennanstown Road. - [DZ26A/0252/WEB](https://cherrywoodplans.com/application/DZ26A-0252-WEB.md): A site in the townlands of Brennanstown and Laughanstown, Dublin 18. The main development site forms part of ‘Development Area 3. Granted (7 Oct 2026). 343 apartments in 8 blocks of up to 5 storeys off Castle Street in Priorsland. - [DZ23A/0120](https://cherrywoodplans.com/application/DZ23A-0120.md): Site in the townlands of Laughanstown and Brennanstown, Castle Street, Barrington's Road, Dublin 18. Refused or withdrawn (29 Jan 2024). 240 build-to-rent apartments in 6 blocks of 2–4 storeys in Priorsland, off Castle Street. - [D18B/0189](https://cherrywoodplans.com/application/D18B-0189.md): Jamilah, 13 Brennanstown Vale, Cabinteely, Dublin 18. Granted (14 Jun 2018). Adds a single-storey rear extension with a bay window to a house at Brennanstown Vale. - [D04B/0806](https://cherrywoodplans.com/application/D04B-0806.md): Jamilah, 13, Brennanstown Vale, Cabinteely, Dublin 18. Granted (11 Jan 2005). Two-storey side extensions and a front porch at a house on Brennanstown Vale. - [D23A/0200](https://cherrywoodplans.com/application/D23A-0200.md): 12 Brennanstown Vale, Dublin 18, D18W6E5. Granted (18 May 2023). Two new 5-bedroom houses in the garden of 12 Brennanstown Vale. - [DZ20A/0690](https://cherrywoodplans.com/application/DZ20A-0690.md): Site area of 9.77, in townlands of Laughanstown Brennanstown and Cherrywood, Dublin 18. Refused or withdrawn (3 Nov 2020). 152 new homes, mostly apartments plus houses, off Barrington's Road and Castle Street in Lehaunstown. - [DZ23A/0005](https://cherrywoodplans.com/application/DZ23A-0005.md): Site in the the townlands of Laughanstown and Brennanstown, Castle Street, Barrington's Road, Dublin 18. Granted (7 Jul 2023). 89 new homes (houses and two-level apartments) and a crèche off Castle Street and Barrington's Road. - [ABP31332222](https://cherrywoodplans.com/application/ABP31332222.md): Priorsland, Within the Townsland of Carrickmines Great and Brennanstown, Dublin 18. Refused or withdrawn (20 Nov 2024). A new village centre at Priorsland with 443 homes, a supermarket, shops, crèche and the first phase of a public park. - [DZ21A/0677](https://cherrywoodplans.com/application/DZ21A-0677.md): site of c.8.751 ha located at Priorsland, located within the townlnds of Carrickmines Great and, Brennanstown, Dublin 18. The site comprises lands north and south of the carrickmines Stream and, adjacent Carrickmines Luas Park & Ride.. Refused or withdrawn (15 Sep 2021). Builds a new village centre at Priorsland with 445 homes, a supermarket, shops, crèche and offices beside Carrickmines Luas. - [DZ17A/0114](https://cherrywoodplans.com/application/DZ17A-0114.md): Lands at Priorsland, Glenamuck Road North, Carrickmines, Dublin 18. Granted (8 Feb 2018). A permanent 350-space multi-storey park and ride beside Carrickmines roundabout, replacing the temporary one. - [D14A/0474](https://cherrywoodplans.com/application/D14A-0474.md): Druid Glen, Brennanstown Road, Cabinteely, Dublin 18. Granted (16 Dec 2014). Replacing a derelict two-storey house at Druid Glen, Brennanstown Road, with a new single-storey 4-bed home. - [DZ19A/0683](https://cherrywoodplans.com/application/DZ19A-0683.md): Off Glenamuck Road, adjacent to Carrickmines roundabout, and the Carrickmines M50 interchange, Dublin. Granted (8 Nov 2019). Allows the existing 350-space Carrickmines Luas park and ride to continue for 3 more years. - [DZ16A/0585](https://cherrywoodplans.com/application/DZ16A-0585.md): Off Glenamuck Road, adjacent the Carrickmines roundabout and M50 interchange Carrickmines Dublin. Granted (26 Sep 2016). Keeping the 350-space Carrickmines park and ride for another 3 years. - [D10A/0164](https://cherrywoodplans.com/application/D10A-0164.md): Carrickmines(Priorsland), East Of Glenamuck Road, North Of M50, & South Of Luas Line B1 (Currently under construction). Granted (23 Sep 2010). A temporary 350-space park and ride beside Carrickmines roundabout to serve the Luas extension to Cherrywood. - [DZ18A/1129](https://cherrywoodplans.com/application/DZ18A-1129.md): Site (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8). Granted (4 Feb 2019). Builds a drainage basin and regrades a future school site in Laughanstown. - [DZ23A/0812](https://cherrywoodplans.com/application/DZ23A-0812.md): Townlands of Laughanstown & Brennanstown, Dublin 18. Granted (14 Feb 2024). Amends a permitted housing scheme at L1 West to change the internal layouts of its 4-bed houses and move the site compound. - [DZ23A/0468](https://cherrywoodplans.com/application/DZ23A-0468.md): Townlands of Laughanstown and Brennanstown, Dublin 18. Granted (9 May 2024). Amends a permitted Lehaunstown scheme to rearrange units, add 4 homes (488 to 492) and move a temporary crèche. - [DZ23A/0354](https://cherrywoodplans.com/application/DZ23A-0354.md): Townlands of Laughanstown and Brennanstown, Dublin 18. Refused or withdrawn (23 Jun 2023). Amends a permitted Lehaunstown scheme to rearrange units and add 4 homes, taking it from 488 to 492. ## Links - [This page on CherrywoodPlans](https://cherrywoodplans.com/application/D07A-0161) - [Council record, documents and conditions (DLR planning portal)](https://planning.agileapplications.ie/dunlaoghaire/application-details/43715) - [All Cherrywood applications](https://cherrywoodplans.com/applications.md) _Source: Dún Laoghaire–Rathdown County Council planning data, refreshed daily. CherrywoodPlans is an independent site, not run by the council._