# Planning application D18A/0551 > Site (c.1.46ha) at Ards, Cartref and lands to the rear of Foxley, Old Bray Road, Cabinteely, Dublin 18, Cherrywood, Dún Laoghaire–Rathdown. Granted (23 Jan 2019). - **Reference:** D18A/0551 - **Address:** Site (c.1.46ha) at Ards, Cartref and lands to the rear of Foxley, Old Bray Road, Cabinteely, Dublin 18 - **Status:** Granted (23 Jan 2019) - **Decision:** GRANT PERMISSION - **Application type:** Permission - **Applicant:** Castlethorn Management Services UC - **Lodged:** 18 Dec 2018 - **Decided:** 23 Jan 2019 - **Appeal (An Coimisiún Pleanála):** ABP-303675-19, GRANT PERMISSION - **Appeal decided:** 4 Jul 2019 - **Location (lat, lng):** 53.256574, -6.147613 ## Proposal 72 no. dwellings comprising 46 no. apartments (16 no. 1-bed, 29 no. 2-bed and 1 no. 3-bed units) accommodated in 2 no. 3-5 storey buildings and including balconies or terraces on north, east, south and west elevations and solar panels on the roof; 22 no. 2-storey terraced semi-detached and detached houses and 4 no. 2-storey plus attic semi-detached houses (18 n9o. 3 bed and 8 no. 4-bed units), including solar panels on the roof. All associated site development, landscape and boundary treatment works including demolition of 2 no. existing habitable houses, Cartref (c.206.5 sqm) and Ards (c.263 sqm) and associated outbuildings, main vehicular access and egress to scheme via the existing Cartref site onto the Old Bray Road, to provide two-way carriageway and a footpath, existing vehicular driveway to Ards to serve as private driveway to 1 no. dwelling within the proposed scheme, 103 no. car parking spaces (32 no. semi-basement and 71 no. surface), 109 no. bicycle spaces located in external shelters and semi-basement to serve apartment units and visitors, pedestrian link to existing linear open space alongside Cabinteely stream to the west of the site and an electricity sub-station (c.8.2 sqm) ## In plain English 72 homes, apartments and houses, at Ards, Cartref and behind Foxley on the Old Bray Road. - **72** homes - **103** car parking spaces - **109** bicycle spaces - **1.46** hectare site ### What's planned A residential scheme on about **1.46** hectares, with the houses Cartref and Ards demolished. ### Residential **46** apartments (**16** one-bed, **29** two-bed, **1** three-bed) in two 3–5 storey buildings, and **26** two-storey houses (**18** three-bed, **8** four-bed). ### Transport **103** car spaces (**32** semi-basement, **71** surface) and **109** bicycle spaces. Main access via the Cartref entrance onto the Old Bray Road. ### Environment Solar panels on roofs and a footpath link to the open space along the Cabinteely Stream. _This summary was written by AI from the proposal text. Check the council record before relying on it._ ## Conditions ### Condition 1 The development shall be carried out in its entirety in accordance with the plans, particulars and specifications lodged with the application, as amended by Further Information received on Dec 18th 2018 save as may be required by the other conditions attached hereto. REASON: To ensure that the development shall be in accordance with the permission and that effective control be maintained. 2. Details of all external finishes including materials, colours and textures shall be submitted prior to the commencement of development, for the written agreement of the Planning Authority. REASON: In the interest of visual amenity 3. An acceptable street naming and house numbering scheme, in both Irish and English, shall be submitted for the written agreement of the Planning Authority prior to the commencement of development or the erection of any advertising hoardings on site. In this regard, the use of street names reflecting local place names or local history would be acceptable. REASON: In the interest of orderly development. 4.The Applicant/ Developer shall enter into an agreement in accordance with Part V of the Planning and Development Acts 2000-2015 as amended prior to commencement of any development, unless the applicant / developer has applied for and been granted an exemption certificate under section 97 of the Planning and Development Act, 2000 (as amended). REASON: In the interests of the proper planning and sustainable development of the area. 5. Each proposed house and apartment shall be used as a single dwelling unit only and shall not be sub-divided in any manner or used as two or more separate habitable units. REASON: To prevent unauthorised development. 6. At least one car parking space shall be allocated to each residential unit within the scheme. Car Parking spaces shall be sold off in conjunction with the units and not sold separately, or let, to avoid non take-up by residents. REASON: In the interest of traffic safety. 7. The Applicant shall ensure that the proposed basement car parks and access complies with the UK’s Institution of Structural Engineers booklet entitled “Design Recommendations for Multi-Storey and Underground Car Parks Fourth Edition” in accordance with section 8.2.4.10 of CDP 2016-2020. REASON: In the interest of traffic safety 8. The Applicant shall ensure that a minimum of one car parking space per ten residential units shall have a functional Electric Vehicle Charging Point. REASON: To accord with Section 8.2.4.12 of County Development Plan 2016-2022. 9. (a) The applicant shall ensure that suitable facilities for vehicle cleansing and wheel washing, to the satisfaction of the Planning Authority, are provided on site. (b) The applicant shall ensure that adequate on-site car parking facilities, to the satisfaction of Dún Laoghaire Rathdown County Council, are made available for site workers during the course of construction. (c) The applicant shall maintain all footpaths and roads affected by the development works in a safe and tidy condition. REASON: In the interest of the amenity, safety and maintenance of adjoining roads and footpaths. 10. (a) Prior to commencement of development the applicant shall agree with the Planning Authority which areas of the proposed development are to be taken in charge by the Council. This shall be clearly detailed on a layout map. All areas not to be Taken in Charge by the Council shall be maintained by a properly constituted Private Management Company. Membership of this Company shall be compulsory for all purchasers of property in the development. Full details of the Private Management Company shall be submitted for the written agreement of the Planning Authority. (b) Confirmation that this Company has been set up shall be submitted to the Planning Authority prior to the occupation of the first residential unit. Access for members of the public to the open space and links/accesses to and from adjoining public roads and footpaths outside of the development, over roads and footpaths which are to be vested in the Management Company, shall be maintained. All roads, services and open space are to be completed to the standards required for development works as set out in the Council’s “Development Works Guidance Document”. REASON: To ensure a proper standard of residential development and maintenance of communal facilities, and access to public areas. 11. The applicant shall ensure that - (a) Development described in Class 1 of Part 1 of Schedule 2 to the Planning and Development Regulations, 2001 (as amended), or any statutory provision modifying or replacing them, shall not be carried out within the curtilage of any of the proposed dwelling house(s) of House 1, 2, 5, 6, 7, 8, 9, 10, 11, and 12 without a prior grant of planning permission. (b) Development described in Classes 1 and 3 of Part 1 of Schedule 2 to the Planning and Development Regulations, 2001 (as amended), or any statutory provision modifying or replacing them, shall not be carried out within the curtilage of any of the proposed dwelling house of House 13 without a prior grant of planning permission. (c) The side garden of house no 13 shall be squared off to include the area of public open space as shown in the revised Site Layout Plan dwg no 1504-OMP-00-00-DR-A-XX-11000 Rev 1. A revised site layout plan shall be agreed in writing with the Planning Authority prior to the commencement of development. REASON: In the interests of the proper planning and sustainable development of the area and residential amenity. 12. Site development and building works shall be carried out only between the hours of 8.00am to 7.00pm Monday to Friday inclusive, 8.00am to 2.00pm Saturdays and no works permitted on site on Sundays and Public holidays. Deviations from these times will only be allowed in exceptional circumstances where prior written approval has been obtained from the Planning Authority. REASON: In order to safeguard the residential amenities of property in the vicinity. 13. All necessary measures shall be taken by the Applicant and Contractor to avoid conflict between construction activities and pedestrian/vehicular movements on the public road. A final construction management shall be agreed in writing with the Planning Authority prior to the commencement of development. REASON: In the interest of traffic safety. 14. The proposed development shall be undertaken in accordance with the Section 5.2 of the Archaeological Assessment Report. Reason: In ensure consistency with the Cherrywood Planning Scheme. 15. Prior to the commencement of development, the developer shall engage the services of a qualified arborist as an Aboricultural Consultant for the entire period of construction. The applicant shall inform the planning authority in writing of the appointment and name of the Consultant, prior to commencement of development. The Aboricultural Consultant shall visit the site at regular intervals (not less than weekly), to ensure the implementation of the all of the recommendations in the submitted Tree Report. The applicant shall implement all the recommendations pertaining to tree retention, tree protection and tree works, as detailed in the Aboricultural Assessment and Tree Protection Plan. The arborist shall carry out a post construction tree survey and assessment on the condition of the retained trees. A Completion Certificate is to be signed off by the arborist when all permitted development works are practically complete, and in line with the recommendations of the tree report. Reason: To ensure consistency with the Cherrywood Planning Scheme. 16. Prior to the commencement of development, the developer shall retain the professional services of a qualified Landscape Architect, as his/her Landscape Consultant, throughout the course of the development works; and shall notify the planning authority of that appointment in writing prior to commencement. The developer shall engage the Landscape Consultant to procure, oversee and supervise the landscape contract for the implementation of the permitted landscape proposals. When all landscape works are inspected and completed to the satisfaction of the Landscape Consultant, he/she shall prepare, sign and submit a Practical Completion Certificate (PCC) to Dlr Parks and Landscape Services, as verification that approved landscape plans and specification have been fully implemented. REASON: To ensure full and verifiable implementation of the approved landscape design proposals for the permitted development, to the approved standards and specification. 17. Prior to the commencement of any permitted development, the applicant shall submit comprehensive and detailed landscape proposals all prepared by a qualified Landscape Architect (or qualified Landscape Designer), for the written approval of the Planning Authority. Such proposals shall include the following:- • A scaled Landscape Master plan with cross- sections (where appropriate) showing the general layout and hard and soft landscape treatment of all external areas/spaces, boundaries, structures and features. • A Landscape Specification for all materials, workmanship and landscape maintenance (18 months minimum period). • Details of links to the adjoining linear park (including levels and finishes). • Details of the ramp design to the south of Block 1 and the treatment of public open space (that includes stepped areas and retaining walls) between Blocks 1 and 2 (including levels and finishes). • Details of Hard Landscape Design (where applicable) for boundaries, (walls, fences, screens), lighting, seating, kerbing, edging, surfacing and water features. • Details of Soft Landscape Design to include detailed Planting Plan(s) and Planting Schedule(s) - as appropriate - stating species/varieties, quantities, sizes, rootball presentation and spacing’s. Planting Design mixes should include a range of specified forms and sizes of both native and exotic species, to provide visual and biological diversity. • A Timescale for Implementation of all proposals, including the specified landscape maintenance operations. The landscape contract shall include a post- Practical Completion (certified by the landscape consultant) and Defects Liability Clause of 18 months minimum. Reason: To ensure compliance with the County Development Plan and Taking-in-Charge requirements and in the interests of proper planning and sustainable development. Reason: In the interest of visual amenity. 18. Prior to the commencement of any permitted development, the applicant should confirm in writing that they are satisfied that the landscape proposals comply with DLRs’ Guidelines for The Development and Taking-in-Charge of Public Open Space. Upon completion of the works, the Landscape Architect (or qualified Landscape Designer) as a Landscape Consultant, shall provide a Certificate/Letter stating that all landscape works are fully completed and compliant with DLRs’ Guidelines for The Development and Taking-in-Charge of Public Open Space. Reason: To ensure that designs, materials and specifications shall meet with the requirements of the Local Authority and the Development Agency and in the interests of proper planning and sustainable development. 19. The Developer shall engage the services of a qualified ecologist as an ecological consultant, from the commencement of construction for the duration of the works. The Developer shall inform the Planning Authority in writing of the appointment and name of the consultant, prior to the commencement of development. The consultant shall ensure the implementation of all the recommendations within the submitted Ecological Assessment. REASON: To provide for the protection of biodiversity in accordance with Policy LHB20:Habitats Directive, Policy LHB26: Hedgerows, Policy LHB24: County-Wide Ecological Network and LHB25:Rivers and Waterways. 20. A Final site specific detailed Construction and Environment Plan (CEMP) shall be submitted to the planning authority at least 5 weeks in advance of site clearance and site works commencing. a) The CEMP will include a Biodiversity section with site specific mitigation measures which have been provided in the Ecological Impact Assessment report including the appropriate phasing of the works and with further input from a suitably qualified ecologist, if required. b) Inland Fisheries shall be consulted and a construction method statement agreed with them and then submitted to the Planning Authority. c) The programme and details of works that amongst other items provides for interception, containment and treatment of construction runoff. No construction runoff should be diverted to proposed SuDS measures such as swales, bioretention areas or attenuation tanks. Any surface water sewer pipes used to convey construction runoff should be thoroughly cleaned before subsequent connection to SuDS elements. The Construction Plan shall also detail measures for the protection of attenuation tanks, swales and bioretention areas from construction traffic damage. d) Any removal of trees, shrub, from the development site should only be carried out in the months from September to February inclusive i.e. outside of the main bird nesting season. e) Stockpiles shall be located away from boundary treelines, hedgerows and woodland. The applicant shall thereafter, unless otherwise agreed with the Planning Authority, be required to construct the works in accordance with the agreed construction management plan. REASON: To protect the Environment during the construction phase and also to avoid impacts on water quality, fisheries, sustainable drainage and flooding. 21. The Green roof shall be designed in accordance with The SUDS Manual (C753) and BS EN 12056-3:200. Prior to the commencement of development the applicant shall submit full details of the proposed Green Roof showing a minimum 60% coverage of the entire footprint of the Block 1 apartment building (797.38m2). Details shall include a construction plan and a post-construction maintenance specification and schedule. The applicant shall enter a formal maintenance agreement with a professional contractor. Maintenance contractors with specialist training in green roof care shall be used. REASON: In the interest of Public Health 22. The manhole in which each flow control device is located shall be fitted with a penstock on the inflow pipe, not the outflow pipe, to facilitate maintenance of the flow control device. The flow control device shall not have a bypass door or other mechanism for bypassing the device. REASON: In the interest of Public Health. 23. Prior to the commencement of development the applicant shall submit to the Planning Authority for its written agreement a Stage 2 - Detailed Design Stage Stormwater Audit, as required under Policy EI9: Stormwater Impact Assessments of the County Development Plan, so as to check the detail of all the Suds elements and to ensure that any necessary amendments have been included in the construction stage drawings. REASON: In the interest of Public Health. 24. Upon completion of the development, the applicant shall submit to the Planning Authority for its written agreement a Stage 3 Completion Stage Stormwater Audit to ensure the SuDS measures were installed and working as designed, no misconnections have taken place and that damage has not occurred to any of the stormwater drainage infrastructure during construction. A report shall, be issued to the Planning Authority and any necessary recommendations carried out, unless agreed otherwise with the Planning Authority. This stage may require the installation of flow monitors and/or dye testing; the extent of monitoring will depend on the findings of the audit. A CCTV survey shall be carried out of all stormwater pipes and the survey and report forwarded to the Planning Authority. REASON: In the interest of Public Health. 25. Prior to the commencement of development on site the developer shall submit to the Planning Authority for their written agreement the following: a) A Construction Waste Management Plan, having regard to Circular WPR 07/06 - Best Practice Guidelines on the Preparation of Waste Management Plans for Construction and Demolition Projects - published by the DECLG, July 2006. This plan shall provide details including intended construction practice for the management of waste arising from the construction process and in particular recyclable materials. b) A Waste Management Plan. This plan shall contain details for the management of waste both commercial and domestic, and in particular recyclable materials and food waste arising within the development, including the provision of facilities for the separation, storage and collection of the waste and the provision of adequate signage and lighting to facilitate the ongoing operation of these facilities. This plan shall be consistent with ‘The DLR Guidance Notes for Waste Management Planning’. c) Separate Residential Units Provision of a secure storage compound sized to cater for a standard 3 bin system for residential units not using the communal storage area. This should be set out in a site layout plan and also suitable elevations. REASON: In the interests of amenities, environmental protection, public health and safety and the proper planning and sustainable development of the area. 26. The development shall be carried out on a phased basis in accordance with a Phasing Schedule, which shall be submitted to and agreed in writing with, the Planning Authority prior to the commencement of development on site. REASON: In the interests of clarity and orderly development. 27. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €17,906.91, to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of Surface Water Public Infrastructure and Facilities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Public Infrastructure and Facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. Note on above Condition: Please note that with effect from 1st January, 2014 Irish Water are now the statutory body responsible for both water and waste water services. Accordingly, the contribution payable has been reduced by the amount of the contribution associated with these services. Further details/clarification can be obtained from Irish Water at Tel. 1 850 278 278. 28.The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €410,081.80, to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON It is considered reasonable that the payment of a contribution be required in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 29.The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €266,193.91, to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Community & Parks Public Infrastructure, Facilities and Amenities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks Public Infrastructure, Facilities and Amenities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 30. This development shall not be carried out without prior agreement, in writing, between the Applicants and the Planning Authority relating to the payment of development contributions. REASON: Investment by Dún Laoghaire-Rathdown County Council in Local Authority works has facilitated and will facilitate the proposed development. It is considered appropriate and reasonable that the developer should contribute to the cost of same. 31. That a financial contribution shall be paid by the proposer to the Council towards the cost of the extension of Luas Line B from the Sandyford Depot to Cherrywood, namely Luas Line B1. This contribution to be paid prior to the commencement of the development or in such other manner as may otherwise be agreed with the Planning Authority. The rate of contribution payable shall be that pertaining to the particular year in which implementation of the Planning Permission is commenced. The Supplementary Development Contribution Scheme provides for an annual increase in the levels of contribution payable, as outlined in the scheme, by a factor of 5% compound interest per annum. The levels of contribution will be reviewed annually on the 13th of January of each year during which the scheme is in force to take account of the aforementioned increase. The rate of contribution payable in respect of this development, at current contribution rates, is € 513,590.04, and is subject to increase as outlined above. It should be noted that contributions assessed in accordance with the Supplementary Development Contribution Scheme cannot be appealed to An Bord Pleanala unless the applicant considers the levy referred to in this condition has not been properly applied in accordance with the terms of the Scheme. REASONS FOR CONTRIBUTIONS: To part finance the extension of the Luas Line B1 from Sandyford Depot to Cherrywood, as provided for in the Supplementary Development Contribution Scheme adopted by the Council of Dunlaoghaire-Rathdown on the 13th of January, 2003. (incorporating amendments to Clause 13 as adopted by the County Council at it’s meeting on 13th May, 2013 – to be effective for all decisions from 14th May, 2013) 32. No development on foot of this permission shall commence until security for the provision and satisfactory completion of services (including roads, footpaths, open spaces, public lighting, sewers, watermains and drains) in accordance with the Plans and particulars lodged with the application, has been given by:- a) Lodgement with the Council of an approved Insurance Company Bond in the sum of € 318,700.00, which shall be kept in force by the Developer until such time as Roads, Open Spaces, Car Parks, Sewers, Watermains and Drains are completed to the satisfaction of the Council OR/... b) Lodgement with the Council of a Cash Sum of € 193,500.00, to be applied by the Council at its absolute discretion if such services are not duly provided to its satisfaction on the provision and completion of such services to standard specifications. REASON: To ensure that a ready sanction may be available to the Council to induce the provision of services and prevent disamenity in the development NOTE 1: The attention of the applicant is drawn to Section 34(13) of the Planning and Development Act 2000, which relates as follows- "A person shall not be entitled solely by reason of a permission under this section to carry out any development". NOTE 2: Where the applicant proposes to connect directly or indirectly to a public water/wastewater network operated by Irish Water, the applicant must sign a connection agreement with Irish Water prior to the commencement of the development and adhere to the standards and conditions set out in that agreement. NOTE 3: In the interest of Public Health and Environmental Sustainability, Irish Water Infrastructure capacity requirements and proposed connections to the Water and Waste Water Infrastructure will be subject to the constraints of the Irish Water Capital Investment Programme ## Nearby applications - [D08A/0717](https://cherrywoodplans.com/application/D08A-0717.md): Ards, Cartref and Foxley, Old Bray Road, Cabinteely, Dublin 18.. Refused or withdrawn (14 Aug 2008). 127 apartments, penthouses and two-level homes in 4 buildings at Ards, Cartref and Foxley, Old Bray Road. - [D15A/0716](https://cherrywoodplans.com/application/D15A-0716.md): Cartref and Ards, Old Bray Road, Cabinteely, Dublin 18. Refused or withdrawn (19 Jan 2016). 51 homes, apartments and houses, at Cartref and Ards on the Old Bray Road. - [D06A/0557](https://cherrywoodplans.com/application/D06A-0557.md): Grounds and Dwellings Ards & Cartref, Old Bray Road, Cabinteely, Dublin 18. Granted (9 Nov 2006). 77 apartments and two-level homes in 3 blocks of 2 to 5 storeys at Ards and Cartref, Old Bray Road. - [D22A/0350](https://cherrywoodplans.com/application/D22A-0350.md): Circle K Centenary Service Station, Bray Road, Dublin 18, D18AK58. Granted (25 Aug 2022). Shop revamp at the Circle K service station on Bray Road, adding a deli and enlarging the retail area. - [D06A/0452](https://cherrywoodplans.com/application/D06A-0452.md): Centenary Service Station, Bray Road, Cabinteely, Dublin 18.. Granted (26 May 2006). Lets part of the approved shop at Centenary Service Station, Cabinteely, operate as an off-licence. - [D05A/0567](https://cherrywoodplans.com/application/D05A-0567.md): Centenary Service Station, Bray Road, Cabinteely, Dublin 18.. Granted (20 Jan 2006). Upgrades the shop and car wash at Centenary Service Station, Cabinteely, adding a hot food deli. - [D05A/0322](https://cherrywoodplans.com/application/D05A-0322.md): Centenary Service Station, Bray Road, Cabinteely, Dublin 18.. Refused or withdrawn (19 Apr 2005). Upgrades the shop and car wash at Centenary Service Station, Cabinteely, adding a hot food deli. - [PC/IC/02/16](https://cherrywoodplans.com/application/PC-IC-02-16.md): N11, Cabinteely, Dublin 18. Granted (12 Jun 2017). Builds a new signalised junction on the N11 at Cabinteely with crossings, bus stops and landscaping. - [DZ16A/0587](https://cherrywoodplans.com/application/DZ16A-0587.md): Site of 2.79 ha approx. at Beech Park, Bray Road, Cabinteely, Dublin 18/Loughlinstown, Co Dublin. Granted (21 Dec 2016). 34 houses at Beech Park, Bray Road, replacing six homes, plus part of the Druid's Glen Road and bridge. - [DZ18A/0208](https://cherrywoodplans.com/application/DZ18A-0208.md): Site approx. 6.57ha in area and generally bounded by, Lehaunstown Lane to the west, Carrickmines Stream (partly) to the south, and Cabinteely Stream, (partly) to the east that is, located within the townland of, Brennanstown, Dublin 18. Granted (4 Feb 2020). Builds 367 homes, a mix of apartments, two-level units and houses, plus a childcare facility in Brennanstown. - [D04A/0988](https://cherrywoodplans.com/application/D04A-0988.md): BRENNANSTOWN, CABINTEELY, DUBLIN 18.. Refused or withdrawn (22 Oct 2004). A large Brennanstown development of 702 homes in 26 buildings of 3 to 8 storeys, with a school building, shop and community hall. - [DZ19A/0863](https://cherrywoodplans.com/application/DZ19A-0863.md): Site is generally bounded by Lehaunstown Lane to the west, Carrickmines Stream (partly) to the south and, Cabinteely Stream (partly) to the east and is located within the townland of, Brennanstown, Dublin 18. Granted (14 Jan 2020). 342 new homes in Druid's Glen, Brennanstown, with a crèche and part of the Druid's Glen road and bridge. - [DZ26A/0245/WEB](https://cherrywoodplans.com/application/DZ26A-0245-WEB.md): Lands within the Townland of, Brennanstown, Dublin 18. Granted (30 Jul 2026). Amends a permitted Druid's Glen scheme, adding 18 apartments and enlarging the childcare facility. - [DZ25A/0515/WEB](https://cherrywoodplans.com/application/DZ25A-0515-WEB.md): Lands within the Townland of, Brennanstown, Dublin 18. Granted (4 Dec 2025). Amends Phases 2 and 3 of a permitted Druid's Glen scheme, swapping unit types and adding 7 homes (346 to 353). - [DZ24A/0621/WEB](https://cherrywoodplans.com/application/DZ24A-0621-WEB.md): Lands within the Townland of Brennanstown, Brennanstown, Dublin 18. Granted (21 Jan 2025). Amends Phase 1 of a permitted Druid's Glen scheme, adding 4 homes to bring the total from 342 to 346. - [DZ24A/0585/WEB](https://cherrywoodplans.com/application/DZ24A-0585-WEB.md): Lands within the Townland of Brennanstown, Brennanstown, Dublin 18. Refused or withdrawn (8 Aug 2024). Amends Phase 1 of a permitted Druid's Glen scheme, adding 4 homes to bring the total from 342 to 346. - [DZ25A/0318/WEB](https://cherrywoodplans.com/application/DZ25A-0318-WEB.md): Lands within the townland of Brennanstown, Dublin 18. Granted (20 Aug 2025). 24 new two-storey houses off the Druid's Glen road in Brennanstown. - [D04A/0926](https://cherrywoodplans.com/application/D04A-0926.md): Brennanstown Avenue, Brennanstown, Cabinteely, Co. Dublin. Granted (11 Oct 2004). Adds a 26 sq.m single-storey rear extension to each of 11 approved houses on Brennanstown Avenue. - [D10A/0262](https://cherrywoodplans.com/application/D10A-0262.md): Talblich, Lehaunstown Lane, Cabinteely, Dublin 18. Refused or withdrawn (8 Jul 2010). 13 new houses replacing a house at Talblich, Lehaunstown Lane. - [D13A/0545](https://cherrywoodplans.com/application/D13A-0545.md): Tablick, Lehaunstown, Cabinteely, Co Dublin. Granted (24 Jan 2014). Extends and alters a dormer bungalow at Tablick, Lehaunstown, adding a larger kitchen and an ensuite. - [D15A/0385](https://cherrywoodplans.com/application/D15A-0385.md): Site of 5.295 ha approximately at Beech Park, Cabinteely, Dublin 18 / Loughlinstown, Co Dublin and its connection with the N11.. Granted (18 Oct 2017). 164 homes, mostly houses and two-level apartments, at Beech Park, Cabinteely, plus the first stretch of the Druid's Glen Road. - [DZ20A/0491](https://cherrywoodplans.com/application/DZ20A-0491.md): Site of c. 5.295 hectares, located at Beech Park (also known as Beechpark), Bray Road, Cabinteely, Dublin 18/Loughlinstown, County Dublin. Granted (19 Oct 2020). Amends a permitted Beech Park apartment block, raising it from 65 to 70 homes with no change in parking. - [DZ20A/0362](https://cherrywoodplans.com/application/DZ20A-0362.md): On a site of c. 5.295 hectares, Beech Park (also known as Beechpark), Bray Road, Cabinteely, Dublin 18, Loughlinstown, County Dublin. Granted (31 Aug 2020). Amends the Beech Park scheme on Bray Road to add 3 apartments to Block F, a gym and a pet room, and more bike parking. - [DZ20A/0056](https://cherrywoodplans.com/application/DZ20A-0056.md): Beech Park (also known as Beechpark), Bray Road, Cabinteely, Dublin 18/Loughlinstown, County Dublin. Granted (18 Mar 2020). Amends the permitted Beech Park scheme to reconfigure 78 apartments in Blocks D, E and F. - [DZ19A/0768](https://cherrywoodplans.com/application/DZ19A-0768.md): Beech Park, Bray Road, Cabinteely, Dublin 18, Loughlinstown, Co. Dublin. Granted (29 Nov 2019). Amends the permitted Beech Park scheme to reconfigure 78 apartments in Blocks D, E and F and add a residents' gym. - [DZ19A/0622](https://cherrywoodplans.com/application/DZ19A-0622.md): Beech Park, Bray Road, Cabinteely, Dublin 18 / Loughlinstown, County Dublin. Granted (17 Oct 2019). Amends the permitted Beech Park scheme to reconfigure 78 apartments and split off land taken by the Council for a new road. - [DZ20A/0073](https://cherrywoodplans.com/application/DZ20A-0073.md): At a site of c. 5.295 hectares, Beech Park, Bray Road, Cabinteely, Dublin 18, Loughlinstown, Co. Dublin. Granted (30 Jun 2020). Redesign of three permitted apartment blocks at Beech Park, Bray Road, changing the unit mix but keeping 65 apartments. - [D06A/1367](https://cherrywoodplans.com/application/D06A-1367.md): Navarone & Tablick, Brennanstown Road / Lehaunstown Lane, Cabinteely, Dublin 18.. Granted (7 Feb 2008). 76 apartments and townhouses in two blocks of up to 5 storeys at Navarone and Tablick, Brennanstown Road. - [D15A/0228](https://cherrywoodplans.com/application/D15A-0228.md): Navarone, Brennanstown Road, Cabinteely, Dublin 18. Refused or withdrawn (28 May 2015). Either 7 or 9 new large houses in the grounds of Navarone, Brennanstown Road. - [D02A/0317](https://cherrywoodplans.com/application/D02A-0317.md): Site (walled garden) Glendruid, Brennanstown Road,, Cabinteely, Dublin 18.. Granted (10 Jun 2002). Builds a two-storey, four-bedroom house with a garage and stables in the walled garden at Glendruid, a protected structure. - [DZ23A/0083](https://cherrywoodplans.com/application/DZ23A-0083.md): Druid House & Glendruid House (protected structure), Lehaunestown Lane, Brennanstown Road, Brennanstown, Dublin 18. Granted (20 Oct 2023). Rebuilding a boundary wall on Lehaunstown Lane and a new access road to prepare for the permitted Druid's Glen Road. - [D08A/0728](https://cherrywoodplans.com/application/D08A-0728.md): Lahaunstown House, Lahaunstown, Cabinteely, Dublin 18.. Refused or withdrawn (31 Jul 2008). A new 4-bedroom, two-storey house beside Lahaunstown House, Cabinteely. - [D08A/1293](https://cherrywoodplans.com/application/D08A-1293.md): Lehaunstown House, Lehaunstown, Cabinteely, Dublin 18. Refused or withdrawn (30 Jan 2009). Extensions to Lehaunstown House, Cabinteely, making it a 5-bedroom home with a sunroom and pool. - [D16A/0852](https://cherrywoodplans.com/application/D16A-0852.md): Navarone, Brennanstown Road, Cabinteely, Dublin 18. Granted (12 Apr 2017). A new 5-bedroom detached house beside Navarone on Brennanstown Road. - [D15A/0667](https://cherrywoodplans.com/application/D15A-0667.md): Glendruid Mews, Brennanstown Road, Cabinteely, Dublin 18 (corner with Lehaunstown Lane). Granted (23 Mar 2016). Refurbishes an outbuilding at Glendruid Mews to add living space to the existing house. - [D15A/0187](https://cherrywoodplans.com/application/D15A-0187.md): Glendruid Mews, Brennanstown Road, Cabinteely, Dublin 18 (corner with Lehaunstown Lane). Refused or withdrawn (13 May 2015). Replaces a storage shed with a two-storey extension to a house at Glendruid Mews. - [PC/10/06](https://cherrywoodplans.com/application/PC-10-06.md): Kilbogget Park, Cabinteely, Dublin 18. Granted (13 Nov 2006). Upgrades Kilbogget Park with a new playground, games area, clubhouses, paths and wetlands. - [D18A/0590](https://cherrywoodplans.com/application/D18A-0590.md): The Pines, Lehaunstown Lane, Cabinteely, Dublin 18, D18 E3X7. Granted (11 Sep 2018). Replaces a septic tank with a modern wastewater treatment system at The Pines, Lehaunstown Lane. - [D06A/0330](https://cherrywoodplans.com/application/D06A-0330.md): Glendruid and Knockenree, Brennanstown Road and Druid House, Lehaunstown Lane, Cabinteely, Dublin 18. Refused or withdrawn (7 Apr 2006). Builds 191 homes, a mix of apartments and houses, at Glendruid and Knockenree off Brennanstown Road. ## Links - [This page on CherrywoodPlans](https://cherrywoodplans.com/application/D18A-0551) - [Council record, documents and conditions (DLR planning portal)](https://planning.agileapplications.ie/dunlaoghaire/application-details/79175) - [All Cherrywood applications](https://cherrywoodplans.com/applications.md) _Source: Dún Laoghaire–Rathdown County Council planning data, refreshed daily. CherrywoodPlans is an independent site, not run by the council._