# Planning application D18A/1175 > site of c. 0.4713 ha at, The Glen, Golf Lane, Glenamuck Road, Carrickmines, Dublin 18, Cherrywood, Dún Laoghaire–Rathdown. Granted (14 May 2019). - **Reference:** D18A/1175 - **Address:** site of c. 0.4713 ha at, The Glen, Golf Lane, Glenamuck Road, Carrickmines, Dublin 18 - **Status:** Granted (14 May 2019) - **Decision:** GRANT PERMISSION - **Application type:** Permission - **Applicant:** Torca Developments Ltd - **Lodged:** 17 Apr 2019 - **Decided:** 14 May 2019 - **Appeal (An Coimisiún Pleanála):** ABP-304641-19, GRANT PERMISSION - **Appeal decided:** 23 Oct 2019 - **Location (lat, lng):** 53.25139, -6.174774 ## Proposal Ing of the following: Construction of 1 no. apartment block 4-5 storeys above basement with a total of 48 no. dwelling units comprising: 20 no. 1-bedroom apartments and 28 no.2-bedroom apartments. Total residential gross floor area c. 3,697.7 sqm: Vehicular access to the development will be served by a new access to the existing road through Blackberry Hill off Golf Lane as per condition no. 4 ABP Reg. Ref.: PL06D.222927 (DLR Reg. Ref.: D06A/1266); Existing site vehicular access to be removed, direct pedestrian access to Golf Lane to be provided; All associated site development works, services, provision, car parking, cycle parking, bin stores, open space, vehicular/pedestrian access, landscaping and boundary treatment works. Part of the application site is located within the Cherrywood Strategic Development Zone. ## In plain English 48 apartments in a 4–5 storey block at The Glen, Golf Lane, Carrickmines. - **48** apartments - **5** storeys max - **0.47** hectare site ### What's planned An apartment block over a basement on about **0.47** hectares. ### Residential **48** apartments (**20** one-bed, **28** two-bed), about **3,698** sq.m, in a building of **4** to **5** storeys. ### Transport Vehicle access through Blackberry Hill off Golf Lane, with direct pedestrian access to Golf Lane. _This summary was written by AI from the proposal text. Check the council record before relying on it._ ## Conditions ### Condition 2 The development shall be carried out in its entirety in accordance with the plans, particulars and specifications lodged with the application, save as amended by Further Information received on 17/04/2019, save as may be required by the other conditions attached hereto. Reason: To ensure that the development shall be in accordance with the permission and that effective control be maintained. 2. Prior to the commencement of development on site revised site layout drawings shall be submitted, for the written agreement of the Planning Authority, which show the existing hedgerow, and trees within it, along the northern site boundary and north east site boundary retained, with the exception of the section shown to be removed to facilitate the continuation of the road to the site boundary. Reason: In the interest of ecology and visual amenity. 3. Prior to the commencement of development on site, details of all external finishes including materials, colours and textures shall be submitted for the for the written agreement of the Planning Authority. In this regard a palette of proposed finishes should be made available on site. Reason: In the interest of visual amenity. 4. Prior to the commencement of development on site revised elevation drawings showing the inclusion of privacy screens on the balconies of the corner units identified as apartment no’s 101, 201 & 301 within the front block on levels 1, 2 and 3, will be submitted for the written agreement of the Planning Authority. Reason: In the interest of residential amenity. 5. Prior to Surface Water connection to the public system, the applicant shall make a submission to the Planning Authority, showing that the attenuation system, including the hydro-brake, has been installed according to the planning application plans and conditions, and set to the maximum permitted discharge limit. This shall include photo documentation of the installation process, and certification from who installed the system. The applicant shall then facilitate an inspection from the Planning Authority, and will proceed to connection if the inspection was deemed satisfactory. Reason: In the interest of public health. 6. Prior to the commencement of development, the applicant shall submit to the Planning Authority for its written agreement a construction management plan and programme of works that amongst other items provides for interception, containment and treatment of construction runoff. No construction runoff should be diverted to proposed SuDS measures such as permeable paving or attenuation systems. Any surface water sewer pipes used to convey construction runoff should be thoroughly cleaned before subsequent connection to SuDS elements. Reason: In the interest of public health. 7. Prior to the commencement of development the applicant shall submit full details of the proposed Green Roofs to the Planning Authority for its written agreement. Details shall include a construction plan and a post-construction maintenance specification and schedule. Maintenance contractors with specialist training in green roof care should be used, where possible. Thereafter the works shall be carried out in accordance with the agreed details and the green roof shall be maintained at all times in accordance the post-construction maintenance specification and schedule. Reason: In the interest of public health. 8. Prior to the commencement of development, the applicant shall submit full details of the flow restricting device, including model and make number, orifice size and flow control hydraulic characteristics graph. The flow control device will not be permitted to have a bypass door and a penstock must be provided in the manhole in which the flow restricting device is to be located. Reason: In the interest of public health. 9. The applicant/contractors shall comply with all the requirements set out in the submitted documents, including but not limited to: • Quality Audit and Construction Traffic Management Plan – As part of the Transportation Report Prepared by Transport Insights Limited dated – Final Report dated November 2018. • Construction and Environmental Management Plan prepared by Torca Development dated 18/09/2018. Reason: In the interest of sustainable development and proper planning. 10. Prior to undertaking works to be carried out on the public road/footpath the Appli-cants shall obtain a Road Opening Licence from DLRCC Municipal Services Department Road Maintenance & Roads Control Sections. Reason: In the interest of sustainable development and proper planning. 11. Prior to commencement of development on site the Applicant shall ensure that the road reservation line is set out by the Contractor and agreed with the Road Projects Office (DLRCC), as set out in Drawing ‘No 18010-CRA-XX-XXDR-A-31002 – Proposed Site Layout Plan’. The front face (roadside) of the required set back proposed front boundary wall along Golf Lane shall be constructed along or behind this line. Reason: In the interest of protecting the future deliverability of the proposed road scheme. 12. The Applicant shall ensure that all development works (i.e. the proposed internal road, footpaths, street lighting, etc.) are designed and constructed to meet Dún Laoghaire-Rathdown County Council's 'Taking-in-Charge' requirements ‘Taking In Charge Policy Document (September, 2011 - Updated April 2013)’: http://www.dlrcoco.ie/media/media,7464,en.doc and ‘Taking in Charge Procedure Document’: http://www.dlrcoco.ie/media/media,10719,en.pdf, and all to the satis-faction of the Planning Authority at the Applicant’s own expense. Reason: In the interest of sustainable development and proper planning 13. Prior to the first occupation of proposed residential development the Applicant shall ensure permeability linkage for pedestrians/cyclists are delivered. Reason: In the interest of sustainable development and proper planning 14. The applicant shall undertake and submit to the Transportation section a ‘Post construction (Stage 3)’ independent Quality Audit (which shall include a Road Safety Audit, Access Audit, Walking Audit and a Cycle Audit) shall be carried out for the development in accordance with the Design Manual for Urban Roads & Streets (DMURS) guidance and TII (Transport Infrastructure Ireland) standards. A feed-back report shall also be submitted providing a response to each of the items. Reason: In the interest of sustainable development and proper planning 15. With regard to the lands reserved for the Kilternan Link Road as identified on the 'Roads Layout' (Drawing 18010-CRA—XX-XX-DR-A-11001 Rev. M) and the 'Landscape Masterplan' (Drawing 001), the following shall apply: 1.The applicant shall submit revised drawings, including landscaping drawings, prior to the commencement of development, and for the written agreement of the Planning Authority, identifying the following: a) Clearly delineating the Road reservation as an area for the future development of the Kilternan Link Road to be retained as a grassed area as a temporary measure, until such time that the construction of the Kilternan Link Road commences. b) An appropriate boundary treatment set back so as to be located outside the Kilternan Link Road road reservation. The drawings shall clearly show the location, setting-out and design of this boundary treatment. The construction of the boundary treatment, once agreed, shall be completed prior to any occupation of the development. 2. Any future purchaser shall be made aware of the above condition (1 a & b) at the point of sale. In this regard a clause that identifies the temporary grassed area of open space shall be included in any contract of sale; and all future sales, between the applicant and any purchaser. REASON: For consistency with the Cherrywood Planning Scheme in relation to the proposed Kilternan Link Road, Objective PI 14 and Map 4.5. To prevent development from encroaching on the road reservation for the proposed Cherrywood Kilternan Link Road and thereby creating additional constraints. To ensure any future purchaser are fully aware of proposed future road infrastructure. 16. Prior to commencement of development, the developer shall comply with the Dún Laoghaire-Rathdown County Council Housing Strategy, drawn up in accordance with Part V, Section 96(4) of the Planning & Development Act, 2000, as amended by Section 3 of the Planning & Development (Amendment) Act, 2002, and in ac-cordance with agreement to be reached with the County Council Housing Depart-ment unless the developer shall have applied for and been granted an exemption certificate under Section 97 of the Planning and Development Act, 2000, as amended. NOTE: Where a developer opts to transfer units to the Council, this shall be subject to the availability of funding. REASON: To comply with the County Council Housing Strategy & Part V of the Planning & Development Act, 2000, as amended by Section 3 of the Planning & Development (Amendment) Act, 2002. 17. In relation to archaeology; a. The applicant is required to engage the services of a suitably qualified archaeologist (licensed under the National Monuments Acts 1930 – 2004) to carry out pre-development testing at the site in advance of the commencement of construction. No sub –surface work shall be undertaken in the absence of the archaeologist without his/her express consent. b. The archaeologist is required to notify the Department of Culture, heritage and the Gaeltacht in writing at least four weeks prior to the commencement of site preparations. This will allow the archaeologist sufficient time to obtain a license to carry out the work. c. The archaeologist shall carry out any relevant documentary research and may excavate test trenches at locations chosen by the archaeologist, having consulted the proposed development plans. d. Having completed the work, the archaeologist shall submitted a written report to the Planning Authority and to the Department of Culture, Heritage and the Gaeltacht for consideration. e. Where archaeological material is shown to be present, avoidance, preservation in situ, preservation by record (excavation) and or monitoring may be required and the Department of Culture, Heritage and the Gaeltacht will advise the Applicant /Developer with regard to these matters. f. No site preparation or construction work shall be carried out until after the archaeologist’s report has been submitted and permission to proceed has been received in writing from the Planning Authority in consultation with the Department of Culture, Heritage and the Gaeltacht. Reason: To ensure the continued preservation (either in situ or by record) of places, caves, sites features or other objects or archaeological interest. 18. Prior to commencement of development, the developer shall submit final landscaping plans for the development, for the written agreement of the Planning Authority, and details of public lighting in relation to the hedgerow to be retained doing the north and north east boundary. Reason: in the interest of ecology and amenity. 19. Prior to commencement of development the developer shall submit for the written agreement of the Planning Authority details of the wall between the site and Blackerry Hill, which shall be finished in stone for its entire length. Reason: To create a suitable sense of place for the development. 20. The trees and hedgerow on the site shown on the submitted drawings and conditioned to be protected shall be protected against damage throughout the period of building and other operations pursuant to this permission. Reason: To ensure that the trees and hedgerow are adequately protected and to safeguard the amenities of the area. 21. Prior to the commencement of development on site a Final Landscape Masterplan shall be submitted for the written agreement of the Planning Authority. A satisfactory scheme of landscaping, including a proposed programme of works shall be submitted to and agreed in writing by the Planning Authority also. Reason: In the interest of amenity. 22. To ensure full implementation of the proposed landscape plan, the developer is required to retain the services of a Landscape Consultant throughout the life of the site development works. A completion certificate is to be signed off by the Landscape consultant when all works are completed and in line with the submitted landscape drawings. This completion certificate shall be submitted to the Planning Authority for written agreement upon completion of works. Reason: In the interest of amenity. 23. Vegetation clearance and tree removal shall take place outside the bird breeding season (March 1st – August 31st). Reason: To protect birds and bird breeding habitats during the nesting season. 24. All public services to the proposed development, including electrical, telephone cables and equipment shall be located underground throughout the entire site. Provision shall be made for broadband connectivity in the development. REASON: In the interest of amenity. 25. Prior to commencement of development the applicant shall submit full details of the Private Management Company for the written agreement of the Planning Authority. This shall include a detailed layout map of the development showing those areas to be Taken in Charge and those areas to be maintained by the Private Management Company. Membership of this Private Management Company shall be compulsory for all purchasers of property in the development. Confirmation that this Company has been set up shall be submitted to the Planning Authority prior to the occupation of the first residential unit. All roads, services and open spaces within the privately managed areas, irrespective of the management and maintenance regime to be put in place for these areas, shall be satisfactorily completed to the standard for development works as set out in the Council’s 'Development Works Guidance Document'. REASON: To provide for the satisfactory completion and maintenance of the development in the interest of residential amenity. 26. Construction work shall be restricted to between the hours of 0800hrs - 1900hrs Monday to Friday and 0800hrs - 1300hrs on Saturdays. No construction works to be carried out on Sundays and Public Holidays. The use of compressors/generators or any such equipment shall not be used outside the specified construction hours. Any deviation from this shall be agreed with the Planning Authority. REASON: To reduce the impact of noise emanating from the site in the interests of the amenities of the adjoining residences. 27. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €12,106.08, to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of Surface Water Public Infrastructure and Facilities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme ) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Public Infrastructure and Facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. Note on above Condition: Please note that with effect from 1st January, 2014 Irish Water are now the statutory body responsible for both water and waste water services. Accordingly, the contribution payable has been reduced by the amount of the contribution associated with these services. Further details/clarification can be obtained from Irish Water at Tel. 1 850 278 278. 28. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €277,238.40, to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 29. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €179,962.08, to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Community & Parks Public Infrastructure, Facilities and Amenities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks Public Infrastructure, Facilities and Amenities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 30. This development shall not be carried out without prior agreement, in writing, between the Applicant and the Planning Authority relating to the payment of development contributions. REASON: Investment by Dún Laoghaire-Rathdown County Council in Local Authority works has facilitated and will facilitate the proposed development. It is considered appropriate and reasonable that the developer should contribute to the cost of same. 31. That a financial contribution shall be paid by the proposer to the Council towards the cost of the extension of Luas Line B from the Sandyford Depot to Cherrywood, namely Luas Line B1. This contribution to be paid prior to the commencement of the development or in such other manner as may otherwise be agreed with the Planning Authority. The rate of contribution payable shall be that pertaining to the particular year in which implementation of the Planning Permission is commenced. The Supplementary Development Contribution Scheme provides for an annual increase in the levels of contribution payable, as outlined in the scheme, by a factor of 5% compound interest per annum. The levels of contribution will be reviewed annually on the 13th of January of each year during which the scheme is in force to take account of the aforementioned increase. The rate of contribution payable in respect of this development, at current contribution rates, is € 165,333.78, and is subject to increase as outlined above. It should be noted that contributions assessed in accordance with the Supplementary Development Contribution Scheme cannot be appealed to An Bord Pleanala unless the applicant considers the levy referred to in this condition has not been properly applied in accordance with the terms of the Scheme. REASONS FOR CONTRIBUTIONS: To part finance the extension of the Luas Line B1 from Sandyford Depot to Cherrywood, as provided for in the Supplementary Development Contribution Scheme adopted by the Council of Dunlaoghaire-Rathdown on the 13th of January, 2003. (incorporating amendments to Clause 13 as adopted by the County Council at it’s meeting on 13th May, 2013 – to be effective for all decisions from 14th May, 2013). 32. No development on foot of this permission shall commence until security for the provision and satisfactory completion of services (including roads, footpaths, open spaces, public lighting, sewers, watermains and drains) in accordance with the Plans and particulars lodged with the application, has been given by:- a) Lodgement with the Council of an approved Insurance Company Bond in the sum of € 244,300.00, which shall be kept in force by the Developer until such time as Roads, Open Spaces, Car Parks, Sewers, Watermains and Drains are completed to the satisfaction of the Council OR/... b) Lodgement with the Council of a Cash Sum of € 147,900.00, to be applied by the Council at its absolute discretion if such services are not duly provided to its satisfaction on the provision and completion of such services to standard specifications. REASON: To ensure that a ready sanction may be available to the Council to induce the provision of services and prevent disamenity in the development. NOTE 1: Where the applicant proposes to connect directly or indirectly to a public water/wastewater network operated by Irish Water, the applicant must sign a connection agreement with Irish Water prior to the commencement of the development and adhere to the standards and conditions set out in that agreement. NOTE 2: In the interests of Public Health and Environmental Sustainability, Irish Water Infrastructure capacity requirements and proposed connections to the Water and Waste Water Infrastructure will be subject to the constraints of the Irish Water Capital Investment Programme. NOTE 3: In advance of making the connections to the public foul/combined sewers, the applicant shall contact the Drainage Area Engineer of the County Council. NOTE 4: The attention of the applicant is drawn to Section 34(13) of the Planning and Development Act 2000, which relates as follows, 'A person shall not be entitled solely by reason of a permission under this section to carry out any development'. ## Nearby applications - [D26A/0430/WEB](https://cherrywoodplans.com/application/D26A-0430-WEB.md): Golf Lane, Carrickmines, Dublin. Refused or withdrawn (26 Jun 2026). Permission to keep a partly built block of 48 apartments, 4–5 storeys high, on Golf Lane, Carrickmines. - [D24A/0893/WEB](https://cherrywoodplans.com/application/D24A-0893-WEB.md): The Glen, Golf Lane, Glenamuck Road, Carrickmines, Dublin 18. Granted (8 Jan 2025). Amends a permitted apartment scheme at The Glen, Golf Lane, to move its ESB substation. - [D23A/0025](https://cherrywoodplans.com/application/D23A-0025.md): The Glen, Golf Lane, Glenamuck Road, Carrickmines, Dublin 18. Granted (9 Mar 2023). Permission to keep changes to and finish a 48-apartment block at The Glen, Golf Lane, which was moved on its site and built about 1m taller. - [D07A/1435](https://cherrywoodplans.com/application/D07A-1435.md): The Glen, Glenamuck Road, Carrickmines, Dublin 18. Granted (16 Jul 2008). 49 apartments in a five-to-five-and-a-half-storey block at The Glen, Glenamuck Road, replacing a house. - [D08A/0197](https://cherrywoodplans.com/application/D08A-0197.md): Benolagh and Blackberry Hill, Glenamuck Road, Carrickmines, Dublin 18. Granted (28 Jan 2009). Changes the house types in a permitted scheme at Benolagh and Blackberry Hill, Glenamuck Road, with larger homes. - [D06A/1266](https://cherrywoodplans.com/application/D06A-1266.md): Benolagh & Blackberry Hill, Glenamuck Road, Carrickmines, Carrickmines Great, Dublin 18, Dublin. Granted (22 Mar 2007). 58 three-storey houses replacing two homes at Benolagh and Blackberry Hill, Glenamuck Road. - [D06A/0210](https://cherrywoodplans.com/application/D06A-0210.md): Benolagh & Blackberry Hill, Glenamuck Road, Carrickmines, Dublin 18. Refused or withdrawn (7 Apr 2006). Demolishes two houses on Glenamuck Road and builds 59 three-storey houses. - [D15A/0530](https://cherrywoodplans.com/application/D15A-0530.md): Old Glenamuck Road (Golf Lane), Carrickmines, Dublin 18. Granted (17 Dec 2015). Builds a single-storey curved house with a green roof and a granny flat on Old Glenamuck Road. - [D08A/0590](https://cherrywoodplans.com/application/D08A-0590.md): Villa Nova & Arda Lodge, Glenamuck Road, Carrickmines. Granted (22 Dec 2008). Phase 2 at Villa Nova and Arda Lodge, Glenamuck Road: 90 homes in blocks of 6 to 8 storeys, a crèche and a health spa. - [D07A/1496](https://cherrywoodplans.com/application/D07A-1496.md): Villa Nova and Arda Lodge, Glenamuck Road, Carrickmines, Co. Dublin.. Refused or withdrawn (20 Dec 2007). Replaces two houses on Glenamuck Road with 109 apartments, a crèche, medical centre, shops and a gym in three blocks. - [D08A/0708](https://cherrywoodplans.com/application/D08A-0708.md): Knockree, Glenamuck Road, Carrickmines, Dublin 18. Granted (18 Dec 2008). 21 large 5-bedroom houses at Knockree, Glenamuck Road, replacing an existing house. - [D08A/0190](https://cherrywoodplans.com/application/D08A-0190.md): Knockcree, Glenamuck Road, Carrickmines, Dublin 18. Granted (14 Apr 2008). Revises a permitted apartment scheme at Knockcree, Glenamuck Road, from 64 to 77 apartments. - [D07A/0014](https://cherrywoodplans.com/application/D07A-0014.md): Knockree, Glenamuck Road, Carrickmines, Dublin 18. Granted (21 May 2007). 74 apartments in four blocks of five to five-and-a-half storeys at Knockree, Glenamuck Road, replacing a house. - [D20A/0152](https://cherrywoodplans.com/application/D20A-0152.md): Tintagel, Auburn, Keelogues, Villa Nova and Arda Lodge, Golf Lane, Glenamuck Road South, Carrickmines, Dublin 18. Granted (15 Jun 2020). Permission to keep the demolition of six detached houses on Golf Lane, Carrickmines. - [ABP30233618](https://cherrywoodplans.com/application/ABP30233618.md): Golf Lane, Glenamuck Road, Carrickmines, Dublin 18. Refused or withdrawn (18 Nov 2018). Builds 250 apartments in five blocks of up to six storeys off Golf Lane, Carrickmines, with a crèche. - [ABP30902620](https://cherrywoodplans.com/application/ABP30902620.md): c. 2.56 hectares at Golf Lane, Carrickmines, Dublin 18. Granted (20 Apr 2021). Builds 482 apartments in seven blocks up to 22 storeys at Golf Lane, Carrickmines, with a crèche, gym and shop. - [D06A/1157](https://cherrywoodplans.com/application/D06A-1157.md): Glenamuck Road, Carrickmines, Dublin 18. Granted (5 Mar 2007). 121 apartments in three blocks of 5–6 storeys and 4 detached houses on Glenamuck Road, Carrickmines, replacing four homes. - [D24A/0569/WEB](https://cherrywoodplans.com/application/D24A-0569-WEB.md): Greenan, Glenamuck Road South, Dublin 18, D18P3C2. Refused or withdrawn (16 Jan 2025). Replaces a vacant house at Greenan, Glenamuck Road South, with a 26-apartment block of up to 5 storeys. - [D25A/0449/WEB](https://cherrywoodplans.com/application/D25A-0449-WEB.md): A c.0223 Ha site comprising the property known as 'Greenan', Golf Lane, Carrickmines, Dublin 18, D18 P3C2. Granted (30 Jul 2025). 26 apartments in a 3–5 storey block replacing a vacant house at Greenan, Golf Lane, Carrickmines. - [D11A/0197](https://cherrywoodplans.com/application/D11A-0197.md): Waterville, Glenamuck Road, Carrickmines, Dublin 18. Refused or withdrawn (7 Jun 2011). 19 apartments in two 5-storey blocks replacing a bungalow at Waterville, Glenamuck Road. - [D18A/0579](https://cherrywoodplans.com/application/D18A-0579.md): Waterville, Old Glenamuck Road/Golf Road, Carrickmines, Dublin 18. Refused or withdrawn (10 Aug 2018). Replaces a house at Waterville, Carrickmines, with 5 three-storey houses and a 12-apartment block. - [D21A/0269](https://cherrywoodplans.com/application/D21A-0269.md): 0.4167 Ha site at Waterville, Old Glenamuck/Golf Lane, Carrickmines, Dublin 18 and, adjacent lands to the west bounded by Old Glenamuck/Golf Lane, and Glenamuck Road, Carrickmines, Dublin 18. Refused or withdrawn (26 May 2021). 72 apartments in a 6 to 8 storey block replacing a house at Waterville, Golf Lane, Carrickmines. - [D04A/0327](https://cherrywoodplans.com/application/D04A-0327.md): Site on Glenamuck Road, Carrickmines Great, Dublin 18.. Granted (23 Sep 2004). 227 homes, a crèche and a shop on Glenamuck Road, Carrickmines Great. - [D05A/1501](https://cherrywoodplans.com/application/D05A-1501.md): Carrickmines Great, Glenamuck Road,Carrickmines,Co.Dublin.. Granted (26 Jan 2006). Alters the Carrickmines–Deansgrange 110 kV power line at Glenamuck Road so about 1.8 km of it can be put underground. - [D08A/0454](https://cherrywoodplans.com/application/D08A-0454.md): Glenamuck Road, Carrickmines, Dublin 18. Granted (1 Oct 2008). Changes the access to the permitted Carrickmines Green housing with a new T-junction onto Glenamuck Road. - [D07A/1546](https://cherrywoodplans.com/application/D07A-1546.md): Carrickmines Green, Glenamuck Road, Kilternan, Co. Dublin. Refused or withdrawn (25 Jan 2008). Proposes an alternative road access for the permitted Carrickmines Green housing development off Glenamuck Road. - [DZ19A/0683](https://cherrywoodplans.com/application/DZ19A-0683.md): Off Glenamuck Road, adjacent to Carrickmines roundabout, and the Carrickmines M50 interchange, Dublin. Granted (8 Nov 2019). Allows the existing 350-space Carrickmines Luas park and ride to continue for 3 more years. - [DZ16A/0585](https://cherrywoodplans.com/application/DZ16A-0585.md): Off Glenamuck Road, adjacent the Carrickmines roundabout and M50 interchange Carrickmines Dublin. Granted (26 Sep 2016). Keeping the 350-space Carrickmines park and ride for another 3 years. - [D10A/0164](https://cherrywoodplans.com/application/D10A-0164.md): Carrickmines(Priorsland), East Of Glenamuck Road, North Of M50, & South Of Luas Line B1 (Currently under construction). Granted (23 Sep 2010). A temporary 350-space park and ride beside Carrickmines roundabout to serve the Luas extension to Cherrywood. - [DZ17A/0114](https://cherrywoodplans.com/application/DZ17A-0114.md): Lands at Priorsland, Glenamuck Road North, Carrickmines, Dublin 18. Granted (8 Feb 2018). A permanent 350-space multi-storey park and ride beside Carrickmines roundabout, replacing the temporary one. ## Links - [This page on CherrywoodPlans](https://cherrywoodplans.com/application/D18A-1175) - [Council record, documents and conditions (DLR planning portal)](https://planning.agileapplications.ie/dunlaoghaire/application-details/81228) - [All Cherrywood applications](https://cherrywoodplans.com/applications.md) _Source: Dún Laoghaire–Rathdown County Council planning data, refreshed daily. CherrywoodPlans is an independent site, not run by the council._