# Planning application DZ16A/0570 > Lands (c.19.1 ha) in the townlands of Ticknick, Co Dublin and Laughanstown, Dublin 18, Cherrywood, Dún Laoghaire–Rathdown. Granted (3 Nov 2016). - **Reference:** DZ16A/0570 - **Address:** Lands (c.19.1 ha) in the townlands of Ticknick, Co Dublin and Laughanstown, Dublin 18 - **Status:** Granted (3 Nov 2016) - **Decision:** GRANT PERMISSION - **Application type:** Permission (SDZ) - **Applicant:** Hines Cherrywood Development Fund ICAV - **Lodged:** 7 Oct 2016 - **Decided:** 3 Nov 2016 - **Location (lat, lng):** 53.237472, -6.164202 ## Proposal The construction of a Public Park known as Ticknick Park, consisting of: earthworks/reshaping of existing lands to provide areas of passive and active open space (Class 1 Amenity open space) with hard and soft landscaping, pavilion building, pedestrian paths (including stepped ramps), cycleways, access route, parking, boundary treatments and all associated site and development works all on a site extending to c.19.1 ha. The site is mostly within the Cherrywood Planning Scheme boundary (Development Area 2, Cherrywood), with c.2.3 ha outside the Planning Scheme boundary. The key elements of the Ticknick Park proposals include the following: A. Areas of passive and active amenity open space (Class 1) to include 4 no. grassed playing pitches (with ball stop netting), pedestrian paths and cycle ways. B. Greenway pedestrian route (stepped and ramped) from M50 over-bridge to access Ticknick Park pitches. C. Green access route (c.605 metres) from the existing Lehanunstown Lane/M50 vehicular over-bridge to Ticknick Park pitches. Part of this access route (c. 283 metres) is outside the Planning Scheme boundary. D. Pavilion building (c.1,367 sqm gfa) with changing room facilities, toilets and associated ancillary requirements (ie sports hall, multi-purpose room) associated car park (with coach and motorcycle bays) and cycle parking stands. Provision for overflow parking is included. E. Park seating, signage (information and directional), wildflower/meadow areas, woodland spaces/copses, tree and hedgerow planting, boundary treatments. F. All associated site and development works, including surface water drainage proposals, on-site waste water treatment system, utility and telecoms ducts (including ducts for the future undergrounding of overhead power lines), etc. The key elements of the proposed development outside the Cherrywood Planning Scheme boundary relate to c. 283 metres of the green access route (noted above), landscaping and associated site and development works. Total area outside the Planning Scheme boundary is c. 2.3 ha. ## In plain English Creates Ticknick Park, a 19-hectare public park with four playing pitches and a pavilion. - **19.1** hectares - **4** playing pitches - **1,367** sq.m pavilion - **605** metre access route ### What's planned A new public park on about **19.1** hectares, mostly within the Cherrywood scheme. ### Community **4** grass playing pitches with ball-stop netting, paths and cycleways. A **1,367** sq.m pavilion with changing rooms, toilets, a sports hall and multi-purpose room. ### Transport A **605** m access route and a stepped and ramped greenway from the Lehaunstown Lane/M50 bridge. A car park with coach and motorcycle bays, overflow parking and cycle stands. ### Environment Wildflower meadows, woodland, tree and hedgerow planting, drainage and ducts for future undergrounding of overhead power lines. _This summary was written by AI from the proposal text. Check the council record before relying on it._ ## Conditions ### Condition 1 The development to be carried out in its entirety in accordance with the plans, particulars and specifications lodged with the application, as amended by Further Information received on the 7th of October, 2016, save as may be required by the other conditions attached hereto. REASON: To ensure that the development shall be in accordance with the permission and that effective control be maintained. ### Condition 2 The proposed on site waste water treatment system shall be designed and constructed in accordance with the plans, particulars and specifications lodged with the application and by means of Further Information. REASON: In the interest of public health and the proper planning and sustainable development of the area. ### Condition 3 No discharge from the proposed on site waste water treatment system to the Loughlinstown River shall be permitted until the applicant or end user has demonstrated in writing, to the satisfaction of the Planning Authority, that the required effluent discharge targets have been complied with. REASON: In the interest of public health and the proper planning and sustainable development of the area. ### Condition 4 Upon commencement of operation, the applicant/end user shall submit, for the written agreement of the Planning Authority, the results of effluent sampling for Suspended Solids (mg/l), BOD (mg/l), Ammonia (NH3 as N) (mg/l) and Orthophosphate as P (mg/l) every two weeks and continue at this frequency thereafter unless otherwise agreed with the Planning Authority. REASON: In the interest of public health and the proper planning and sustainable development of the area. ### Condition 5 Prior to commencement of development or as otherwise agreed, the developer shall consult and agree in writing with Irish Water and subsequently agree in writing with the Planning Authority on works in the vicinity of the existing 33 inch watermain traversing the site. REASON: To ensure compliance with Irish Water requirements and specification and consistency with the Planning Scheme. ### Condition 6 The developer shall undertake the following with regard to the surface water drainage: a) Prior to commencement of development or as otherwise agreed with the Planning Authority: i. The design and the construction detail for all infiltration and detention features shall be confirmed and agreed in writing with the Planning Authority; ii. The detailed design and construction details of the surface water management system and attenuation storage design shall consider any necessary adaptation required to facilitate the possible extension of the park; iii. The full road drainage details shall be submitted and agreed in writing with the Planning Authority b) Prior to the opening of the park the construction of the relevant infiltration/detention basins and associated storm infrastructure shall be completed. c) The minimum size storm sewer shall be a minimum of 225mm in diameter. d) Prior to commencement of development or as otherwise agreed with the Planning Authority, an operations and management plan for the proposed sustainable urban drainage components (inclusive of the attenuation ponds and basins) shall be agreed in writing with the Planning Authority. REASON: In the interest of orderly and sustainable development, proper management of flood risk and master planning. To ensure all roads are fully drained to the requirements of the Planning Authority. In the interest of orderly development, to prevent blockages, to ensure long term optimum operation of the surface water management system. ### Condition 7 A Signage Strategy for the Park– directional and wayfinding, which also considers any future directional/wayfinding signage required throughout Cherrywood, shall be submitted and agreed in writing with the Planning Authority prior to the operation of the development. REASON: In order to comply with the Cherrywood Planning Scheme and in the interests of visual amenity. ### Condition 8 Prior to the operation of the car park serving Ticknick Park, planning permission for a vehicular access shall be secured and implemented. REASON: To ensure the provision of a vehicular access route that is consistent with Objectives PI 21 and GI28 of the Planning Scheme. ### Condition 9 Prior to the operation of the car park serving Ticknick Park, the developer shall submit a Travel Plan for the written agreement of the Planning Authority, in accordance with the guidance and requirements of the Cherrywood Area Wide Travel Plan. REASON: To ensure that the proposed development is consistent with PI 24 of the Planning Scheme. ### Condition 10 The height of the lighting columns for the car park shall be a minimum height of 6 metres. Prior to the commencement of development, a layout drawing for public lighting and location of public lighting mini pillars shall be submitted for the written agreement of the Planning Authority. REASON. In the interest of the proper planning and sustainable development of the area. ### Condition 11 The location of charge points for electric vehicles shall be in accordance with the requirements of the Planning Authority. REASON: To ensure that designs shall be consistent with the Planning Scheme and in the interests of the proper planning and sustainable development of the area. ### Condition 12 Detailed design of the electricity supply network shall be agreed in writing with ESB Networks/ESBI. Written evidence of this agreement shall be provided to the Planning Authority prior to commencement of development. REASON: In the interest of orderly development, to ensure that design shall meet with the current and future requirements of ESB Networks/ESBI and in the interest of the proper planning and sustainable development of the area. ### Condition 13 Detailed design of the gas network shall be agreed in writing with Gas Networks Ireland. Written evidence of this agreement shall be provided to the Planning Authority prior to commencement of development. REASON: In the interest of orderly development, to ensure that design shall meet with the current and future requirements of Gas Networks Ireland and in the interest of the proper planning and sustainable development of the area. ### Condition 14 Detailed design of the telecoms network shall be agreed in writing with the telecoms providers. Written evidence of these agreements shall be provided to the Planning Authority prior to commencement of development. REASON: In the interests of orderly development, to ensure that designs shall meet with the current and future requirements of the telecoms providers, to ensure consistency with Objective PI 26 of the Planning Scheme and in the interest of the proper planning and sustainable development of the area. ### Condition 15 Detailed design of the fibre network shall be agreed in writing with the Planning Authority. REASON: In the interests of orderly development, to ensure that designs shall meet with the current and future requirements of the Planning Authority and in the interest of the proper planning and sustainable development of the area. ### Condition 16 The following shall be submitted and agreed in writing with the Planning Authority prior to commencement of development or as otherwise agreed. a) Detailed design including samples and specifications of the hard and soft landscape areas including all sports facilities. b) Samples are to be provided in advance for approval by the Planning Authority and approved control samples are to be held on site at all times. Hard landscape materials shall be high quality and include a percentage of natural stone. c) Exact detail, mixes and locations of soft landscaping. d) The steep slopes formed around the playing pitches shall be planted with a woodland mix and understory and in certain instances extend beyond the areas of the slope for ease of maintenance. Any understory or ground cover mixes shall not include gorse species. e) The exact locations of the meadow and amenity grass areas shall be agreed with the Planning Authority prior to commencement of any permitted development or as otherwise agreed. f) All steel is to be galvanised and powder coated (may include some stainless steel finishes) including lighting, fencing, street furniture, etc to an agreed ral colour. No galvanized finish will be accepted. g) Exact locations and details for any Wifi hotspots, CCTV and security system within the site areas. h) All public lighting should be LED lighting and ducted with suitable access chambers for future maintenance. i) Additional spare duct routes and quantities for future development. j) All street furniture. REASON: To ensure that designs, materials and specifications shall be in accordance with the Cherrywood Planning Scheme and to meet with the requirements of the Local Authority. ### Condition 17 Prior to the commencement of development, the following shall be submitted and agreed in writing with the Planning Authority: a) A Landscape Plan indicating new Hedgerow along the ‘Green Access Route’ as identified within the Ecological Impact Assessment – BP01 & BP 12. REASON: To ensure that proposals comply with the objective of the Biodiversity Plan which forms part of the Planning Scheme and meet with the requirements of the Planning Authority. ### Condition 18 Exact details of the grass pitches including but not limited to the pitch build-up and drainage system shall be agreed with the Planning Authority prior to commencement of any permitted development or as otherwise agreed. Ballstop netting shall be minimum 35 metres long and 13.5 metres high with a curtain type system for the bottom 2.5 metres. The post and rail fence shall include a suitable mesh wire type system. REASON: To ensure that designs, materials and specifications shall meet with the requirements of the Planning Authority and in the interests of proper planning and sustainable development. ### Condition 19 Detail design, schedules, samples and specifications of all elements of the sports building shall be agreed in writing with the Planning Authority prior to commencement of any permitted development or as otherwise agreed. The glazing elements shall be further reviewed for potential vandalism and suitable protection put in place as required - electronic roller shutter or equivalent type system. The storage area should be accessible by an electronically controlled roller shutter wide enough to fit a small tractor and other maintenance/storage equipment. REASON: To ensure that designs, materials and specifications shall meet with the requirements of the Planning Authority and in the interests of proper planning and sustainable development. ### Condition 20 Prior to the commencement of development, the developer shall engage the services of a qualified ecologist as an ecological consultant, from the commencement of construction to 5-year post-completion. a) The applicant shall inform the Planning Authority in writing of the appointment and name of the consultant, prior to commencement of development. b) The consultant shall ensure the implementation of the all of the recommendations in the submitted Ecological Impact Assessment. c) Monitoring of CEMP – A monitoring programme shall be provided and implemented by the qualified ecologist to ensure that the mitigation measures are implemented and success of these will be reported to the planning authority. d) The programme of monitoring shall be agreed with the planning authority prior to commencement of construction. REASON: In the interests of proper planning and sustainable development. ### Condition 21 Prior to the commencement of development, the developer shall engage the services of a qualified arborist as an arboricultural consultant, for the entire period of construction activity. a) The applicant shall inform the Planning Authority in writing of the appointment and name of the consultant, prior to commencement of development. b) The consultant shall visit the site on a monthly basis, to ensure the implementation of the all of the recommendations in the submitted application. c) The arborist shall carry out a post-construction assessment on the condition of the hedges and trees to be retained on site, and submit a report of that assessment to The Planning Authority for written agreement upon completion of the permitted development. A completion certificate is to be signed off by the arborist when all permitted development works are completed and in line with the recommendations of the tree report. The certificate shall be submitted the Planning Authority for written agreement upon completion of the works. d) The hedges and trees to be retained shall be protected during the course of construction by a temporary fence, in accordance with the default specification of barrier fencing shown in BS 5837: 2012 Trees in relation to design, demolition and construction – recommendations (in Figs 2, 3), or a 1.5 metre high robust timber post and rail fence or similar approved and agreed with the Planning Authority prior to the commencement of development. The fence shall be installed along the outside of the hedges on either side, so that vulnerable Root Protection Zone, as determined by the qualified arborist, is protected. Notices are to be placed on all protective fences stating that the trees within the fence are protected. e) To ensure the protection of trees to be retained within the site, the applicant shall implement all the recommendations pertaining to tree retention, tree protection and tree works, as detailed in the Arboricultural Method Statement and Tree Protection Plan in the submitted tree report. All tree felling, surgery and remedial works shall be completed upon completion of the works. All works on retained trees shall comply with proper arboricultural techniques conforming to BS 3998: 2010 Tree Work – Recommendations. The clearance of any vegetation including trees and scrub should be carried out outside the bird-breeding season (1 March – 31 August inclusive) or as stipulated under the Wildlife Acts, 1976 and 2000. REASON: To ensure the protection and long-term viability of trees to be retained on the site and in the interest of protecting the visual character and quality of the site and of local wildlife. To ensure and give practical effect to the retention, protection and sustainability of trees during and after construction of the permitted development. ### Condition 22 Prior to the commencement of any permitted development or any related construction activity or tree felling on the site, the applicant shall lodge a Tree and Hedgerow Bond to the value of €150,000.00 with the Planning Authority. This is to ensure the protection of trees on and immediately adjacent to the site to make good any damage caused during the construction period. a) The bond lodgement shall be coupled with an Arboricultural Agreement, with the developer, empowering the planning authority to apply such security, or part thereof, to the satisfactory protection of any tree/hedgerow or trees/hedgerows on or immediately adjoining the site, or the appropriate and reasonable replacement of any such trees/hedgerows which die, are removed or become seriously damaged or diseased within a period of three years from the substantial completion of the development. Any replacement planting shall use large semi-mature tree size(s) and species or similar as may be stipulated by the planning authority. b) An Arboricultural Assessment Report and Certificate is to be signed off by a qualified Arborist after the period of 3 years of completion of the works. Any remedial tree surgery, tree felling works recommended in that Report and Certificate shall be undertaken by the developer, under the supervision of the Arborist. The bond will only be refunded upon receipt by the Planning Authority of a satisfactory post-construction arboricultural assessment, carried out by a qualified arborist and provided that the hedges/trees proposed for retention are alive, in good condition with a useful life expectancy. REASON: to ensure the protection, safety, prudent retention and long-term viability of trees to be retained on and immediately adjacent to the site. ### Condition 23 Prior to Taking in Charge, the applicant shall submit for the written agreement of the Planning Authority, a Hedgerow Maintenance Plan in accordance with DLR Co. Co. Biodiversity Policy. REASON: To ensure that green infrastructure is consistent with the provisions of the current County Council’s Parks Biodiversity Policy, to be in accordance with the Planning Scheme and to meet with the requirements of the Local Authority. ### Condition 24 The applicant shall confirm the following in writing with the Planning Authority: . a) Upon completion of the works, the Landscape Architect (or qualified Landscape Designer) as a Landscape Consultant, shall provide a Certificate/Letter stating that all landscape works are fully completed and compliant with the requirements of the Planning Authority. b) All of the Planning Authority’s policies and procedures must be adhered to in relation to the Taking in Charge process. c) A Safety File including all Operations & Maintenance Manuals and ‘As Built’ drawings shall be provided upon Taking in Charge. The park shall be completed in its entirety prior to it being open to the public or for any other use or as agreed with the Planning Authority. REASON: To ensure that designs, materials and specifications shall meet with the requirements of the Planning Authority and in the interests of proper planning and sustainable development. ### Condition 28 The following shall be submitted and agreed in writing with the Planning Authority prior to commencement of development or as otherwise agreed with the Planning Authority. a) A more detailed Habitat Management Plan which shall be designed and submitted with appropriate consideration of the site specific ecology. This shall be completed in consultation with the Ecologist who will liaise with the landscape architect and the hydrogeologist to devise an appropriate plan for the site and its most sensitive ecological features. REASON: To protect and enhance the overall biodiversity of the area. ### Condition 29 The Applicant shall comply with the recommendations of the submitted Outline Construction Environmental Management Plan by Arup including preparation of a Community Liaison Plan. REASON: In the interest of the proper planning and sustainable development of the area and to protect the amenity of the area. ### Condition 30 The developer shall prevent any mud, dirt, debris or building material being carried onto or placed on the public road or adjoining property(s) as a result of the site construction works and repair any damage to the public road arising from carrying out the works. REASON: In the interests of traffic safety and residential amenity. ### Condition 31 The following shall be submitted and agreed in writing with the Planning Authority prior to commencement of development or as otherwise agreed with the Planning Authority. a) A detailed Site Specific CEMP (Construction Environmental Management Plan) shall be submitted prior to commencement of construction and will include the following additional measures: i. Measures shall be described for minimising the impacts on breeding birds including riparian breeding birds from noise, dust, human and machinery movement. ii. The riparian area should be fenced off from the proposed works to delineate the proposed 10m buffer area and access to the river should only be permitted during installation of the outfall. iii. Works on the outfall shall follow the Guidelines on the Protection of Fisheries during Construction Works in and adjacent to Waters (IFI, 2016) along with the mitigation outlined in the EcIA. A fisheries Protection / Construction Method Statement shall be prepared in consultation with the IFI. iv. For construction of the overflow carpark and associated bund, a Fisheries Protection / Construction Method Statement shall be prepared in consultation with the IFI. v. CEMP shall include a CEMP drawing for the construction site to show where runoff goes to and how it is controlled along with location of silt traps, petrol interceptors, site compound, storage areas etc. and how the surface water, groundwater, tufa springs, tall herb swamp and river will be protected from site runoff/accidental spillages and other disturbances. vi. The site compounds and storage areas shall be located as far from the river as possible and the location shall be shown on the CEMP drawing. REASON: To protect the overall biodiversity of the area. ### Condition 32 Prior to commencement of development, the applicant shall submit for the written agreement of the Planning Authority a management programme specific to the control of identified invasive species on site. REASON: To ensure the effective management of Invasive Species. ### Condition 33 Access across the existing Lehaunstown Lane M50 Overbridge to the Park and to the proposed ‘Green Access Route’ to the Park shall be restricted to pedestrian and cycle use only with the exception of limited access for maintenance and emergency. Prior to the commencement of development or as otherwise agreed with the Planning Authority the proposed removable bollards shall be erected, on the north side of the existing M50 bridge, in accordance with the details on drawings numbered 1647-TK_PL_P_02.01_IFP and 1647-TK_PL_P_04_IFP. REASON: To consistency with the specific objectives GI 38 and PI 13 and of the Planning Scheme. ### Condition 34 The proposed development shall be undertaken in accordance with the Section 6.2 Mitigation IAC Archaeological Assessment Report (dated 5th July, 2016) a) With regard to the preservation in situ of the bivallate enclosure with satellite enclosure (AA3),a Conservation Plan for the future preservation of these sites shall be submitted for the written agreement of the Planning Authority and to the Department of Housing, Planning, Community and Local Government, in advance of the commencement of any construction works. b) The conservation plan shall address the future preservation and conservation of the enclosures during the lifespan of the development. REASON: To ensure consistency with the Cherrywood Planning Scheme. ### Condition 35 The normal working hours within the site shall be Monday to Friday between 08:00 and 19:00hours and Saturday between 08:00 and 14:00 hours with no working on public holidays. The contractor will not be permitted to start work each day before 08:00 hours. REASON: To mitigate against adverse impacts on the residents in the Cherrywood area. ### Condition 37 Prior to commencement of development, the applicant shall submit for the written agreement of the Planning Authority, all drawings in digital format (CAD/GIS) projected to ITM (Irish Transverse Mercator). REASON: To ensure consistency with the Cherrywood Planning Scheme. ### Condition 38 Adequate pest control measures shall be in place at all times to prevent and control possible rodent activity during and after construction works. REASON: In the interest of public health. ### Condition 39 The glazing to the changing rooms and toilets in the sports pavilion shall be manufactured opaque or frosted glass and shall be permanently maintained. The application of film to the surface of clear glass is not acceptable. REASON: In the interests of the amenity of the users of the sports pavilion. ### Condition 40 The developer shall comply with the following during the construction phase: a) No outdoor burning shall occur on site. The site must be secured to prevent access by third parties. b) All necessary steps shall be taken to contain dust and airborne pollutants arising from the site. This shall include covering skips, covering slack heaps, netting of scaffolding, use of water spray to suppress dust, proper paved or hard standing access for trucks and vehicles to and from the site to prevent dirt and dust from the site being carried from the site onto public roads, etc. c) Use of rubble chutes and receptor skips during construction activities. d) During dry periods dust emissions from heavily trafficked locations (on and off site) shall be controlled by spraying surfaces with water and wetting agents. e) Overloading of any tipper trucks exiting the site shall not be permitted. f) Any aggregates transported to and from the site shall be covered out in covered trucks. g) Material stockpiles containing fine or dusty elements shall be covered with tarpaulins. h) Wind break/barriers shall be erected when there are any activities involving drilling or pavement cutting, grinding, stone finishing operations, etc. taking place. i) Dust control measures should be active on equipment used for drilling or pavement cutting, grinding of block surfaces or similar types of stone finishing. j) All site vehicles and machinery shall be switched off when not in use. k) A temporary wheel wash facility shall be installed close to the location of the site entrance. l) Any spillage of material from vehicles departing from the site shall be promptly removed. m) A programme of dust monitoring shall be carried out at locations adjacent to the site boundaries and shall be made available to the Planning Authority on request. The amount of dust deposited anywhere outside the site, when averaged over a thirty day period, should not exceed 130mg/m2 per day when measured according to the BS method which takes account of insoluble components only or 350mg/m2 per day when measured according to TA Luft, which includes both. n) The Applicant shall maintain all footpaths and roads affected by the development works in a safe and tidy condition, at the developer's expense and to the satisfaction of the Area Engineer. REASON: In the interests of the amenity of the area and the proper planning and sustainable development of the area. ### Condition 41 Construction works shall be carried out in accordance with the, 'Guidelines of the Air Pollution and Noise Control Unit regarding construction and demolition sites' while building work is in progress. The guidelines are made based on the requirements of the Air Pollution Act, 1987 and the Environmental Protection Agency Act, 1992 (Noise) Regulations, 1994. Contact should be made with the Air Quality and Noise Environmental Health Office with regard to Air and Noise Control Legislation. Contact 01 8905982. REASON: In the interest of public health. ### Condition 42 No development on foot of this permission shall commence until security for the provision and satisfactory completion of the proposed development of the park in accordance with the Plans and particulars lodged with the application and to Local Authority Standards, has been given by:- a) Lodgement with the Council of an approved Insurance Company Bond in the sum of €4,931,161.00 excluding VAT which shall be kept in force by the Developer until such time as the permitted development works are completed to the satisfaction of the Council OR/... b) Lodgement with the Council of a Cash Sum of €4,931,161.00 excluding VAT to be applied by the Council at its absolute discretion if the permitted works are not completed to its satisfaction. REASON: To ensure that a ready sanction may be available to the Council to induce the provision of services and prevent dis-amenity in the development. ### Condition 25 Prior to the commencement of development, a schedule for the completion and Taking in Charge of the proposed development shall be agreed in writing with the Planning Authority. REASON: To ensure consistency with the Cherrywood Planning Scheme and in the interest of the proper planning and sustainable development of the area. ### Condition 26 Within 12 months of the completion and opening of the park, and at the discretion of the Planning Authority, the applicant shall undertake all remediation works required to bring the park up to the Taking in Charge standards and hand over the park to the Local Authority. Upon the completion of the park, the park shall immediately be made available for public use. REASON: To ensure that designs, materials and specifications shall meet with the requirements of the Planning Authority and in the interests of proper planning and sustainable development. ### Condition 27 The Pavilion Building shall only be used for activities associated with the use of the park. REASON: To ensure that the proposed development is consistent with Specific Objective GI 28 of the Planning Scheme. ### Condition 36 A mechanism and structure for reporting on progress and quality control in relation to construction standards, materials, as-built drawings and records shall be agreed in writing with the Planning Authority prior to commencement of any construction works REASON: To ensure that development meets with the standards and quality required by the DLRCC Development Works Guidance Document. ## Nearby applications - [DZ19A/0874](https://cherrywoodplans.com/application/DZ19A-0874.md): Tiknick, Co. Dublin, and Laughanstown, Dublin 18. Granted (14 Jan 2020). Shrinks the planned Ticknick Park pavilion to a small changing building and adds a temporary car park for about 75 cars. - [DZ20A/0478](https://cherrywoodplans.com/application/DZ20A-0478.md): Laughanstown and Cherrywood, Dublin 18. Granted (30 Nov 2020). A temporary car park for about 75 cars and 3 coaches to serve Ticknick Park, for up to 3 years. - [DZ19A/0765](https://cherrywoodplans.com/application/DZ19A-0765.md): Tiknick, Co. Dublin, and Laughanstown, Dublin 18. Refused or withdrawn (5 Dec 2019). Extends Ticknick Park by about 42 hectares, creating a 61.5-hectare public park with trails, meadows and woodland. - [D15A/0770](https://cherrywoodplans.com/application/D15A-0770.md): Grove Dale House, Ballycorus Road, Kilternan, Co. Dublin. Granted (5 Apr 2016). Replacing and relocating the septic tank at Grove Dale House, Ballycorus Road. - [REF14526](https://cherrywoodplans.com/application/REF14526.md): Carrickmines Equestrian Centre, Springfield Lane, Carrickmines, Dublin 18, D18R922. Refused or withdrawn (12 Oct 2026). Bringing in clean soil to level a field at Carrickmines Equestrian Centre. ## Links - [This page on CherrywoodPlans](https://cherrywoodplans.com/application/DZ16A-0570) - [Council record, documents and conditions (DLR planning portal)](https://planning.agileapplications.ie/dunlaoghaire/application-details/72075) - [All Cherrywood applications](https://cherrywoodplans.com/applications.md) _Source: Dún Laoghaire–Rathdown County Council planning data, refreshed daily. CherrywoodPlans is an independent site, not run by the council._