# Planning application DZ17A/0122 > Lands (c.1.6284 ha) at Cherrywood Business Park (lands including former Block F), Cherrywood, Co Dublin (also Dublin 18), Cherrywood, Dún Laoghaire–Rathdown. Granted (7 Feb 2018). - **Reference:** DZ17A/0122 - **Address:** Lands (c.1.6284 ha) at Cherrywood Business Park (lands including former Block F), Cherrywood, Co Dublin (also Dublin 18) - **Status:** Granted (7 Feb 2018) - **Decision:** GRANT PERMISSION - **Application type:** Permission (SDZ) - **Applicant:** Hines Cherrywood Development Fund ICAV - **Lodged:** 11 Jan 2018 - **Decided:** 7 Feb 2018 - **Location (lat, lng):** 53.242621, -6.138894 ## Proposal Part of the permitted basement (which included a total of 518 parking spaces) permitted under Reg. Ref. D08A/0035. The proposed development, which is the subject of this planning application, will consist of/consists of: Existing Development (approved Block F): Retention permission is sought for the as-built basement and access ramp arrangement. The configuration of the as-built basement/access ramp are not strictly in accordance with the layout permitted under Reg. Ref. D08A/0035. Therefore, in the interests of clarity, this application seeks Retention permission for the minor revisions to the layout of the basement/access ramp in addition to the Planning Permission sought for the new office floor space. It is proposed that the as-built access ramp from the existing roundabout on Cherrywood Avenue will be used as an interim solution pending the delivery of an extended basement and revised access arrangements as part of a future planning application for the eastern part of the site: Proposed Block F1: 5 storey block for office use including all associated ancillary accommodation (6,244 sqm gross floor area) with a maximum height of 195m: Proposed Block F2: 5 storey block for office use including all associated ancillary accommodation (7,423 sqm gross floor area) with a maximum height of 19.5m: Reconfiguration of the existing 3 level basement to correspond with buildings F1 and F2 over. The basement area proposed in this application will include car parking (339 spaces), motorcycle parking spaces (14 spaces), cycle parking (84 spaces). Accommodation at basement levels includes ancillary accommodation, plant, storage and staff facilities totalling 592 sqm. Permission is also sought for all associated site and development works, including associated hard and soft landscaping works, screened roof plant area, external roof terraces, public lighting, electricity substation (50.4 sqm), fire escapes from basement office buildings, cycle parking (56 spaces), set down/parking on Cherrywood Avenue (6 spaces and loading bay). The total gross floor area proposed is 14,309.40 sqm gross floor area. ## In plain English Builds two five-storey office blocks, F1 and F2, over an existing basement car park at Cherrywood Business Park. - **14,309.40** sq.m floor area - **5** storeys - **339** car spaces - **140** cycle spaces - **1.6284** hectares ### What's planned Two new office blocks on the former Block F site, plus retention (permission after the fact) of the as-built basement and ramp. ### Commercial Block F1 is **6,244** sq.m and Block F2 **7,423** sq.m, both **5** storeys and up to **19.5** m tall. Total floor area is **14,309.40** sq.m. ### Transport The **3**-level basement holds **339** car, **14** motorcycle and **84** cycle spaces, plus **56** cycle spaces outside. The existing ramp off Cherrywood Avenue is used for now; **6** set-down spaces and a loading bay on Cherrywood Avenue. ### Environment Landscaping, roof terraces and screened roof plant. _This summary was written by AI from the proposal text. Check the council record before relying on it._ ## Conditions ### Condition 1 1. The development shall be carried out in its entirety in accordance with the plans, particulars and specifications lodged with the application, as amended by Further Information received on the 11/01/2018, save as may be required by the other conditions attached hereto. Reason: To ensure that the development shall be in accordance with the permission and that effective control be maintained. 2. Any future site development of the remainder of this HIE plot (to the south-east of Block F2 and adjacent to Block G) at the southern end of Cherrywood Avenue, shall ensure the view along Cherrywood Avenue north-south is adequately and appropriately exploited in its design to accentuate the view. Reason: To ensure consistency with Section 2.8 of the Planning Scheme. 3. That the ramped access to the basement car park of Blocks F1 and F2 shown on HJL Drawing PLP0010RevC shall be a temporary interim arrangement until such time as Block F3 is completed. In this regard the design for Block F3 shall include a permanent access to the Block G and G2 basement car park in accordance with Reg Ref: D08A/0035 and DZ16A/0124. Any such proposals shall not affect the future delivery of the LUAS. Reason: For clarity, in the interests of orderly development and proper planning and the sustainable development of the area, to ensure the implementation of the Travel Plan for the development and for consistency with specific objective PI 14, GI 22, DA 36, PI 20, PI 21 and PI 24 of the Cherrywood Planning Scheme. 4. Details of all external finishes, including the proposed glazing for both the buildings and the glazed stairs, shall be submitted for the written agreement of the Planning Authority prior to commencement of development on site. The cladding for the stairwells shall be of a similar high quality finish to that of the overall building. Reason: In the interest of visual amenity. 5. Revised details of the new path linking the development to the linear park greenway that will accommodate access for mobility impaired/disabled persons, shown on drawings 1682_PL_P_01-RevC and PLP0010-RevC, shall be submitted for the written agreement of the Planning Authority, prior to the commencement of the development. Gradients exceeding desirable 5% (1:20) should not be steeper than max DMURS recommendation of 8.3% (1:12) over short distances with suitable mitigation measures. Reason: In the interest of proper planning and universal access. 6. The developer shall comply with the following: - a) The detailed design drawings for the road infrastructure shown on drawing 251932-PL001-PL3 shall be submitted for agreement, in writing, to the Planning Authority prior to the commencement of the construction works and shall subsequently be completed in accordance with the final agreed detailed design, to a standard to be taken in charge, prior to the occupation of any new development proposed by this application. b) A Quality Audit including a Road Safety Audit shall be carried out at Stage 2 for the detailed design stage and at Stage 3 for the post construction / prior to opening stage. All audits shall be carried out at the developer's expense in accordance with the Design Manual for Urban Roads & Streets (DMURS) guidance and TII (Transport Infrastructure Ireland) standards. The independent audit team(s) shall be approved in writing by the Planning Authority and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Audit reports shall be submitted for the written agreement of the Planning Authority prior to the commencement of construction. The Stage 3 Audit reports shall be submitted for the written agreement of the Planning Authority prior to the opening for public use/ taking in charge by Dun Laoghaire Rathdown County Council. Reason: For clarity, in the interests of orderly development and proper planning and the sustainable development of the area, to ensure the implementation of the Travel Plan for the development and for consistency with specific objective PI 14, GI 22, DA 36, PI 20, PI 21 and PI 24 of the Cherrywood Planning Scheme. 7. Prior to the commencement of development or any construction works on site the developer shall submit for agreement, in writing, to the Planning Authority a Travel Plan in accordance with the guidance and requirements of the Cherrywood Area Wide Travel Plan. The travel plan shall include the details and contact information of the key contact or Travel Plan Coordinator for this development. The nominated person shall be suitably qualified and experienced to undertake the role. Reason: For clarity, in the interests of orderly development and proper planning and the sustainable development of the area, to ensure the implementation of the Travel Plan for the development and for consistency with specific objective PI 14, GI 22, DA 36, PI 20, PI 21 and PI 24 of the Cherrywood Planning Scheme. 8. A car parking management strategy shall be prepared by the developer and submitted for agreement, in writing, to the Planning Authority prior to the occupation of any new development proposed by this application. Reason: For clarity, in the interests of orderly development and proper planning and the sustainable development of the area, to ensure the implementation of the Travel Plan for the development and for consistency with specific objective PI 14, GI 22, DA 36, PI 20, PI 21 and PI 24 of the Cherrywood Planning Scheme. 9. The Travel Plan Coordinator appointed for this development shall submit a biannual (at 6 month intervals) Travel Plan Monitoring Report to the Planning Authority for a period of 6 years commencing from the time of first occupation. The report shall demonstrate what soft and hard measures have been implemented to promote the use of sustainable travel modes to access the development. This annual report should include results of an annual travel survey carried out on the different modes of travel to work used by employees. A sample monitoring report template is included in Appendix F of the Cherrywood Area Wide Travel Plan. Reason: For clarity, in the interests of orderly development and proper planning and the sustainable development of the area, to ensure the implementation of the Travel Plan for the development and for consistency with specific objective PI 14, GI 22, DA 36, PI 20, PI 21 and PI 24 of the Cherrywood Planning Scheme. 10. The car parking spaces included in this development that are associated with future Block F3 and future HIE uses shall not be brought into operation for any use or purpose prior to the se blocks being permitted and commenced (F3 and future HIE). A drawing identifying these spaces shall be submitted for the written agreement of the Planning Authority prior to the commencement of the permitted development under this application. Reason: For clarity, in the interests of orderly development and proper planning and the sustainable development of the area, to ensure the implementation of the Travel Plan for the development and for consistency with specific objective PI 14, GI 22, DA 36, PI 20, PI 21 and PI 24 of the Cherrywood Planning Scheme. 11. Prior to the commencement of development the developer shall submit for the written agreement of the Planning Authority drawings, prepared by a suitably qualified landscape architect, of the detailed design of the public realm and plaza area located along the edge of Cherrywood Avenue and to the front of Blocks F1, F2 and future Block F3. The design and layout shall create an area which will ensure animation and encourage activity along Cherrywood Avenue and between the blocks. Reason: To ensure consistency with Section 2.8 Urban Form of the Cherrywood Planning Scheme. 12. The Developer shall comply with the following: - a. The normal working hours within the site shall be Monday to Friday between 08:00 and 19:00 hours and Saturday between 08:00 and 14:00 hours with no working on Sunday and public holidays. b. The construction of the development shall be managed in accordance with a final Construction Management Plan, which shall be submitted for the development in its entirely to the Planning Authority for agreement in writing, prior to the commencement of any development. Reason: To mitigate against adverse impacts on nearby residents. 13. The Applicant/Developer shall ensure by appropriate lease/contract clauses that all future occupiers of the proposed buildings will be obliged to implement Workplace Travel Plan measures to achieve smarter travel targets. Reason: In the interest of proper planning and sustainable travel. 14. a)The detailed design of the water supply infrastructure including details of connections shall be in accordance with Irish Water specification and requirements. Written evidence of the design compliance with Irish Water specification and requirements and copies of the final water supply detail design shall be provided to the Planning Authority prior to commencement of development. b)The detailed design of the Foul Water Drainage network including details of connections shall be in accordance with Irish Water specification and requirements. Written evidence of the design compliance with Irish Water specification and requirements and copies of the final detail design shall be provided to the Planning Authority prior to the commencement of development. Reason: In the interests of consistency with PI 4 and PI12 of the Planning Scheme. 15.Surface Water discharge from the site shall be restricted to 1 l/s/ha . Reason: In the interests of orderly and sustainable development, to comply with the requirements of the Cherrywood Planning Scheme and to ensure long term optimum operation of the surface water management system. 16. A).Prior to the commencement of development, full detailed design for the subject site's surface water drainage inclusive of petrol interceptor location, rainwater harvesting, Outlet to Pond 4, Green Roofs and all other SuDS measures shall be submitted and agreed in writing with the Planning Authority. B) Prior to the commencement of development and as part of the detailed design, full hydraulic calculations, inclusive of the 30 year and 100 year storm events, demonstrating that no flooding will occur at the subject site, shall be submitted and agreed with the Planning Authority. C) As part of the detailed design for the development and prior to the commencement of development, the applicant shall submit a stage 2 Stormwater Audit to the Planning Authority. D) Prior to the commencement of development, a Construction and Environmental Management Plan shall be submitted and agreed in writing with the Planning Authority. E) Prior to the commencement of development, an operations and maintenance plan for the proposed SuDS componants, inclusive of the attenuation structures, shall be submitted and agreed in writing with the Planning Authority. Reason: In the interests of orderly and sustainable development, to comply with the requirements of the Cherrywood Planning Scheme and to ensure long term optimum operation of the surface water management system. 17. The proposed hydrobrake shall be fitted with by-pass doors to facilitate draining down of the surface water system if required. Reason: In the interests of orderly and sustainable development, to comply with the requirements of the Cherrywood Planning Scheme and to ensure long term optimum operation of the surface water management system. 18. Prior to the commencement of any permitted development - the developer shall appoint and retain the services of a qualified Landscape Architect (or qualified Landscape Designer) as a Landscape Consultant, for the duration of the construction works and shall notify the planning authority of that appointment in writing prior to commencement. A Practical Completion Certificate shall be signed off by the Landscape Architect when all landscape works are fully completed to the satisfaction of DLR Parks and Landscape Services and in accordance with the permitted landscape proposals. Reason: To ensure full and verifiable implementation of the approved landscape design 19. Detailed design including samples and specifications of the hard and soft landscape areas shall be submitted for the written agreement of the Planning Authority prior to the commencement of development or as otherwise agreed. Reason: To ensure that designs, materials and specifications shall be in accordance with the Cherrywood Planning Scheme and to meet with the requirements of the Local Authority and the Development Agency 20. Prior to the commencement of development the developer shall agree, in writing, with the Planning Authority, the method and programme for delivery of the completed Linear Park including provision for pedestrian and cycle connections to link Cherrywood Business Park and the proposed Town Centre to Cherrywood Road, Brides Glen Road, Mullinastill and along the old railway viaduct to Shankill via Loughlinstown hospital. Reason: For consistency with specific objective GI 22 and PI 20 of the Cherrywood Planning Scheme. 21. Prior to the commencement of development, the developer shall engage the services of a qualified ecologist as an ecological consultant, from the commencement of construction to 5 year post - completion. The applicant shall inform the Planning Authority in writing of the appointment and name of the consultant, prior to commencement of development. Reason: For consistency with specific objective GI 46 and in the interests of proper planning and sustainable development. 22. A badger survey demonstrating compliance with the relevant objectives of the Planning Scheme and ensuring adequate coverage of the scrub area at the north of the site shall be completed and submitted to the planning authority prior to commencement of any works. Reason: To ensure that the development complies with the GI 48 and the Cherrywood SDZ Biodiversity Plan. 23. A lighting plan with specific regard for biodiversity, containing specific details that clearly demonstrate compliance with relevant biodiversity related objectives of the Planning Scheme low lumen directional light fixtures that do not produce any lighting above the horizontal plane, shall be submitted for agreement with the planning authority prior to commencement of any works. Reason: To ensure that the development complies with the GI50 and the Cherrywood SDZ Biodiversity Plan. 24. Prior to commencement of development the applicant shall submit for the written agreement of the Planning Authority, all drawings in digital format (CAD/GIS) projected to ITM (Irish Transverse Mercator). This information should include the following: • Overall site plan's in DWG format (ITM projection in metres) • Ground floor plans of buildings in DWG format (ITM projection in metres) • Site sections and elevations in PDF format. Reason: To ensure consistency with the Cherrywood Planning Scheme. 25. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of € €27,744.01, to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of Surface Water Public Infrastructure and Facilities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme ) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Public Infrastructure and Facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. Note on above Condition: Please note that with effect from 1st January, 2014 Irish Water are now the statutory body responsible for both water and waste water services. Accordingly, the contribution payable has been reduced by the amount of the contribution associated with these services. Further details/clarification can be obtained from Irish Water at Tel. 1 850 278 278 . 26. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of € €636,062.18, to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 27. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of € €412,743.40, to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Community & Parks Public Infrastructure, Facilities and Amenities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks Public Infrastructure, Facilities and Amenities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 28.The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of € €84,735.40, to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Roads Public Infrastructure and Facilities in the Cherrywood Planning Scheme Area. This Cherrywood Planning Scheme element of the Development Contribution shall be used solely to fund infrastructure identified in the Plan, as listed in Appendix III – Cherrywood Planning Scheme Projects List, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the Cherrywood Planning Scheme Area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 29.The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of € €539,026.48, to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Community & Parks Public Infrastructure Facilities & Amenities in the Cherrywood Planning Scheme Area. This Cherrywood Planning Scheme element of the Development Contribution shall be used solely to fund infrastructure identified in the Plan, as listed in Appendix III – Cherrywood Planning Scheme Area Only, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks Public Infrastructure Facilities & Amenities benefiting development in the Cherrywood Planning Scheme Area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 30. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of € €146,236.90, to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of Surface Water Public Infrastructure and Facilities benefiting development in the Cherrywood Planning Scheme area only of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Public Infrastructure and Facilities benefiting development in the in the Cherrywood Planning Scheme area and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 31. That a financial contribution shall be paid by the proposer to the Council towards the cost of the extension of Luas Line B from the Sandyford Depot to Cherrywood, namely Luas Line B1. This contribution to be paid prior to the commencement of the development or in such other manner as may otherwise be agreed with the Planning Authority. The rate of contribution payable shall be that pertaining to the particular year in which implementation of the Planning Permission is commenced. The Supplementary Development Contribution Scheme provides for an annual increase in the levels of contribution payable, as outlined in the scheme, by a factor of 5% compound interest per annum. The levels of contribution will be reviewed annually on the 13th of January of each year during which the scheme is in force to take account of the aforementioned increase. The rate of contribution payable in respect of this development, at current contribution rates, is € €1,323,377.55, and is subject to increase as outlined above. It should be noted that contributions assessed in accordance with the Supplementary Development Contribution Scheme cannot be appealed to An Bord Pleanala unless the applicant considers the levy referred to in this condition has not been properly applied in accordance with the terms of the Scheme. REASONS FOR CONTRIBUTIONS: To part finance the extension of the Luas Line B1 from Sandyford Depot to Cherrywood, as provided for in the Supplementary Development Contribution Scheme adopted by the Council of Dun laoghaire-Rathdown on the 13th of January, 2003. (incorporating amendments to Clause 13 as adopted by the County Council at it’s meeting on 13th May, 2013 – to be effective for all decisions from 14th May, 2013). 32. This development shall not be carried out without prior agreement, in writing, between the Applicant and the Planning Authority relating to the payment of development contributions. REASON: Investment by Dún Laoghaire-Rathdown County Council in Local Authority works has facilitated and will facilitate the proposed development. It is considered appropriate and reasonable that the developer should contribute to the cost of same. ## Nearby applications - [DZ19A/0186](https://cherrywoodplans.com/application/DZ19A-0186.md): c. 1.676 ha at Cherrywood Business Park (lands including former Block F), Cherrywood, Co. Dublin (also Dublin 18). Granted (9 May 2019). Adds landscaped roof terraces to permitted office Blocks F1 and F2 at Cherrywood Business Park. - [D09A/0501](https://cherrywoodplans.com/application/D09A-0501.md): Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Refused or withdrawn (3 Sep 2009). 112 apartments, offices and shops in three buildings of 5–6 storeys at Cherrywood Science & Technology Park. - [D07A/0597](https://cherrywoodplans.com/application/D07A-0597.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.(Blocks F and G),. Refused or withdrawn (12 Jun 2007). Three office buildings of 4 to 7 storeys at Cherrywood Science & Technology Park, with a 612-space basement car park. - [DZ19A/1021](https://cherrywoodplans.com/application/DZ19A-1021.md): Blocks F1, F2 and F3 (3no. office blocks under construction) at Cherrywood Business Park, Cherrywood, Co Dublin (also Dublin 18). Refused or withdrawn (5 Feb 2020). Allows up to 229 spaces in the basement car park of office Blocks F1–F3 to be used for temporary parking for 7 years. - [DZ18A/1104](https://cherrywoodplans.com/application/DZ18A-1104.md): Lands (c.2.57ha) Cherrywood Business Park (lands including & adjoining former Block F, part of existing Block G (basement level -1 only) & lands to rear Blocks G & G2, Cherrywood, Co Dublin (also Dublin 18). Site is within Development Area 6A Brides Glen. Granted (29 Jan 2019). Builds office Block F3 and expands the shared basement car park to 658 spaces, with a new linear park, at Cherrywood Business Park. - [D08A/0035](https://cherrywoodplans.com/application/D08A-0035.md): Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (26 Jun 2008). A 4–5 storey office building (Building F) and new road at Cherrywood Science & Technology Park, with 289 basement car spaces. - [D02A/0430](https://cherrywoodplans.com/application/D02A-0430.md): Cherrywood Science & Technology Park,, Cherrywood, Loughlinstown, Co. Dublin.. Granted (10 Jul 2002). Allows five permitted science and technology buildings at Cherrywood Business Park to be used instead for office-based industry. - [D06A/1475](https://cherrywoodplans.com/application/D06A-1475.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (20 Dec 2006). Enlarges the approved Block G office building by filling in a front recess and extending the penthouse, adding 502 sq.m. - [D06A/0015](https://cherrywoodplans.com/application/D06A-0015.md): Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (1 Mar 2006). Adds an extra floor to the approved Block G office building at Cherrywood Business Park, taking it from three to four storeys. - [D05A/0219](https://cherrywoodplans.com/application/D05A-0219.md): Cherrywood Science & Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (9 Nov 2005). Changes the approved Block G office building with a two-level underground car park and a larger floor area. - [DZ24A/0366/WEB](https://cherrywoodplans.com/application/DZ24A-0366-WEB.md): Building 8, Cherrywood Business Park, Dublin 18, D18W319. Granted (17 Jul 2024). Adds tenant signage and a wayfinding totem at Building 8, Cherrywood Business Park. - [DZ23A/0283](https://cherrywoodplans.com/application/DZ23A-0283.md): Building 8, Cherrywood Business Park, Cherrywood, Loughlinstown, Co. Dublin, D18 W319. Granted (11 Aug 2023). Turns Building 8 at Cherrywood Business Park from offices into a private medical clinic. - [DZ21A/0029](https://cherrywoodplans.com/application/DZ21A-0029.md): Site of approximately 1,094 sq m at Building 8 (formerly known as Block E), Cherrywood Business Park, Cherrywood, Co. Dublin, c. Granted (29 Apr 2021). Rebuilds the front entrance of Building 8 at Cherrywood Business Park with a slightly larger lobby. - [DZ21A/0818](https://cherrywoodplans.com/application/DZ21A-0818.md): Site of approximately 0.43 ha at Building 10 (formerly known as Block G), Cherrywood Business Park, Cherrywood, Co. Dublin, D18 T3Y1. Granted (24 Feb 2022). New plant enclosures, flue stacks and doors at Building 10 in Cherrywood Business Park. - [D21B/0118](https://cherrywoodplans.com/application/D21B-0118.md): Saint Michael's Lodge, Cherrywod Road, Shankill, Dublin 18, D18F7AR. Granted (16 Jul 2021). Seeks to keep a rear dormer window at Saint Michael's Lodge, Cherrywood Road. - [DZ19A/0577](https://cherrywoodplans.com/application/DZ19A-0577.md): Cherrywood Avenue South adjacent to Building 11, formally known as Building G2, Cherrywood Business Park, Loughlinstown, Dublin, D18 DH50. Granted (23 Jan 2020). A new loading bay on Cherrywood Avenue South beside Building 11 in Cherrywood Business Park. - [D04A/0232](https://cherrywoodplans.com/application/D04A-0232.md): Block H, Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (23 Apr 2004). Puts up a lit corporate logo sign at Block H, Cherrywood Business Park. - [D07A/0229](https://cherrywoodplans.com/application/D07A-0229.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.. Granted (28 May 2007). Adds a temporary vehicle ramp to the basement car park serving Blocks G and G2 at Cherrywood Business Park. - [D11B/0364](https://cherrywoodplans.com/application/D11B-0364.md): 105, Cherrywood Road, Loughlinstown, Co. Dublin. Granted (12 Jan 2012). Adds a single-storey extension to the rear and side of a house at 105 Cherrywood Road. - [DZ16A/0124](https://cherrywoodplans.com/application/DZ16A-0124.md): Cherrywood Business Park (to west of Block G2 and south of Block G and G2), Cherrywood, Loughlinstown, Co Dublin. Granted (21 Apr 2016). Seeks to keep a temporary access road to the Blocks G and G2 car park at Cherrywood Business Park for 7 years. - [D09A/0804](https://cherrywoodplans.com/application/D09A-0804.md): Cherrywood Science & Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (14 Jan 2010). Permission to keep changes at Blocks G and G2, Cherrywood Science & Technology Park, including a larger basement car park. - [D08A/1062](https://cherrywoodplans.com/application/D08A-1062.md): Unit 6, Block C, The Facilities Building, Cherrywood, Co. Dublin. Granted (13 Nov 2008). Adds lit signage to the front of Unit 6, Block C, at Cherrywood Business Park. - [D15B/0171](https://cherrywoodplans.com/application/D15B-0171.md): Clanart, Cherrywood Road, Loughlinstown, Dublin 18. Granted (10 Jul 2015). Rebuilds and extends a single-storey house at Clanart, Cherrywood Road, with a new raised roof. - [D02A/0660](https://cherrywoodplans.com/application/D02A-0660.md): Clanart, Cherrywoood Road, Loughlinstown, Dublin 18.. Granted (20 Aug 2002). Seeks permission to keep part of an existing single-storey bungalow on Cherrywood Road. - [D08A/0762](https://cherrywoodplans.com/application/D08A-0762.md): Unit 6, Block C, The Facilities Building, Cherrywood, Co. Dublin. Refused or withdrawn (25 Aug 2008). Adds lit signage to the front of Unit 6, Block C, at Cherrywood Business Park. - [DZ17A/0171](https://cherrywoodplans.com/application/DZ17A-0171.md): Cherrywood Business Park, Cherrywood, Dublin 18. Granted (21 Apr 2017). Seeks to keep the existing entrance and wayfinding signs at Cherrywood Business Park. - [DZ19A/0808](https://cherrywoodplans.com/application/DZ19A-0808.md): Cherrywood Business Park, Cherrywood & Loughlinstown, Co. Dublin, (Also Dublin 18). Granted (17 Dec 2019). Installs a small gas pressure regulator building in Cherrywood Business Park. - [DZ19A/0647](https://cherrywoodplans.com/application/DZ19A-0647.md): Cherrywood Business Park, Cherrywood & Loughlinstown, Co. Dublin, (Also Dublin 18). Refused or withdrawn (18 Sep 2019). Installs a small gas pressure regulator building in Cherrywood Business Park. - [DZ19A/0523](https://cherrywoodplans.com/application/DZ19A-0523.md): Cherrywood Business Park, Cherrywood & Loughlinstown, Co. Dublin, (Also Dublin 18). Refused or withdrawn (23 Aug 2019). Installs a small gas pressure regulator building in Cherrywood Business Park. - [D08A/0687](https://cherrywoodplans.com/application/D08A-0687.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Refused or withdrawn (7 Aug 2008). Replacing Block D with a 5-storey office building with a large ground-floor shop at Cherrywood Science & Technology Park. - [D08A/0121](https://cherrywoodplans.com/application/D08A-0121.md): Block C, Cherrywood Science And Technology Park, Cherrywood, Loughlinstown, Co. Dublin. Granted (24 Jun 2008). Seeks to keep an extension to the Block C facilities building and sets out options for a front loading bay. - [D07A/0604](https://cherrywoodplans.com/application/D07A-0604.md): Cherrywood Science Technology Park,(Block D1), Loughlinstown, Co. Dublin.. Granted (2 Apr 2008). Replacing a crèche with a 4-storey office building and restaurant (Block D1) at Cherrywood Science & Technology Park. - [D07A/1607](https://cherrywoodplans.com/application/D07A-1607.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.. Refused or withdrawn (24 Jan 2008). The top floor of Block C at Cherrywood Science & Technology Park changes from recreation use to offices. - [D07A/1503](https://cherrywoodplans.com/application/D07A-1503.md): Block C, Cherrywood Science And Technology Park, Cherrywood, Loughlinstown, Co. Dublin. Refused or withdrawn (18 Dec 2007). Keeping a 52 sq.m ground-floor extension and shopfronts at Block C, Cherrywood Science & Technology Park. - [D06A/0911](https://cherrywoodplans.com/application/D06A-0911.md): Block D, Cherrywood Science & Technology Park, Cherrywood, Loughlinstown, Co. Dublin. Granted (23 Aug 2006). Makes internal changes to the Block D office building, enclosing its entrance and adding a fire escape stairs. - [D05A/0419](https://cherrywoodplans.com/application/D05A-0419.md): Block D, Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (26 Oct 2005). Extends the existing Block D building at Cherrywood Business Park, adding 790 sq.m of shop and office space. - [DZ16A/0530](https://cherrywoodplans.com/application/DZ16A-0530.md): Units 2 & 4 Building 7 (previously 'Block D'), Cherrywood Business Park, Cherrywood, Loughlinstown, Co Dublin. Granted (9 Sep 2016). Changes two vacant units in Building 7, Cherrywood Business Park, into medical and dental use. - [D07A/0233](https://cherrywoodplans.com/application/D07A-0233.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.. Granted (27 Aug 2007). Extends and reworks the approved Block C leisure building, adding a double-height swimming pool hall. - [D06A/0268](https://cherrywoodplans.com/application/D06A-0268.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (16 Jun 2006). Builds a four-storey leisure and retail building (Block C) with a fitness centre and 25-metre pool at Cherrywood Business Park. - [D05A/1672](https://cherrywoodplans.com/application/D05A-1672.md): Block D, Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (13 Feb 2006). Makes small changes to Block D, enlarging a ground-floor shop and trimming the offices. - [D05A/1715](https://cherrywoodplans.com/application/D05A-1715.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Refused or withdrawn (12 Jan 2006). Builds a four-storey leisure and retail building (Block C) with a fitness centre and 20-metre pool at Cherrywood Business Park. - [DZ16A/0816](https://cherrywoodplans.com/application/DZ16A-0816.md): Unit 4 Building 5 (previously Block C), Cherrywood Business Park, Cherrywood, Dublin 18. Granted (10 Jan 2017). Changes a vacant shop unit in Cherrywood Business Park into a bank with an ATM. - [DZ25A/0066/WEB](https://cherrywoodplans.com/application/DZ25A-0066-WEB.md): Building 7 The Campus, Cherrywood Avenue, Cherrywood (Glebe Townland), Co Dublin, Dublin 18, D18T8Y6. Granted (20 Mar 2025). Part of Building 7 at The Campus changes from offices to medical and dental use. - [D06A/0289](https://cherrywoodplans.com/application/D06A-0289.md): 107, Cherrywood Road, Loughlinstown, Dublin 18. Granted (26 Sep 2006). Builds a new five-bedroom, two-storey detached house beside 107 Cherrywood Road. - [D06A/0065](https://cherrywoodplans.com/application/D06A-0065.md): 107 Cherrywood Road, Cherrywood, Loughlinstown, Co. Dublin.. Refused or withdrawn (23 Feb 2006). Builds a new five-bedroom, two-storey detached house beside 107 Cherrywood Road. - [D02A/0508](https://cherrywoodplans.com/application/D02A-0508.md): Building H, Cherrywood Science & Technology Park,, Cherrywood, Loughlinstown, Co. Dublin.. Granted (22 Jul 2002). Adds 15 parking spaces to the car park serving Building H at Cherrywood Business Park. - [D06A/0630](https://cherrywoodplans.com/application/D06A-0630.md): Spar Retail Unit, Block D, Cherrywood Science & Technology Park, Loughlinstown, Dublin 18. Granted (12 Jul 2006). An off-licence counter added to the Spar shop in Block D of Cherrywood Science & Technology Park. - [DZ17A/0649](https://cherrywoodplans.com/application/DZ17A-0649.md): Block G2, Cherrywood Business Park, Cherrywood, Co Dublin. Granted (8 Sep 2017). Adds louvred screening around rooftop plant on Block G2, Cherrywood Business Park. - [DZ20A/0611](https://cherrywoodplans.com/application/DZ20A-0611.md): Site of approximately 4,730 sq m at Building 11, (formerly known as Block G2), Cherrywood Business Park, Cherrywood, Co. Dublin, D18 DH50. Granted (19 Oct 2020). Expands the day hospital in Building 11, Cherrywood Business Park, to 1,220 sq.m. - [DZ18A/1131](https://cherrywoodplans.com/application/DZ18A-1131.md): Site of approx. 4,730 sqm at Building 11 (formerly known as Block G2), Cherrywood Business Park, Cherrywood, Dublin D18 DH50. Granted (5 Feb 2019). Turns part of the ground floor of Building 11 at Cherrywood Business Park into a 922 sq.m day hospital. - [DZ16A/0935](https://cherrywoodplans.com/application/DZ16A-0935.md): Block G2, Cherrywood Business Park, Cherrywood, Co. Dublin. Granted (17 Feb 2017). Adds landscaping, a drop-off area and a sign at Block G2, Cherrywood Business Park, and keeps three glass canopies. - [D06A/1497](https://cherrywoodplans.com/application/D06A-1497.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (14 Dec 2006). Builds a new four-storey office building, Block G2, over a two-level car park at Cherrywood Business Park. - [D08A/0952](https://cherrywoodplans.com/application/D08A-0952.md): Cherrywood Science & Technology Park,(Block D1), Cherrywood, Loughlinstown, Co. Dublin. Refused or withdrawn (15 Oct 2008). Design changes to the approved Block D1 office building at Cherrywood Science & Technology Park. - [DZ23A/0508](https://cherrywoodplans.com/application/DZ23A-0508.md): Unit 3 and Unit 1, Building 5, Cherrywood Business Park, Cherrywood, Loughlinstown, Co Dublin. Granted (22 Sep 2023). Two units in Building 5, Cherrywood Business Park, become a dental clinic and a café. - [DZ16A/0123](https://cherrywoodplans.com/application/DZ16A-0123.md): Units 1 & 2 Block C, Cherrywood Business Park, Cherrywood, Loughlinstown, Co Dublin. Granted (21 Apr 2016). Reconfigures two ground-floor shop units in Block C and turns one into a café/restaurant. - [D16A/0361](https://cherrywoodplans.com/application/D16A-0361.md): The Orchard, Cherrywood Road, Loughlinstown, Co. Dublin. Granted (12 Sep 2016). Builds two new two-storey houses beside an existing home at The Orchard, Cherrywood Road. - [DZ14A/0596](https://cherrywoodplans.com/application/DZ14A-0596.md): Unit 1 , Block C, Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co Dublin. Granted (11 Dec 2014). Changes Shop Unit 1 in Block C, Cherrywood Business Park, into a dental clinic. - [DZ19A/0255](https://cherrywoodplans.com/application/DZ19A-0255.md): Cherrywood Business Park (lands including & adjoining Bldgs 2-5 & 7 & basement level under Buildings 3, 4 & 5, Pond 4 & part of the linear park), Cherrywood, Co Dublin .. Granted (3 Dec 2019). Upgrades the public spaces of Cherrywood Business Park with raised meeting pods, a large canopy, a sunken garden and linear park improvements. - [D07A/0654](https://cherrywoodplans.com/application/D07A-0654.md): Block AD, Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin.. Granted (6 Jul 2007). Signs and a refuse store for the crèche in Block AD, Cherrywood Science & Technology Park. - [D06A/1722](https://cherrywoodplans.com/application/D06A-1722.md): Block AD, Cherrywood Science & Technology, Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (26 Jan 2007). Part of Block AD in Cherrywood Science & Technology Park changes from offices to a 952 sq.m crèche. - [DZ17A/0061](https://cherrywoodplans.com/application/DZ17A-0061.md): Building 4 (previously Block AD), Cherrywood Business Park, Cherrywood, Dublin 18. Granted (16 Mar 2017). Turns 1,035 sq.m of vacant office space in Building 4, Cherrywood Business Park, into a medical research laboratory. - [D10A/0701](https://cherrywoodplans.com/application/D10A-0701.md): Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (24 May 2011). A 197-space surface park and ride car park beside the Brides Glen Luas stop. - [D03A/0479](https://cherrywoodplans.com/application/D03A-0479.md): ESB, Plot M, Cherrywood Science And Technology Park, Wyatville Link Road. Granted (14 Jul 2003). Seeks to keep an ESB 38 kV line mast already installed at Cherrywood Business Park. - [D08B/0452](https://cherrywoodplans.com/application/D08B-0452.md): Heather Hill, Cherrywood Road, Loughlinstown, Co. Dublin. Granted (7 Aug 2008). Extends a house at Heather Hill, Cherrywood Road, with single and two-storey additions. - [DZ17A/0731](https://cherrywoodplans.com/application/DZ17A-0731.md): G3 (west of Block G2), Cherrywood Business Park, Cherrywood, Loughlinstown, Co Dublin (within the Cherrywood Strategic Development Zone (SDZ) and subject to the Cherrywood Planning Scheme 2014). Granted (26 Jan 2018). Builds a new four-storey office building, G3, on Cherrywood Avenue in Cherrywood Business Park. - [D02A/0424](https://cherrywoodplans.com/application/D02A-0424.md): Cherrywood Science & Technology Park,, Cherrywood, Loughlinstown, Co. Dublin.. Granted (10 Jul 2002). Allows two permitted three-storey science and technology buildings, AA and AB, to be used instead for office-based industry. - [D09A/0146](https://cherrywoodplans.com/application/D09A-0146.md): Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (23 Apr 2009). Fills in atrium spaces in Building AA at Cherrywood Business Park, adding 269 sq.m and 5 parking spaces. - [DZ16A/0535](https://cherrywoodplans.com/application/DZ16A-0535.md): Hibernia House, Cherrywood Business Park, Loughlinstown, Dublin 18. Granted (9 Sep 2016). Puts up two high-level lit 'evros' signs on Hibernia House, Cherrywood Business Park. - [DZ24A/0485/WEB](https://cherrywoodplans.com/application/DZ24A-0485-WEB.md): Site Known as Block G3, Cherrywood Business Park, Cherrywood, Loughlinstown, Co. Dublin. Granted (19 Dec 2024). A 4-storey science and technology office building with labs on Block G3, Cherrywood Business Park. - [DZ25A/0543/WEB](https://cherrywoodplans.com/application/DZ25A-0543-WEB.md): Dlr Properties Limited, Hibernia House, Cherrywood Business Park, Dublin 18, D18E440. Granted (28 Aug 2025). Hibernia House in Cherrywood Business Park changes from offices to a medical centre with a pharmacy. - [D03A/0626](https://cherrywoodplans.com/application/D03A-0626.md): Cherrywood Science & Technology Park, Cherrywood Business Park 1, Cherrywood, Loughlinstown, Co. Dublin. Granted (22 Sep 2003). A new office building of three storeys plus penthouse at Cherrywood Science & Technology Park, with 350 basement car spaces. - [D04A/1361](https://cherrywoodplans.com/application/D04A-1361.md): Cherrywood Science & Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (12 Jan 2005). Extends the approved third floor of the Block AC office building over two terraces and moves all rooftop plant onto the roof. - [D04A/0335](https://cherrywoodplans.com/application/D04A-0335.md): Cherrywood Science & Technology Park,, Cherrywood, Loughlinstown, Co. Dublin.. Granted (26 May 2004). Builds a new office building of three storeys plus a penthouse over a basement car park at Cherrywood Business Park. - [D05A/0232](https://cherrywoodplans.com/application/D05A-0232.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.. Granted (20 Apr 2005). Adds two windows to the west side of the approved third floor of the Block AC office building. - [DZ19A/1022](https://cherrywoodplans.com/application/DZ19A-1022.md): On a site of 0.625ha, Dell Technologies, Block AB, Cherrywood Business Park, Cherrywood, Dublin 18. Granted (25 Feb 2020). Replaces two lit signs on the Dell Technologies building, Block AB, Cherrywood Business Park. - [DZ17A/0466](https://cherrywoodplans.com/application/DZ17A-0466.md): Block AB of CHerrywood, Science and Technology Park, Loughlinstown, Dublin 18. Granted (13 Jul 2017). Replaces signs at Block AB, Cherrywood Business Park, with two lit wall signs and a totem sign. - [D04A/0915](https://cherrywoodplans.com/application/D04A-0915.md): Block AC, Cherrywood Business Park, Loughlinstown, Co. Dublin.. Granted (10 Nov 2004). Enlarges the approved link between office Blocks AC and AB, adding 990 sq.m of floor space. - [D05A/1057](https://cherrywoodplans.com/application/D05A-1057.md): Blocks AB/AC, Cherrywood Science & Technology Park, Cherrywood, Co. Dublin. Granted (10 Oct 2005). Adds emergency exit doors and a screened rooftop plant room to office Blocks AB and AC. - [D22A/0353](https://cherrywoodplans.com/application/D22A-0353.md): Cherrywood House, Cherrywood Road, Shankill, Dublin 18 (A Protected Structure). Granted (15 Sep 2022). Restores and upgrades Cherrywood House, a protected structure, replacing its 20th-century flat-roofed extensions. - [D08A/0961](https://cherrywoodplans.com/application/D08A-0961.md): 6, Cherrywood Road North, Loughlinstown, Co. Dublin. Refused or withdrawn (15 Oct 2008). Seeks to keep the walls and piers at the front entrance of a house on Cherrywood Road North. - [D13A/0117](https://cherrywoodplans.com/application/D13A-0117.md): Block AB Cherrywood Science & Technology Park, Loughlinstown, Dublin 18. Granted (8 May 2013). Puts up two lit Dell logo signs on Block AB at Cherrywood Business Park. - [D22A/1019](https://cherrywoodplans.com/application/D22A-1019.md): Old Glebe House, Brides Glen Road, Shankill, Dublin 18, D18Y7H7. Refused or withdrawn (22 Feb 2023). Builds two four-bedroom houses in the lower grounds of the Old Glebe on Brides Glen Road. - [D24A/0037](https://cherrywoodplans.com/application/D24A-0037.md): The Old Glebe House, Brides Glen Road, Shankill, Dublin 18, D18Y7H7. Granted (11 Mar 2024). Changes to an approved extension at The Old Glebe House, Brides Glen Road, enlarging the ground floor from 83 to 103 sq.m. - [D23A/0820](https://cherrywoodplans.com/application/D23A-0820.md): The Old Glebe House, Brides Glen Road, Shankill, Dublin 18, D18Y7H7. Refused or withdrawn (15 Jan 2024). Changes to an approved extension at The Old Glebe House, Brides Glen Road, enlarging the ground floor from 83 to 103 sq.m. - [D23A/0392](https://cherrywoodplans.com/application/D23A-0392.md): The Old Glebe House, Brides Glen Road, Shankill, Dublin 18, D18Y7H7--a protected structure.. Granted (1 Nov 2023). Two new 4-bedroom, two-storey houses in the lower grounds of The Old Glebe House, Brides Glen Road. - [D08A/0443](https://cherrywoodplans.com/application/D08A-0443.md): 12, Cherrywood Park, Loughlinstown, Dublin 18. Granted (17 Jul 2008). Builds a new detached dormer bungalow beside 12 Cherrywood Park. - [D13A/0534](https://cherrywoodplans.com/application/D13A-0534.md): Old Glebe House, Brides Glen Road, Townland Glebe (Rathmichael),Dublin 18. Granted (11 Feb 2014). Replaces a single-storey annex on Old Glebe House, a protected structure, with a new single-storey extension. - [D19A/0277](https://cherrywoodplans.com/application/D19A-0277.md): Old Glebe House, Brides Glen Road, Rathmichael, Dublin 18. Refused or withdrawn (19 Jun 2019). Builds three detached three-storey houses within the grounds of Old Glebe House, a protected structure, on Brides Glen Road. - [D22A/0964](https://cherrywoodplans.com/application/D22A-0964.md): The Old Glebe, Brides Glen Road, Dublin 18, D18Y7H7. Granted (4 Apr 2023). Alters Old Glebe House, a protected structure, and extends its coach house from one to three bedrooms. - [D22A/0079](https://cherrywoodplans.com/application/D22A-0079.md): Cherrywood Lodge, Brides Glen Road, Shankill, Dublin 18. Granted (30 Mar 2022). Converting and extending an outbuilding at Cherrywood Lodge, Brides Glen Road, into a new single-storey home. - [DZ23A/0242](https://cherrywoodplans.com/application/DZ23A-0242.md): Townland of Cherrywood Dublin 18 The site is located in the Cherrywood Planning Scheme and forms part of the south eastern porti. Granted (7 Jun 2023). Changes to the permitted basement at Town Centre 3 so it can later connect to the wider TC3 basement. - [DZ21A/0785](https://cherrywoodplans.com/application/DZ21A-0785.md): c.0.95 ha townland, Cherrywood, Dublin 18 (also Co. Dublin). Granted (30 Mar 2022). An office building of up to 8 storeys with ground-floor cafés at the corner of Town Centre 3, beside the Bride's Glen Luas stop. - [D07A/1243](https://cherrywoodplans.com/application/D07A-1243.md): Glencarrig, Rathmichael, Co. Dublin. Granted (25 Oct 2007). Amends an earlier permission at Glencarrig to redesign one house and add a tenth five-bedroom house. - [DZ18A/0854](https://cherrywoodplans.com/application/DZ18A-0854.md): site (c.2.62 HA) at Cherrywood Business Park, Cherrywood Avenue, Cherrywood, Co. Dublin (also Dublin 18) (lands to the south and west of Blocks G and G2, south of Cherrywood Avenue). Granted (31 Oct 2018). Builds a three-pond drainage system with a walking and cycling route south of Cherrywood Avenue. - [DZ22A/0342](https://cherrywoodplans.com/application/DZ22A-0342.md): Building 3, (formerly known as Block AC), Cherrywood Business Park, Cherrywood, Dublin 18, D18TF72. Refused or withdrawn (27 Mar 2023). New design for the north facade of Building 3 in Cherrywood Business Park. - [D04A/0924](https://cherrywoodplans.com/application/D04A-0924.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (25 Aug 2005). A gateway office building of 6 storeys rising to 10 at one end, with a bar and café, on the Wyattville Link Road at Cherrywood Science & Technology Park. - [D07A/0779](https://cherrywoodplans.com/application/D07A-0779.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin.. Refused or withdrawn (3 Mar 2008). A five-to-eight-storey office building with a café at Cherrywood Science & Technology Park. - [D07A/0620](https://cherrywoodplans.com/application/D07A-0620.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.. Refused or withdrawn (1 Jun 2007). Builds a new five-to-eight-storey office building with a café, linked to Block AC at Cherrywood Business Park. - [D06A/1972](https://cherrywoodplans.com/application/D06A-1972.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Refused or withdrawn (20 Feb 2007). Builds a new eight-storey office building with a café/bar, linked to Block AC on the Wyattville Link Road. - [DZ22A/0681](https://cherrywoodplans.com/application/DZ22A-0681.md): Cherrywood Avenue, (Adjoining Cherrywood Business Park), Cherrywood, Dublin 18. Granted (28 Jun 2023). A 5-storey block of 70 apartments on Cherrywood Avenue, beside Cherrywood Business Park. - [D04A/1211](https://cherrywoodplans.com/application/D04A-1211.md): Cherrywood Road Bus Stop, (opposite Lucent), Loughlinstown, Co. Dublin. Refused or withdrawn (29 Jun 2005). Installs a steel and glass bus shelter with two lit advertising panels on Cherrywood Road. - [D06A/0116](https://cherrywoodplans.com/application/D06A-0116.md): Glencarraig, Rathmichael, Co. Dublin. Granted (18 Aug 2006). 19 homes and a new access road linking Brides Glen Road to Cherrywood Science & Technology Park at Glencarraig. - [D05A/1083](https://cherrywoodplans.com/application/D05A-1083.md): Glencarrig (site At), Rathmichael, Co. Dublin. Refused or withdrawn (12 Oct 2005). Builds 73 apartments in two blocks at Glencarrig, with a new road and cycle route from Brides Glen Road to Cherrywood Business Park. - [D13A/0292](https://cherrywoodplans.com/application/D13A-0292.md): Site at Glencarrig, Brides Glen Road, Rathmichael, Co. Dublin. Granted (1 Aug 2013). Amends the earlier Glencarrig permission with a revised design for 10 five-bedroom detached houses. - [DZ26A/0001/WEB](https://cherrywoodplans.com/application/DZ26A-0001-WEB.md): Cherrywood Avenue, (Adjoining Cherrywood Business Park), Cherrywood, Dublin 18. Granted (29 Jun 2026). Amends a permitted apartment scheme on Cherrywood Avenue to go from 67 to 70 apartments, with more parking. - [DZ25A/0983/WEB](https://cherrywoodplans.com/application/DZ25A-0983-WEB.md): Cherrywood Avenue ( adjoining Cherrywood Business Park), Cherrywood, Dublin 18. Refused or withdrawn (22 Dec 2025). Amends a permitted apartment scheme on Cherrywood Avenue to go from 67 to 70 apartments, with more parking. - [DZ20A/0052](https://cherrywoodplans.com/application/DZ20A-0052.md): 1.86 ha in the townlands of Cherrywood, Dublin 18 (also Co. Dublin)--TC3. Granted (13 Apr 2021). A mixed-use block at Town Centre 3 with an 8-storey office building and 198 build-to-rent apartments. - [D07A/1770](https://cherrywoodplans.com/application/D07A-1770.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin.. Refused or withdrawn (28 Jan 2008). Builds a multi-storey car park with 1,081 spaces and 10 ground-floor shops at Cherrywood Business Park. - [DZ22A/1025](https://cherrywoodplans.com/application/DZ22A-1025.md): Cherrywood Avenue, Lands within the townlands of Glebe and Cherrywood, Dublin 18. Granted (2 Nov 2023). Builds 44 homes, houses and two-level units, off Cherrywood Avenue. - [DZ22A/0591](https://cherrywoodplans.com/application/DZ22A-0591.md): C. 3.71 in the Townland of Cherrywood, Block Town Centre 3 (TC3), Dublin 18. Granted (20 Jun 2023). 418 build-to-rent apartments in four blocks of up to 5 storeys at Town Centre 3, with shops, cafés and community space. - [D07A/1565](https://cherrywoodplans.com/application/D07A-1565.md): Unit 1A, Main Street, Loughlinstown, Dublin 18. Refused or withdrawn (16 Jan 2008). Replacing a building on Main Street, Loughlinstown, with ground-floor offices and four apartments above. - [DZ17A/0862](https://cherrywoodplans.com/application/DZ17A-0862.md): Lands (17.01ha) in the townlands of Cherrywood, Dublin 18. Granted (29 May 2018). The original Cherrywood Town Centre permission: 15 blocks with 1,269 homes, shops, offices, two hotels and a library, plus Grand Parade. - [D07A/0387](https://cherrywoodplans.com/application/D07A-0387.md): 1A, Main Street, Loughlinstown, Dublin 18. Refused or withdrawn (16 May 2007). Replaces an existing building at 1A Main Street, Loughlinstown, with ground-floor offices and apartments above. - [DZ18A/1178](https://cherrywoodplans.com/application/DZ18A-1178.md): 2.2 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (17 Apr 2019). Amends Town Centre plot TC2 to add one apartment, expand retail and resident amenity space, and move the crèche. - [PC/CSDZ/013/22](https://cherrywoodplans.com/application/PC-CSDZ-013-22.md): Cherrywood Strategic Development Zone, Co. Dublin. Granted (13 Jun 2022). Creates a natural green walking route through Cherrywood from Bride's Glen to Brennanstown. - [DZ23A/0573](https://cherrywoodplans.com/application/DZ23A-0573.md): Lands (c. 17.03 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (19 Oct 2023). Amends the Cherrywood Town Centre permission to add 4 apartments in Blocks F2 and F3, bringing plot TC4 to 524 homes. - [DZ20A/0824](https://cherrywoodplans.com/application/DZ20A-0824.md): Lands (c. 17.01 ha), in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (11 Jan 2021). Changes the windows, balconies and frontage of Town Centre Block F2 on Cherrywood Avenue and Central Avenue. - [DZ19A/0148](https://cherrywoodplans.com/application/DZ19A-0148.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (24 Apr 2019). Amends Town Centre plot TC2 to add 47 apartments, taking Blocks C1 and C2 from 384 to 431 homes. ## Links - [This page on CherrywoodPlans](https://cherrywoodplans.com/application/DZ17A-0122) - [Council record, documents and conditions (DLR planning portal)](https://planning.agileapplications.ie/dunlaoghaire/application-details/73992) - [All Cherrywood applications](https://cherrywoodplans.com/applications.md) _Source: Dún Laoghaire–Rathdown County Council planning data, refreshed daily. CherrywoodPlans is an independent site, not run by the council._