# Planning application DZ17A/0714 > Lands in the townlands of Lehaunstown and Cherrywood, Dublin 18. The application relates to development in the Cherrywood Strategic Development Zone.(Domville site), Cherrywood, Dún Laoghaire–Rathdown. Granted (7 Aug 2018). - **Reference:** DZ17A/0714 - **Address:** Lands in the townlands of Lehaunstown and Cherrywood, Dublin 18. The application relates to development in the Cherrywood Strategic Development Zone.(Domville site) - **Status:** Granted (7 Aug 2018) - **Decision:** GRANT PERMISSION - **Application type:** Permission (SDZ) - **Applicant:** William Neville & Sons - **Lodged:** 11 Jul 2018 - **Decided:** 7 Aug 2018 - **Location (lat, lng):** 53.247594, -6.150001 ## Proposal The following external road and drainage infrastructure previously permitted by the Planning Authority, which will provide access and services to the development: - A section of Grand Parade from the existing Tully Vale Road to the junction with Gun and Drum Hill Road; A section of Gun and Drum Hill Road from the junctions of Grand Parade to Tully Park Access Road; Tully Park Access Road; Attenuation pond in Lehaunstown Valley, east of Tully Vale apartments. The development will include new internal access roads, surface level car parking (174 spaces) and bicycle parking, landscaping and boundary treatments; part of the new landscaped Greenway connecting Tully Park and Lehanustown Valley and all associated site development works and services, Sustainable Urban Drainage Systems (SUDS) components will include green and blue roofs, detention basins, underground modular storage and swales.The application relates to a development in the Cherrywood S.D.Z. ## In plain English Builds 322 new homes, 242 apartments and 80 houses, plus a crèche on the Domville site in Cherrywood. - **322** homes - **512** car spaces - **242** bicycle spaces - **4** storeys max ### What's planned A new neighbourhood of **322** homes and a crèche set around **3** main public spaces. ### Residential There are **242** apartments in **8** four-storey blocks: **3** studios, **80** one-beds, **152** two-beds and **7** three-beds. The **80** houses (**41** three-bed, **39** four-bed) are 2–3 storeys, mostly in terraces. ### Commercial A crèche is on the ground floor of Block C. ### Transport Two basements hold **338** car spaces and **242** bicycle spaces, with **174** more car spaces at surface level. Previously permitted sections of Grand Parade, Gun and Drum Hill Road and Tully Park Access Road will serve the site. ### Environment Includes part of a landscaped greenway linking Tully Park and Lehaunstown Valley, plus green and blue roofs, detention basins, swales and underground water storage. _This summary was written by AI from the proposal text. Check the council record before relying on it._ ## Conditions ### Condition 3 1. The development shall be carried out in its entirety in accordance with the plans, particulars and specifications lodged with the application, as amended by Further Information received on 23rd January 2018, and by Clarification of Further Information on 11th July 2018, save as may be required by the other conditions attached hereto. REASON: To ensure that the development shall be in accordance with the permission and that effective control be maintained. 2. Prior to the commencement of development and for the written agreement of the Planning Authority the applicant shall submit revised floor plans, elevations, site layout plans and landscaping plans showing the omission of the following apartments and car parking spaces as listed under a) to f) below. In this regard: a) the revised architectural drawings shall include a revised design for the top floors of apartment blocks A1, A2, B, E, G and H will shall include a set back from the building edge in order to provide variety in terms of the roof profile and massing of these buildings in accordance with Specific Objective PD 13 and Section 2.8.2 Skyline, of the Planning Scheme. b) The following apartments shall be omitted: i. 1 no. 2 bed apartment from the top floor and Block A1. ii. 1 no. 2 bed apartment from the top floor of Block A2. iii. 1 no. 1 no. 1 bed apartment and 1 no. 2 bed apartment from the top floor of Block B. iv. 2 no. 2 bed apartments from the top floor of Block E. v. 2 no. 2 bed apartments from the top floor of Block G. 2 no. 2 bed apartment from the top floor of Block H. c) The omission of the surface car parking spaces 10-18 inclusive (as shown on Site Master from the proposed car parking plot located adjacent to the basement ramp serving Blocks A2 and B and the landscaping of this area. 6 of the remaining car parking spaces in this plot, no.s 4-9 inclusive, shall be allocated to crèche staff. The remaining 3 car parking spaces, no.s 1-3 inclusive in this plot shall be designated as visitor car parking. The 3 drop off car parking spaces for the crèche shall remain in their current location adjacent to Block A1. d) The omission of car parking spaces 4-13 inclusive located adjacent to the basement ramp associated with Blocks E, G and H and the landscaping of this area. Car parking spaces no.s 1-3 inclusive located in this plot shall be relocated as follows: 2 no spaces shall be integrated into the remaining strip of perpendicular car parking spaces directly adjacent to the basement ramp serving Blocks E, G and H and 1 no. parking spaces shall be integrated into the strip of 20 no. perpendicular car parking spaces proposed by the applicant by way of Clarification of Further Information. REASON: In the interest of clarity and to safeguard residential amenity and ensure consistency with Section 2.8 Urban Form, Specific Objectives PD11, PD13 and Section 4.2.10 Car Parking Standards, Specific Objective PI 21, Section 5.4.4, GI173 and Table 4.4 of the Cherrywood Planning Scheme. e) The revised landscape proposals shall include a homezone topology within the proposed additional surface car parking areas located to the north and south of Domville Park and shall include additional screening of the remaining parking spaces from within the open space. The revised landscaping plans shall clearly indicate all permanent communal open spaces as indicated on the original Landscape Masterplan drawing number is 17402-2-100 rev 0, the CFI Landscape Masterplan drawing number is 17402-2-100 rev B and clearly indicate those which are intended to be temporary and retained for future possible development, ie the former development plots of Blocks C,D and F, all for the written agreement of the Planning Authority and prior to the commencement of development. f) The areas identified as retained for future development on the drawings requested under point (e), shall be developed as amenity areas/parking areas in accordance with this permission and its attached conditions for the amenity of the residents , unless permission is granted at a future date for an alternative development/use on these identified plots. All purchasers of property in the proposed development shall be made aware of this condition at the point of sale. In this regard a clause that identifies the temporary areas of open space shall be included in any contract of sale; and all future sales, between the applicant and any purchaser. 3. No development shall commence within the application site until the school site zoned for the First Primary School in the First Growth Area (including the associated open space provision for the school identified as Parade Green on Map 5.1) has been made available to the Department of Education and Skills (DES) in accordance with Section 2.4 and Table 7.2 of the Cherrywood Planning Scheme and as shown on Map 2.1 'Primary land Use'. REASON: For the purpose of ensuring compliance with the Cherrywood Planning Scheme. 4. Save for amendments granted on foot of this permission, Tully Park shall be completed in accordance with Planning Permission Reg. Ref. D15A/0813 prior to the first occupation of units REASON: In the interest of the proper planning and sustainable development of the area. 5. Prior to the commencement of development and for the written agreement of the Planning Authority the applicant/developer shall submit revised plans and elevations indicating that the proposed crèche at ground floor level in Block A1 shall increase in size and capacity to include the 2 bed ground floor apartment associated with Block A1. REASON: To ensure the proposed development is consistent with Section 2.3.3 of the Cherrywood Planning Scheme and in the interest of the proper planning and sustainable development of the area. 6. Prior to the commencement of development the developer shall submit, for the written agreement of the Planning Authority, revised drawings for Blocks A, E, G & H, as follows: a. Revised Masterplan-1 (Dwg. No. P16-319D-RAU-ZZ-00-DR-A-31010)and Landscape Masterplan and Circulation diagram (Dwg. No. 17402-2-100) clearly annotating and including the Finish Floor Level and Finished Ground level of the ground floor terraces, access gates and footpath/steps connecting with the pathway which runs parallel to the Luas. b. Ground Floor Plans clearly annotating the footprint of the terrace/ boundary and access point (gate). These drawings shall be consistent with the Master Plan -1 Landscape Masterplan (as referred to under (a)). c. Elevations, including contiguous elevations, fronting the Luas clearly annotating the steps and access points which connect the pathway which runs parallel to the Luas with the podium level. These drawings shall be consistent with the Master Plan -1/Landscape Masterplan and Ground Floor Plans (referred to under (a) & (b)) and annotating the access gate and boundary treatment. d. The applicant shall submit revised architectural drawings and floor plans of Blocks A, A1, B, E, G and H showing the inclusion of the own door access to the ground floor apartments. These drawings shall be consistent with Drawing No. 17402-2-100 Landscape Masterplan and Circulation diagram. REASON: To ensure consistency with Section 2.8 and Objective PD3 of the Cherrywood planning Scheme. 7. Each proposed house and apartment shall be used as a single dwelling unit only and shall not be sub-divided in any manner or used as two or more separate habitable units. REASON: To prevent unauthorised development. 8. Prior to commencement of development, the developer shall comply with the Dún Laoghaire Rathdown County Council Housing Strategy, drawn up in accordance with Part V, Section 96(4) of the Planning & Development Act 2000, as amended, and in accordance with agreement to be reached with the County Council's Housing and Community Department unless the developer shall have applied for and been granted an exemption certificate under Section 97 of the Planning & Development Act, 2000, as amended. REASON: To comply with the County Council Housing Strategy & Part V of the Planning & Development Act, 2000, as amended. 9. The area in the north east corner of the site adjoining the green way, the proposed Luas crossing, the crèche open space and bin store shall be redesigned to create a stronger entrance point and plaza area to the development. The bin store area shall be relocated away from the green way. The revised design shall allow for a continuation of the pedestrian path by the Luas line to the lands to the north. Detailed drawings showing the above revisions shall be submitted to the Planning Authority for written agreement before the commencement of development. REASON: To ensure consistency with Specific Objective GI 8 of the Cherrywood Planning Scheme. 10. Prior to the commencement of development the developer shall submit for the written agreement of the Planning Authority: a. Revised plans for Block H. The revised drawings shall show and provide for direct passive surveillance from each of the proposed apartment units along the southern elevation of Block H. b. Revised plans and elevations for the retaining walls and other apartment block boundary treatments facing the public path along the Luas line. The treatment and finish of the wall and other apartment block boundary treatments in these locations should not be opaque. REASON: To ensure consistency with Specific Objective PD 10 of the Cherrywood Planning Scheme. 11. Prior to the commencement of the development, the developer shall submit for the written agreement of the Planning Authority, full details of the proposed external finishes of all buildings including ESB substations and entrances to basement car parks, all elevational treatments including brick details including colour, windows and doors, balcony/terrace and boundary treatments, and roof surface materials/finishes, in the form of samples and on site mock ups. In this regard the coloured spandrel panels as shown on the submitted drawings shall be omitted. Details of the longevity of the materials proposed and the overall long term maintenance of same shall also be submitted and agreed in writing. The external finishes of buildings shall; a. Comprise of durable and high quality materials including natural stone or brick. b. Ensure harmony and visual coherence in the built environment, with the use of materials that identifies it as a distinct neighbourhood, yet articulate interest to avoid monolithic and bulky facades along the perimeter elevations, with particular attention to the upper floors and roofs. REASON: To ensure consistency with Section 2.8 'Layout' and Objectives PD 7, PD 8, PD 13, PD 14, PD 19 and PD 24 of the Cherrywood Planning Scheme. 12. Prior to the commencement of development, as part of the detailed design of the scheme the location of bin stores, service boxes, metre boxes and similar ancillary provision shall be submitted to the Planning Authority for their written agreement. Such ancillary provision shall be located within the curtilage of individual apartment blocks and houses and/or incorporate measures to enhance the streetscape mitigating their visual impact and reducing visual clutter. REASON: To ensure consistency with Specific Objective PD 15 of the Cherrywood Planning Scheme. 13. Rooftop materials and treatments, including screening, shall be light in colour. Notwithstanding the provisions of Part 1 of Schedule 2 of the Planning & Development Regulations 2001 (as amended), no additional services or installations shall be located on the roofs of the apartment blocks without a prior grant of planning permission. REASON: In the interests of visual amenity of and to ensure consistency with Specific Objective PD 19 of the Cherrywood Planning Scheme. 14. The applicant shall submit revised house types for house No.Z1.6, Z1.15, Z3.7, Z3.19 and Z4.1. These revised house shall be full three storey dual fronted and shall adequately address their prominent corner positions. Drawings showing the revised house type shall be submitted to the planning authority for written agreement before the commencement of development. REASON: In the interest of visual amenity and the urban form of the development. 15. The developer shall comply with the following: a. Prior to commencement of development, the developer shall procure, prepare and submit a demolition and construction method statement for the agreement, in writing, of Planning Authority. The method statement should identify all interfaces to the Luas alignment and contain a risk assessment for works associated with the interfaces including mitigation measures for unacceptably high risks. The method statement should demonstrate resolution of all issues outlined above when viewed in the context of the existing operational Luas infrastructure. The demolition and construction method statement shall form part of a finalised Construction Management Plan and shall be submitted for the written agreement of the Planning Authority prior to the commencement of development on site. b. The normal working hours within the site shall be Monday to Friday between 08:00 and 19:00 hours and Saturday between 08:00 and 14:00 hours with no working on Sunday and public holidays. The contractor will not be permitted to start work each day before 08:00 hours. c. The construction of the development shall be managed in accordance with a final Construction Management Plan, which shall be submitted for the development in its entirety to the Planning Authority for agreement in writing, prior to the commencement of any development. In this regard the final Construction Management Plan shall including a Community Liaison Plan. d. A community liaison contact shall be established by the developer with details given to local residents, so that particular issues and complaints may be quickly identified and responded to. e. Prior or to commencement of development a mechanism and structure for on-site monitoring, reporting on progress and quality control to the Planning Authority in relation to construction standards, materials, as-built drawings and records shall be agreed in writing with the Planning Authority. f. Prior to commencement of development, a Site Monitoring Engineer shall be appointed at the Developer's expense for independent on-site monitoring on behalf of DLRCC and for reporting on progress and quality control to DLRCC with regard to the elements to be taken in charge/or constructed to taking in charge standard. The appointment of the Site Monitoring Engineer shall be agreed in advance and in writing with the Planning Authority, shall be independent of the Developer and the Developer's design and construction teams and shall report exclusively and directly to DLRCC only. The Site Monitoring Engineer shall be suitably qualified and experienced in the design and construction of surface water and roads infrastructure. REASON: To ensure adherence to DLRCC Standards for Taking in Charge. In the interests of orderly development, proper planning, sustainable development and the residential amenity of the area and to mitigate against adverse impacts on nearby residents and the operation of the Luas. 16. Prior to the commencement of development, archaeological testing shall be carried out on site. This pre-development testing shall consist of the following: a. The applicant is required to engage the services of a suitably qualified archaeologist (licensed under the National Monuments Acts 1930-2004) to carry out pre-development testing at the site. No sub-surface work shall be undertaken in the absence of an archaeologist without his/her consent. b. The archaeologist is required to notify the Department of Culture, Heritage and the Gaeltacht in writing at least four weeks prior to the commencement of site preparations, this will allow the archaeologist sufficient time to obtain a licence to carry out the work. c. The archaeologist shall carry out any relevant documentary research and may excavate test trenches at locations chosen by the archaeologist, having consulted the proposed development plans. d. Having completed the work, the archaeologist shall submit a written report to the Planning Authority and the Department of Culture, Heritage and the Gaeltacht for consideration. e. Where archaeological material is shown to be present, avoidance, preservation in situ, preservation by record (excavation) and/or monitoring may be required and the Department of Culture, Heritage and the Gaeltacht will advise the applicant/develop with regard to these matters. f. No site preparation work shall be carried out until after the archaeologist's report has been submitted and permission to proceed has been received in writing from the Planning Authority in consultation with the Department of Culture, Heritage and the Gaeltacht. REASON: To ensure the continued preservation (either in situ or by record) of places, caves, sites, features or other objects of archaeological interest. 17. Prior to commencement of development and the erection of any advertising hoardings on site the Developer shall submit the following for the written agreement of the Planning Authority: a. An acceptable naming and numbering scheme for the development. In this regard, the use of street names and public spaces reflecting local place names or local history would be acceptable. The applicant is advised that the development names as annotated on the drawings submitted as part of this planning application, for example on the Site Layout Masterplan -1 dated the 01/06/2017, Drawing P16-319D-RAU-ZZ-00-DR-A-31010 Rev, P03.07, are not considered to be acceptable and should be rationalised. b. Details of all signage, including all external signage, signage for the crèche, way-finding and directional signage. c. Full details of the location and content including background colour, lettering typeface, logos and colour d. Materials that are high quality, modern and durable, and that respect the proportions and design of the building and its surroundings. REASON: In the interests of visual amenity and clarity and to ensure consistency with Specific Objective H6, PD30 and PD32 of the Cherrywood Planning Scheme. 18. Prior to the commencement of development, or as otherwise agreed in writing with the Planning Authority, the developer shall submit the following to the Planning Authority: a. Written evidence of the water supply design compliance with Irish Water specification and requirements and copies of the final detailed design. The detailed design of the water supply infrastructure including details of all connections shall be in accordance with Irish Water specification and requirements. b. Written evidence of the wastewater design compliance with Irish Water specification and requirements and copies of the final detail design. The detailed design of the wastewater supply infrastructure including details of all connections shall be in accordance with Irish Water specification and requirements. REASON: In the interests of consistency with PI 4 And PI 12 of the Planning Scheme. 19. In relation to Surface Water Drainage, the development shall comply with the following: a. Surface Water discharge from the subject development shall be limited to 1 l/s/ha as per the Cherrywood Planning Scheme. b. As part of the detailed design and prior to the commencement of development, the developer shall re-design the precise location of the proposed Storage Tank C and submit the revised design, inclusive of engineering drawings and a revised site layout if necessary to the Planning Authority for their written agreement. Storage Tank C shall form part of the stormwater infrastructure for the subject residential development alone. Storage tank C shall not be the same tank as that tank located in Tully Park and shall therefore be re-designed to an alternative location in order to avoid conflict with the Tully Park surface water storage facility permitted under Planning Application ref: DZ15A/0813. Storage tank C shall be located within the residential development and not within the public lands of Tully Park. c. Prior to the commencement of development the applicant shall submit to the Planning Authority for its written agreement a SuDS Construction and Environmental Management Plan and programme of works that amongst other items provides for interception, containment and treatment of construction runoff. No construction runoff shall be diverted to proposed SuDS measures such as swales, detention basins or attenuation tanks. Any surface water sewer pipes used to convey construction runoff should be thoroughly cleaned before subsequent connection to SuDS elements. The Construction Plan shall also detail measures for the protection of attenuation tanks, swales and other SuDs elements from construction traffic damage. d. Prior to the commencement of development, full detailed design for the subject development's surface water drainage inclusive of road drainage details, gully locations, infiltration trench details, petrol interceptor location, Detention basins, swales, storage tanks, Green/Blue roofs and all other SuDS measures shall be submitted for the written agreement of the Planning Authority. The full detailed design for the development shall be consistent with any detailed design measures required by the Hydrogeological Risk Assessment (HRA), required under condition No. 52 of this report. e. Prior to the commencement of development, a phasing plan shall be submitted to the Planning Authority that details the construction of the relevant SuDS measures and surface water infrastructure being completed prior to the occupation of development. The phasing plan shall be consisted with required under Condition no.55. The phasing plan shall be consistent with any detailed design measures required by the Hydrogeological Risk Assessment (HRA), as per condition No.44 of this report. f. Prior to the provision of any hard-standing areas and/or occupation of any houses, relevant surface water infrastructure on Grand Parade/Tully Vale Road together with Regional Pond 2B shall be commissioned and operational. A letter of Confirmation that Regional Pond 2B has been designed to accommodate the subject lands shall be submitted to the Planning Authority. g. The minimum size storm sewer serving a road gully shall be a minimum of 225mm. h. Prior to the commencement of development, an operations and management plan for the proposed sustainable urban drainage components (inclusive of the attenuation structures) shall be submitted for the written agreement of the Planning Authority. i. A storm water management plan shall be prepared and shall be approved by the Planning Authority prior to the commencement of development. j. Hydrobrakes shall be fitted with by-pass doors, the design of which shall be submitted to the Planning Authority for their written agreement prior to the commencement of development. k. Prior to the commencement of development the applicant shall submit to the Planning Authority for its written agreement a Stage 2 - Detailed Design Stage Stormwater Audit, as required under PI 7 of the Cherrywood Planning Scheme , so as to check the detail of all the Suds elements and to ensure that any necessary amendments have been included in the construction stage drawings. l. Upon completion of each phase of the development, the applicant shall submit to the Planning Authority for its written agreement a Stage 3 Completion Stage Stormwater Audit to ensure the SuDS measures were installed and working as designed, no misconnections have taken place and that damage has not occurred to any of the stormwater drainage infrastructure during construction. A report shall, be issued to the Planning Authority and any necessary recommendations carried out, unless agreed otherwise with the Planning Authority. This stage may require the installation of flow monitors and/or dye testing; the extent of monitoring will depend on the findings of the audit. A CCTV survey shall be carried out of all stormwater pipes and the survey and report forwarded to the Planning Authority. m. Prior to the commencement of development the applicant shall submit full details of the proposed Green/Blue Roof for the written agreement of the Planning Authority. Details shall include a construction plan and a post-construction maintenance specification and schedule. The applicant shall enter a formal maintenance agreement with a professional contractor. Maintenance contractors with specialist training in green/blue roof care should be used. n. Prior to the first occupation of the apartment blocks, the applicant shall make a submission for the written agreement of the Planning Authority showing that the Green/Blue Roof has been installed according to the planning application plans and conditions. This shall include photo documentation of the installation process, and certification from the installer of the system. The applicant shall facilitate inspections during and post installation of the Green/Blue Roof from the Planning Authority. o. Prior to commencement of development of the landscape / public realm areas, the developer shall provide the following for the written agreement of the Planning Authority:- (i) The design and specifications for all SuDs /water features located within the communal open spaces including management / maintenance programme and safety audits. REASON: In the interests of orderly and sustainable development, to comply with the requirements of the Cherrywood Planning Scheme including GI15 and GI16 and to ensure long term optimum operation of the surface water management system. 20. The developer shall comply with the following: a. Save for amendments granted on foot of this permission, the roads network shall be completed in accordance with Planning Permission Reg. Ref. DZ15A/0758 DZ15A/0813 prior to the first occupation of units. b. A Quality Audit (which shall include a Road Safety Audit, Access Audit, Cycle Audit and Walking Audit) shall be carried out at Stage 2 for the detailed design stage and at Stage 3 for the post construction / prior to opening stage. All audits shall be carried out at the Developers expense in accordance with the Design Manual for Urban Roads & Streets (DMURS) guidance and TII (Transport Infrastructure Ireland) standards. The independent audit team(s) shall be approved in writing by the Planning Authority and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Audit reports shall be submitted for the written agreement of the Planning Authority prior to the commencement of development. The Stage 3 Audit reports shall be submitted for the written agreement of the Planning Authority prior to the opening for public use/ taking in charge by Dun Laoghaire Rathdown County Council. REASON: In the interests of orderly development and proper planning and the sustainable development of the area and for consistency with the Cherrywood Planning Scheme. In order that the road network is provided in tandem with the residential development thus providing connectivity and accessibility for future residents. 21. The proposed development shall comply with the following: a. Street trees shall be positioned at intervals of not more than five perpendicular or two parallel car parking spaces. b. Pedestrian footpaths shall have a minimum width of not less than 2.0 metres. REASON: In the interests of consistency with PI 14 of the Planning Scheme. 22. With regard to Section 4.2.9 of the Cherrywood Planning Scheme, Pedestrian and Cycle Movement Strategy, the development shall comply with the following: a. The developer shall include a pedestrian/cycle crossing of the Luas at the southeast corner of the development similar to that detailed at the northeast corner on drawing D1833-C-125-RevB. Prior to the commencement of the development the detailed design of this crossing shall be agreed with Transport Infrastructure Ireland (TII) and subsequently submitted for agreement, in writing, to the Planning Authority. b. The pedestrian footpath along the boundary of the development that runs along the west side of the Luas and the Greenway that runs along the Northern boundary shall be made publicly accessible at all times. c. Prior to the commencement of development the detailed design of the roads, pedestrian and cycle routes and crossings including the Luas crossings shall be agreed, in writing, with the Planning Authority. d. Prior to the commencement of development the detailed design issues associated with accessibility, permeability and landscaping and public realm elements directly involving Luas infrastructure or its' immediate environs shall be agreed in writing with the Planning Authority. e. The Developer is required in the detailed design of this development to connect to and to facilitate the pedestrian route along the west side of the Luas line that would link the proposed development and the Bishop Street / Grand Parade Junction. REASON: In the interests of consistency with PI 20 of the Planning Scheme. 23. One car parking space shall be sold with each 1 and 2 bed dwelling and 2 no. car parking spaces shall be sold with each 3/4 bed dwelling. The car parking spaces allocated to each dwelling shall be clearly marked as attaching to a particular dwelling unit and allocated spaces shall not be sold or let independently. The remaining car parking spaces not associated with private dwellings or the crèche, shall be designated as visitor parking to serve the residential development and shall not be let or sold for any commercial purposes. In this regard: a. The resident car parking spaces to be directly associated with and sold with the apartments in Block A1 shall be located immediately adjacent to Block A1 and shall be clearly indicated as resident only car parking for Block A1. b. The resident car parking spaces to be directly associated with and sold with the apartments in Blocks A2 and B shall be located in the basement associated with these 2 blocks and shall be clearly indicated as resident only car parking. The remaining car parking spaces located in the basement shall be designated as visitor spaces. c. The resident car parking spaces to be directly associated with and sold with the apartments in Blocks E, G and H shall be located in the basement associated with these 3 blocks and shall be clearly indicated as resident only car parking. The remaining car parking spaces located in the basement shall be designated as visitor spaces. REASON: To ensure consistently with the Specific Objective PI 21 and Table 4.4 of the Planning Scheme. 24. The developer shall comply with the following: a. The provision and design of cycle parking required for the development shall adhere to the requirements of the Dun Laoghaire Rathdown County Council's 'Standards for Cycle Parking and associated Cycling Facilities for New Developments' (January 2018). REASON: In the interests of consistency with PI 22 of the Cherrywood Planning Scheme. 25. Prior to the commencement of development or any construction works on site the developer shall submit for agreement, in writing, to the Planning Authority a Travel Plan in accordance with the guidance and requirements of the Cherrywood Area Wide Travel Plan. The travel plan shall include the details and contact information of the key contact or Travel Plan Coordinator for this development. The nominated person shall be suitably qualified and experienced to undertake the role. REASON: To ensure consistency with Specific Objective PI 24 of the Cherrywood Planning Scheme. 26. The provision and location of charge points for electric vehicles shall be in accordance with the requirements of the Section 8.2.4.12 of the Dun Laoghaire Rathdown County Development Plan 2016-2022 REASON: To ensure that the provision and design shall be in accordance with the requirements of the Planning Authority. 27. Prior to commencement of development the detailed design of public lighting complying with 'Public Lighting Installations in Residential and Industrial Areas Guidance Document - February 2015' (DLRCC), shall be agreed (in writing) with the Planning Authority. REASON: To ensure that designs shall meet with the requirements of the Planning Authority and shall be consistent with the Cherrywood Planning Scheme Specific Objective PI 28 and the documents listed in section 4.2.7. 28. Prior to commencement of development, the developer shall provide the following for the written agreement of the Planning Authority:- a. The developer shall retain the services of a qualified Landscape Architect, as his / her Landscape Consultant, throughout the course of the development works, and shall notify the Planning Authority of that appointment in writing prior to the commencement of development. The developer shall engage the Landscape Consultant to procure, oversee and supervise the landscape contract for the implementation of the permitted landscape proposals. When all landscape works are inspected and completed to the satisfaction of the Landscape Consultant, he/she shall prepare, sign and submit a Practical Completion Certificate (PCC) to the Planning Authority, as verification that approved landscape plans and specifications have been fully implemented. b. The developer shall engage the services of a qualified arborist as an arboricultural consultant, for the entire period of construction activity. The applicant shall inform the Planning Authority in writing of the appointment and name of the consultant, prior to commencement of development. The consultant shall visit the site on a monthly basis, to ensure the implementation of the all of the recommendations in the submitted application. REASON: To ensure a high quality Public Realm and consistency GI 43 with the Cherrywood Planning Scheme and in the interest of proper planning and sustainable development of the area. 29. Prior to the commencement of development: a. The detailed design, including materials of the retaining structure along the boundary between the permitted Tully park (Reg. Ref. DZ15A/0813) and the proposed developed at Zone 4 Domville Court is submitted for the written agreement of the Planning Authority. b. The developer shall submit for the written agreement of the Planning Authority maintenance proposals outlining how private rear and side garden boundaries adjoining communal and/or public open spaces will be managed to retain uniformity. c. Notwithstanding the provisions of Part 1 of Schedule 2 of the Planning & Development Regulations 2001 (as amended), within the rear gardens of the proposed houses located in the areas indicated as Lehaun Court and Domville Court on Site Layout Masterplan - 1P16-319D-RAU-ZZ-00-DR-A-31010 REV P03.07, no structures ancillary to the residential use shall be erected without a prior grant of planning permission. REASON: In the interests of visual amenity of and to ensure consistency with Specific Objective GI 8 of the Cherrywood Planning Scheme. 30. Prior to the commencement of development, or as otherwise agreed in writing with the planning authority, the developer shall submit for the written agreement of the Planning Authority the following: a. Drawings (including hard landscape plans) and construction details for all hard standing pedestrian, cycling, vehicular areas (including adjoining road interfaces) and Homezones detailing the specifications of all surface/finish materials. In this regard, samples, data sheets and on site mock ups of all materials shall be provided for the agreement of the Planning Authority and approved control samples must be held on site at all times. Finishes shall comprise of durable, easily sourced and high quality materials comprising natural stone (or other materials as agreed with the Planning Authority). b. an 'External Street Furniture Strategy', proposals shall be in accordance with dlr Age Friendly Strategy 2016-2020. c. the location, type and integration of all lighting types shall be clearly shown on the landscape drawings for all public realm areas. d. Detailed drawings and specifications of the proposed public realm area between the luas interface and the terraces of the apartment block including a revised boundary treatment along the pedestrian path. e. Hard landscape plans and construction details for all hard standing pedestrian, cycling, and vehicular areas (including adjoining road interfaces), detailing the specifications of all surface/finish materials. In this regard, samples, data sheets and on site mock ups of all materials shall be provided for the agreement of the written Planning Authority and approved control samples must be held on site at all times. All surfaces and finishes shall include materials that are consistent PD 14. In particular the finishes shall comprise of durable, easily sourced and high quality materials comprising natural stone (or other materials as agreed with the Planning Authority) that harmonise and complement those within the adjoining Tully Park and Greenway entrance space . REASON: To ensure a high quality open space in accordance with the Cherrywood Amenity Space Guidance Document and to ensure consistency with section 5.4.4 and Objective PD 14 and GI 8.of the Cherrywood Planning Scheme. 31. Prior to the commencement of development, the following shall be submitted for the written agreement of the Planning Authority: a. A design strategy for all areas of public realm which identifies all locations for vents which are visible within any public or communal spaces and details of how they will integrate with future landscape plans. Vents shall be integrated sensitively and appropriately into the surrounding landscape having regard for maintenance, public safety and visual appearance. REASON: To ensure a high quality standard of development where adequate amenity / recreational facilities are provided on the site to meet local need. 32. The design, installation and maintenance of all tree planting along Luas lines has to be agreed with the Planning Authority, prior to commencement of any works to include the following: a. Tree planting must account for adjacent services and infrastructure which includes Luas tracks and OCS installations and thus should use root barriers and root directors as per BS 8545 and current best practice. b. The visibility of approaching trams as well as pedestrian and general road traffic has to be ensured through siting and the design of the tree line or individual trees REASON: To ensure consistency with GI 42 and GI 44 of the Cherrywood Planning Scheme. 33. Prior to the commencement of development, the developer shall engage the services of a qualified ecologist as an ecological consultant, from the commencement of construction and for the duration of the monitoring requirements as set out in the Habitat Management Plan. The developer shall inform the Planning Authority in writing of the appointment and name of the consultant, prior to commencement of development. The consultant shall ensure the implementation of the all of the recommendations in the submitted Ecological Report. REASON: In the interests of proper planning and sustainable development. 34. With regard to the protection of ecology, prior to the commencement of development the following pre-development testing shall be carried out with regard to the proposed removal from the development site of sods containing bee and pyramidal orchids and from the area of dry calcareous grassland. In this regard a detailed plan should be submitted to the Planning Authority for written agreement containing a time table for the sods, details of their treatment and the locations of appropriate areas (i.e. Tully Park / Luas embankment) where they can be re-established. REASON: To conserve local diversity, particularly of orchid and calcareous grassland species and to ensure compliance with Section 5.5 of the Cherrywood Planning Scheme. 35. All specimens of orchid species occurring on the development site, namely bee orchids, pyramidal orchids, and common spotted orchids, shall be translocated within sods of the grassland vegetation surrounding them from the development site to the adjacent site of the proposed Tully Park according to the methodology set out in the document 'Revised Ecology Report'. REASON: To conserve orchid and associated calcareous grassland vegetation species contributing to local biodiversity and to ensure compliance with Section 5.5 of the Cherrywood Planning Scheme. 36. Clearance of Vegetation including trees and shrubs from the development site shall only take place outside the period from 1st of March to the 31st of August in any year REASON: To prevent the destruction of the nests, eggs and young of any birds nesting on the development site and to ensure compliance with Section 5.5 of the Cherrywood Planning Scheme. 37. The mitigation measures to protect Badgers and Badger Setts occurring on lands adjacent to the development site during the course of the proposed development, as set out in the document 'Revised Ecology Further Information Request' shall be implemented in full. REASON: To prevent the injury or death of badgers, members of a species protected under the Wildlife Acts, 1976 - 2000, or damage or destruction of their resting or breeding places, also protected under these acts and to ensure compliance with Section 5.5 of the Cherrywood Planning Scheme. 38. Prior to the commencement of development the applicant /developer shall submit for the written agreement of the Planning Authority a full plan for the eradication of the hybrid knotweed Fallopia x bohemica, an invasive alien, occurring on the development site, and the disposal of all remains of the knotweed and soil contaminated by it, in particular specifying whether it is intended to dispose of this material in sealed cells on site or to transport it off site under licence from the National Park & Wildlife Service for final disposal at a licenced facility elsewhere. REASON: To ensure all plant material originating from the hybrid knotweed Fallopia x bohemica, an invasive alien which can undermine buildings and threatens biodiversity, is removed from the development site and safely disposed of and to ensure compliance with Section 5.5 of the Cherrywood Planning Scheme. 39. Prior to the commencement of development, the applicant shall submit for the written agreement of the planning authority a schedule of Ecological monitoring including dates for inspections. REASON: In the interest of proper planning and sustainable development and to ensure compliance with Section 5.5 of the Cherrywood Planning Scheme. 40. Prior to the commencement of development, the applicant shall submit for the written agreement of the planning authority plans indicating locations for spoil storage including Phase 3 works as shown on drawing No.P16-319D-RAU-ZZ-ZZ-DR-A-31019 Rev P03.02, no spoil shall be stored in any lands other than that permitted under the current application. REASON: In the interest of proper planning and sustainable development and to ensure compliance with Section 5.5 of the Cherrywood Planning Scheme. 41. Prior to commencement of development, a construction engineer with hydrogeological experience shall be appointed at the developer's expense for independent on-site monitoring on behalf of DLRCC to supervise and ensure the implementation of the mitigation measures relating to hydro-geology / protection of the Tufa springs. The appointment of the above construction engineer shall be agreed in advance and in writing with the Planning Authority, shall be independent of the developer and the developer's design and construction teams and shall report exclusively to DLRCC. REASON: To ensure protection of the Tufa springs that are considered to be Annex I EU Priority Habitat and to ensure compliance with Objectives GI3 and GI61 of the Cherrywood Planning Scheme 42. In relation to the protection of the Tufa Springs, prior to the commencement of development and for the written agreement of the Planning Authority the developer shall comply with the following: - a. The following independent suitably qualified specialists will be retained by the Applicant for agreement by the Planning Authority 6 weeks prior to the first phase Site Investigations outlined in condition No.44, in order to provide input to the proposed development at the appropriate stages outlined in the subsequent conditions: i. Site Investigations specialist; ii. Professional suitably qualified Hydrogeologist; iii. Professional suitably qualified Ecologist with tufa springs experience; iv. Professional suitably qualified Invasive Species Plant Specialist. b. These specialists will perform their role and provide reports in agreement with and to the satisfaction of the Planning Authority. REASON: To provide timely appropriate advice to protect the Tufa springs that are considered to be Annex I EU Priority Habitat - 'Petrifying Springs with Tufa formation' and are afforded protection under the County Development Plan and considered of county level importance and in accordance with the Cherrywood Planning Scheme and in accordance with GI 3, GI 52 and GI 61 of the Cherrywood Planning Scheme. 43. In relation to the protection of the Tufa Springs, prior to the commencement of development and for the written agreement of the Planning Authority the developer shall comply with the following: - a. Phased Site Investigations will be carried out to obtain sufficient information prior to the production of a Hydrogeological Risk Assessment. The phases of site investigations will be carried out by an independent suitably qualified contractor with input from an independent suitably qualified hydrogeologist and suitably qualified ecologist. These specialists, retained by the Applicant, will perform their role and after each phase of investigation, progress reports will detail the finding of the phase and any requirements for further phase of site investigation in agreement with and to the satisfaction of the Planning Authority. The invasive species plant specialist will provide advice regarding the Japanese Knotweed Hybrid Management Plan and the contractor will implement their recommendations, if any. REASON: To provide sufficient data for the independent Hydrogeological Risk Assessment in relation to the groundwater and to provide measures to protect the Tufa springs that are considered to be Annex I EU Priority Habitat - 'Petrifying Springs with Tufa formation' and are afforded protection under the County Development Plan and considered of county level importance and in accordance with the Cherrywood Planning Scheme and in accordance with the Cherrywood Planning Scheme and in accordance with GI 3, GI 52 and GI 61 of the Cherrywood Planning Scheme. 44. In relation to the protection of the Tufa Springs, prior to the commencement of development and for the written agreement of the Planning Authority the developer shall comply with the following: - a. Following the site investigations and 8 weeks prior to the commencement of the proposed development the developer shall provide a robust Hydrogeological Risk Assessment (HRA). This will be undertaken and based on sufficient site investigation data and monitoring of groundwater carried out on behalf of the developer. This HRA will be produced by an independent suitably qualified hydrogeologist with input where necessary by an independent professional ecologist, and will perform their role and provide reports in agreement with and to the satisfaction of the Planning Authority. The HRA will address the construction measures and any detailed design measures required and this will be finalised and agreed with the Planning Authority. REASON: To provide appropriate advice for the protection of the groundwater and the Tufa springs that are considered to be Annex I EU Priority Habitat - 'Petrifying Springs with Tufa formation' and are afforded protection under the County Development Plan and considered of county level importance and in accordance with the Cherrywood Planning Scheme and in accordance with the Cherrywood Planning Scheme and in accordance with GI 3, GI 52 and GI 61 of the Cherrywood Planning Scheme. 45. In relation to the protection of the Tufa Springs, prior to the commencement of development and for the written agreement of the Planning Authority the developer shall comply with the following: A final site specific detailed Construction and Environment Plan (CEMP) will be submitted for agreement with the planning authority following the outcomes of the Site Investigations and the HRA and at least 8 weeks prior to the commencement of the proposed development. In this regard: a. The CEMP will include a Biodiversity section with site specific mitigation measures which will be provided by the independent suitably qualified Hydrogeologist, independent suitably qualified Ecologist with cognisance of the Ecology Report and the Ecology Appraisal Report, the HRA and the Japanese Knotweed Hybrid Management Plan. It will also include the appropriate phasing of the works as outlined in these documents and/or as advised by the specialists, where relevant. b. The CEMP will include detailed method statements of the construction phase including the construction of the basements and incorporate measures prescribed by the independent suitably qualified Hydrogeologist and independent suitably qualified Ecologist. c. The CEMP will include a programme of the proposed construction works will be provided for agreement with the Planning Authority as part of the Final CEMP with input by the independent suitably qualified Hydrogeologist, independent suitably qualified Ecologist and invasive species plant specialist. d. A monitoring programme of the construction works by the independent suitably qualified Hydrogeologist, independent suitably qualified Ecologist and invasive species plant specialist will be provided for agreement with the Planning Authority. e. It is noted that the submitted CEMP highlights the concept of a 'live' CEMP to facilitate changes during construction. Any changes required that may relate to the sensitive ecological features such as protected habitats and species will be submitted for agreement with the Planning Authority and/or other statutory agencies such as licence requirements by NPWS. REASON: To provide timely appropriate advice to prevent the spread of invasive species and to protect Biodiversity during the construction phase, including the tufa springs that are considered to be Annex I EU Priority Habitat - 'Petrifying Springs with tufa formation' and are afforded protection under the County Development Plan and considered of county level importance. 46. In order to provide greater clarity regarding the specific treatment option for, an updated Japanese Knotweed Hybrid Management Plan report for agreement by the Planning Authority at least 4 weeks in advance of first phase Site Investigations of the proposed development. This will include the following: Details of the exact treatment option chosen. a. Demarcation of areas and locations of treatment, including signs at any access points to/from site, to indicate the presence of the knotweed and to warn others not to enter the areas marked. b. Confirmation that tracked machines will not be used in the areas of the Japanese Knotweed Hybrid. c. Biosecurity measures to be implemented. d. Programme of implementation and monitoring of, the treatment option chosen, for the written agreement of the Planning Authority. e. If the final option/s chosen requires a licence from another agency, this will be obtained and provided to the Planning Authority. f. Final details of the treatment option and associated measures relevant to the construction phase and the incorporation of these into the programme of works will be submitted in the updated Final Construction and Environment Management, for the written agreement of the Planning Authority. The Invasive Plant Specialist will oversee the Japanese Knotweed Hybrid Management Plan and will provide monitoring reports that will be submitted at intervals based upon the programme of works and thereafter, for the written agreement of the Planning Authority. Actions required to be undertaken by the Applicant as a result of the recommendations of monitoring will be reported to the Planning Authority. REASON: To prevent the spread of Japanese Knotweed, Giant Knotweed and Knotweed hybrids. 47. Vegetation clearance and tree removal shall take place outside the bird breeding season (March 1st - August 31st). REASON: To protect birds and bird breeding habitats during the nesting season. 48. All mature trees proposed for felling will be re-examined for evidence of bats prior to demolition/felling by a bat specialist and their recommendations, if any implemented. REASON: To provide appropriate advice for the protection of bats which are afforded a regime of special protection under the European Habitats Directive. 49. Prior to the commencement of development, the applicant shall submit to the planning authority a letter from their bat consultants, that they are satisfied that the final design of the external illumination proposed at the proposed for the development, will be to the required specification recommended by the bat specialist and that they are satisfied that proposed roosts and important bat corridors are not illuminated; the applicant will also submit a report from the bat specialist to the planning authority after the installation of the external lighting, at the proposed development, confirming that it is operating according to specification. REASON: To mitigate the potential impact of increased nocturnal illumination at the proposed development on bats, which are afforded a regime of special protection under the European Habitats Directive. 50. The developer shall make available a single document that will detail the mitigation measures/recommendations relating to Biodiversity and the Tufa springs having regard to the following documents: a. Revised Ecology Report; b. Hydrogeological Risk Assessment; c. Final Construction and Environment Management Plan (CEMP); d. JBA's Hydrogeological Review Reports e. and all other relevant Planning documents. The document will also detail how these mitigation measures will be implemented and the programme of implementation. This document will be provided to the Planning Authority for written agreement 8 weeks prior to the commencement of site works. NOTE: The Planning Authority will make the JBA's Hydrogeological Review Reports available to the applicant/developer on request. REASON: In the interest of a coherent approach and to ensure the protection of the groundwater and the Tufa springs that are considered to be Annex I EU Priority Habitat - 'Petrifying Springs with Tufa formation' and are afforded protection under the County Development Plan and considered of county level importance and in accordance with the Cherrywood Planning Scheme and in accordance with the Cherrywood Planning Scheme and in accordance with GI 3, GI 52 and GI 61 of the Cherrywood Planning Scheme. 51. Prior to the commencement of development, a biodiversity monitoring programme for all phases of the proposed development including the site investigation, construction, post construction and operation phase will be submitted for written agreement of the Planning Authority. Actions required to be undertaken by the applicant as a result of the recommendations of monitoring will be reported to the planning authority. REASON: To monitor Biodiversity and to undertake any remedies if required. 52. Prior to the commencement of landscape works the following shall be submitted for the written agreement of the Planning Authority: a. Details of Soft Landscape Design to include detailed Planting Plan and Planting Schedule (as appropriate)- stating species/varieties, approximate quantities, sizes, rootball presentation and spacings. Planting mixes should specify a diverse range of species/varieties/cultivars and a diversity of forms and plant sizes (multi-stems, feathered, semi-matures, etc.) using both native and exotic species and pollinator-friendly native species (in accordance with the All-Ireland Pollinator Plan 2015-2020), all designed to provide vegetation that is visually-appealing, bio-diverse, and easily managed. This should include management programmes for all proposed trees, shrubs and other vegetation demonstrating long-term continuity and consistency. REASON: To ensure consistency with the Cherrywood Planning Scheme. 53. Prior to the commencement of landscape development of residential courtyards the following shall be submitted for the written agreement of the Planning Authority: a. Final design and details of all play opportunities and facilities (formal and/or informal as appropriate), in respect of design detailing, planting, boundaries, equipment and safety surface in accordance with section 4.7.1, 4.7.2, and 4.7.3 of the Amenity Space Guidance Document. All proposed equipment and ancillaries shall include specifications for the same and proof that all equipment conforms to European Standards EN 1176-1-11 and EN 1177 Playground equipment and surfacing. b. Upon completion of each play space and prior to occupation of the residential units within the subject development the developer shall submit for the written agreement of the Planning Authority a play map in GIS format which details all play provision provided for within each specific community garden in accordance with 4.6.3 & 4.7.2 of the Cherrywood Amenity Space Guidance Document. The applicant shall also submit a post-installation Practical Completion Certificate, in accordance with the requirements and guidelines of the Royal Society for the Prevention of Accidents (RoSPA). The Certificate shall be prepared and signed by a suitably qualified (RoSPA-approved), techical professional with expertise and experience in playground design and playground health and safety. REASON: To ensure the provision and construction of safe, quality play provision in compliance with best practice and reputable guidance; also GI 72 of the Cherrywood Planning Scheme and Sections 4.6.3, 4.7.1 & 4.7.2 of the Cherrywood Amenity Space Guidance Document. 54. Prior to the commencement of development the developer shall submit for the written agreement of the planning authority appropriate annotated scaled plans illustrating clear delineation of the boundaries, interfaces and transitions between private space, communal space, public space including were relevant, details, sections & elevations clearly indicating the location, specification, type & height of all proposed edge restraints, structures, boundary treatments and gates in accordance with GI 76 of the Cherrywood Planning Scheme . REASON: To ensure consistency with Specific Objective GI 76 of the Cherrywood Planning Scheme. 55. The development shall be carried out on a phased basis in accordance with a phasing scheme, which shall be submitted to and agreed in writing with the Planning Authority prior to the commencement of any development. REASON: To ensure the timely provision of services, and in the interests of residential amenity. 56. Prior to commencement of development the developer shall submit for the written agreement of the Planning Authority, all drawings in digital format (CAD/GIS) projected to ITM (Irish Transverse Mercator). This information should include the following: a. Overall site plans in DWG format (ITM projection in metres) b. Ground floor plans of buildings in DWG format (ITM projection in metres) c. Site sections and elevations in PDF format. REASON: To ensure consistency with Section 7.4 of the Cherrywood Planning Scheme. 57. Prior to commencement of development the applicant shall submit full details of a properly constituted Owners' Management Company for the written agreement of the Planning Authority. Membership of this Company shall be compulsory for all purchasers of property in the development. Confirmation that this Company has been set up shall be submitted to the Planning Authority prior to the occupation of the first residential unit. REASON: To provide for the satisfactory completion and maintenance of the development in the interest of residential amenity. 58. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €57,228.32 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of Surface Water Public Infrastructure and Facilities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme ) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Public Infrastructure and Facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. Note on above Condition: Please note that with effect from 1st January, 2014 Irish Water are now the statutory body responsible for both water and waste water services. Accordingly, the contribution payable has been reduced by the amount of the contribution associated with these services. Further details/clarification can be obtained from Irish Water at Tel. 1 850 278 278 . 59. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €1,310,593.42 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 60. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €850,734.82 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Community & Parks Public Infrastructure, Facilities and Amenities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks Public Infrastructure, Facilities and Amenities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 61. This development shall not be carried out without prior agreement, in writing, between the Applicant and the Planning Authority relating to the payment of development contributions. REASON: Investment by Dún Laoghaire-Rathdown County Council in Local Authority works has facilitated and will facilitate the proposed development. It is considered appropriate and reasonable that the developer should contribute to the cost of same. 62. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €727,374.82 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Roads Public Infrastructure and Facilities in the Cherrywood Planning Scheme Area. This Cherrywood Planning Scheme element of the Development Contribution shall be used solely to fund infrastructure identified in the Plan, as listed in Appendix III - Cherrywood Planning Scheme Projects List, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017 . These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the Cherrywood Planning Scheme Area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 63. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €197,428.12 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Community & Parks Public Infrastructure Facilities & Amenities in the Cherrywood Planning Scheme Area. This Cherrywood Planning Scheme element of the Development Contribution shall be used solely to fund infrastructure identified in the Plan, as listed in Appendix II - Cherrywood Planning Scheme Area Only, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017 . These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks Public Infrastructure Facilities & Amenities benefiting development in the Cherrywood Planning Scheme Area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 64. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €114,300.18 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of Surface Water Public Infrastructure and Facilities in the Cherrywood Planning Scheme area only as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/6/2017 . These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Public Infrastructure and Facilities benefiting development in the Cherrywood Planning Scheme area and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 65. A financial contribution shall be paid by the proposer to the Council towards the cost of the extension of Luas Line B from the Sandyford Depot to Cherrywood, namely Luas Line B1. This contribution shall be paid prior to the commencement of the development or in such other manner as may otherwise be agreed with the Planning Authority. The rate of contribution payable shall be that pertaining to the particular year in which implementation of the Planning Permission is commenced. The Supplementary Development Contribution Scheme provides for an annual increase in the levels of contribution payable, as outlined in the scheme, by a factor of 5% compound interest per annum. The levels of contribution will be reviewed annually on the 13th of January of each year during which the scheme is in force to take account of the aforementioned increase. The rate of contribution payable in respect of this development, at current contribution rates, is €1,649,820.06 and is subject to increase as outlined above. It should be noted that contributions assessed in accordance with the Supplementary Development Contribution Scheme cannot be appealed to An Bord Pleanala unless the applicant considers the levy referred to in this condition has not been properly applied in accordance with the terms of the Scheme. REASONS FOR CONTRIBUTIONS: To part finance the extension of the Luas Line B1 from Sandyford Depot to Cherrywood, as provided for in the Supplementary Development Contribution Scheme adopted by the Council of Dún laoghaire-Rathdown on the 13th of January, 2003. 66. No development on foot of this permission shall commence until security for the provision and satisfactory completion of services (including roads, footpaths, open spaces, public lighting, sewers, watermains and drains) in accordance with the Plans and particulars lodged with the application, has been given by:- a) Lodgement with the Council of an approved Insurance Company Bond in the sum of €839,500 which shall be kept in force by the Developer until such time as Roads, Open Spaces, Car Parks, Sewers, Watermains and Drains are completed to the satisfaction of the Council OR/... b) Lodgement with the Council of a Cash Sum of €512,700 to be applied by the Council at its absolute discretion if such services are not duly provided to its satisfaction on the provision and completion of such services to standard specifications. REASON: To ensure that a ready sanction may be available to the Council to induce the provision of services and prevent disamenity in the development. ## Nearby applications - [DZ24A/0236/WEB](https://cherrywoodplans.com/application/DZ24A-0236-WEB.md): Lands in the townland of Laughanstown, between Grand Parade and Tully Park, in Domville Development Area 4, Cherrywood, Dublin 18. Refused or withdrawn (15 Apr 2024). Amends the Domville permission to raise four blocks on Grand Parade from 4 to 6 storeys, adding 58 apartments. - [DZ21A/0806](https://cherrywoodplans.com/application/DZ21A-0806.md): Lands in the townland of, Laughanstown, Dublin 18, located between Grand Parade and Tully Park. Granted (12 Aug 2022). Amends a permitted scheme between Grand Parade and Tully Park to add 60 apartments in three new 4-storey blocks. - [DZ24A/0291/WEB](https://cherrywoodplans.com/application/DZ24A-0291-WEB.md): Lands in the townland of Laughanstown, Dublin 18, located between Grand Parade and Tully Park., The application relates to development in Domville Development Area 4 of the Cherrywood Strategic Development Zone.. Granted (25 Mar 2025). Amends the Domville permission to raise four blocks on Grand Parade from 4 to 6 storeys, adding 58 apartments. - [DZ15A/0758](https://cherrywoodplans.com/application/DZ15A-0758.md): in the townlands of Cherrywood, Laughanstown, Brennanstown, Loughlinstown and Glebe, Dublin 18. Granted (16 Aug 2016). Phase 1 roads for Cherrywood: about 5.4km of new and upgraded roads including Grand Parade, Castle Street and Bishop Street. - [DZ26B/0366/WEB](https://cherrywoodplans.com/application/DZ26B-0366-WEB.md): 10 Domville Square, Cherrywood, Dun Laoghaire, Dublin 18, D18H7WA. Granted (14 Aug 2026). Adds a small glass conservatory to the rear of a house at Domville Square. - [DZ26B/0360/WEB](https://cherrywoodplans.com/application/DZ26B-0360-WEB.md): 10, Domville Square, Cherrywood, Dun Laoghaire, Dublin 18, D18H7WA. Refused or withdrawn (24 Jun 2026). A small glass conservatory added to the back of a house on Domville Square. - [DZ25A/0489/WEB](https://cherrywoodplans.com/application/DZ25A-0489-WEB.md): 20, Domville Court, Tullyvale, Cherrywood, Dublin 18, D18VN3A. Granted (11 Aug 2025). Permission to keep a glass conservatory permanently at the back of a house on Domville Court. - [DZ25A/0480/WEB](https://cherrywoodplans.com/application/DZ25A-0480-WEB.md): 20, Domville Court, Tullyvale, Cherrywood, Dublin 18, D18VN3A. Refused or withdrawn (19 Jun 2025). Permission to keep a glass conservatory at the back of a house on Domville Court. - [D03A/0735](https://cherrywoodplans.com/application/D03A-0735.md): Tullyvale, Druid Valley, Cherrywood, Loughlinstown, Co. Dublin.. Granted (22 Sep 2003). Changes the approved Tullyvale housing development by realigning its access road and adding a signalised pedestrian crossing. - [DZ26B/0030/WEB](https://cherrywoodplans.com/application/DZ26B-0030-WEB.md): 17 Domville Court, Tullyvale, Cherrywood, Dublin 18, D18 WEK6. Refused or withdrawn (28 Jan 2026). Permission to keep a glass conservatory built in the back garden of a house on Domville Court. - [DZ26B/0241/WEB](https://cherrywoodplans.com/application/DZ26B-0241-WEB.md): 17 Domville Court, Cherrywood, Dublin 18, D18WEK6. Granted (10 Jun 2026). Permission to keep a glass conservatory permanently in the back garden of a house on Domville Court. - [DZ26B/0073/WEB](https://cherrywoodplans.com/application/DZ26B-0073-WEB.md): 17 Domville Court, Cherrywood, Dublin 18, D18WEK6. Refused or withdrawn (13 Mar 2026). Permission to keep a glass conservatory built in the back garden of a house on Domville Court. - [DZ25A/0161/WEB](https://cherrywoodplans.com/application/DZ25A-0161-WEB.md): Lands in the townlands of Laughanstown, Dublin 18. The application relates to development in Cherrywood Strategic Development Zone. Granted (23 Apr 2025). Completion of a 145-metre stretch of Grand Parade from Tully Vale Road towards Bishop Street. - [D05A/1658](https://cherrywoodplans.com/application/D05A-1658.md): Tullyvale, Druids Valley, Cherrywood, Loughlinstown, Co. Dublin. Refused or withdrawn (22 Feb 2006). 396 homes in 9 buildings of 3 to 8 storeys, with a childcare facility, at Tullyvale, Druids Valley. - [DZ26A/0148/WEB](https://cherrywoodplans.com/application/DZ26A-0148-WEB.md): Townland of Laughanstown, Dublin 18, The site is bounded by Grand Parade and Western Courtyard roads. Granted (20 Jul 2026). 311 new homes and a crèche in buildings of 3 to 6 storeys between Grand Parade and Western Courtyard. - [DZ26A/0151/WEB](https://cherrywoodplans.com/application/DZ26A-0151-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18.. Granted (24 Jun 2026). 188 new homes, a mix of apartments, two-level units and houses, beside Tully Park off Bishop Street. - [DZ22A/0133](https://cherrywoodplans.com/application/DZ22A-0133.md): Townlands of Laughanstown and Cherrywood, Dublin 18. Granted (22 Nov 2022). Builds 163 homes, a mix of apartments, triplexes, maisonettes and houses, beside Tully Park. - [DZ15A/0813](https://cherrywoodplans.com/application/DZ15A-0813.md): Laughanstown, Dublin 18, (Tully Park). Granted (13 Jul 2016). Creates Tully Park, a 12.9-hectare public park with a playground, café kiosk and nature trails. - [DZ20A/0946](https://cherrywoodplans.com/application/DZ20A-0946.md): Lands known as Tully Park (c12.9HA), Laughanstown, Dublin 18. Granted (18 Feb 2021). Revises part of the permitted Tully Park, moving the café kiosk, redesigning the playground and adding a raised boardwalk. - [D05A/0162](https://cherrywoodplans.com/application/D05A-0162.md): Druid Valley, Cherrywood, Loughlinstown, Co, Dublin.. Refused or withdrawn (7 Apr 2005). Builds 805 apartments and homes plus a crèche across 50 buildings at Druid Valley, Cherrywood. - [ABP30342919](https://cherrywoodplans.com/application/ABP30342919.md): Site (c.3.06ha) in the townlands of Laughanstown, Dublin 18 (lands generally bounded by Bishop Street to the south, the Luas green line to the east and Tully park to the north. Granted (18 Apr 2019). Builds 184 homes, a mix of apartments, two-level units and houses, between Bishop Street, the Luas line and Tully Park. - [DZ18A/0499](https://cherrywoodplans.com/application/DZ18A-0499.md): Lands (c.1.22ha) in the townlands of Cherrywood & Laughanstown, Dublin 18. Granted (11 Jan 2019). 146 apartments in four 4-storey blocks off Grand Parade on plot TC5. - [DZ24A/1030/WEB](https://cherrywoodplans.com/application/DZ24A-1030-WEB.md): In the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18. Granted (11 Jun 2025). Amends a permitted scheme off Tully Vale Road to add 59 apartments by raising four blocks by one or two storeys. - [DZ20A/0877](https://cherrywoodplans.com/application/DZ20A-0877.md): Bishop Street, Cherrywood, Dublin 18, Co Dublin. Granted (29 Jan 2021). Installs a small gas regulator building on Bishop Street near the Luas line. - [DZ25A/0152/WEB](https://cherrywoodplans.com/application/DZ25A-0152-WEB.md): Land in the townland of Laughanstown, Dublin 18, located north-west of the Tullyvale residential development.The application relates to development in. Granted (11 Jul 2025). Amends an earlier housing permission to shrink the planned basement car park to 13 spaces. - [DZ21A/0414](https://cherrywoodplans.com/application/DZ21A-0414.md): Townland of Laughanstown, Dublin 18. Granted (5 May 2022). 107 new homes, a mix of apartments and houses, north-west of Tullyvale. - [DZ22A/0093](https://cherrywoodplans.com/application/DZ22A-0093.md): Townland of Laughanstown, Dublin 18. Granted (1 Apr 2022). Seeks to keep two advertising signs for Cherrywood housing for 3 more years. - [DZ26A/0032/WEB](https://cherrywoodplans.com/application/DZ26A-0032-WEB.md): Block A1, The Tully Building, Civic Street, Cherrywood Town Centre, Dublin 18, D18WDK0. Granted (13 Mar 2026). Revised plan for 24 mobile phone antennas and 9 dishes on Block A1, The Tully Building, after an earlier compliance submission was rejected. - [DZ25A/0485/WEB](https://cherrywoodplans.com/application/DZ25A-0485-WEB.md): Block A1, Tully Buildings, Cherrywood, Dublin 18. Granted (1 Aug 2025). 24 mobile phone antennas and 9 dishes on the facade and roof of Block A1, Tully Buildings. - [DZ21A/1042](https://cherrywoodplans.com/application/DZ21A-1042.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (30 May 2022). 122 new homes, a mix of houses, two-level units and apartments, beside Tully Park and Lehaunstown Lane. - [D04A/1013](https://cherrywoodplans.com/application/D04A-1013.md): Laughanstown/Cherrywood, With Access From N11, Wyattville Road, Co. Dublin.. Refused or withdrawn (9 May 2005). Seeks to keep modified land shaping and drainage works on a 36-hectare site at Laughanstown/Cherrywood and further alter them. - [DZ18A/0458](https://cherrywoodplans.com/application/DZ18A-0458.md): on lands (c.0.74 HA) in the townland of Laughanstown, Dublin 18 (Development Area 8 - Tully). Granted (11 Jul 2018). Builds a new primary school with 24 classrooms plus a special needs unit, south-west of Tully Park. - [DZ22A/0952](https://cherrywoodplans.com/application/DZ22A-0952.md): The Hunt Building, Grand Parade, Cherrywood Town Centre, Dublin 18. Refused or withdrawn (1 Feb 2023). 6 mobile phone antennas and 2 dishes on the roof of The Hunt Building, Grand Parade. - [DZ22A/0796](https://cherrywoodplans.com/application/DZ22A-0796.md): The Hunt Building, Grand Parade, Cherrywood Town Centre, Dublin 18. Refused or withdrawn (23 Nov 2022). 6 mobile phone antennas and 2 dishes, finished to look like brick, on the roof of The Hunt Building, Grand Parade. - [D15A/0355](https://cherrywoodplans.com/application/D15A-0355.md): Site located in the green area at the entrance to, Druid Valley Estate, Cabinteely, Dublin 18. Refused or withdrawn (9 Jul 2015). Installs a small gas safety regulator unit on the green at the entrance to Druid Valley. - [DZ21A/1038](https://cherrywoodplans.com/application/DZ21A-1038.md): site 1.85 ha at Castle Street and Bishop Street, Cherrywood, Dublin 18. Granted (8 Nov 2022). Builds a new 1,000-pupil secondary school at Castle Street and Bishop Street, Cherrywood. - [DZ26A/0052/WEB](https://cherrywoodplans.com/application/DZ26A-0052-WEB.md): Townland of Laughanstown, Cherrywood, Dublin 18. Granted (24 Mar 2026). Makes minor layout and landscaping changes to a permitted Tully housing scheme, moving bin stores to the front of the two-level homes. - [DZ25A/0044/WEB](https://cherrywoodplans.com/application/DZ25A-0044-WEB.md): In the Townlands of Laughanstown, and Brennanstown, Dublin 18. Granted (10 Jul 2025). Amends a permitted Lehaunstown scheme to add a storey to two buildings, taking it from 492 to 517 homes, with fewer car spaces. - [DZ21A/0334](https://cherrywoodplans.com/application/DZ21A-0334.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (7 Apr 2022). 482 new homes, mostly apartments in five blocks up to 5 storeys, beside Barrington's Road and the Luas in Lehaunstown. - [DZ25A/0325/WEB](https://cherrywoodplans.com/application/DZ25A-0325-WEB.md): In the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18. Granted (15 Jan 2026). 121 apartments in two blocks of 3 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ25A/0102/WEB](https://cherrywoodplans.com/application/DZ25A-0102-WEB.md): In the Townlands of Laughanstown, in Cherrywood, Dublin 18. Granted (26 May 2025). Amends a permitted 200-apartment scheme in Macnebury to drop its basement and cut car parking from 241 to 160 spaces. - [DZ24A/1024/WEB](https://cherrywoodplans.com/application/DZ24A-1024-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood,, Dublin 18. Granted (1 May 2025). Amends a permitted Macnebury apartment scheme to cut car parking from 312 to 213 spaces and add bike, bin and storage buildings, with no change to the homes. - [DZ25A/0008/WEB](https://cherrywoodplans.com/application/DZ25A-0008-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18. Refused or withdrawn (6 Feb 2025). Amends a permitted 200-apartment scheme in Macnebury to drop its basement and cut car parking from 241 to 160 spaces. - [DZ24A/1016/WEB](https://cherrywoodplans.com/application/DZ24A-1016-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18. Refused or withdrawn (3 Jan 2025). Amends a permitted Macnebury development by removing its basement and cutting car parking from 241 to 160 spaces. - [DZ24A/0017](https://cherrywoodplans.com/application/DZ24A-0017.md): Townlands of Laughanstown and Cherrywood, Macnebury - Development Area 7 - Cherrywood, Dublin 18. Granted (11 Jun 2024). 200 apartments in three blocks of 4 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ23A/0811](https://cherrywoodplans.com/application/DZ23A-0811.md): In the Townlands of Laughanstown and Cherrywood. Macnebury, Development Area 7 , Cherrywood, Dublin 18. Refused or withdrawn (4 Jan 2024). 200 apartments in three blocks of 4 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ22A/1021](https://cherrywoodplans.com/application/DZ22A-1021.md): Lands within Development Area 7 - Macnebury, including part of the Res 3 plot known as M1 located south of Bishop Street, west of Cherrywood Avenue, east and north of the proposed Beckett Road, Laughanstown, Dublin 18. Granted (27 Jun 2023). 283 new homes, mostly apartments in four blocks of 4–5 storeys, plus a crèche, south of Bishop Street in Macnebury. - [D07A/1723](https://cherrywoodplans.com/application/D07A-1723.md): Lehaunstown Bungalow, Lehaunstown Lane, Cabinteely, Co. Dublin. Refused or withdrawn (11 Feb 2008). Demolishes Lehaunstown Bungalow and builds a replacement house. - [DZ22A/0820](https://cherrywoodplans.com/application/DZ22A-0820.md): Townlands of Laughanstown, Brennanstown and Cherrywood,, Dublin 18. Granted (12 Dec 2022). Makes minor changes to the already-permitted 168-home scheme in Tully, swapping the designs of 12 houses and altering some roofs. - [DZ22A/0403](https://cherrywoodplans.com/application/DZ22A-0403.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Refused or withdrawn (22 Jul 2022). Makes minor changes to the already-permitted 168-home scheme in Tully, swapping the designs of 12 houses and altering some roofs. - [DZ21A/0699](https://cherrywoodplans.com/application/DZ21A-0699.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (23 Sep 2021). Smaller first-floor bathroom windows on 33 permitted houses in Tully. - [DZ20A/0552](https://cherrywoodplans.com/application/DZ20A-0552.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18,. Granted (11 Mar 2021). 163 new homes, mostly houses, between Castle Street and Tully Park. - [DZ25A/0197/WEB](https://cherrywoodplans.com/application/DZ25A-0197-WEB.md): Located to the north end of the Valley Drive public road, which is a cul-de-sac, opposite the corner apartment building 97-106 E. Refused or withdrawn (18 Mar 2025). Provides a paved bin collection area at the end of Valley Drive for the Tullyvale apartments. - [DZ23A/0423](https://cherrywoodplans.com/application/DZ23A-0423.md): On lands (c.17.03 a) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (Also Co. Dublin). Granted (10 Aug 2023). Amends the Cherrywood Town Centre permission to add two 2-bed apartments to Block A1. - [DZ22A/0690](https://cherrywoodplans.com/application/DZ22A-0690.md): Townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (12 May 2023). Facade and balcony design changes to Cherrywood Town Centre apartment Blocks A1, A2 and A3. - [DZ22A/0747](https://cherrywoodplans.com/application/DZ22A-0747.md): Townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (30 Mar 2023). Changes of use and merging of units in Town Centre Blocks C1 and C2 to create a larger 723 sq.m shop with off-licence. - [DZ22A/0846](https://cherrywoodplans.com/application/DZ22A-0846.md): Lands (c. 17.03 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (22 Dec 2022). Removes a planned viewing platform at Block F1 in Cherrywood Town Centre, replacing it with a glass balustrade. - [DZ22A/0138](https://cherrywoodplans.com/application/DZ22A-0138.md): (c. 17.03ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (30 Aug 2022). Minor changes of use between shop and restaurant-type units in Town Centre Blocks C1 and C2, and a slightly larger crèche. - [DZ21A/0807](https://cherrywoodplans.com/application/DZ21A-0807.md): Lands (c. 17.03 ha), in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (8 Jul 2022). Amends the Cherrywood Town Centre permission to cut residential parking from 1,363 to 1,169 spaces and add 41 car-sharing spaces. - [DZ21A/0713](https://cherrywoodplans.com/application/DZ21A-0713.md): Lands (c. 17.01 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (3 Oct 2021). Design changes to the three apartment blocks A1–A3 in Cherrywood Town Centre, including taller windows and smaller roof terrace. - [DZ19A/1024](https://cherrywoodplans.com/application/DZ19A-1024.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (9 Sep 2020). Amends the Cherrywood Town Centre plan to shrink the basement under Blocks A1–A3 and reassign parking. - [DZ20A/0002](https://cherrywoodplans.com/application/DZ20A-0002.md): Lands (c.17.01ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (9 Sep 2020). Makes minor changes to electrical rooms and landscaping in Town Centre Blocks F1 and F3. - [DZ19A/0458](https://cherrywoodplans.com/application/DZ19A-0458.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (19 Jun 2020). Major redesign of Cherrywood Town Centre plot TC1, adding two supermarkets, an 11-screen cinema and much more retail space. - [DZ17A/0161](https://cherrywoodplans.com/application/DZ17A-0161.md): Lands (site area c.0.95ha) in the townland of Laughanstown, Dublin 18. Granted (12 Dec 2017). Sets up a temporary concrete plant for 7 years to supply the building of Cherrywood. - [DZ18A/1178](https://cherrywoodplans.com/application/DZ18A-1178.md): 2.2 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (17 Apr 2019). Amends Town Centre plot TC2 to add one apartment, expand retail and resident amenity space, and move the crèche. - [PC/CSDZ/005/2021](https://cherrywoodplans.com/application/PC-CSDZ-005-2021.md): Cherrywood Strategic Development Zone, Townland of Laughanstown, County Dublin. Granted (5 Jul 2021). A council plan for a regional storm water pond (Pond 2A) in Laughanstown, draining to the Cabinteely River. - [DZ20A/0824](https://cherrywoodplans.com/application/DZ20A-0824.md): Lands (c. 17.01 ha), in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (11 Jan 2021). Changes the windows, balconies and frontage of Town Centre Block F2 on Cherrywood Avenue and Central Avenue. - [DZ19A/0148](https://cherrywoodplans.com/application/DZ19A-0148.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (24 Apr 2019). Amends Town Centre plot TC2 to add 47 apartments, taking Blocks C1 and C2 from 384 to 431 homes. ## Links - [This page on CherrywoodPlans](https://cherrywoodplans.com/application/DZ17A-0714) - [Council record, documents and conditions (DLR planning portal)](https://planning.agileapplications.ie/dunlaoghaire/application-details/76027) - [All Cherrywood applications](https://cherrywoodplans.com/applications.md) _Source: Dún Laoghaire–Rathdown County Council planning data, refreshed daily. CherrywoodPlans is an independent site, not run by the council._