# Planning application DZ17A/0862 > Lands (17.01ha) in the townlands of Cherrywood, Dublin 18, Cherrywood, Dún Laoghaire–Rathdown. Granted (29 May 2018). - **Reference:** DZ17A/0862 - **Address:** Lands (17.01ha) in the townlands of Cherrywood, Dublin 18 - **Status:** Granted (29 May 2018) - **Decision:** GRANT PERMISSION - **Application type:** Permission (SDZ) - **Applicant:** Hines Cherrywood Dev Fund ICAV - **Lodged:** 4 Apr 2018 - **Decided:** 29 May 2018 - **Location (lat, lng):** 53.244097, -6.144981 ## Proposal A total of 191,115sq.m (gross floor area - GFA) in 15 blocks including: 1,269 no. residential units (115,332 sqm), Retail Gross (20,284 sqm), High Intensity Employment (HIE) uses (22,946 sqm), Non Retail uses (31,115 sqm), Community uses (1,437 sqm) and all associated roads, streets and public spaces, services infrastructure and all associated site and development works. The 15 blocks are located above 2-3 levels of basement/ below podium car parking and service areas which create revised/ new site levels across the site. The development is described as follows on a plot by plot and block by block basis: - Plot TC1: Block A1 (13,976 sqm): 146 no. apartments, ancillary accommodation and associated balconies and roof terraces in a 5 to 8 storey block (comprising 4 no. studios, 31 no. 1 bed, 90 no. 2 bed and 21 no. 3 bed). The block includes 1 no. retail unit of 467 sqm and 2 no. Non Retail units totalling 380 sqm (comprising 1 no. restaurant / bar of 297 sqm and 1 no. financial/ professional/ other services unit of 83 sqm) on the ground floor fronting Cherrywood Square/ Grand Parade, Bishop Street and Civic Street (proposed internal street). Block A2 (10,803 sqm): 110 no. apartments, ancillary accommodation and associated balconies and roof terraces in a 5 storey block (comprising 14 no. studios, 1 no. 1 bed, 81 no. 2 bed and 14 no. 3 bed and including communal facilities at Ground and First Floor levels totalling 398 sqm); 1 no. non-retail unit (restaurant/ bar of 223 sqm) at ground floor level fronting onto Civic Street. Block A3 (5,314 sqm): 61 no. apartments, ancillary accommodation and associated balconies and roof terraces in a 5 storey block (comprising 6no. studios, 16 no. 1 bed, 25 no. 2 bed and 14 no. 3 bed). Block B1 (14,700 sqm): 5no. retail units and associated ancillary areas totalling 7,564 sqm over 2 levels; 9 no. Non Retail units totalling 2,523 sqm over 2 levels (comprising 7 no. restaurant/ bar units totalling 1,574 sqm, 2 no. financial/ professional/ other services units totalling 246sq.m and associated ancillary areas totalling 703 sqm); HIE uses consisting of office accommodation and associated ancillary accommodation totalling 4,613 sqm in 3 levels above 2 levels of retail and Non Retail uses (i.e. 5 levels in total). Block B2 (8,037 sqm): 9no. retail units and associated ancillary areas totalling 3,578 sqm; 14 no. Non Retail units totalling 4,459 sqm over 2 levels (comprising foodcourt restaurant area and associated seating areas totalling 2,199 sqm, 1 no. leisure/ entertainment unit of 709 sqm, 1no. financial/ professional/ other services unit of 114 sqm, 1 no. pub of 494 sqm and ancillary / circulation space totalling 943 sqm). Block B5 (14,890 sqm): 8 no. retail units and ancillary / circulation space totalling 3,504 sqm over 2 levels; HIE uses consisting of office accommodation and ancillary / circulation space totalling 4,413 sqm in 3 levels above 2 levels of retail, Non Retail and Community uses (i.e. 5 levels in total); Non Retail uses totalling 2,482 sqm over 2 levels (comprising 1 no. restaurant / bar of 128 sqm, a primary care centre of 1,820 sqm and ancillary/ circulation space of 534 sqm); Community uses comprising a library and exhibition space and ancillary/ circulation space totalling 1,437 sqm at ground floor level; 48no. apartments with ancillary accommodation and associated balconies (comprising 12 no. studios, 24 no. 1 bed and 12 no. 2 bed) over 6 storeys above 2 levels of retail, Non Retail and Community uses (i.e. 8 levels in total). Block B6 (5,011 sqm): 12 no. retail units and ancillary / circulation space of totalling 2,478 sqm at ground floor; Non Retail uses totalling 2,533 sqm (comprising 4 no. restaurant/ bar units totalling 1,668 sqm over 2 levels, 1 no. leisure / entertainment unit of 714 sqm and ancillary / circulation space of 151sqm) over 2 levels. The pedestrian streets between Blocks B1 to B6 are covered by a building mounted glazed roof structure providing shelter to these areas (with provision for temporary supports, if necessary, pending construction of Blocks B3 and B4). Blocks B3 and B4 are not part of the current application but will be subject to a separate future planning application. These blocks, which will accommodate Retail and Non Retail floorspace at Level B1, Level G and Level 1 and a 14 screen cinema, are shown and referred to in the plans and particulars submitted for information purposes and to demonstrate conformity with the Planning Scheme and the Cherrywood Urban Form Development Framework (UFDF). The layout and use of the floorspace at Level B1 will also be the subject of a separate future planning application. Plot TC2: Block C1 (17,956 sqm): 181 no. apartments, ancillary accommodation and associated balconies (comprising 13 no. studios, 38 no. 1 bed, 98 no. 2 bed and 32 no. 3 bed and including communal facilities at Ground and Lower Ground Floor Levels totalling 857 sqm); 2 no. retail units totalling 300 sqm at ground level fronting Grand Parade and Bishop Street; Non Retail uses over 2 levels fronting Grand Parade totalling 608 sqm (comprising 2 no. restaurant / café units totalling 550 sqm and 1 no. financial/ professional/ other services unit of 55 sqm and ancillary / circulation space of 3 sqm). This block is 5 storeys to Grand Parade, 5 - 6 storeys to Bishop Street and 5 storeys to Tullyvale Road. Block C2 (19,632 sqm): 203 no. apartments, ancillary accommodation and associated balconies (comprising 27 no. studios, 38 no. 1 bed, 113 no. 2 bed and 25 no. 3 bed); Non Retail uses at 2 levels fronting Grand Parade and internal streets totalling 1,390 sqm (comprising 2 no. restaurant / café units totalling 507 sqm, 4 no. financial/ professional/ other services units totalling 357 sqm, ancillary / circulation space of 52 sqm and a crèche of 474 sqm). This block is 5 storeys to Grand Parade and Tullyvale Road and 4 - 6 storeys to the proposed internal streets. Block D1 (8,792 sqm): Hotel consisting of 204 no. bedrooms and associated ancillary accommodation in a block which is 5 storeys to Grand Parade and the proposed internal street and 6 storeys to Tullyvale Road. Plot TC1 and TC2 Below Podium: The 10 blocks proposed on Plots TC1 and TC2 (and the future Blocks B3 and B4) are located over and serviced by a 3 level basement which, in addition to basement accommodation directly associated with the relevant block referred to above, includes shared facilities including 2,792 car parking spaces (comprising 749 no. residential spaces and 2 ,043no. non-residential space s), 135no. motorcycle parking spaces, service/ delivery yards, bicycle parking spaces (882 spaces), vehicle and pedestrian circulation, stair cores, lifts, plant and storage and other ancillary accommodation. The TC1/2 basement creates a raised podium which establishes new ground levels which generally follow the level of the existing Luas line and the proposed Grand Parade (see description below). The proposed buildings range from 2 storeys to 8 storeys in height above the new ground/ street formation level. The basement car park is accessed from Tully Vale Road (left-in/ left-out), an entrance/ exit on Grand Parade and 2 no. entrance/ exits on Cherrywood Avenue (WLR - J) (see description below). A dedicated service entrance from the WLR is also proposed. Plot TC4: Block E1 (13,920 sqm): HIE uses comprising office accommodation associated ancillary accommodation and roof terrace in a building which is 5 storeys to Grand Parade, 7 storeys to the WLR and 5 storeys to Cherrywood Avenue (A - I1). Block F1 (21,687 sqm): 228 no. apartments, ancillary accommodation and associated balconies and roof terrace (comprising 25 no. studios, 49 no. 1 bed, 115 no. 2 bed and 39 no. 3 bed and including communal amenity facilities totalling 951 sqm at Ground and Fourth Floor Levels); 3 no. retail units totalling 393 sqm (comprising 2 no. retail units fronting Grand Parade and 1 no. retail unit fronting onto Central Avenue (proposed internal street). The block is 5 to 8 storeys to Grand Parade and 4 to 7 storeys to the internal courtyard and Central Avenue. Block F2 (19,567 sqm): 212 no. apartments, ancillary accommodation and associated balconies (comprising 22 no. studios, 41 no. 1 bed, 117 no. 2 bed and 32 no. 3 bed and including communal amenity facilities of 115 sqm at Fourth Floor Level); 1 no. retail unit of 114 sqm at ground level fronting Cherrywood Avenue (A - I). This block is 5 storeys to Central Avenue and 5 to 6 storeys to the internal courtyard and Cherrywood Avenue (A - I). Block F3 (7,298 sqm): 80 no. apartments, ancillary accommodation and associated balconies (comprising 6no. studios, 12 no. 1 bed, 48 no. 2 bed and 14 no. 3 bed); 1no. retail unit of 63 sqm at ground level fronting Grand Parade; Non Retail uses consisting of a Luas toilet/ welfare facility of 16sq.m at ground level to internal street. The block is 5 storeys to the Grand Parade and 5 to 7 storeys to Cherrywood Avenue (I - A3). Block G1 (9,510 sqm): Non Retail uses comprising a Hotel consisting of 223 no. bedrooms and associated ancillary accommodation totalling 7,687 sqm); 1 no. retail unit of 1,823 sqm fronting Cherrywood Avenue (I - A3). The block is 5 storeys to Grand Parade and 5 to 6 storeys to Cherrywood Avenue (I - A3). Plot TC4 Below Podium: The 5 blocks on Plot TC4 are serviced by a 2 level basement which, in addition to basement accommodation directly associated with the relevant block referred to above, includes shared facilities including 1,120 no. car parking spaces (comprising 520 no. residential spaces, 406 no. non-residential spaces and 194 no. Park & Ride spaces), 56 no. motorcycle parking spaces, service/ delivery yards, bicycle parking (930 spaces), vehicle and pedestrian circulation, stair cores, lifts, plant and storage and other ancillary accommodation. The TC4 basement creates a raised podium over part of the site between the Grand Parade and the internal street (Central Avenue). The basement car park is accessed from Cherrywood Avenue (I1 - I) and via Central Avenue and from Cherrywood Avenue (A3 - I). The proposed blocks range from 5 storeys to 8 storeys in height. Grand Parade: Grand Parade (A2-A3) is a new vehicular/ cycle and pedestrian boulevard which runs for c.450 metres on the northern edge of the existing Luas Corridor between Cherrywood and Brides Glen Luas Stops. The Grand Parade has a cross section of c.27.1 metres minimum and includes a new bridge structure crossing the Wyattville Link Road, incorporating Non Retail uses (coffee dock building) of 22 sqm, and providing a link between the 2 northern town centre plots (TC1 and TC2) and the southern town centre plots (TC3 and TC4). The proposals include new public spaces at Cherrywood and Brides Glen Luas stops and secondary public spaces on either side of the new bridge. The proposals for Grand Parade provide for tie-in works to Cherrywood Avenue (A3) and revisions to the previously permitted road layout and treatment to tie-in with Bishop Street (A2). The proposals for Cherrywood Square and Grand Parade incorporate existing and new Luas furniture and street furniture and public lighting. Existing Luas poles and power cables will be retained. Infrastructure and Associated Site and Development Works: The proposed infrastructure and associated site and development works include: Minor revisions and tie-ins to the road layout permitted under Reg Ref: DZ15A/0758 affecting Tully Vale Road (A1 - A), Bishop Street (A1 - J), the Wyattville Link Road (WLR) and WLR/ Junction A; A new road from Bishop Street (J) to the existing junction on the WLR is proposed (Cherrywood Avenue J - WLR) and this link serves an underpass access road/ tunnel providing access to TC1/2 basement; Transport Interchange with bus stop, 4 no. taxi-set down spaces and cycle parking linking to Cherrywood Luas Stop; Revised proposals for the hard and soft landscaping at the Tully Park pedestrian entrance (permitted under Reg. Ref. DZ15A/0813) to integrate Tully Park entrance, Bishop Street and Cherrywood Square and a new pedestrian crossing of Bishop Street at a new public space adjacent to Block A3 (Bishop Street Square); Upgrade of part of Cherrywood Avenue (A - I1 - I - A3) are proposed adjacent to TC4 and including the tie-in with Grand Parade (and providing for future upgrade works as part of the TC3 development - by others); 12no. surface car parking spaces on Central Avenue in TC4; 28 no. surface car parking spaces and 1no. loading bay at Cherrywood Avenue (I1 - I); 1no. car parking space, 2 no. loading bays and 2 no. Luas set down spaces on Cherrywood Avenue (I - A3); 2,690 no. bicycle parking spaces are proposed (comprising 1,812 no. basement level spaces and 878 no. surface level spaces); Services infrastructure/ public utilities including 2no. gas district regulator installations (comprising 1no. adjacent to Tully Park entrance and 1 no. south of Cherrywood Avenue junction I1); Connection to the existing attenuation Pond 4 in Cherrywood Business Park and works are proposed to Pond 4 and lands in the immediate vicinity. The development also connects to the permitted surface water drainage in Tully Vale Road permitted under Reg. Ref. DZ15A/0758 which connects to permitted attenuation Pond 2B; Future pedestrian bridge connection from Level 1 of Block B2 over Wyattville Link Road (WLR) to Plot TC3 will be the subject of a separate future planning application. The support column within the WLR median for this future pedestrian bridge is included within this application. Permission is also sought for all ancillary uses and all site and development works associated with the above development including internal roads/ streets, Town Centre and shopfront signage, directional signage, stairs, lifts, escalators and all associated hard and soft landscaping. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the planning authority with this application. ## In plain English The original Cherrywood Town Centre permission: 15 blocks with 1,269 homes, shops, offices, two hotels and a library, plus Grand Parade. - **1,269** homes - **20,284** sq.m retail - **22,946** sq.m offices - **2,690** bicycle spaces - **8** storeys max ### What's planned A **10**-year permission for a mixed-use town centre of **191,115** sq.m in **15** blocks on plots TC1, TC2 and TC4, over basements, on a **17.01**-hectare site. ### Residential **1,269** apartments across blocks of 2 to 8 storeys. ### Commercial **20,284** sq.m of retail, **22,946** sq.m of offices and **31,115** sq.m of other commercial uses, including restaurants, a food court, a pub, a primary care centre, a crèche and two hotels (**204** and **223** bedrooms). ### Community A library and exhibition space of **1,437** sq.m and new public squares at the Cherrywood and Brides Glen Luas stops. ### Transport Basement parking for **2,792** cars under TC1/TC2 and **1,120** under TC4 (including **194** park and ride), plus **2,690** bicycle spaces. Grand Parade, a **450**m boulevard with a bridge over the Wyattville Link Road, and a bus and taxi interchange at Cherrywood Luas. ### Environment Connections to existing storm water ponds and landscaped streets. _This summary was written by AI from the proposal text. Check the council record before relying on it._ ## Conditions ### Condition 1 General 1. The development to be carried out in its entirety in accordance with the plans, EIAR, particulars and specifications lodged with the application, as amended by Further Information received on 04/04/2018 save as may be required by the other conditions attached hereto. REASON: To ensure that the development shall be in accordance with the permission and that effective control be maintained. 2. The applicant shall submit final and revised digital drawings of the proposed development (CAD/GIS) projected to ITM (Irish Transverse Mercator), to the satisfaction of the Planning Authority. REASON: To ensure consistency with Section 7.4 of the Cherrywood Planning Scheme. Land Use & Development Type 3. With regard to Land Use and Development Type:- a) The use of the retail and non-retail units ground floor only in Blocks A1, A2, B1, B2, B5, B6, C1, C2, F1, F3 & Block G (indicated as retail, café, restaurant uses, crèche and non-retail use), shall be agreed in writing with the Planning Authority, prior to the commencement of the use. In this regard, a schedule of units identifying the use (convenience, comparison, retail services, non-retail) and number for each such unit and accompanying drawings shall also be submitted. b) Any change to the use identified in the schedule of units referred to in (a) above, within Blocks A1 & C1 which front Cherrywood Square, F1 and F3 which front Bride's Glen Square and within Block G which fronts Cherrywood Avenue shall be the subject of a separate planning application. c) No amalgamation of units or subdivision of any unit shall take place without a prior grant of planning permission. REASON: To ensure an appropriate level of active frontage in accordance with Section 2.2 of the UFDF for Cherrywood Town Centre and the Cherrywood Planning Scheme, and in the interests of the proper planning and sustainable development of the area. 4. In relation to the residential apartments and blocks:- a) Prior to the commencement of residential development, the applicant shall submit for agreement in writing with the Planning Authority, a Building Life Cycle report, in compliance with Section 6.13 of the Sustainable Urban Housing: Design Standards for New Apartments Guidelines for Planning Authorities 2018. b) The 3-bed units in blocks F1 and F2 in TC4 shall consist of 2 no. double bedrooms and 1 no. single bedroom and the floor areas of these rooms shall comply with the minimum standards stated in the 'Sustainable Urban Housing: Design Standards for New Apartments Guidelines for Planning Authorities 2018'. c) That each apartment be used as a single apartment unit and shall not be subdivided in any manner or used as two or more separate habitable units. REASON: In the interests of clarity and proper planning and sustainable development of the area. 5. Prior to commencement of development, the developer shall comply with the Dún Laoghaire-Rathdown County Council Housing Strategy, drawn up in accordance with Part V, Section 96(4) of the Planning & Development Act, 2000, as amended by Section 3 of the Planning & Development (Amendment) Act, 2002, and in accordance with agreement to be reached with the County Council Housing Department unless the developer shall have applied for and been granted an exemption certificate under Section 97 of the Planning and Development Act, 2000, as amended. NOTE: Where a developer opts to transfer units to the Council, this shall be subject to the availability of funding. REASON: To comply with the County Council Housing Strategy & Part V of the Planning & Development Act, 2000, as amended by Section 3 of the Planning & Development (Amendment) Act, 2002. Urban and Built Form and Layout 6. With regard to urban form and layout, a) Prior to the commencement of development of the superstructure of Quadrant TC1 (above podium) the following shall be submitted in respect to Quadrant TC1 Blocks A1, A2 and A3, for the written agreement of the Planning Authority:- i) Revised drawings (floor plans, elevations and landscape plans) indicating both external direct access (own door) via Bishop Street and from the internal core within Block A2 into Apartment nos. 22, 25 and 26. ii) Revised drawings (including floor plans, elevations and landscape drawings) to show where feasible, and ensuring no negative impacts on access and movement and public realm, the stepped access points from Bishop Street to Blocks A1 and A2, orientated towards the street (north). iii) Revised elevational drawings clearly annotating the private terraces and direct access to the ground floor apartments as represented on Drawing TC1/A/00/A/1000, Level; 00 Plan - Blocks A1, A2 & A3, and the landscaping drawings (including sections), as submitted by way of Further Information on the 04/04/2018 and having regard to the above (a) and (b). iv) Revised drawings (floor plans and elevations) omitting the ramp/plinth as indicated on floor plan TC1/A/00/A/1000, Level; 00 Plan - Blocks A1, A2 & A3 at the retail unit in Block A1. The changes in finished floor level shall be resolved internally, if necessary. b) Prior to the commencement of development of the superstructure of Quadrant TC2 (above podium) the following shall be submitted in respect to Quadrant TC2 Blocks C1 and C2, for the written agreement of the Planning Authority:- i) Revised drawings (floor plans, elevations and landscape plans) indicating external direct access (own door) into the apartments within Blocks C1 and C2 from the internal courtyards. ii) Revised elevational drawings clearly annotating the private terraces and direct access to the ground floor apartments from Bishop Street and Tully Vale Road as represented on Drawing TC2/C/00/A/1002, Level; 00 Plan - Blocks C1 and C2, and the landscaping drawings (including sections), submitted by way of Further Information on the 04/04/2018 and having regard to the above (a). iii) Revised drawings (floor plans and elevations) showing the entrance into the retail unit which faces both Bishop Street and Grand Parade, within Block C1 at 00 Level, reoriented to face equally Grand Parade and Bishop Street to maximise streetscape frontage to both Grand Parade and Bishop Street. c) Prior to the commencement of development of the superstructure of Quadrant TC4 (above podium) the following shall be submitted in respect to Quadrant TC4 Blocks F1, F2, F3 and G1 for the written agreement of the Planning Authority:- i) Revised drawings (floor plans, elevations and Landscape plans) indicating external direct access (own door) into the apartments within Block F1 at level +48 from Central Avenue and from the amenity space (hard landscaped courtyard). ii) Revised drawings (floor plans, elevations and Landscape plans) indicating external direct access (own door) into the apartments within Block F2 at level +41 from the internal courtyard. iii) Revised drawings (floor plans, elevations and Landscape plans) indicating external direct access (own door) into the apartments within Block F3 at level +48 from the internal courtyard. d) The developer shall ensure that the private terraces belonging to each respective Level 00 Apartment in Blocks A1, A2, A3, C1, C2, F1, F2 and F3 are built in accordance with the plans submitted (including the landscape plans and sections) and that all apartments indicated as having direct own door access from the street and/or internal courtyards (and as amended by way of compliance with condition of permission) shall have an inward opening gateway included in the boundary treatment of their private terrace to ensure security and clear definition of their private terrace, while facilitating this direct access. e) Prior to the commencement of development of the superstructure (above podium), or as otherwise agreed in writing with the Planning Authority, the developer shall provide, for the written agreement of the Planning Authority details of the proposed external finishes of all buildings, including ESB substations and entrances to basement car parks, in the form of samples and on-site mock ups. The external finishes shall include materials that are consistent with Section 3.4 of the UFDF. In particular the external finishes of buildings/structures shall: • at ground floor, comprise of durable and high quality materials including natural stone or brick. • ensure harmony and visual coherence in the built environment, yet articulating interest to avoid monolithic and bulky facades along the perimeter elevations, with particular attention to the visual appearance of the streetscape and public realm and to the upper floors. f) Prior to the commencement of the superstructure (above podium), or as otherwise agreed in writing with the Planning Authority, the developer shall submit for the written agreement of the Planning Authority, revised drawings, including coloured CGI's which clearly show the design detail, including height and finish of roof plant/lift over run/services/screens. In this design particular regard shall be had to ensure: i) the height of any such structure shall be kept to a minimum; ii) the external finishes be light in colour and blend with the external materials of the building or as otherwise to be agreed by the planning authority. iii) The protection of residential amenity at roof terrace level. g) No additional development shall take place above roof level, including lift motors, air handling equipment, storage tanks, ducts or other external plant other than those shown on the drawings hereby approved, unless authorised by a prior grant of planning permission. h) That all public services to the proposed development, including electrical, telephone cables and equipment be located underground throughout the entire site. i) An acceptable naming and numbering scheme shall be submitted for the written agreement of the Planning Authority prior to the commencement of development or the erection of any advertising hoardings on site. In this regard, the use of street names and public spaces reflecting local place names or local history would be acceptable. REASON: In the interests of clarity, visual and residential amenity, street animation and good urban design and to ensure consistency with Sections 2.2, 3.2.2, 3.2.3, 3.2.5, 3.4 and 3.5 of the UFDF and Objectives PD9, PD19 Cherrywood Planning Scheme. Signage and Advertising 7. With regard to signage and advertising:- a) All signage shall be at street level. In this regard the signage identified as No. 1 in the Signage Hierarchy, Beacon Signage and Wayfinding received on 27th September 2017, in the submitted Signage Strategy shall be omitted. b) Prior to the installation of any signage including shopfronts, awnings, canopies, banners, flags, other projecting elements and outdoor seating areas, the developer shall submit for the written agreement of the Planning Authority full details of the location and content including background colour, lettering typeface, logos and colour for the proposed signage in accordance with the Signage Strategy submitted and as amended by way of (a) above. c) Notwithstanding the provisions of the Planning and Development Regulations 2001 (as amended), advertisement signs (including any signs installed to be visible through windows), advertisement structures, banners, canopies, flags or other projecting element, other than those which form part of the Signage Strategy as submitted and amended by way of (a) above, shall not be displayed or erected on the building or within the curtilage, or attached to the glazing, without the prior grant of planning permission. d) As part of this application, window displays shall be maintained at all times and the glazing in shop fronts shall be kept free of all stickers, decals, posters and advertisements. e) Roller shutters (where deemed necessary) and its casing, shall be recessed behind glazing and shall be factory finished in a single colour to match the colour scheme of the building prior to their erection. The said shutters shall be open lattice type and shall not be painted on site, be left unpainted or used for advertising. f) Prior to the installation of any signage, a Signage Strategy for Wayfinding and Directional Signage shall be submitted and agreed in writing with the Planning Authority including details of the location and content including background colour, lettering typeface, logos and colour for the proposed signage. g) The proposed bus shelter and any advertising panels shall be so lit as not to cause glare to users of the public road or adjacent residential properties. All such panels shall be of the static type only, and scrolling/prismatic advertisements shall not be used. REASON: To ensure consistency with Section 2.12 'Signage and Advertising' of the Cherrywood Planning Scheme and in the interest of visual amenity and to protect the civic design character and dignity of the area. Built Heritage 8. With regard to Built Heritage: a) Prior to the commencement of the superstructure (above podium), or as otherwise agreed in writing with the Planning Authority, the developer shall submit for the written agreement of the Planning Authority and in consultation with the Department of Arts, Heritage and the Gaeltacht, details of appropriate exhibition space for heritage artefact(s) in accordance with Section 2.4.1 of the UFDF and Specific Objective H4 of the Planning Scheme. b) With regard to the placement of stockpiles derived from deep excavations (Sections 7.4.1 and 7.5.1) Archaeological Monitoring shall be carried out and shall consist of the following:- i) The developer is required to engage the services of a suitably qualified archaeologist to monitor the proposed methodology and placement of excavated material in stockpile areas to avoid designated archaeological areas or areas of archaeological potential. ii) Should archaeological material be found during the course of monitoring, the archaeologist may have work on the site stopped pending a decision as to how best to deal with the archaeology. The developer shall be prepared to be advised by the Department of Culture, Heritage and the Gaeltacht with regard to any necessary mitigating action (e.g. preservation in situ, and/or excavation). The developer shall facilitate the archaeologist in recording any material found. iii) The Planning Authority and the Department of Culture, Heritage and the Gaeltacht shall be furnished with a report describing the results of the monitoring. REASON: To ensure the continued preservation (either in situ or by record) of places, caves, sites, features or other objects of archaeological interest and to ensure consistency with Specific Objectives H2, H4 of the Cherrywood Planning Scheme and Section 2.4.1 of the UFDF. Public Realm & Landscape 9. Prior to the commencement of any development of the superstructure (above podium), or as otherwise agreed in writing with the Planning Authority, the developer shall provide the following, for the written agreement of the Planning Authority:- a) Within the TC1 Quadrant - Drawings (including hard landscape plans) and construction details for all hard standing pedestrian, cycling, Luas and vehicular areas (including adjoining road interfaces), detailing the specifications of all surface/finish materials. In this regard, samples, data sheets and on site mock ups of all materials shall be provided for the agreement of the Planning Authority and approved control samples must be held on site at all times. All surfaces and finishes shall include materials that are consistent with Section 4.5 of the UFDF. In particular the finishes shall comprise of durable, easily sourced and high quality materials comprising natural stone (or other materials as agreed with the Planning Authority). b) Within the TC2 Quadrant - Drawings (including hard landscape plans) and construction details for all hard standing pedestrian, cycling, Luas and vehicular areas (including adjoining road interfaces), detailing the specifications of all surface/finish materials. In this regard, samples, data sheets and on site mock ups of all materials shall be provided for the agreement of the Planning Authority and approved control samples must be held on site at all times. All surfaces and finishes shall include materials that are consistent with Section 4.5 of the UFDF. In particular the finishes shall comprise of durable, easily sourced and high quality materials comprising natural stone (or other materials as agreed with the Planning Authority). c) Within the TC4 Quadrant - Drawings (including hard landscape plans) and construction details for all hard standing pedestrian, cycling, Luas and vehicular areas (including adjoining road interfaces), detailing the specifications of all surface/finish materials. In this regard, samples, data sheets and on site mock ups of all materials shall be provided for the agreement of the Planning Authority and approved control samples must be held on site at all times. All surfaces and finishes shall include materials that are consistent with Section 4.5 of the UFDF. In particular the finishes shall comprise of durable, easily sourced and high quality materials comprising natural stone (or other materials as agreed with the Planning Authority). d) Along the entire length of Grand Parade - Drawings (including hard landscape plans) and construction details for all hard standing pedestrian, cycling, Luas and vehicular areas (including adjoining road interfaces), detailing the specifications of all surface/finish materials. In this regard, samples, data sheets and on site mock ups of all materials shall be provided for the agreement of the Planning Authority and approved control samples must be held on site at all times. All surfaces and finishes shall include materials that are consistent with Section 4.5 of the UFDF. In particular the finishes shall comprise of durable, easily sourced and high quality materials comprising natural stone (or other materials as agreed with the Planning Authority). e) Revised landscape proposals for Wyattville Link Plaza West, including levels and details which clearly demonstrate an appropriate interface between the Luas line and pedestrian walkway. f) An 'External Seating and Street Furniture Strategy' in accordance with the DLR Age Friendly Strategy 2016-2020, which includes for all proposed formal and informal seating types within the Public Realm areas and within the residential courtyards/amenity spaces at ground and roof levels. g) Prior to the commencement of development a strategy for all areas of public realm which identifies all locations for vents which are visible within any public or communal spaces and details of how they will integrate with future landscape plans (see condition No. 8 (a) - 8 (d) above) ) shall be submitted for the written agreement of the Planning Authority. Vents shall be integrated sensitively and appropriately into the surrounding landscape having regard for maintenance, public safety and visual appearance. h) The location, type and integration of all proposed lighting types for the public realm. All lighting types and locations shall be clearly shown on the revised landscape drawings for all public realm areas and shall have regard to the placement and species of trees. i) All water feature designs, specifications and locations including safety audits. j) Lighting class selection procedure for the residential areas, commercial areas and pedestrian thoroughfares. k) Conflict area lighting designs (car park entrances from Tully Vale Road, Grande Parade and the link road south of TC1). l) The dimming regime selected for each section of the scheme (if any). m) Mini-pillar locations for the electricity supply for the lighting, including the wall mounted lighting. n) Evidence of wayleave agreements to allow for future maintenance of the lanterns which will be placed on-top of the Luas power line towers along Grand Parade. o) Details, specifications and samples for all boundaries, interfaces and transitions between private space, communal space with public space within TC1, having regard to the need to ensure a coherent and complementary palette of materials and finishes across the application site. p) Details, specifications and samples for all boundaries, interfaces and transitions between private space, communal space with public space within TC2, having regard to the need to ensure a coherent and complementary palette of materials and finishes across the application site. q) Details, specifications and samples for all boundaries, interfaces and transitions between private space, communal space with public space within TC4, having regard to the need to ensure a coherent and complementary palette of materials and finishes across the application site. r) The developer shall retain the professional services of a qualified Landscape Architect, as his/her Landscape Consultant, throughout the course of the development works; and shall notify the planning authority of that appointment in writing prior to commencement. The developer shall engage the Landscape Consultant to procure, oversee and supervise the landscape contract for the implementation of the permitted landscape proposals. When all landscape works are inspected and completed to the satisfaction of the Landscape Consultant, he/she shall prepare, sign and submit a Practical Completion Certificate (PCC) to the Planning Authority, as verification that approved landscape plans and specification have been fully implemented. REASON: To ensure a high quality Public Realm and consistency with Sections 4.0, 4.1, 4.2.1, 4.2.2, 4.5 of the UFDF and Specific Objectives GI8, GI76, PD 14 and PI 14 of the Cherrywood Planning Scheme and in the interest of the proper planning and sustainable development of the area. 10. a) The developer shall ensure that the landscape proposals for the planting of all trees within the public realm (including all roads) is in accordance with the landscape drawings as submitted by Gross Max Landscape Architects. Any conflicts that arise due to the location of utilities or services either above or below ground shall be resolved by the relocation or diversion of such services. b) Prior to the commencement of landscape works the following shall be submitted for the written agreement of the Planning Authority:- i. Within TC1 - Block A1/ A2 / A3 / Central Space between A2 and A1/ B5 and Public Realm areas- Details of Soft Landscape Design to include detailed Planting Plan and Planting Schedule - as appropriate - stating species/varieties, approximate quantities, sizes, rootball presentation and spacings. Planting mixes should specify a diverse range of species/varieties/cultivars and a diversity of forms and plant sizes (multi-stems, feathered, semi-matures, etc.); using both native and exotic species and pollinator-friendly native species (in accordance with the All-Ireland Pollinator Plan 2015-2020), all designed to provide vegetation that is visually-appealing, bio-diverse, and easily managed. Including management programmes for all proposed trees, shrubs and other vegetation demonstrating long term continuity and consistency. ii. Within TC2 - Blocks C1 / C2 and Public Realm areas - Details of Soft Landscape Design to include detailed Planting Plan and Planting Schedule - as appropriate - stating species/varieties, approximate quantities, sizes, rootball presentation and spacings. Planting mixes should specify a diverse range of species/varieties/cultivars and a diversity of forms and plant sizes (multi-stems, feathered, semi-matures, etc.); using both native and exotic species and pollinator-friendly native species (in accordance with the All-Ireland Pollinator Plan 2015-2020), all designed to provide vegetation that is visually-appealing, bio-diverse, and easily managed. Including management programmes for all proposed trees, shrubs and other vegetation demonstrating long term continuity and consistency. iii. Within TC4 - Block F1/ F2 / F3 / G1 and Public Realm areas - Details of Soft Landscape Design to include detailed Planting Plan and Planting Schedule - as appropriate - stating species/varieties, approximate quantities, sizes, rootball presentation and spacings. Planting mixes should specify a diverse range of species/varieties/cultivars and a diversity of forms and plant sizes (multi-stems, feathered, semi-matures, etc.); using both native and exotic species and pollinator-friendly native species (in accordance with the All-Ireland Pollinator Plan 2015-2020), all designed to provide vegetation that is visually-appealing, bio-diverse, and easily managed. Including management programmes for all proposed trees, shrubs and other vegetation demonstrating long term continuity and consistency. iv. Along all roads (Grand Parade, Tullyvale Road, Bishop Street & Cherrywood Avenue) and Tully Park Entrance Space - Details of Soft Landscape Design to include detailed Planting Plan and Planting Schedule - as appropriate - stating species/varieties, approximate quantities, sizes, rootball presentation and spacings. Planting mixes should specify a diverse range of species/varieties/cultivars and a diversity of forms and plant sizes (multi-stems, feathered, semi-matures, etc.); using both native and exotic species and pollinator-friendly native species (in accordance with the All-Ireland Pollinator Plan 2015-2020), all designed to provide vegetation that is visually-appealing, bio-diverse, and easily managed. Including management programmes for all proposed trees, shrubs and other vegetation demonstrating long term continuity and consistency. c) Prior to the commencement of development, the developer shall engage the services of a qualified ecologist as an ecological consultant, from the commencement of construction and for the duration of the monitoring requirements as set out in section 5 of the Habitat Management Plan. The developer shall inform the Planning Authority in writing of the appointment and name of the consultant, prior to commencement of development. The consultant shall ensure the implementation of the all of the recommendations within the submitted Habitat Management Plan and the EIAR. REASON: To ensure consistency with Specific Objectives PI10, GI15, GI44 & GI45 of the Cherrywood Planning Scheme and Section 4 of the UFDF and in the interest of the proper planning and sustainable development of the area. 11. Prior to the commencement of development within Tully Park entrance space, the developer shall submit for the written agreement of the Planning Authority the following:- a) A detailed landscape design including plans, sections and elevations for Tully Park entrance space which includes details of hard landscape materials, soft landscaping proposals, street furniture, lighting, signage and focal features / public art. b) A sculptural element shall be incorporated within the proposed Tully Park entrance space, either as a landscape integrated work or individual art piece. The developer shall engage the services of a public art specialist to advise regarding this commission. The final artwork shall be agreed by way of an expert selection panel which will include representation from Dún Laoghaire-Rathdown County Council and at least one external arts expert. The final artwork must comply with the standard requirements of DLRCC with regard to health and safety and ongoing maintenance. The developer's public art specialist shall liaise with the DLRCC (including the Arts Office) and the final location and design shall be agreed in writing with the Planning Authority prior to installation. c) The developer shall construct the pedestrian link / pathway into Tully Park from Tully Park entrance space in accordance with the permitted proposals for application Reg. Ref. DZ15A/0813. REASON: To ensure a high quality Public Realm and consistency with Section 4.2.1 of the UFDF. 12. With regard to planting plans within the public realm:- a) The developer shall ensure that the landscape proposals for the planting of all trees within the public realm (including all roads) is in accordance with the landscape drawings as submitted by Gross Max Landscape Architects as submitted by way of Further Information on 04/04/2018. Any conflicts that arise due to the location of utilities or services either above or below ground shall be resolved by the relocation or diversion of such services. b) Prior to the commencement of development, the developer shall retain the professional services of a qualified Landscape Architect, as his/her Landscape Consultant, throughout the course of the development works; and shall notify the planning authority of that appointment in writing prior to commencement. The developer shall engage the Landscape Consultant to procure, oversee and supervise the landscape contract for the implementation of the permitted landscape proposals. When all landscape works are inspected and completed to the satisfaction of the Landscape Consultant, he/she shall prepare, sign and submit a Practical Completion Certificate (PCC) to the planning authority, as verification that approved landscape plans and specification have been fully implemented. d) Prior to the commencement of development, the developer shall engage the services of a qualified ecologist as an ecological consultant, from the commencement of construction and for the duration of the monitoring requirements as set out in section 5 of the Habitat Management Plan. The developer shall inform the Planning Authority in writing of the appointment and name of the consultant, prior to commencement of development. The consultant shall ensure the implementation of the all of the recommendations within the submitted Habitat Management Plan and the EIAR. REASON: To ensure consistency with Specific Objectives PI10, GI15, GI44 & GI45 of the Cherrywood Planning Scheme and Section 4 of the UFDF and in the interest of the proper planning and sustainable development of the area. 13. The public realm network within the Town Centre, including the covered retail streets, shall be publicly accessible 24 hours a day, 7 days a week, unless otherwise agreed in writing with the Planning Authority. REASON: To ensure consistency with Specific Objective DA13 and PD20 of the Cherrywood Planning Scheme and Section 4 of the UFDF. Play opportunities and facilities 14. With regard to play facilities: a) Prior to the commencement of development of residential ground level courtyards within TC1 blocks A1, A2, A3 & Central space between A1 & A2 blocks the following shall be submitted for the written agreement of the Planning Authority: Final design and Details of all play opportunities and facilities - formal and/or informal as appropriate, in respect of design detailing, planting, boundaries, equipment and safety surface. Proposed equipment and ancillaries shall include specifications for the same, and proof that all equipment conforms to European Standards EN 1176-1-11 and EN 1177 Playground equipment and surfacing. b) Prior to the commencement of development of residential ground level courtyards within TC2 blocks C1, C2 & Central space between C1 & C2 blocks the following shall be submitted for the written agreement of the Planning Authority: Final design and Details of all play opportunities and facilities - formal and/or informal as appropriate, in respect of design detailing, planting, boundaries, equipment and safety surface. Proposed equipment and ancillaries shall include specifications for same, and proof that all equipment conforms to European Standards EN 1176-1-11 and EN 1177 Playground equipment and surfacing. c) Prior to the commencement of development of residential ground level courtyards within TC4 blocks F1, F2 & F3 the following shall be submitted for the written agreement of the Planning Authority: Final design and Details of all play opportunities and facilities - formal and/or informal as appropriate, in respect of design detailing, planting, boundaries, equipment and safety surface. Proposed equipment and ancillaries shall include specifications for same, and proof that all equipment conforms to European Standards EN 1176-1-11 and EN 1177 Playground equipment and surfacing. d) Upon completion of each play space and prior to occupation of the residential units within TC1, the developer shall submit for the written agreement of the Planning Authority a play map in GIS format which details all play provision provided for within each specific community garden in accordance with 4.6.3 & 4.7.2 of the Cherrywood Amenity Space Guidance Document. The applicant shall also submit a post-installation Practical Completion Certificate, in accordance with the requirements and guidelines of the Royal Society for the Prevention of Accidents (RoSPA). The Certificate shall be prepared and signed by a suitably qualified (RoSPA-approved), technical professional with expertise and experience in playground design and playground health and safety. e) Upon completion of each play space and prior to occupation of the residential units within TC2, the developer shall submit for the written agreement of the Planning Authority a play map in GIS format which details all play provision provided for within each specific community garden in accordance with 4.6.3 & 4.7.2 of the Cherrywood Amenity Space Guidance Document. The applicant shall also submit a post-installation Practical Completion Certificate, in accordance with the requirements and guidelines of the Royal Society for the Prevention of Accidents (RoSPA). The Certificate shall be prepared and signed by a suitably qualified (RoSPA-approved), technical professional with expertise and experience in playground design and playground health and safety. f) Upon completion of each play space and prior to occupation of the residential units within TC4, the developer shall submit for the written agreement of the Planning Authority a play map in GIS format which details all play provision provided for within each specific community garden in accordance with 4.6.3 & 4.7.2 of the Cherrywood Amenity Space Guidance Document. The applicant shall also submit a post-installation Practical Completion Certificate, in accordance with the requirements and guidelines of the Royal Society for the Prevention of Accidents (RoSPA). The Certificate shall be prepared and signed by a suitably qualified (RoSPA-approved), technical professional with expertise and experience in playground design and playground health and safety. REASON: To ensure the provision and construction of safe, quality play provision in compliance with best practice and reputable guidance; also Specific Objective GI72 of the Cherrywood Planning Scheme and Sections 4.6.3, 4.7.1 & 4.7.2 of the Cherrywood Amenity Space Guidance Document. Microclimate 15. With regard to microclimate:- a) Prior to the commencement of development of the superstructure of Quadrant TC1 (above podium level), the developer shall submit details including revised drawings, for the written agreement of the Planning Authority, which demonstrate the incorporation of wind mitigation measures to achieve sitting conditions for the balconies relating to Block A2 and Block A3 of TC1 where air speed exceeds 4m/s for more than 5% of the year, as indicated on Figures 10.15 - 10.17 of the revised EIAR submitted by way of Further Information. b) Prior to the commencement of development of the superstructure of Quadrant TC4 (above podium level), the developer shall submit details including revised drawings, for the written agreement of the Planning Authority, which demonstrate the incorporation of wind mitigation measures to achieve sitting conditions associated with Blocks F1 and F3 on TC4 where air speed exceeds 4m/s for 5-10% of the year as indicated on Figures 10.35 - 10.38 of the revised EIAR submitted by way of Further Information. REASON: In the interests of clarity, residential amenity and to ensure consistency with Specific Objective PD12 of the Cherrywood Planning Scheme and Section 4.7 of the UFDF. Drainage Infrastructure 16. Prior to the commencement of development, or as otherwise agreed in writing with the Planning Authority, the developer shall submit the following to the Planning Authority: a) Written evidence of the design compliance with Irish Water specification and requirements and copies of the final detailed design, including water saving systems. The detailed design of the water supply infrastructure including details of all connections shall be in accordance with Irish Water specification and requirements. b) Written evidence of the design compliance with Irish Water specification and requirements and copies of the final detail design. The detailed design of the wastewater supply infrastructure including details of all connections shall be in accordance with Irish Water specification and requirements. REASON: In the interests of public health. 17. Prior to the commencement of development, or as otherwise agreed in writing with the Planning Authority, the developer shall submit the following for agreement in writing with the Planning Authority: a) A full Factual Report from the Ground Investigations contractor along with an accompanying engineering report for the Pond 4 geotechnical ground investigations that confirm the validity of the pond stability analysis. b) Prior to the commencement of development, the relevant and accurate drawings to accompany the letters of consent from the other landowner(s) in Development Areas 2, 6 and 7 detailing both the Pond 2B works and the revised catchment outfall arrangements as proposed under this application shall be submitted for agreement in writing with the Planning Authority. c) Full detailed design of the surface water drainage infrastructure shall be submitted and agreed with the Planning Authority. This shall include detailed design for all of the SuDS components for the development, including full detail of interception volumes provided. d) An operations and maintenance plan for the proposed SuDS componants, inclusive of the attenuation structures. e) Detailed calculations, including area allocations, design input details and results for all hydraulic calculations. f) Detailed design of the green roof proposals for TC1, TC2 and TC4; including an engineering drawing of the green roof proposals showing locations and proposed outlets to the internal drainage network and a table showing the details of the types of green roof proposed, depth of stratum and extent. In addition, evidence based detail showing green roofs and soft landscaping for the development are in compliance with Criterion 1, Table 6.3 of the GDSDS. g) Calculations to demonstrate the adequacy of the internal and suspended drainage systems discharging to the attenuation tank for the 1 in 100 year storm for TC1/2 and TC4 (and 1 in 1000 year storm for TC1/2) and the impact/management of any temporary ponding on the surface if proposed during times of exceedance rainfall. In this regard, it is noted that floor levels shall be a minimum of 500mm above any flood level. h) Proposals that outline how, in the event of blockage or exceedance, storm water will be isolated from the foul network. i) Full details of rain water harvesting and water butts as proposed for the development. j) A Stormwater Management Plan for the construction phase. REASON: In the interests of orderly and sustainable development, to comply with the Objectives PI 4 and PI 12 of the Cherrywood Planning Scheme and to ensure long term optimum operation of the surface water management system. 18. With regards to surface water drainage, the following shall apply: a) Surface Water discharge from the subject development shall be limited to 1 l/s/ha. b) All proposed hydrobrakes shall be fitted with by-pass doors to facilitate draining down of the surface water system if required. c) The new parking/hardstanding areas within the development shall be constructed in accordance with the recommendations of the Greater Dublin Strategic Drainage Study for sustainable drainage systems (SUDS) and all to the satisfaction of the Planning Authority. d) Prior to the commencement of construction works to modify Pond 4, full details of the proposed overflow flow control arrangement for Pond 4 and details of proposals to reduce the risk of blockages at the new outlet pipe from Pond 4 shall be submitted for agreement in writing with the Planning Authority. e) A Stormwater Audit shall be carried out at Stage 2 for the detailed design stage and at Stage 3 for the post construction / prior to opening stage in accordance with PI 7 of the Cherrywood Planning scheme. All audits shall be carried out at the developer's expense. An independent audit team shall be used and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the commencement of development. The Stage 3 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the commissioning of the Stormwater infrastructure/Taking-in-Charge by Dún Laoghaire-Rathdown County Council REASON: To comply with the requirements of the Cherrywood Planning Scheme, including Specific Objective PI7 and to ensure long term optimum operation of the surface water management system. Pedestrian & Cycle Movement Strategy 19. The Developer shall comply with the following requirements: - a) Having regard to other conditions regarding the detailed design of Tully Park, design details for a pedestrian route along the west side of the Luas track from A2 to the boundary of Tully Park and the Res 2 plot in Development Area 4 shall be submitted to the Planning Authority for agreement in writing prior to the commencement of development of the superstructure (above podium). b) No outdoor seating areas for catering shall be allowed within the 3 metre wide footpath along the east and west sides of Grand Parade. Noting the location of street trees, lighting and Luas Overhead Catenary System (OCS) poles, a minimum clear and unobstructed width of 2 metres shall be provided. c) Prior to the commencement of development of the superstructure (above podium) the developer shall submit for the written agreement of the Planning Authority details of how they will accommodate the pedestrian/cycle bridge between TC 1 and TC 3. d) Prior to the occupation of the development, the design and the method and programme for delivery of the pedestrian/cycle connections to Bride's Glen Road, Shankill/Bray and N11/Dún Laoghaire as shown on UFDF Maps 8 and 9 that is within the applicant's ownership, shall be agreed in writing with the Planning Authority. e) Revised drawings detailing the provision, location and design of covered short stay cycle parking spaces that are appropriately integrated into the public realm areas, shall be submitted to the Planning Authority, for agreement in writing, prior to the commencement of the paving and finishes in the public realm areas. The provision, location and design shall have regard to the Standards for Cycle Parking and associated Cycling Facilities for new Developments (DLRCC July 2017). f) Revised drawings detailing a minimum of 20 no. short stay cycle parking spaces in the retail core of TC1 shall be submitted to the Planning Authority, for agreement in writing, prior to the commencement of the paving and finishes in the public realm areas. g) The provision of usage of short stay cycle parking shall be monitored on an annual basis (or at another agreed interval) by the Developer/Occupier in consultation with the Planning Authority (DLR Traffic Section). Additional short stay cycle parking shall be provided, if deemed necessary, to ensure that adequate provision is made. The above shall the undertaken entirely at the expense of the Developer/Occupier. REASON: In the interests of proper planning and the sustainable development of the area and for consistency with Sections 5.1, 5.2 and 5.2.2 of the UFDF and Specific Objectives PI20 and PI22 of the Cherrywood Planning Scheme. Car Parking and Vehicular Access 20. The Developer shall comply with the following requirements: - a) The road infrastructure included in this development and granted permission under Reg. Ref. DZ15A/0758, and listed below, shall be completed in accordance with the cross sections in the Cherrywood Planning Scheme (figure 4.4) and the UFDF (Figures 16a-g), to a standard to be taken in charge, prior to the occupation of development proposed by this application. • Reconstruct existing roundabout at A to signalised 4 arm junction. • Complete existing Tully Vale Road A to B in accordance with cross sections. To include the completed construction of the northbound bus lane, footpath and cycle track adjacent to the boundary of TC2 with Tully Vale Road A to A1. • Construct Bishop Street A1 to F1. To include the completed construction of the westbound bus lane, footpath and cycle track adjacent to the boundary of TC1 and TC2 with Bishop Street A1 to J. • Construct at-grade junction (left in/left out) on Wyattville Road (eastbound). • Construct road J to Wyattville Link Road. • Construct Overbridge on Wyattville Link Road and street A2-A3 (Grand Parade) (or as otherwise agreed in writing with the Planning Authority). • Reconstruct existing road A3 to I to A in accordance with cross section (Cherrywood Avenue). • Construct street A2-B (Grand Parade). • Construct the core street network of TC1, TC2 and TC4. b) The detailed design drawings for the road infrastructure shown on planning drawings numbered OTC-XX-CW-0100-00 to OTC-XX-CW-0100-14 shall be submitted for agreement, in writing, to the Planning Authority prior to the commencement of road construction works. c) The operation and management of the Park and Ride facility in TC4 shall be agreed in writing with TII prior to the operation or any use of these Park and Ride spaces. Written evidence of this agreement with TII shall also be provided to the Planning Authority prior to the operation or any use of this car park. Any change of use of these spaces shall be subject to a separate planning application. d) A design drawing, demonstrating that the future arrangement of junction A3 has been considered and is fully compatible with the current design proposals and the future extension of the Luas line to Bray, shall be submitted to the Planning Authority, for agreement in writing, prior to the commencement of development. e) The applicant shall ensure that prior to undertaking works to be carried out on the public road (including on footpaths) that they shall obtain a Road Opening License from the Road Maintenance and the Roads Control Sections. f) Details and drawings showing the developer's proposals for the provision of appropriate car park signage including directional and Variable Message Signs (VMS) shall be prepared by the developer and submitted, for agreement in writing, to the Planning Authority prior to any occupation of development. g) Details and drawings to show the proposed layout and provision of both external approach signage and internal circulation signage shall be prepared by the developer and submitted, for agreement in writing, to the Planning Authority prior to any occupation of development (see also Condition No. 7). h) That the car parking spaces allocated to residential use shall be clearly marked as attaching to a particular apartment unit and allocated spaces shall not be sold or let independently. i) The 795 no. car parking spaces included in the development in TC1 that are associated with blocks B3 and B4 shall not be brought into operation for any use or purpose prior to occupation in the event of grant of planning permission for these blocks. j) A car parking management strategy shall be prepared by the developer and submitted for agreement, in writing, to the Planning Authority prior to the occupation of any new development proposed by this application. k) The operation of the service/HGV access junction on the Wyattville Link Road shall be monitored on an annual basis (or at another agreed interval) by the Developer/ Occupier in consultation with the Planning Authority (DLR Traffic Section). Restrictions on the hours of operation of the service/HGV access junction shall be imposed by the Planning Authority, if deemed necessary, in order to prevent any adverse impacts on the strategic road network, namely the M50 and N11. The above shall be undertaken entirely at the expense of the Developer/Occupier. l) The Developer/Occupier shall ensure that no conflict arises between HGV's and pedestrians and cyclists due to the operation of the service zone in TC4 as shown on Figure 3.12 of the Traffic and Transport Assessment. m) In accordance with Section 8.2.4.12 'Electrically Operated Vehicles' of the current County Development Plan (2016-2022) the Applicant shall ensure that the proposed residential/visitor car parking spaces are constructed so as to be capable of accommodating future electric charging points as required. The following weblink is recommended http://www.esb.ie/electric-cars/index.jsp REASON: In the interests of orderly development and proper planning and the sustainable development of the area and for consistency with Specific Objectives PI14, PI16 and PI21 of the Cherrywood Planning Scheme and Table 7.1, and Sections 5.3, 5.4, 5.4.2 and 5.4.3 of the UFDF. Construction Management 21. Site development and building works shall be carried out only between the hours of 8.00am to 7.00pm Monday to Friday inclusive, 8.00am to 2.00pm Saturdays and no works permitted on site on Sundays and public holidays. Deviation from these times will only be allowed in exceptional circumstances where prior written approval has been received from the Planning Authority. This shall also be addressed in the Community Liaison Plan. A Community Liaison contact shall be established by the Developer with details given to local residents, so that particular issues and complaints may be quickly identified and responded to. REASON: To protect residential amenity. 22. During the construction period: a) The site development works and construction works shall be carried out in such a manner as to ensure that the adjoining public roads are kept clear of debris, soil and other material and if the need arises for cleaning works to be carried out on the adjoining public roads, the said cleaning works shall be carried out at the developer's expense. b) The applicant shall ensure that suitable facilities for vehicle cleansing and wheel washing, to the satisfaction of the Area Engineer, are provided on site. c) The applicant shall ensure that adequate on-site car parking facilities, to the satisfaction of Dún Laoghaire-Rathdown County Council, are made available for site workers during the course of construction. d) The applicant shall maintain all footpaths and roads effected by the development works in a safe and tidy condition to the satisfaction of the Area Engineer. e) Sprinklers shall be used on any on-site mobile crusher, which shall not be used within 200m of sensitive receptors. f) The spraying of any exposed earthworks shall include sufficient mobile bowser units. REASON: In the interests of the amenity, safety and maintenance of adjoining roads and footpaths. 23. The Developer shall comply with the following requirements: - a) The construction of the development shall be managed in accordance with a final Construction Management Plan, which shall be submitted for the development in its entirely to the Planning Authority for agreement in writing, prior to commencement of any development in TC 1, TC2 or TC4. In this regard the final Construction Management Plan shall include a Construction Traffic Management Plan and a Community Liaison Plan. This plan shall provide details of intended construction practice for the development, including: i. location of the site and materials compound(s) including area(s) identified for the storage of construction refuse; ii. location of areas for construction site offices and staff facilities; iii. details of site security fencing and hoardings; iv. details of on-site car parking facilities for site workers during the course of construction; v. details of the timing and routing of construction traffic to and from the construction site and associated directional signage, to include proposals to facilitate the delivery of abnormal loads to the site; vi. measures to obviate queuing of construction traffic on the adjoining road network; vii. measures to prevent the spillage or deposit of clay, rubble or other debris on the public road network, including road sweeping; viii. alternative arrangements to be put in place for pedestrians and vehicles in the case of the closure of any public road or footpath during the course of site development works; ix. provision of parking for existing properties during the construction period (this may require planning permission); x. details of appropriate mitigation measures for noise, dust and vibration, and monitoring of such levels; xi. containment of all construction-related fuel and oil within specially constructed bunds to ensure that fuel spillages are fully contained. Such bunds shall be roofed to exclude rainwater; xii. off-site disposal of construction/demolition waste and details of how it is proposed to manage excavated soil; and xiii. means to ensure that surface water run-off is controlled such that no silt or other pollutants enter local surface water sewers or drains. A record of daily checks that the works are being undertaken in accordance with the Construction Management Plan shall be kept for inspection by the Planning Authority. b) Prior to the commencement of development on site the developer shall submit to the Planning Authority for their written agreement the following: i. A Construction Waste Management Plan, having regard to Circular WPR 07/06 - Best Practice Guidelines on the Preparation of Waste Management Plans for Construction and Demolition Projects - published by the DECLG, July 2006. This plan shall provide details including intended construction practice for the management of waste arising from the construction process and in particular recyclable materials. ii. A Waste Management Plan. This plan shall contain details for the management of waste both commercial and domestic, and in particular recyclable materials and food waste arising within the development, including the provision of facilities for the separation, storage and collection of the waste and the provision of adequate signage and lighting to facilitate the ongoing operation of these facilities. c) Prior to commencement of development a mechanism and structure for on-site monitoring, reporting on progress and quality control to the Planning Authority in relation to construction standards, materials, as-built drawings and records shall be agreed in writing with the Planning Authority. d) Prior to commencement of development, a Site Monitoring Engineer shall be appointed at the Developer's expense for independent on-site monitoring on behalf of the Planning Authority (Municipal Services Department) and for reporting on progress and quality control to the Planning Authority (Municipal Services Department) with regard to the elements to be Taken-in-Charge (see Condition No. 25). The appointment of the Site Monitoring Engineer shall be agreed in advance and in writing with the Planning Authority, shall be independent of the Developer and the Developer's design and construction teams and shall report exclusively and directly to the Planning Authority (Municipal Services Department) only. The Site Monitoring Engineer shall be suitably qualified and experienced in the design and construction of surface water and roads infrastructure. With regard to the Wyattville Link Road Bridge the Site Monitoring Engineer shall have specialist knowledge and experience in the design and construction of bridge structures. e) Prior to the commencement of development of the areas to be Taken-in-Charge, or as otherwise agreed in writing with the Planning Authority, a Maintenance Licence/Agreement shall be agreed between the Developer and the Planning Authority. The Licence/Agreement shall address such items as (i) the supervision by both parties of any construction works that require the excavation of Grand Parade and (ii) the indemnification of DLRCC against any damage to the podium waterproofing or loss resulting therefrom. f) Prior to the opening of any areas within TC1, TC2 or TC4 for public/private use details shall be agreed in writing with the Planning Authority on how areas under construction will be segregated from areas that are to be open for public access. g) Any temporary closure of the Luas that is required by the developer to facilitate the construction works shall be at the discretion of, and subject to agreement with TII and shall be agreed in advance and in writing by the Developer with TII, the Luas operator (Transdev) and Dún Laoghaire-Rathdown County Council. Any proposed temporary closure shall be minimised and limited as much as practicable with regard to both its extent and duration. h) The development shall comply with the 'Code of engineering practice for works on, near, or adjacent the Luas light rail system'. i) Prior to commencement of development, or as otherwise agreed in writing with the Planning Authority, the developer shall submit the following to the Planning Authority for appropriate formal agreement with TII : - i. Agreements for maintenance arrangements for areas adjacent to Luas. ii. Formal ownership and maintenance agreements for the Luas over Wyattville Link Road. iii. Submission of appropriate plans and details to demonstrate no risk of intrusion into the Overhead Catenary System (OCS) danger zone via opening windows, maintenance, cleaning, balconies or terraces of properties. iv. Arrangement of specific pedestrian crossings of track to ensure no adverse effects on Luas operations and in accordance with the Cherrywood Town Centre UFDF. v. Plans and details to ensure the safety interface with Luas infrastructure. This shall include for protection of sight lines, intervisibility, accessibility, permeability and safety along full extent of the alignment. Specific attention shall be paid to lighting design for the development scheme to ensure no glare onto the Luas alignment. vi. Details of interface with Luas infrastructure and hardscaping to the newly established public realm and reinstatement works. This will include:- • Materials, finishes, surfacing and landscaping where it interfaces and impacts Luas. This includes any proposed upgrade to the track materials and finishes • Facilities and provision for modal interchange at stops such as dedicated set down areas, cycling stands etc. • Provision of minimum clear widths for footpaths beside track (e .g. no intrusion from outdoor seating or furniture). • Provision of facilities for Luas staff in lieu of the existing temporary arrangement at terminus stop. j) Prior to commencement of development the developer shall submit a Construction Management and Traffic Plan to the Planning Authority which shall require appropriate formal agreement between TII and developer. Details shall include for: - • The procurement of a demolition and construction method statement for the agreement of TII. The method statement should identify all interfaces to the Luas alignment and contain a risk assessment for construction works associated with the interfaces including mitigation measures for unacceptably high risks. • Details shall include for settlement and vibration monitoring, covered by legal agreement during the construction works, must be carried out in accordance with TII's 'Code Of Engineering Practice For Works On, Near, or Adjacent the Luas Light Rail System'. • Full plans and details of servicing access arrangements during construction works to the proposed development, these plans details shall demonstrate that there is no adverse impact on Luas operation's and safety shall be submitted to the planning authority and agreed with TII prior to the commencement of development. • The Construction Management and Traffic Plan shall demonstrate resolution of construction issues when viewed in the context of the existing operational Luas infrastructure. REASON: To ensure adherence to DLRCC Standards for Taking-in-Charge, in the interests of orderly development, proper planning, sustainable development and the residential amenity of the area and to mitigate against adverse impacts on nearby residents, to ensure no adverse impact on Luas passengers, the operation and safety of the Luas, to minimise any reduction in public transport services and in the interests of public safety and amenity. Future Roads Strategy & Travel Plans 24. The Developer shall undertake and provide the following: a) Landscaping design details and drawings or otherwise for the area between the Luas swept path and Grand Parade between junction B and A2 and referred to on section A-A of Arup drawing number OTC-XX-CW-0100-07 shall be submitted to the Planning Authority for agreement in writing, prior to the commencement of the development or as otherwise agreed in writing with the Planning Authority. b) Having regard to other conditions with regard to the design of the Public Realm and Landscaping, engineering details and drawings of the actual proposed pavement construction details for Grand Parade, including the specification of the proposed finish materials shall be submitted to the Planning Authority for agreement in writing, prior to the commencement of the development. c) Details and drawings to show that adequate cover is provided to services contained within the Grand Parade Bridge shall be submitted to the Planning Authority for agreement in writing, prior to the commencement of the development. d) A Quality Audit (which shall include a Road Safety Audit, Access Audit, Cycle Audit and Walking Audit) shall be carried out at Stage 2 for the detailed design stage and at Stage 3 for the post construction / prior to opening stage. All audits shall be carried out at the Developers expense in accordance with the Design Manual for Urban Roads & Streets (DMURS) guidance and TII (Transport Infrastructure Ireland) standards. An independent audit team shall be used and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Audit reports shall be submitted for the written agreement of the Planning Authority prior to the commencement of development. The Stage 3 Audit reports shall be submitted for the written agreement of the Planning Authority prior to the opening for public use/ Taking-in-Charge by Dún Laoghaire Rathdown County Council. e) Prior to commencement of development, a revised Travel Plan for the entire development of the Cherrywood Town Centre (TC1, TC2 and TC4) shall be submitted to the Planning Authority for agreement, in writing. The Planning Authority will consider its agreement following consultation with the National Transport Authority and Transport Infrastructure Ireland. The Travel Plan shall include the following at a minimum:- • The full integration of the Cherrywood Town Centre (TC1, TC2 and TC4) Travel Plan with the existing Cherrywood Area Wide Travel Plan; • Details and contact information of the key contact or Travel Plan Coordinator. The appointed person shall be suitably qualified and experienced to undertake the role; • Details of the establishment and operation of Cherrywood Town Centre Steering Group; • Details of all cycle parking facilities, availability of cycle parking for public use and proposed operation, maintenance and provision for future demand; • Comprehensive details of a car parking operation and monitoring regime; • Full details of the monitoring arrangements of the Cherrywood Town Centre Travel Plan; • Confirmation within leasing/letting arrangements that tenants will comply with the requirements of the Cherrywood Town Centre Travel Plan; • Details of publication of the Cherrywood Town Centre Travel Plan; • Plan review arrangements. REASON: For clarity, In the interest of sustainable transport, to ensure implementation of the Cherrywood Town Centre Travel Plan for the development and for consistency with Specific Objectives PI14 and PI24 of the Cherrywood Planning Scheme. Taking-In-Charge 25. With regard to Taking-in-Charge:- a) All works to be carried out on the public road (including footpath and off road cycle track) shall be at the applicant's expense to meet the Dún Laoghaire-Rathdown County Council's 'Taking-in-Charge' requirements and all to the satisfaction of the Transportation Planning and Road Maintenance Sections. b) Taking-in-charge drawings shall be submitted and agreed in writing with the Planning Authority, prior to the commencement of any development on site. The Taking-in-Charge drawings shall show the following: i. the red line boundary for the development ii. the road infrastructure that is proposed by the Developer for taking in charge that includes the following roads: - • Tully Vale Road, A to A1 • Bishop Street, A1 to J • Cherrywood Avenue, J to the Wyattville Link Road • Wyattville Link Road • Cherrywood Avenue, A to I1 to I to A3 • Grand Parade, B to A2 • Grand Parade, A2 to A3 • Grand Parade Bridge over the Wyattville Link Road iii. the surface water attenuation ponds that are proposed by the Developer for taking in charge that includes the following: - • surface water attenuation pond 2B • the maintenance access and wayleave to pond 2B • surface water attenuation pond 4 • the maintenance access and wayleave to pond 4 iv. The Tully Park entrance and any adjoining areas within Tully Park. c) Prior to the commencement of development the developer shall submit design drawings that show, in plan and cross section, the construction details for the zone above podium level that is proposed for Taking-in-Charge with regard to Grand Parade between points A2 and A3. d) Prior to the occupation of the development, the Developer shall submit a Management Plan for the Public Realm network, other than the areas to be Taken-in-Charge, including details of maintenance and safety which shall be reviewed on an annual basis unless otherwise agreed in writing with the Planning Authority. e) With regard to the roads that are proposed for taking in charge, the provision and location of service ducts, pipes, manholes and service chambers shall be agreed with the relevant service providers prior to commencement of road construction works. The services to be considered include, electricity, water, gas, telecoms, traffic communication, public lighting. Written evidence of the agreements shall be provided to the Planning Authority prior to the commencement of development, or as otherwise agreed with the Planning Authority. REASON: In the interest of the proper planning and sustainable development of the area; of orderly development, and to ensure consistency with Specific Objective PI14 and Table 7.1 of the Cherrywood Planning Scheme and Section 5.4 of the UFDF. Phasing, Bonds and Financial Contributions 26. Prior to the commencement of development, the applicant shall submit the following for agreement in writing with the Planning Authority: a) Details of the phasing of development to facilitate the phased payment of the Section 48 Development Contributions. b) Details of the phasing of the residential units, to facilitate the phased payment of the residential bond. c) A drawing defining the boundary of the residential areas (to be covered by (b) above). This shall include the public spaces adjoining the blocks. All drawings shall be to scale with dimensions to boundaries stated on the drawing. d) A table indicating the number of units and square metres of development in each phase and setting out the expected timeframe within which each phase shall be completed. e) To assist in the management of compliances, a schedule of compliance submissions for each phase of development. Any deviation in the agreed phasing during the permission shall be agreed in writing with the Planning Authority prior to commencement of the affected development. REASON: To ensure an orderly phasing of the development and to facilitate the phased payment of the Residential Bond and the Section 48 Development Contribution. 27. If agreement cannot be reached between the Developer of the land and the Planning Authority on any of the compliance conditions the matter maybe referred to the Board for determination in accordance with Section 34 (5) of the Planning and Development Act 2000, as amended. REASON: In the interest of proper planning and sustainable development 28. No development on foot of this permission shall commence until security to allow for resurfacing, remedial and other ancillary works to the proposed new road infrastructure has been given by: a) Lodgement with the Council of an approved Insurance Company Bond in the sum of €1,281,025 which shall be kept in force by the developer until such time as the proposed development road works are completed to the satisfaction of the Council OR b) Lodgement with the Council of a Cash Sum of €1,281,025 to be applied by the Council at its absolute discretion if the road works are not completed to its satisfaction. REASON: To ensure that a ready sanction may be available to the Council to allow for resurfacing, remedial and other ancillary works to ensure and secure the satisfactory completion of new roads. 29. No development on foot of this permission shall commence until security to allow for remedial and other ancillary works to the proposed new and upgraded surface water attenuation ponds 2B and 4 has been given by: a) Lodgement with the Council of an approved Insurance Company Bond in the sum of €200,000 which shall be kept in force by the developer until such time as the proposed development surface water attenuation ponds 2B and 4 are completed to the satisfaction of the Council. OR b) Lodgement with the Council of a Cash Sum of €200,000 to be applied by the Council at its absolute discretion if the surface water attenuation ponds 2B and 4 are not completed to its satisfaction. REASON: To ensure that a ready sanction may be available to the Council to allow for remedial and other ancillary works to ensure and secure the satisfactory completion of the proposed new and upgrade surface water attenuation ponds 2B and 4. 30. The following shall be submitted for written agreement of the Planning Authority: a) Prior to commencement of development, the developer is required to submit details of the phasing of the public infrastructure elements as referenced in Condition No. 28 (Physical Infrastructure - Roads Bonds) and Condition 29 (Physical Infrastructure - Surface Water Attenuation Bond), to facilitate the phased payment of the Public Infrastructure Bond. b) A table shall be submitted indicating the relevant public infrastructure elements and the expected timeframe within which each phase shall be completed. c) Any deviation in the agreed phasing during the permission shall be agreed in writing with the Planning Authority prior to commencement of the affected development. REASON: To ensure an orderly phasing of the development and to facilitate the phased payment of the Public Infrastructure Bond. Management 31. All commercial units (including the public realm) in the town centre areas (TC1, 2, 3 and 4) shall be managed by a central management agency/company details of which shall be agreed in writing with the Planning Authority prior to the letting of any units. As the car park and other under podium services as well as the access and egress arrangements are shared facilities that relate to each block, no block shall be segregated by sale or letting from the approved right of access and egress and use of the shared service elements that relate to it, whether constructed or yet to be constructed. REASON: In the interest of orderly development. 32. Prior to the commencement of the residential development the applicant shall submit full details of a properly constituted Owners' Management Company for the apartments for the written agreement of the Planning Authority. This shall include a layout plan of the development showing the areas to be maintained by the Owners' Management Company. Membership of this Company shall be compulsory for all purchasers of property in the development. Confirmation that this Company has been set up shall be submitted to the Planning Authority prior to the occupation of the first residential unit. As the car park and other under podium services as well as the access and egress arrangements are shared facilities that relate to each block, no block shall be segregated by sale or letting from the approved right of access and egress and use of the shared service elements that relate to it, whether constructed or yet to be constructed. REASON: To provide for the satisfactory completion and maintenance of the development in the interest of residential amenity. EIAR 33. All monitoring and mitigation measures detailed in Appendix 17A Mitigating and Monitoring Commitments of the EIAR, including the Habitat Management Report, shall be implemented and maintained throughout the construction phase of the proposed development. The results of any monitoring shall be made available to the Planning Authority, if required. REASON: In the interest of the proper planning and sustainable development of the area. 34. Prior to the commencement of development, the applicant is requested to submit the following for agreement in writing with the Planning Authority: a) An Environmental Emergency Response Procedure in accordance with the requirements of Article 3 (2) and Annex IV of the EIA Directive 2011/92/EU, as amended. b) A detailed Operational Environmental Monitoring Plan (OEMP) for the post-construction phase. The OEMP shall detail how all post construction monitoring proposals contained in the EIAR will be implemented and managed in accordance with the planning application, planning conditions, any other relevant legislative environmental requirements and with best practice. It shall clearly show how all aspects of the post-construction development will be monitored to ensure that likely significant environmental effects will not exceed the limits set out in the EIAR (or as modified by these conditions). The OEMP shall describe all details that are relevant in this context and shall be restricted to these aspects. All proposals in the OEMP shall be set out clearly and shall include clear trigger values along with actions that will follow in event of exceedance or failure of mitigation measures. All reporting procedures shall be clear and transparent. The OEMP shall include provisions for review at appropriate intervals. The first review shall be within 24 months of completion of construction. All iterations of the OEMP shall be subject to the same agreement, clarity, monitoring and reporting requirements. c) Prior to the commencement of development, the applicant shall submit for the written agreement of the Planning Authority, a final site specific detailed Construction Environmental Management Plan (CEMP). The final CEMP shall include the following additions: i. The fisheries protection measures incorporated into the Final CEMP as outlined in the Fisheries Protection Method Statement in consultation with Inland Fisheries and the Project Ecologist. ii. The location of stockpiles for agreement with the Planning Authority. iii. The programme of reporting and monitoring by Project Ecologist to be agreed with the Planning Authority. The CEMP will detail how all significant elements of the construction works will be undertaken and managed in accordance with the planning application, planning conditions, any other relevant legislative environmental requirements and with best practice. It shall be prepared to clearly show how all aspects of construction will be planned and managed to ensure that likely significant environmental effects will not exceed the limits set out in the EIAR (or as modified by these conditions). The CEMP shall describe all details that are relevant in this context and shall be restricted to these aspects. All proposals in the CEMP shall be set out as clear commitments. All monitoring proposals shall include clear trigger values along with actions that will follow in event of exceedance or failure of mitigation measures. All reporting procedures shall be clear and transparent. The CEMP shall include provisions for review at appropriate intervals which may be linked to the schedule for key construction phases but shall in any event be reviewed at least every 12 months during the construction process. All iterations of the CEMP shall be subject to the same agreement, clarity, monitoring and reporting requirements. d)Prior to the commencement of development an independent, and suitably qualified, Environmental Monitoring Officer (EMO) shall be appointed at the applicant's expense to ensure effective monitoring of environmental impacts during the construction and operational phases. The EMO shall report to the Planning Authority and shall maintain communication with the applicant, the local community and other relevant interests. The EMO shall be responsible for maintaining a clear and readily accessible record of monitoring compliance that shall highlight any exceedances or complaints, remedial actions taken to address these and the effectiveness of the remedial actions. The role of the EMO shall be closely aligned with the Construction Environmental Management Plan, the Operational Environmental Monitoring Plan and the Environmental Emergency Management Procedure. The detailed specification of the EMO's role including the mechanism for liaising with the relevant parties, frequency of communications, format and frequency of reporting and the procedure for investigating and responding to any complaints or exceedances shall be agreed in writing with the Planning Authority prior to commencement. e) The proposed planting as part of the landscape plan including planting species list for the Living Wall, Green roofs, tree species and any proposed pollinator planting along with the detailed management and maintenance of these items. f) A letter from the applicant's bat consultants, stating that they are satisfied that the final design of the external illumination proposed for the development, will be to the required specification recommended by the bat specialist and that they are satisfied that any important bat corridors are not illuminated. g) A report from the bat specialist to the Planning Authority after the installation of the external lighting, at the proposed development, confirming that it is operating according to specification. REASON: To ensure effective monitoring, including liaison with the local community, in the interests of amenities, environmental protection, public health and safety and the proper planning and sustainable development of the area, and to mitigate the impact of habitat loss and the potential impact of increased nocturnal illumination at the proposed development on bats. 35. The developer shall comply with the following: a) The 2 no. District Regulator Installations (DRI) shall be omitted and shall be subject to a future planning application, or unless otherwise exempt. b) Any ground works, vegetation clearance and tree removal shall take place outside of the bird breeding season (March 1st - August 31st). REASON: In the interest of orderly development and to protect birds and bird breeding habitats during the nesting season. 36. No residential development on foot of this permission shall commence until security for the provision and satisfactory completion of services (including roads, footpaths, open spaces, public lighting, sewers, watermains and drains) in accordance with the Plans and particulars lodged with the application, has been given by: a) Lodgement with the Council of an approved Insurance Company Bond in the sum of €4,029,400.00, which shall be kept in force by the Developer until such time as Roads, Open Spaces, Car Parks, Sewers, Watermains and Drains are completed to the satisfaction of the Council OR; b) Lodgement with the Council of a Cash Sum of €2,467,800.00 to be applied by the Council at its absolute discretion if such services are not duly provided to its satisfaction on the provision and completion of such services to standard specifications. REASON: To ensure that a ready sanction may be available to the Council to induce the provision of services and prevent disamenity in the development. 37. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of € €449,477.98, to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of Surface Water Public Infrastructure and Facilities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme ) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Public Infrastructure and Facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. Note on above Condition: Please note that with effect from 1st January, 2014 Irish Water are now the statutory body responsible for both water and waste water services. Accordingly, the contribution payable has been reduced by the amount of the contribution associated with these services. Further details/clarification can be obtained from Irish Water at Tel. 1 850 278 278 . 38. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of € €10,297,223.33, to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 39. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of € €6,683,419.60 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Community & Parks Public Infrastructure, Facilities and Amenities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks Public Infrastructure, Facilities and Amenities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 40.The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of € €986,267.20, to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of Surface Water Public Infrastructure and Facilities benefiting development in the the Cherrywood Planning Scheme Area only of the Authority as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Public Infrastructure and Facilities benefiting development in the in the Cherrywood Planning Scheme area and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 41. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of € €6,276,279.52, to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Roads Public Infrastructure and Facilities in the Cherrywood Planning Scheme Area. This Cherrywood Planning Scheme element of the Development Contribution shall be used solely to fund infrastructure identified in the Plan, as listed in Appendix III - Cherrywood Planning Scheme Projects List, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the Cherrywood Planning Scheme Area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 42. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of € €1,702,987.33, to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of provision of the Community & Parks Public Infrastructure Facilities & Amenities in the Cherrywood Planning Scheme Area. This Cherrywood Planning Scheme element of the Development Contribution shall be used solely to fund infrastructure identified in the Plan, as listed in Appendix III- Cherrywood Planning Scheme Area only as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks Public Infrastructure Facilities & Amenities benefiting development in the Cherrywood Planning Scheme Area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 43. That a financial contribution shall be paid by the proposer to the Council towards the cost of the extension of Luas Line B from the Sandyford Depot to Cherrywood, namely Luas Line B1. This contribution to be paid prior to the commencement of the development or in such other manner as may otherwise be agreed with the Planning Authority. If phasing of the payment of the Section 49 Development Contribution is proposed the developer shall submit for the written agreement of the Planning Authority the phasing of the payment of the Section 49 Development Contribution based on the gross site area of 8.26 Ha. The rate of contribution payable shall be that pertaining to the particular year in which implementation of the Planning Permission is commenced. The Supplementary Development Contribution Scheme provides for an annual increase in the levels of contribution payable, as outlined in the scheme, by a factor of 5% compound interest per annum. The levels of contribution will be reviewed annually on the 13th of January of each year during which the scheme is in force to take account of the aforementioned increase. The rate of contribution payable in respect of this development, at current contribution rates, is € €4,364,988.04, and is subject to increase as outlined above. It should be noted that contributions assessed in accordance with the Supplementary Development Contribution Scheme cannot be appealed to An Bord Pleanala unless the applicant considers the levy referred to in this condition has not been properly applied in accordance with the terms of the Scheme. REASONS FOR CONTRIBUTIONS: To part finance the extension of the Luas Line B1 from Sandyford Depot to Cherrywood, as provided for in the Supplementary Development Contribution Scheme adopted by the Council of Dun laoghaire-Rathdown on the 13th of January, 2003. (incorporating amendments to Clause 13 as adopted by the County Council at its meeting on 13th May, 2013 - to be effective for all decisions from 14th May, 2013). NOTE: That water supply and foul drainage shall be in accordance with the requirements of Irish Water. NOTE: Superstructure refers to any buildings or surface above podium level, or basement level where there is no podium, having regard to the establishment of new ground levels as referenced in Section 6.2 of the Cherrywood Planning Scheme and Section 3.2.5 of the Cherrywood Town Centre UFDF. NOTE: Where conditions refer to agreement, this is agreement in writing with the Authority referenced. ## Nearby applications - [DZ23A/0573](https://cherrywoodplans.com/application/DZ23A-0573.md): Lands (c. 17.03 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (19 Oct 2023). Amends the Cherrywood Town Centre permission to add 4 apartments in Blocks F2 and F3, bringing plot TC4 to 524 homes. - [DZ20A/0824](https://cherrywoodplans.com/application/DZ20A-0824.md): Lands (c. 17.01 ha), in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (11 Jan 2021). Changes the windows, balconies and frontage of Town Centre Block F2 on Cherrywood Avenue and Central Avenue. - [DZ19A/0148](https://cherrywoodplans.com/application/DZ19A-0148.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (24 Apr 2019). Amends Town Centre plot TC2 to add 47 apartments, taking Blocks C1 and C2 from 384 to 431 homes. - [DZ23A/0423](https://cherrywoodplans.com/application/DZ23A-0423.md): On lands (c.17.03 a) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (Also Co. Dublin). Granted (10 Aug 2023). Amends the Cherrywood Town Centre permission to add two 2-bed apartments to Block A1. - [DZ22A/0690](https://cherrywoodplans.com/application/DZ22A-0690.md): Townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (12 May 2023). Facade and balcony design changes to Cherrywood Town Centre apartment Blocks A1, A2 and A3. - [DZ22A/0747](https://cherrywoodplans.com/application/DZ22A-0747.md): Townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (30 Mar 2023). Changes of use and merging of units in Town Centre Blocks C1 and C2 to create a larger 723 sq.m shop with off-licence. - [DZ22A/0846](https://cherrywoodplans.com/application/DZ22A-0846.md): Lands (c. 17.03 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (22 Dec 2022). Removes a planned viewing platform at Block F1 in Cherrywood Town Centre, replacing it with a glass balustrade. - [DZ22A/0138](https://cherrywoodplans.com/application/DZ22A-0138.md): (c. 17.03ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (30 Aug 2022). Minor changes of use between shop and restaurant-type units in Town Centre Blocks C1 and C2, and a slightly larger crèche. - [DZ21A/0807](https://cherrywoodplans.com/application/DZ21A-0807.md): Lands (c. 17.03 ha), in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (8 Jul 2022). Amends the Cherrywood Town Centre permission to cut residential parking from 1,363 to 1,169 spaces and add 41 car-sharing spaces. - [DZ21A/0713](https://cherrywoodplans.com/application/DZ21A-0713.md): Lands (c. 17.01 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (3 Oct 2021). Design changes to the three apartment blocks A1–A3 in Cherrywood Town Centre, including taller windows and smaller roof terrace. - [DZ19A/1024](https://cherrywoodplans.com/application/DZ19A-1024.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (9 Sep 2020). Amends the Cherrywood Town Centre plan to shrink the basement under Blocks A1–A3 and reassign parking. - [DZ20A/0002](https://cherrywoodplans.com/application/DZ20A-0002.md): Lands (c.17.01ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (9 Sep 2020). Makes minor changes to electrical rooms and landscaping in Town Centre Blocks F1 and F3. - [DZ19A/0458](https://cherrywoodplans.com/application/DZ19A-0458.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (19 Jun 2020). Major redesign of Cherrywood Town Centre plot TC1, adding two supermarkets, an 11-screen cinema and much more retail space. - [DZ18A/1178](https://cherrywoodplans.com/application/DZ18A-1178.md): 2.2 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (17 Apr 2019). Amends Town Centre plot TC2 to add one apartment, expand retail and resident amenity space, and move the crèche. - [DZ26A/0032/WEB](https://cherrywoodplans.com/application/DZ26A-0032-WEB.md): Block A1, The Tully Building, Civic Street, Cherrywood Town Centre, Dublin 18, D18WDK0. Granted (13 Mar 2026). Revised plan for 24 mobile phone antennas and 9 dishes on Block A1, The Tully Building, after an earlier compliance submission was rejected. - [DZ25A/0485/WEB](https://cherrywoodplans.com/application/DZ25A-0485-WEB.md): Block A1, Tully Buildings, Cherrywood, Dublin 18. Granted (1 Aug 2025). 24 mobile phone antennas and 9 dishes on the facade and roof of Block A1, Tully Buildings. - [DZ22A/0952](https://cherrywoodplans.com/application/DZ22A-0952.md): The Hunt Building, Grand Parade, Cherrywood Town Centre, Dublin 18. Refused or withdrawn (1 Feb 2023). 6 mobile phone antennas and 2 dishes on the roof of The Hunt Building, Grand Parade. - [DZ22A/0796](https://cherrywoodplans.com/application/DZ22A-0796.md): The Hunt Building, Grand Parade, Cherrywood Town Centre, Dublin 18. Refused or withdrawn (23 Nov 2022). 6 mobile phone antennas and 2 dishes, finished to look like brick, on the roof of The Hunt Building, Grand Parade. - [DZ20A/0877](https://cherrywoodplans.com/application/DZ20A-0877.md): Bishop Street, Cherrywood, Dublin 18, Co Dublin. Granted (29 Jan 2021). Installs a small gas regulator building on Bishop Street near the Luas line. - [D06A/1660](https://cherrywoodplans.com/application/D06A-1660.md): Park One, Cherrywood Science And Technology Park, Loughlinstown, Co. Dublin.. Granted (6 Mar 2007). Completes the distributor road through Park One at Cherrywood Business Park, letting overhead power lines go underground. - [DZ22A/0093](https://cherrywoodplans.com/application/DZ22A-0093.md): Townland of Laughanstown, Dublin 18. Granted (1 Apr 2022). Seeks to keep two advertising signs for Cherrywood housing for 3 more years. - [D15A/0355](https://cherrywoodplans.com/application/D15A-0355.md): Site located in the green area at the entrance to, Druid Valley Estate, Cabinteely, Dublin 18. Refused or withdrawn (9 Jul 2015). Installs a small gas safety regulator unit on the green at the entrance to Druid Valley. - [DZ24A/1030/WEB](https://cherrywoodplans.com/application/DZ24A-1030-WEB.md): In the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18. Granted (11 Jun 2025). Amends a permitted scheme off Tully Vale Road to add 59 apartments by raising four blocks by one or two storeys. - [DZ20A/0052](https://cherrywoodplans.com/application/DZ20A-0052.md): 1.86 ha in the townlands of Cherrywood, Dublin 18 (also Co. Dublin)--TC3. Granted (13 Apr 2021). A mixed-use block at Town Centre 3 with an 8-storey office building and 198 build-to-rent apartments. - [DZ22A/0591](https://cherrywoodplans.com/application/DZ22A-0591.md): C. 3.71 in the Townland of Cherrywood, Block Town Centre 3 (TC3), Dublin 18. Granted (20 Jun 2023). 418 build-to-rent apartments in four blocks of up to 5 storeys at Town Centre 3, with shops, cafés and community space. - [DZ18A/0499](https://cherrywoodplans.com/application/DZ18A-0499.md): Lands (c.1.22ha) in the townlands of Cherrywood & Laughanstown, Dublin 18. Granted (11 Jan 2019). 146 apartments in four 4-storey blocks off Grand Parade on plot TC5. - [D02A/0508](https://cherrywoodplans.com/application/D02A-0508.md): Building H, Cherrywood Science & Technology Park,, Cherrywood, Loughlinstown, Co. Dublin.. Granted (22 Jul 2002). Adds 15 parking spaces to the car park serving Building H at Cherrywood Business Park. - [DZ23A/0242](https://cherrywoodplans.com/application/DZ23A-0242.md): Townland of Cherrywood Dublin 18 The site is located in the Cherrywood Planning Scheme and forms part of the south eastern porti. Granted (7 Jun 2023). Changes to the permitted basement at Town Centre 3 so it can later connect to the wider TC3 basement. - [DZ21A/0785](https://cherrywoodplans.com/application/DZ21A-0785.md): c.0.95 ha townland, Cherrywood, Dublin 18 (also Co. Dublin). Granted (30 Mar 2022). An office building of up to 8 storeys with ground-floor cafés at the corner of Town Centre 3, beside the Bride's Glen Luas stop. - [D07A/1770](https://cherrywoodplans.com/application/D07A-1770.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin.. Refused or withdrawn (28 Jan 2008). Builds a multi-storey car park with 1,081 spaces and 10 ground-floor shops at Cherrywood Business Park. - [DZ25A/0543/WEB](https://cherrywoodplans.com/application/DZ25A-0543-WEB.md): Dlr Properties Limited, Hibernia House, Cherrywood Business Park, Dublin 18, D18E440. Granted (28 Aug 2025). Hibernia House in Cherrywood Business Park changes from offices to a medical centre with a pharmacy. - [DZ19A/0808](https://cherrywoodplans.com/application/DZ19A-0808.md): Cherrywood Business Park, Cherrywood & Loughlinstown, Co. Dublin, (Also Dublin 18). Granted (17 Dec 2019). Installs a small gas pressure regulator building in Cherrywood Business Park. - [DZ19A/0647](https://cherrywoodplans.com/application/DZ19A-0647.md): Cherrywood Business Park, Cherrywood & Loughlinstown, Co. Dublin, (Also Dublin 18). Refused or withdrawn (18 Sep 2019). Installs a small gas pressure regulator building in Cherrywood Business Park. - [DZ19A/0523](https://cherrywoodplans.com/application/DZ19A-0523.md): Cherrywood Business Park, Cherrywood & Loughlinstown, Co. Dublin, (Also Dublin 18). Refused or withdrawn (23 Aug 2019). Installs a small gas pressure regulator building in Cherrywood Business Park. - [DZ17A/0171](https://cherrywoodplans.com/application/DZ17A-0171.md): Cherrywood Business Park, Cherrywood, Dublin 18. Granted (21 Apr 2017). Seeks to keep the existing entrance and wayfinding signs at Cherrywood Business Park. - [DZ16A/0535](https://cherrywoodplans.com/application/DZ16A-0535.md): Hibernia House, Cherrywood Business Park, Loughlinstown, Dublin 18. Granted (9 Sep 2016). Puts up two high-level lit 'evros' signs on Hibernia House, Cherrywood Business Park. - [D09A/0146](https://cherrywoodplans.com/application/D09A-0146.md): Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (23 Apr 2009). Fills in atrium spaces in Building AA at Cherrywood Business Park, adding 269 sq.m and 5 parking spaces. - [D10A/0701](https://cherrywoodplans.com/application/D10A-0701.md): Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (24 May 2011). A 197-space surface park and ride car park beside the Brides Glen Luas stop. - [D06A/0911](https://cherrywoodplans.com/application/D06A-0911.md): Block D, Cherrywood Science & Technology Park, Cherrywood, Loughlinstown, Co. Dublin. Granted (23 Aug 2006). Makes internal changes to the Block D office building, enclosing its entrance and adding a fire escape stairs. - [D02A/0424](https://cherrywoodplans.com/application/D02A-0424.md): Cherrywood Science & Technology Park,, Cherrywood, Loughlinstown, Co. Dublin.. Granted (10 Jul 2002). Allows two permitted three-storey science and technology buildings, AA and AB, to be used instead for office-based industry. - [D04A/1013](https://cherrywoodplans.com/application/D04A-1013.md): Laughanstown/Cherrywood, With Access From N11, Wyattville Road, Co. Dublin.. Refused or withdrawn (9 May 2005). Seeks to keep modified land shaping and drainage works on a 36-hectare site at Laughanstown/Cherrywood and further alter them. - [D08A/0687](https://cherrywoodplans.com/application/D08A-0687.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Refused or withdrawn (7 Aug 2008). Replacing Block D with a 5-storey office building with a large ground-floor shop at Cherrywood Science & Technology Park. - [D06A/0630](https://cherrywoodplans.com/application/D06A-0630.md): Spar Retail Unit, Block D, Cherrywood Science & Technology Park, Loughlinstown, Dublin 18. Granted (12 Jul 2006). An off-licence counter added to the Spar shop in Block D of Cherrywood Science & Technology Park. - [DZ25A/0066/WEB](https://cherrywoodplans.com/application/DZ25A-0066-WEB.md): Building 7 The Campus, Cherrywood Avenue, Cherrywood (Glebe Townland), Co Dublin, Dublin 18, D18T8Y6. Granted (20 Mar 2025). Part of Building 7 at The Campus changes from offices to medical and dental use. - [DZ16A/0530](https://cherrywoodplans.com/application/DZ16A-0530.md): Units 2 & 4 Building 7 (previously 'Block D'), Cherrywood Business Park, Cherrywood, Loughlinstown, Co Dublin. Granted (9 Sep 2016). Changes two vacant units in Building 7, Cherrywood Business Park, into medical and dental use. - [D05A/1672](https://cherrywoodplans.com/application/D05A-1672.md): Block D, Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (13 Feb 2006). Makes small changes to Block D, enlarging a ground-floor shop and trimming the offices. - [D03A/0479](https://cherrywoodplans.com/application/D03A-0479.md): ESB, Plot M, Cherrywood Science And Technology Park, Wyatville Link Road. Granted (14 Jul 2003). Seeks to keep an ESB 38 kV line mast already installed at Cherrywood Business Park. - [D04A/1012](https://cherrywoodplans.com/application/D04A-1012.md): Cherrywood/Glebe, (ED Rathmichael), Wyvattville Link Road, Co. Dublin.. Refused or withdrawn (9 May 2005). Reshapes and drains an 8.6-hectare site at Cherrywood/Glebe and stores topsoil on a further 5.1 hectares at Laughanstown. - [D04A/0232](https://cherrywoodplans.com/application/D04A-0232.md): Block H, Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (23 Apr 2004). Puts up a lit corporate logo sign at Block H, Cherrywood Business Park. - [D08A/0952](https://cherrywoodplans.com/application/D08A-0952.md): Cherrywood Science & Technology Park,(Block D1), Cherrywood, Loughlinstown, Co. Dublin. Refused or withdrawn (15 Oct 2008). Design changes to the approved Block D1 office building at Cherrywood Science & Technology Park. - [ABP30342919](https://cherrywoodplans.com/application/ABP30342919.md): Site (c.3.06ha) in the townlands of Laughanstown, Dublin 18 (lands generally bounded by Bishop Street to the south, the Luas green line to the east and Tully park to the north. Granted (18 Apr 2019). Builds 184 homes, a mix of apartments, two-level units and houses, between Bishop Street, the Luas line and Tully Park. - [D04A/1211](https://cherrywoodplans.com/application/D04A-1211.md): Cherrywood Road Bus Stop, (opposite Lucent), Loughlinstown, Co. Dublin. Refused or withdrawn (29 Jun 2005). Installs a steel and glass bus shelter with two lit advertising panels on Cherrywood Road. - [D05A/0419](https://cherrywoodplans.com/application/D05A-0419.md): Block D, Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (26 Oct 2005). Extends the existing Block D building at Cherrywood Business Park, adding 790 sq.m of shop and office space. - [DZ21A/0029](https://cherrywoodplans.com/application/DZ21A-0029.md): Site of approximately 1,094 sq m at Building 8 (formerly known as Block E), Cherrywood Business Park, Cherrywood, Co. Dublin, c. Granted (29 Apr 2021). Rebuilds the front entrance of Building 8 at Cherrywood Business Park with a slightly larger lobby. - [D07A/0604](https://cherrywoodplans.com/application/D07A-0604.md): Cherrywood Science Technology Park,(Block D1), Loughlinstown, Co. Dublin.. Granted (2 Apr 2008). Replacing a crèche with a 4-storey office building and restaurant (Block D1) at Cherrywood Science & Technology Park. - [DZ24A/0366/WEB](https://cherrywoodplans.com/application/DZ24A-0366-WEB.md): Building 8, Cherrywood Business Park, Dublin 18, D18W319. Granted (17 Jul 2024). Adds tenant signage and a wayfinding totem at Building 8, Cherrywood Business Park. - [DZ23A/0283](https://cherrywoodplans.com/application/DZ23A-0283.md): Building 8, Cherrywood Business Park, Cherrywood, Loughlinstown, Co. Dublin, D18 W319. Granted (11 Aug 2023). Turns Building 8 at Cherrywood Business Park from offices into a private medical clinic. - [DZ26A/0001/WEB](https://cherrywoodplans.com/application/DZ26A-0001-WEB.md): Cherrywood Avenue, (Adjoining Cherrywood Business Park), Cherrywood, Dublin 18. Granted (29 Jun 2026). Amends a permitted apartment scheme on Cherrywood Avenue to go from 67 to 70 apartments, with more parking. - [DZ25A/0983/WEB](https://cherrywoodplans.com/application/DZ25A-0983-WEB.md): Cherrywood Avenue ( adjoining Cherrywood Business Park), Cherrywood, Dublin 18. Refused or withdrawn (22 Dec 2025). Amends a permitted apartment scheme on Cherrywood Avenue to go from 67 to 70 apartments, with more parking. - [DZ26B/0241/WEB](https://cherrywoodplans.com/application/DZ26B-0241-WEB.md): 17 Domville Court, Cherrywood, Dublin 18, D18WEK6. Granted (10 Jun 2026). Permission to keep a glass conservatory permanently in the back garden of a house on Domville Court. - [DZ26B/0073/WEB](https://cherrywoodplans.com/application/DZ26B-0073-WEB.md): 17 Domville Court, Cherrywood, Dublin 18, D18WEK6. Refused or withdrawn (13 Mar 2026). Permission to keep a glass conservatory built in the back garden of a house on Domville Court. - [DZ18A/0854](https://cherrywoodplans.com/application/DZ18A-0854.md): site (c.2.62 HA) at Cherrywood Business Park, Cherrywood Avenue, Cherrywood, Co. Dublin (also Dublin 18) (lands to the south and west of Blocks G and G2, south of Cherrywood Avenue). Granted (31 Oct 2018). Builds a three-pond drainage system with a walking and cycling route south of Cherrywood Avenue. - [DZ19A/1022](https://cherrywoodplans.com/application/DZ19A-1022.md): On a site of 0.625ha, Dell Technologies, Block AB, Cherrywood Business Park, Cherrywood, Dublin 18. Granted (25 Feb 2020). Replaces two lit signs on the Dell Technologies building, Block AB, Cherrywood Business Park. - [DZ17A/0466](https://cherrywoodplans.com/application/DZ17A-0466.md): Block AB of CHerrywood, Science and Technology Park, Loughlinstown, Dublin 18. Granted (13 Jul 2017). Replaces signs at Block AB, Cherrywood Business Park, with two lit wall signs and a totem sign. - [DZ26B/0030/WEB](https://cherrywoodplans.com/application/DZ26B-0030-WEB.md): 17 Domville Court, Tullyvale, Cherrywood, Dublin 18, D18 WEK6. Refused or withdrawn (28 Jan 2026). Permission to keep a glass conservatory built in the back garden of a house on Domville Court. - [DZ22A/0681](https://cherrywoodplans.com/application/DZ22A-0681.md): Cherrywood Avenue, (Adjoining Cherrywood Business Park), Cherrywood, Dublin 18. Granted (28 Jun 2023). A 5-storey block of 70 apartments on Cherrywood Avenue, beside Cherrywood Business Park. - [DZ25A/0161/WEB](https://cherrywoodplans.com/application/DZ25A-0161-WEB.md): Lands in the townlands of Laughanstown, Dublin 18. The application relates to development in Cherrywood Strategic Development Zone. Granted (23 Apr 2025). Completion of a 145-metre stretch of Grand Parade from Tully Vale Road towards Bishop Street. - [DZ16A/0123](https://cherrywoodplans.com/application/DZ16A-0123.md): Units 1 & 2 Block C, Cherrywood Business Park, Cherrywood, Loughlinstown, Co Dublin. Granted (21 Apr 2016). Reconfigures two ground-floor shop units in Block C and turns one into a café/restaurant. - [DZ17A/0731](https://cherrywoodplans.com/application/DZ17A-0731.md): G3 (west of Block G2), Cherrywood Business Park, Cherrywood, Loughlinstown, Co Dublin (within the Cherrywood Strategic Development Zone (SDZ) and subject to the Cherrywood Planning Scheme 2014). Granted (26 Jan 2018). Builds a new four-storey office building, G3, on Cherrywood Avenue in Cherrywood Business Park. - [DZ14A/0596](https://cherrywoodplans.com/application/DZ14A-0596.md): Unit 1 , Block C, Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co Dublin. Granted (11 Dec 2014). Changes Shop Unit 1 in Block C, Cherrywood Business Park, into a dental clinic. - [DZ25A/0489/WEB](https://cherrywoodplans.com/application/DZ25A-0489-WEB.md): 20, Domville Court, Tullyvale, Cherrywood, Dublin 18, D18VN3A. Granted (11 Aug 2025). Permission to keep a glass conservatory permanently at the back of a house on Domville Court. - [DZ25A/0480/WEB](https://cherrywoodplans.com/application/DZ25A-0480-WEB.md): 20, Domville Court, Tullyvale, Cherrywood, Dublin 18, D18VN3A. Refused or withdrawn (19 Jun 2025). Permission to keep a glass conservatory at the back of a house on Domville Court. - [DZ19A/0577](https://cherrywoodplans.com/application/DZ19A-0577.md): Cherrywood Avenue South adjacent to Building 11, formally known as Building G2, Cherrywood Business Park, Loughlinstown, Dublin, D18 DH50. Granted (23 Jan 2020). A new loading bay on Cherrywood Avenue South beside Building 11 in Cherrywood Business Park. - [DZ16A/0816](https://cherrywoodplans.com/application/DZ16A-0816.md): Unit 4 Building 5 (previously Block C), Cherrywood Business Park, Cherrywood, Dublin 18. Granted (10 Jan 2017). Changes a vacant shop unit in Cherrywood Business Park into a bank with an ATM. - [D07A/0233](https://cherrywoodplans.com/application/D07A-0233.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.. Granted (27 Aug 2007). Extends and reworks the approved Block C leisure building, adding a double-height swimming pool hall. - [D06A/0268](https://cherrywoodplans.com/application/D06A-0268.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (16 Jun 2006). Builds a four-storey leisure and retail building (Block C) with a fitness centre and 25-metre pool at Cherrywood Business Park. - [D05A/1715](https://cherrywoodplans.com/application/D05A-1715.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Refused or withdrawn (12 Jan 2006). Builds a four-storey leisure and retail building (Block C) with a fitness centre and 20-metre pool at Cherrywood Business Park. - [DZ23A/0508](https://cherrywoodplans.com/application/DZ23A-0508.md): Unit 3 and Unit 1, Building 5, Cherrywood Business Park, Cherrywood, Loughlinstown, Co Dublin. Granted (22 Sep 2023). Two units in Building 5, Cherrywood Business Park, become a dental clinic and a café. - [DZ25A/0325/WEB](https://cherrywoodplans.com/application/DZ25A-0325-WEB.md): In the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18. Granted (15 Jan 2026). 121 apartments in two blocks of 3 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ25A/0102/WEB](https://cherrywoodplans.com/application/DZ25A-0102-WEB.md): In the Townlands of Laughanstown, in Cherrywood, Dublin 18. Granted (26 May 2025). Amends a permitted 200-apartment scheme in Macnebury to drop its basement and cut car parking from 241 to 160 spaces. - [DZ24A/1024/WEB](https://cherrywoodplans.com/application/DZ24A-1024-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood,, Dublin 18. Granted (1 May 2025). Amends a permitted Macnebury apartment scheme to cut car parking from 312 to 213 spaces and add bike, bin and storage buildings, with no change to the homes. - [DZ25A/0008/WEB](https://cherrywoodplans.com/application/DZ25A-0008-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18. Refused or withdrawn (6 Feb 2025). Amends a permitted 200-apartment scheme in Macnebury to drop its basement and cut car parking from 241 to 160 spaces. - [DZ24A/1016/WEB](https://cherrywoodplans.com/application/DZ24A-1016-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18. Refused or withdrawn (3 Jan 2025). Amends a permitted Macnebury development by removing its basement and cutting car parking from 241 to 160 spaces. - [DZ24A/0017](https://cherrywoodplans.com/application/DZ24A-0017.md): Townlands of Laughanstown and Cherrywood, Macnebury - Development Area 7 - Cherrywood, Dublin 18. Granted (11 Jun 2024). 200 apartments in three blocks of 4 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ23A/0811](https://cherrywoodplans.com/application/DZ23A-0811.md): In the Townlands of Laughanstown and Cherrywood. Macnebury, Development Area 7 , Cherrywood, Dublin 18. Refused or withdrawn (4 Jan 2024). 200 apartments in three blocks of 4 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ22A/1021](https://cherrywoodplans.com/application/DZ22A-1021.md): Lands within Development Area 7 - Macnebury, including part of the Res 3 plot known as M1 located south of Bishop Street, west of Cherrywood Avenue, east and north of the proposed Beckett Road, Laughanstown, Dublin 18. Granted (27 Jun 2023). 283 new homes, mostly apartments in four blocks of 4–5 storeys, plus a crèche, south of Bishop Street in Macnebury. - [DZ24A/0485/WEB](https://cherrywoodplans.com/application/DZ24A-0485-WEB.md): Site Known as Block G3, Cherrywood Business Park, Cherrywood, Loughlinstown, Co. Dublin. Granted (19 Dec 2024). A 4-storey science and technology office building with labs on Block G3, Cherrywood Business Park. - [D08A/0121](https://cherrywoodplans.com/application/D08A-0121.md): Block C, Cherrywood Science And Technology Park, Cherrywood, Loughlinstown, Co. Dublin. Granted (24 Jun 2008). Seeks to keep an extension to the Block C facilities building and sets out options for a front loading bay. - [D07A/1607](https://cherrywoodplans.com/application/D07A-1607.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.. Refused or withdrawn (24 Jan 2008). The top floor of Block C at Cherrywood Science & Technology Park changes from recreation use to offices. - [D07A/1503](https://cherrywoodplans.com/application/D07A-1503.md): Block C, Cherrywood Science And Technology Park, Cherrywood, Loughlinstown, Co. Dublin. Refused or withdrawn (18 Dec 2007). Keeping a 52 sq.m ground-floor extension and shopfronts at Block C, Cherrywood Science & Technology Park. - [DZ19A/0255](https://cherrywoodplans.com/application/DZ19A-0255.md): Cherrywood Business Park (lands including & adjoining Bldgs 2-5 & 7 & basement level under Buildings 3, 4 & 5, Pond 4 & part of the linear park), Cherrywood, Co Dublin .. Granted (3 Dec 2019). Upgrades the public spaces of Cherrywood Business Park with raised meeting pods, a large canopy, a sunken garden and linear park improvements. - [D08A/0762](https://cherrywoodplans.com/application/D08A-0762.md): Unit 6, Block C, The Facilities Building, Cherrywood, Co. Dublin. Refused or withdrawn (25 Aug 2008). Adds lit signage to the front of Unit 6, Block C, at Cherrywood Business Park. - [D08A/1062](https://cherrywoodplans.com/application/D08A-1062.md): Unit 6, Block C, The Facilities Building, Cherrywood, Co. Dublin. Granted (13 Nov 2008). Adds lit signage to the front of Unit 6, Block C, at Cherrywood Business Park. - [D04A/0915](https://cherrywoodplans.com/application/D04A-0915.md): Block AC, Cherrywood Business Park, Loughlinstown, Co. Dublin.. Granted (10 Nov 2004). Enlarges the approved link between office Blocks AC and AB, adding 990 sq.m of floor space. - [DZ21A/1017](https://cherrywoodplans.com/application/DZ21A-1017.md): Townlands of Laughanstown, Glebe, and Cherrywood, Dublin 18, (also Co Dublin). Granted (11 Nov 2022). About 1.6km of new roads including Beckett Road with an underpass below the Wyattville Link Road, plus a park around an ancient wedge tomb. - [D06A/1497](https://cherrywoodplans.com/application/D06A-1497.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (14 Dec 2006). Builds a new four-storey office building, Block G2, over a two-level car park at Cherrywood Business Park. - [D08A/0035](https://cherrywoodplans.com/application/D08A-0035.md): Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (26 Jun 2008). A 4–5 storey office building (Building F) and new road at Cherrywood Science & Technology Park, with 289 basement car spaces. - [DZ20A/0611](https://cherrywoodplans.com/application/DZ20A-0611.md): Site of approximately 4,730 sq m at Building 11, (formerly known as Block G2), Cherrywood Business Park, Cherrywood, Co. Dublin, D18 DH50. Granted (19 Oct 2020). Expands the day hospital in Building 11, Cherrywood Business Park, to 1,220 sq.m. - [DZ18A/1131](https://cherrywoodplans.com/application/DZ18A-1131.md): Site of approx. 4,730 sqm at Building 11 (formerly known as Block G2), Cherrywood Business Park, Cherrywood, Dublin D18 DH50. Granted (5 Feb 2019). Turns part of the ground floor of Building 11 at Cherrywood Business Park into a 922 sq.m day hospital. - [DZ22A/1025](https://cherrywoodplans.com/application/DZ22A-1025.md): Cherrywood Avenue, Lands within the townlands of Glebe and Cherrywood, Dublin 18. Granted (2 Nov 2023). Builds 44 homes, houses and two-level units, off Cherrywood Avenue. - [DZ17A/0649](https://cherrywoodplans.com/application/DZ17A-0649.md): Block G2, Cherrywood Business Park, Cherrywood, Co Dublin. Granted (8 Sep 2017). Adds louvred screening around rooftop plant on Block G2, Cherrywood Business Park. - [DZ25A/0197/WEB](https://cherrywoodplans.com/application/DZ25A-0197-WEB.md): Located to the north end of the Valley Drive public road, which is a cul-de-sac, opposite the corner apartment building 97-106 E. Refused or withdrawn (18 Mar 2025). Provides a paved bin collection area at the end of Valley Drive for the Tullyvale apartments. - [DZ16A/0935](https://cherrywoodplans.com/application/DZ16A-0935.md): Block G2, Cherrywood Business Park, Cherrywood, Co. Dublin. Granted (17 Feb 2017). Adds landscaping, a drop-off area and a sign at Block G2, Cherrywood Business Park, and keeps three glass canopies. - [DZ24A/1007/WEB](https://cherrywoodplans.com/application/DZ24A-1007-WEB.md): ‘Red Zone’ temporary surface car park, and Blocks F1-F3, ‘The Campus’, Cherrywood Avenue,, Cherrywood (Glebe Townland), Co. Dublin, Dublin 18. Granted (18 Feb 2025). Shrinking the temporary Red Zone car park on Cherrywood Avenue to about 398 spaces for another 5 years, and opening 226 basement spaces at The Campus. - [DZ22A/0728](https://cherrywoodplans.com/application/DZ22A-0728.md): Red Zone car park, Cherrywood Avenue, Cherrywood (Glebe Townland), Co Dublin/Dublin 18. Granted (14 Mar 2023). Keeping the temporary Red Zone surface car park for about 740 cars on Cherrywood Avenue for another 5 years. - [D13A/0117](https://cherrywoodplans.com/application/D13A-0117.md): Block AB Cherrywood Science & Technology Park, Loughlinstown, Dublin 18. Granted (8 May 2013). Puts up two lit Dell logo signs on Block AB at Cherrywood Business Park. - [DZ20A/0477](https://cherrywoodplans.com/application/DZ20A-0477.md): Blocks F1,F2 & F3 (3no. office blocks under construction), Cherrywood Business Park, Cherrywood, Co. Dublin (also Dublin 18) & at the temporary surface car park at Cherrywood (Glebe Townland) Co. Dublin (also Dublin 18). Granted (28 Aug 2020). Allows up to 229 spaces in the basement car park of office Blocks F1–F3 to be used for temporary parking for 7 years. - [DZ17A/0417](https://cherrywoodplans.com/application/DZ17A-0417.md): Cherrywood Glebe Townland, Co Dublin ( Dublin 18) (Lands within Dev Area 6-Bride's Glen-bounded by M50 west, Cherrywood Ave & undeveloped lands to north undeveloped lands & Glencarrig res. estate east & res prop. & undev. lands off Brides Glen to south. Granted (7 Nov 2017). Uses land off Cherrywood Avenue as a temporary car park for about 740 cars for 5 years. - [DZ17A/0326](https://cherrywoodplans.com/application/DZ17A-0326.md): Cherrywood, Glebe Townland, Co Dublin (Also Dublin 18) (Lands within Dev Area 7-Macnebury-bounded by M50 to west, Cherrywood Ave & undeveloped lands to north, undeveloped lands & Glencarrig res. estate to east & undeveloped lands off Brides Glen to south. Refused or withdrawn (26 Apr 2017). Uses land off Cherrywood Avenue as a temporary car park for about 740 cars for 5 years. - [D04A/0924](https://cherrywoodplans.com/application/D04A-0924.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (25 Aug 2005). A gateway office building of 6 storeys rising to 10 at one end, with a bar and café, on the Wyattville Link Road at Cherrywood Science & Technology Park. - [DZ22A/0342](https://cherrywoodplans.com/application/DZ22A-0342.md): Building 3, (formerly known as Block AC), Cherrywood Business Park, Cherrywood, Dublin 18, D18TF72. Refused or withdrawn (27 Mar 2023). New design for the north facade of Building 3 in Cherrywood Business Park. - [D07A/0229](https://cherrywoodplans.com/application/D07A-0229.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.. Granted (28 May 2007). Adds a temporary vehicle ramp to the basement car park serving Blocks G and G2 at Cherrywood Business Park. - [D07A/0597](https://cherrywoodplans.com/application/D07A-0597.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.(Blocks F and G),. Refused or withdrawn (12 Jun 2007). Three office buildings of 4 to 7 storeys at Cherrywood Science & Technology Park, with a 612-space basement car park. - [D06A/1972](https://cherrywoodplans.com/application/D06A-1972.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Refused or withdrawn (20 Feb 2007). Builds a new eight-storey office building with a café/bar, linked to Block AC on the Wyattville Link Road. - [D05A/1057](https://cherrywoodplans.com/application/D05A-1057.md): Blocks AB/AC, Cherrywood Science & Technology Park, Cherrywood, Co. Dublin. Granted (10 Oct 2005). Adds emergency exit doors and a screened rooftop plant room to office Blocks AB and AC. - [DZ16A/0124](https://cherrywoodplans.com/application/DZ16A-0124.md): Cherrywood Business Park (to west of Block G2 and south of Block G and G2), Cherrywood, Loughlinstown, Co Dublin. Granted (21 Apr 2016). Seeks to keep a temporary access road to the Blocks G and G2 car park at Cherrywood Business Park for 7 years. - [D09A/0804](https://cherrywoodplans.com/application/D09A-0804.md): Cherrywood Science & Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (14 Jan 2010). Permission to keep changes at Blocks G and G2, Cherrywood Science & Technology Park, including a larger basement car park. - [D07A/0654](https://cherrywoodplans.com/application/D07A-0654.md): Block AD, Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin.. Granted (6 Jul 2007). Signs and a refuse store for the crèche in Block AD, Cherrywood Science & Technology Park. - [D06A/1722](https://cherrywoodplans.com/application/D06A-1722.md): Block AD, Cherrywood Science & Technology, Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (26 Jan 2007). Part of Block AD in Cherrywood Science & Technology Park changes from offices to a 952 sq.m crèche. - [D05A/0232](https://cherrywoodplans.com/application/D05A-0232.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.. Granted (20 Apr 2005). Adds two windows to the west side of the approved third floor of the Block AC office building. - [D04A/0335](https://cherrywoodplans.com/application/D04A-0335.md): Cherrywood Science & Technology Park,, Cherrywood, Loughlinstown, Co. Dublin.. Granted (26 May 2004). Builds a new office building of three storeys plus a penthouse over a basement car park at Cherrywood Business Park. - [D04A/1361](https://cherrywoodplans.com/application/D04A-1361.md): Cherrywood Science & Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (12 Jan 2005). Extends the approved third floor of the Block AC office building over two terraces and moves all rooftop plant onto the roof. - [PC/CSDZ/013/22](https://cherrywoodplans.com/application/PC-CSDZ-013-22.md): Cherrywood Strategic Development Zone, Co. Dublin. Granted (13 Jun 2022). Creates a natural green walking route through Cherrywood from Bride's Glen to Brennanstown. - [DZ17A/0061](https://cherrywoodplans.com/application/DZ17A-0061.md): Building 4 (previously Block AD), Cherrywood Business Park, Cherrywood, Dublin 18. Granted (16 Mar 2017). Turns 1,035 sq.m of vacant office space in Building 4, Cherrywood Business Park, into a medical research laboratory. - [D03A/0626](https://cherrywoodplans.com/application/D03A-0626.md): Cherrywood Science & Technology Park, Cherrywood Business Park 1, Cherrywood, Loughlinstown, Co. Dublin. Granted (22 Sep 2003). A new office building of three storeys plus penthouse at Cherrywood Science & Technology Park, with 350 basement car spaces. - [DZ19A/0186](https://cherrywoodplans.com/application/DZ19A-0186.md): c. 1.676 ha at Cherrywood Business Park (lands including former Block F), Cherrywood, Co. Dublin (also Dublin 18). Granted (9 May 2019). Adds landscaped roof terraces to permitted office Blocks F1 and F2 at Cherrywood Business Park. - [DZ21A/0818](https://cherrywoodplans.com/application/DZ21A-0818.md): Site of approximately 0.43 ha at Building 10 (formerly known as Block G), Cherrywood Business Park, Cherrywood, Co. Dublin, D18 T3Y1. Granted (24 Feb 2022). New plant enclosures, flue stacks and doors at Building 10 in Cherrywood Business Park. - [D07A/0779](https://cherrywoodplans.com/application/D07A-0779.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin.. Refused or withdrawn (3 Mar 2008). A five-to-eight-storey office building with a café at Cherrywood Science & Technology Park. - [D07A/0620](https://cherrywoodplans.com/application/D07A-0620.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.. Refused or withdrawn (1 Jun 2007). Builds a new five-to-eight-storey office building with a café, linked to Block AC at Cherrywood Business Park. - [DZ17A/0122](https://cherrywoodplans.com/application/DZ17A-0122.md): Lands (c.1.6284 ha) at Cherrywood Business Park (lands including former Block F), Cherrywood, Co Dublin (also Dublin 18). Granted (7 Feb 2018). Builds two five-storey office blocks, F1 and F2, over an existing basement car park at Cherrywood Business Park. - [D06A/0116](https://cherrywoodplans.com/application/D06A-0116.md): Glencarraig, Rathmichael, Co. Dublin. Granted (18 Aug 2006). 19 homes and a new access road linking Brides Glen Road to Cherrywood Science & Technology Park at Glencarraig. - [D05A/1083](https://cherrywoodplans.com/application/D05A-1083.md): Glencarrig (site At), Rathmichael, Co. Dublin. Refused or withdrawn (12 Oct 2005). Builds 73 apartments in two blocks at Glencarrig, with a new road and cycle route from Brides Glen Road to Cherrywood Business Park. - [D06A/1475](https://cherrywoodplans.com/application/D06A-1475.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (20 Dec 2006). Enlarges the approved Block G office building by filling in a front recess and extending the penthouse, adding 502 sq.m. - [D06A/0015](https://cherrywoodplans.com/application/D06A-0015.md): Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (1 Mar 2006). Adds an extra floor to the approved Block G office building at Cherrywood Business Park, taking it from three to four storeys. - [D05A/0219](https://cherrywoodplans.com/application/D05A-0219.md): Cherrywood Science & Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (9 Nov 2005). Changes the approved Block G office building with a two-level underground car park and a larger floor area. - [DZ19A/1021](https://cherrywoodplans.com/application/DZ19A-1021.md): Blocks F1, F2 and F3 (3no. office blocks under construction) at Cherrywood Business Park, Cherrywood, Co Dublin (also Dublin 18). Refused or withdrawn (5 Feb 2020). Allows up to 229 spaces in the basement car park of office Blocks F1–F3 to be used for temporary parking for 7 years. - [DZ18A/1104](https://cherrywoodplans.com/application/DZ18A-1104.md): Lands (c.2.57ha) Cherrywood Business Park (lands including & adjoining former Block F, part of existing Block G (basement level -1 only) & lands to rear Blocks G & G2, Cherrywood, Co Dublin (also Dublin 18). Site is within Development Area 6A Brides Glen. Granted (29 Jan 2019). Builds office Block F3 and expands the shared basement car park to 658 spaces, with a new linear park, at Cherrywood Business Park. - [D02A/0430](https://cherrywoodplans.com/application/D02A-0430.md): Cherrywood Science & Technology Park,, Cherrywood, Loughlinstown, Co. Dublin.. Granted (10 Jul 2002). Allows five permitted science and technology buildings at Cherrywood Business Park to be used instead for office-based industry. - [D13A/0292](https://cherrywoodplans.com/application/D13A-0292.md): Site at Glencarrig, Brides Glen Road, Rathmichael, Co. Dublin. Granted (1 Aug 2013). Amends the earlier Glencarrig permission with a revised design for 10 five-bedroom detached houses. - [D09A/0501](https://cherrywoodplans.com/application/D09A-0501.md): Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Refused or withdrawn (3 Sep 2009). 112 apartments, offices and shops in three buildings of 5–6 storeys at Cherrywood Science & Technology Park. - [DZ17A/0161](https://cherrywoodplans.com/application/DZ17A-0161.md): Lands (site area c.0.95ha) in the townland of Laughanstown, Dublin 18. Granted (12 Dec 2017). Sets up a temporary concrete plant for 7 years to supply the building of Cherrywood. - [DZ24A/0291/WEB](https://cherrywoodplans.com/application/DZ24A-0291-WEB.md): Lands in the townland of Laughanstown, Dublin 18, located between Grand Parade and Tully Park., The application relates to development in Domville Development Area 4 of the Cherrywood Strategic Development Zone.. Granted (25 Mar 2025). Amends the Domville permission to raise four blocks on Grand Parade from 4 to 6 storeys, adding 58 apartments. - [D03A/0735](https://cherrywoodplans.com/application/D03A-0735.md): Tullyvale, Druid Valley, Cherrywood, Loughlinstown, Co. Dublin.. Granted (22 Sep 2003). Changes the approved Tullyvale housing development by realigning its access road and adding a signalised pedestrian crossing. - [D07A/1243](https://cherrywoodplans.com/application/D07A-1243.md): Glencarrig, Rathmichael, Co. Dublin. Granted (25 Oct 2007). Amends an earlier permission at Glencarrig to redesign one house and add a tenth five-bedroom house. ## Links - [This page on CherrywoodPlans](https://cherrywoodplans.com/application/DZ17A-0862) - [Council record, documents and conditions (DLR planning portal)](https://planning.agileapplications.ie/dunlaoghaire/application-details/76514) - [All Cherrywood applications](https://cherrywoodplans.com/applications.md) _Source: Dún Laoghaire–Rathdown County Council planning data, refreshed daily. CherrywoodPlans is an independent site, not run by the council._