# Planning application DZ18A/0458 > on lands (c.0.74 HA) in the townland of Laughanstown, Dublin 18 (Development Area 8 - Tully), Cherrywood, Dún Laoghaire–Rathdown. Granted (11 Jul 2018). - **Reference:** DZ18A/0458 - **Address:** on lands (c.0.74 HA) in the townland of Laughanstown, Dublin 18 (Development Area 8 - Tully) - **Status:** Granted (11 Jul 2018) - **Decision:** GRANT PERMISSION - **Application type:** Permission (SDZ) - **Applicant:** Hines Cherrywood Development Fund ICAV - **Lodged:** 17 May 2018 - **Decided:** 11 Jul 2018 - **Location (lat, lng):** 53.245194, -6.154424 ## Proposal 2-3 storey primary school building (gross floor area 4,510sq.m) comprising 24no. Classrooms, special needs unit (with 2no. additional classrooms), general purpose hall, library, resource room, other support teaching rooms, office and staff areas, and ancillary accommodation. Permission is also sought for associated external play areas, boundary treatments, landscaping, car parking (20no. spaces) and cycle parking (192no.spaces). Permission is also sought for all associated site and development works. The school will be accessed from Castle Street via a new local road currently under construction (Reg. Ref. DZ15A/0758). Minor modifications to the design and layout of this road, parking set down area and bus set down area (previously permitted under Reg. Ref. DZ16A/0813) are proposed as part of this application. ## In plain English Builds a new primary school with 24 classrooms plus a special needs unit, south-west of Tully Park. - **24** classrooms - **4,510** sq.m floor area - **192** cycle spaces - **20** car spaces - **0.74** hectares ### What's planned A new **2–3** storey primary school on the school site set aside in the Cherrywood Planning Scheme. ### Community The **4,510** sq.m school has **24** classrooms, a special needs unit with **2** more classrooms, a general purpose hall, library and resource room, plus outdoor play areas. ### Transport Provides **192** cycle spaces and **20** car spaces. Access is from Castle Street via a new local road, with small changes to its parking, drop-off and bus set-down areas. ### Scale The site covers about **0.74** hectares. _This summary was written by AI from the proposal text. Check the council record before relying on it._ ## Conditions ### Condition 2 1. The development to be carried out in its entirety in accordance with the plans, particulars and specifications lodged with the application, save as may be required by the other conditions attached hereto. REASON: To ensure that the development shall be in accordance with the permission and that effective control be maintained. 2. Outside of school hours or school term, the use of school facilities, such as sports facilities and the indoor hall, may be made available to the public and other users where feasible and appropriate and where it will be of benefit to the wider community and sustainable modes of travel shall be encouraged in connection with any such ancillary use. REASON: In the interests of sustainable communities 3. Prior to commencement of development the developer shall submit for the written agreement of the Planning Authority, all drawings in digital format (CAD/GIS) projected to ITM (Irish Transverse Mercator). This information should include the following: • Overall site plans in DWG format (ITM projection in metres) • Ground floor plans of buildings in DWG format (ITM projection in metres) • Site sections and elevations in PDF format REASON: To ensure consistency with Section 7.4 of the Cherrywood Planning Scheme. 4. Prior to the commencement of development, the developer shall submit for the written agreement of the Planning Authority a detailed review of pedestrian access arrangements between the school building and public realm. This may include revised designs that improve the accessibility of the pedestrian entrances (both internal and external of the building) and the efficient access and egress of pupils, parents, staff and visitors for peak times during the school day. REASON: To support the proper planning and sustainable development of the area and to ensure consistency with the Cherrywood Planning Scheme. 5. Prior to the commencement of development, or as otherwise agreed in writing with the Planning Authority, the developer shall submit, for the written agreement of the Planning Authority: a. Details of the proposed external finishes of the building, including samples. In this regard, samples, data sheets and on site mock ups of all materials shall be provided for the agreement of the Planning Authority and approved control samples must be held on site at all times. b. Revised drawings, including coloured CGI's, which clearly show the design detail, including height and finish, of roof plant/services/screens. In this design, particular regard shall be had to ensure: • the height of any such structure shall be kept to a minimum; • the external finishes blend with the external materials of the building or as otherwise to be agreed by the Planning Authority. In relation to item (b), no additional development shall take place above roof level, including lift motors, air handling equipment, storage tanks, ducts or other external plant other than those shown on the drawings hereby approved, unless authorised by a prior grant of planning permission. REASON: In the interest of the visual amenity and to ensure consistency with Objectives PD 14 and PD 19 respectively of the Cherrywood Planning Scheme. 6. Prior to the completion of development the Developer shall submit, for the written agreement of the Planning Authority a Signage Strategy for the proposed development which shall include: a. Details of all signage, including all external signage, way-finding and directional signage b. The colours, materials, scale and finishes of all proposed signage c. Materials that are of high quality, modern and durable and respect the proportions and design of the building and its surroundings REASON: In the interests of visual amenity and in order to comply with Specific Objectives PD 30 and PD 32 of the Cherrywood Planning Scheme. 7. The Developer shall comply with the following requirements: a. Prior to the commencement of development archaeological testing is required which will consist of the following: i. The applicant is required to engage the services of a suitably qualified archaeologist (licensed under the National Monuments Acts 1930-2004) to carry out pre-development testing at the site. No subsurface work shall be undertaken in the absence of the archaeologist without his/her express consent. ii. The archaeologist is required to notify the Department of Culture, Heritage and the Gaeltacht in writing at least four weeks prior to the commencement of site preparation. This will allow the archaeologist sufficient time to obtain a licence to carry out the work. iii. The archaeologist shall carry out any relevant documentary research and may excavate test trenches at locations chosen by the archaeologist, having consulted the proposed development plans. iv. Having completed the work, the archaeologist shall submit a written report to the Planning Authority and to the Department of Culture, Heritage and the Gaeltacht for consideration. v. Where archaeological material is shown to be present, avoidance, preservation in situ, preservation by record (excavation) and/or monitoring may be required and the Department of Culture, Heritage and the Gaeltacht will advise the Applicant/Developer with regard to these matters. vi. No site preparation or construction work shall be carried out until after the archaeologist's report has been submitted and permission to proceed has been received in writing from the Planning Authority in consultation with the Department of Culture, Heritage and the Gaeltacht. REASON: To ensure consistency with Specific Objective H1 of the Cherrywood Planning Scheme. b. Prior to the operation of the school an appropriate name for the school shall be submitted for the written agreement of the Planning Authority. REASON: To ensure consistency with Specific Objective H6 of the Cherrywood Planning Scheme. 8. The Developer shall comply with the following requirements: - a. A Quality Audit (which shall include a Road Safety Audit, Access Audit, Cycle Audit and Walking Audit) shall be carried out at Stage 2 for the detailed design stage and at Stage 3 for the post construction / prior to opening stage. All audits shall be carried out at the developer's expense in accordance with the Design Manual for Urban Roads & Streets (DMURS) guidance and TII (Transport Infrastructure Ireland) standards. An independent audit team shall be used and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Audit reports shall be submitted for the written agreement of the Planning Authority prior to the commencement of development. The Stage 3 Audit reports shall be submitted for the written agreement of the Planning Authority prior to the opening for public use/ taking in charge by Dun Laoghaire Rathdown County Council. b. Traffic control measures shall be put in place (e.g. Bollards) to prevent vehicular traffic from accessing Lehaunstown Lane from the Tully Park Access Road/Car Park. c. A minimum of one dedicated motorcycle parking space shall be provided in the staff parking area. d. Prior to the commencement of development the Developer shall submit a Travel Plan in accordance with the guidance and requirements of the Cherrywood Area Wide Travel Plan. REASON: In the interests of orderly development and proper planning and the sustainable development of the area and for consistency with the Cherrywood Planning Scheme objectives PI 14, PI 22 and PI 24. 10. With regard to the roads and paved areas that are proposed for taking in charge, the provision and location of service ducts, pipes, manholes and service chambers shall be agreed with the relevant service providers prior to commencement of the road construction works. The services to be considered include electricity, water, gas, telecoms, traffic communication, public lighting. Written evidence of the agreements shall be provided to the Planning Authority prior to the commencement of development, or as otherwise agreed with the Planning Authority. REASON: In the interests of orderly development, to ensure the inclusion of below ground service infrastructure and to avoid subsequent excavation of the newly constructed roadway; to ensure that designs shall meet with the current and future requirements of the Planning Authority (DLR Traffic Section) and the utility and service providers; and to ensure consistency with PI 4, PI 14, PI 26 of the Cherrywood Planning Scheme. 11. Prior to the commencement of development, or as otherwise agreed in writing with the Planning Authority, the developer shall submit the following to the Planning Authority: a. Written evidence of the water supply design compliance with Irish Water specification and requirements and copies of the final detailed design. The detailed design of the water supply infrastructure including details of all connections shall be in accordance with Irish Water specification and requirements. b. Written evidence of the wastewater design compliance with Irish Water specification and requirements and copies of the final detail design. The detailed design of the wastewater infrastructure including details of all connections shall be in accordance with Irish Water specification and requirements. REASON: In the interests of consistency with PI 4 & PI 12 of the Planning Scheme. 12. Prior to the commencement of development or as otherwise agreed in writing with the Planning Authority, the developer shall submit the following for the written approval of the Planning Authority: a. Detailed design of the green roof proposals including; an engineering drawing of the green roof proposals showing locations and proposed outlets to the internal drainage network; depth of stratum and extent. In addition, evidence based detail showing green roofs and soft landscaping for the development are in compliance with Criterion 1, Table 6.3 of the GDSDS shall be submitted. b. Full design details of the hydrobrake proposed for flow control. The hydrobrake should be provided with a high level by-pass to allow draw down in times of blockage and also provision of a high level alarm as a warning (or similar approved). c. Full detailed design of the surface water drainage infrastructure shall be submitted and agreed with the Planning Authority. This shall include detailed design for all of the SuDS components for the development, including full detail of interception volumes provided. d. An operations and maintenance plan for the proposed SuDS components, inclusive of the attenuation structures. e. Detailed calculations, design input details and results for all hydraulic calculations. f. Prior to the commencement of development, or as otherwise agreed in writing with the Planning Authority, the locations of all gullies, RWP's etc. shall be provided on engineering drawings for approval to clearly show how storm run-off is collected. g. Pervious paving proposals shall be modified to incorporate easily maintainable grilles, gullies or similar as per Section 4.1.2 of the Cherrywood Planning Scheme. h. Surface water drain run SICI-1 to SMW1.3 is proposed to be located within a designated tree root protection zone. This pipework shall be redesigned and relocated outside of the tree root protection zone and the developer shall submit details to the Planning Authority on how this relocated drain run is to be constructed, prior to the commencement of development. i. A Stormwater Management Plan shall be formulated for the construction phase and shall be submitted by the applicant and agreed with the Planning Authority prior to the commencement of development. REASON: In the interests of sustainable development and to ensure long term optimum operation of the surface water management system. 13. A Stormwater Audit shall be carried out at Stage 2 for the detailed design stage and at Stage 3 for the post construction / prior to opening stage in accordance with PI 7 of the Cherrywood Planning scheme. All audits shall be carried out at the developer's expense. An independent audit team shall be used and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the commencement of development. The Stage 3 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the commissioning of the Stormwater infrastructure. REASON: In the interests of proper stormwater management and to ensure consistency with PI 7 of the Planning Scheme. 14. Surface Water discharge from the subject development shall be limited to 1 l/s/ha. REASON: To comply with the requirements of the Cherrywood Planning Scheme. 15. Prior to the commencement of development, or as otherwise agreed in writing with the Planning Authority, the developer shall provide details concerning the control of exceedance flows during extreme storm events to the Planning Authority for written approval. REASON: To ensure the control of flood waters and to comply with PI 9 of the Planning Scheme. 16. All trees planted in or adjacent to hard paved areas shall incorporate tree root structural cell systems. REASON: To comply with the requirements of the Cherrywood Planning Scheme. 17. Prior to commencement of development, the developer shall comply with the following: a. The developer shall retain the services of a qualified Landscape Architect, as his / her Landscape Consultant, throughout the course of the development works; and shall notify the Planning Authority of that appointment in writing prior to the commencement of development. b. The developer shall engage the Landscape Consultant to procure, oversee and supervise the landscape contract for the implementation of the permitted landscape proposals. c. When all landscape works are inspected and completed to the satisfaction of the Landscape Consultant, he/she shall prepare, sign and submit a Practical Completion Certificate (PCC) to the Planning Authority, as verification that approved landscape plans and specifications have been fully implemented. REASON: To ensure a high quality Public Realm and consistency with the Cherrywood Planning Scheme and in the interest of proper planning and sustainable development of the area. 18. Prior to commencement of development, or as otherwise agreed in writing with the Planning Authority, the developer shall provide the following for the written agreement of the Planning Authority:- a. Hard landscape plans and construction details for all hard standing pedestrian, cycling, and vehicular areas (including adjoining road interfaces), detailing the specifications of all surface/finish materials. b. In this regard, samples, data sheets and on site mock ups of all materials shall be provided for the agreement of the Planning Authority and approved control samples must be held on site at all times. c. All surfaces and finishes shall include materials that are consistent PD 14. In particular the finishes shall comprise of durable, easily sourced and high quality materials comprising natural stone (or other materials as agreed with the Planning Authority) that harmonise and complement those within the adjoining Tully Park Greenway entrance space. REASON: To ensure consistency with the Cherrywood Planning Scheme, Objective PD 14 and GI 8. 19. Prior to commencement of development, or as otherwise agreed in writing with the Planning Authority, the developer shall provide the following for the written agreement of the Planning Authority:- Detail design, schedules and specifications for all play related items within the application areas. The Play space and Ball courts shall be designed and constructed to EN1176 playground and equipment standard. REASON: To ensure consistency with Objectives GI 6, GI 7 and GI 18 of the Cherrywood Planning Scheme. 20. Prior to commencement of development, the developer shall provide the following for the written agreement of the Planning Authority:- a. Revised Landscape plans and details omitting the section of proposed ball court from within the Root Protection Area of Tree Number 0363 and demonstrating appropriate details for construction within the vicinity of tree No. 0368. b. Arboricultural Assessments, Tree Survey, Tree Constraints and Protection plans including details which are in accordance with BS 5837 and Section 5.4.7 of the Cherrywood Planning Scheme. REASON: To ensure consistency with Section 5.4.7 and GI 11 of the Cherrywood Planning Scheme c. Trees/hedgerows and Wildlife corridors to be retained will be protected during site works. Tree Protection fencing will be in accordance with British Standard. There should be no excavations within the Root Protection Area (RPA). Signs prohibiting access to the protected areas around trees and hedgerows will be erected prior to works commencing and will be maintained throughout the construction phase. REASON: To protect the trees and hedgerows and their associated species and to keep them as functioning wildlife corridors during the construction and operation phase. 21. The applicant shall submit management programmes for retained and newly planted trees, shrubs and other vegetation demonstrating long-term continuity and consistency. REASON: To ensure consistency with Specific Objective GI 45 of the Planning Scheme. 22. Prior to the commencement of development the developer shall submit the following for the written agreement of the Planning Authority: Details, specifications and samples for all boundaries, interfaces and transitions between private space, communal space and public space having regard to the need to ensure a coherent and complementary palette of materials and finishes across the application site, and with Tully Park, as permitted under Planning Reg. Ref. DZ15A/0813. REASON: to ensure consistency with GI 8 & GI 78 and PD 14 of the Cherrywood Planning Scheme. 24. Prior to commencement of development the developer shall:- a. Submit a revised Habitat Management Plan for the written agreement of the Planning Authority. This revised Plan shall to clearly demonstrate how management programmes for retained habitats and newly planted trees, shrubs and other vegetation will ensure long-term continuity and consistency through both construction and operation, in full compliance with objective GI 59 and GI 65 b. Engage the services of a qualified ecologist as an ecological consultant, from the commencement of construction and for the duration of the monitoring requirements as set out in section 5 of the submitted Habitat Management Plan. The developer shall inform the Planning Authority in writing of the appointment and name of the consultant, prior to the commencement of development. Subject to Part (a) of this condition, the consultant shall ensure the implementation of all the recommendations within the submitted Environmental Impact assessment and Habitat Management Plan. REASON: To ensure consistency with Specific Objective GI 46, GI 59 and GI 65 of the Planning Scheme. c. A programme for the monitoring and implementation of the mitigation measures both during construction and operation, by a suitably qualified ecologist, shall be submitted for the written agreement with the planning authority, at least 5 weeks in advance of site clearance and site works commencing. REASON: To protect Biodiversity and to ensure the implementation of mitigation measures and monitoring for Biodiversity. Thereafter and subject to paragraph (a) of this condition and in accordance with agreed details d. The applicant will submit monitoring reports from their ecologist to the planning authority at intervals agreed with the planning authority, relating to measures included in the EcIA report and Habitat Management Plan and confirming that the measures have been implemented according to specification. Actions required to be undertaken by the applicant as a result of the recommendations of monitoring will be reported to the planning authority. REASON: To mitigate the potential impact of increased nocturnal illumination at the proposed development on bats, which are afforded a regime of special protection under the European Habitats Directive. 25. Prior to the commencement of development, the applicant shall submit to the planning authority a letter from their bat consultants, that they are satisfied that the final design of the external illumination proposed for the development, shall be to the required specification recommended by the bat specialist and that they are satisfied that important bat corridors are not illuminated; the applicant will also submit a report from the bat specialist to the planning authority after the installation of the external lighting, at the proposed development, confirming that it is operating according to specification. REASON: To mitigate the potential impact of increased nocturnal illumination at the proposed development on bats, which are afforded a regime of special protection under the European Habitats Directive. 26. The installation of bird boxes shall be carried out under the supervision of a suitably qualified ecologist and in consultation with DLR Biodiversity Officer. REASON: To mitigate the loss of bird habitat and to ensure that the appropriate advice and support obtained in relation to birds, to assist the success of the nest boxes. 27. Prior to the commencement of landscape works the following shall be submitted for the written agreement of the Planning Authority: Details of Soft Landscape Design to include detailed Planting Plan and Planting Schedule - as appropriate - stating species/varieties, approximate quantities, sizes, rootball presentation and spacings. Planting mixes should specify a diverse range of species/varieties/cultivars and a diversity of forms and plant sizes (multi-stems, feathered, semi-matures, etc.); using both native and exotic species and pollinator-friendly native species (in accordance with the All-Ireland Pollinator Plan 2015-2020), all designed to provide vegetation that is visually-appealing, bio-diverse, and easily managed. Including management programmes for all proposed trees, shrubs and other vegetation demonstrating long term continuity and consistency. REASON: To ensure consistency with GI 15, GI 44 & GI 45 of the Cherrywood Planning Scheme. 28. The Developer shall comply with the following requirements: - a. Site development and building works shall be carried out only between the hours of 8.00am to 7.00pm Monday to Friday inclusive, 8.00am to 2.00pm Saturdays and no works permitted on site on Sundays and public holidays. Deviation from these times will only be allowed in exceptional circumstances where prior written approval has been received from the planning authority. This should be addressed in the Community Liaison Plan. b. Construction staff shall be prohibited from parking on public roads. Parking for construction staff shall be provided by the Developer/Contractor within the site boundary. c. Construction vehicles shall not be permitted to park or wait on roads outside the site boundary. All parking and waiting areas shall be provided Developer/Contractor within the site boundary. d. The construction of the development shall be managed in accordance with a final Construction Management Plan, which shall be submitted for the development in its entirely to the Planning Authority for agreement in writing, at least 5 weeks prior to commencement of any development. In this regard the final Construction Management Plan shall include a Community Liaison Plan and a Construction Traffic Management Plan. e. Prior to commencement of development a mechanism and structure for on-site monitoring, reporting on progress and quality control to the Planning Authority in relation to construction standards, materials, as-built drawings and records shall be agreed in writing with the Planning Authority. f. The developer and contractor shall comply with the 'Code of engineering practice for works on, near, or adjacent the Luas light rail system'. REASON: To ensure adherence to DLRCC Standards for Taking in Charge, In the interests of orderly development, proper planning, sustainable development and the residential amenity of the area and to mitigate against adverse impacts on nearby residents. To ensure no adverse impact on Luas passengers, the operation and safety of the Luas, to minimise any reduction in public transport services and in the interests of public safety and amenity. 29. The Construction Management Plan shall detail how all significant elements of the construction works with potential to cause significant environmental effects in relation to surface water runoff, noise, air quality and biodiversity (wildlife corridors, trees and water quality) and will be managed in accordance with relevant environmental requirements, best practice and the planning permission including conditions. The Plan will include input from a suitably qualified ecologist for biodiversity elements. REASON: To ensure consistency with Specific Objectives PD 33, GI 19 and GI 58 of the Cherrywood Planning Scheme. 30. Prior to the commencement of development, the Applicant shall prepare and submit for the written agreement of the Planning Authority a Construction Waste Management Plan that accords with Circular WPR 07/06 - Best Practice Guidelines on the Preparation of Waste Management Plans for Construction and Demolition Projects (2006). This plan shall provide details of the intended practice for the management of waste arising from the construction and demolition processes and in particular the management of hazardous waste and recyclable materials. In particular the Plan shall specifically address the following points; a. Overall Waste Management • Analysis of waste arising / material surpluses • Specific Waste Management objectives of the Project including waste minimisation and the potential to reuse and process materials generated on site in the construction phase • Methods proposed for Prevention, Reuse and Recycling • Waste Handling Procedures • Waste Disposal Procedures, including tracking of waste to final destination • Waste Auditing • Record keeping, including gate receipts for waste brought to authorised Waste Handling Facilities b. Waste Compound • Details of the provision of a dedicated and secure compound, containing bins and skips into which all waste generated by construction site activities will be placed • Responsibility for provision of signage and verbal instruction to ensure proper housekeeping and segregation of construction waste materials • Responsibility for identification of Permitted Waste Contractors who shall be employed to collect and dispose of waste arising from the construction works c. Waste Reuse and Recycling Management • Identification of potential for Reuse of Inert Wastes • Proposed management measures d. Hazardous Waste • Identification and management of any Hazardous Wastes likely to arise during the construction process • In the event that hazardous soil, or historically deposited hazardous waste is encountered during the work, the contractor must notify DúnLaoghaire / Rathdown County Council, Environmental Enforcement Section, and provide a Hazardous/Contaminated Soil Management Plan, to include estimated tonnages, description of location, any relevant mitigation, destination for authorised disposal/treatment, in addition to information on the authorised waste collector(s) REASON: In the interests of sustainable waste management ## Nearby applications - [DZ21A/1038](https://cherrywoodplans.com/application/DZ21A-1038.md): site 1.85 ha at Castle Street and Bishop Street, Cherrywood, Dublin 18. Granted (8 Nov 2022). Builds a new 1,000-pupil secondary school at Castle Street and Bishop Street, Cherrywood. - [REF20225](https://cherrywoodplans.com/application/REF20225.md): Lehaunstown Park House, Laughanstown, Co Dublin, (A Protected Structure). Granted (23 Jan 2026). Minor internal changes to the stable building at Lehaunstown Park House, a protected structure. - [DZ23A/0359](https://cherrywoodplans.com/application/DZ23A-0359.md): Lehaunstown Park House, Lehaunstown Co Dublin. Granted (17 May 2024). Restores Lehaunstown Park House and its tower house, converts the stables to shops, and builds a large garden centre. - [DZ21A/0699](https://cherrywoodplans.com/application/DZ21A-0699.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (23 Sep 2021). Smaller first-floor bathroom windows on 33 permitted houses in Tully. - [DZ20A/0552](https://cherrywoodplans.com/application/DZ20A-0552.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18,. Granted (11 Mar 2021). 163 new homes, mostly houses, between Castle Street and Tully Park. - [DZ22A/0820](https://cherrywoodplans.com/application/DZ22A-0820.md): Townlands of Laughanstown, Brennanstown and Cherrywood,, Dublin 18. Granted (12 Dec 2022). Makes minor changes to the already-permitted 168-home scheme in Tully, swapping the designs of 12 houses and altering some roofs. - [DZ22A/0403](https://cherrywoodplans.com/application/DZ22A-0403.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Refused or withdrawn (22 Jul 2022). Makes minor changes to the already-permitted 168-home scheme in Tully, swapping the designs of 12 houses and altering some roofs. - [DZ23A/0443](https://cherrywoodplans.com/application/DZ23A-0443.md): Lands in the townlands of Laughanstown, Dublin 18, (Lands within 'Development Area 7- Macnebury', including part of the Res 2 plot known as 'M4, located West & South of Castle Street, south of Lehaunstown Lane and North of Bishop Street. Granted (7 Nov 2023). Changes a condition so 66 permitted homes in Macnebury can be occupied before the Cherrywood Avenue/Beckett Road underpass is built. - [DZ21A/1085](https://cherrywoodplans.com/application/DZ21A-1085.md): Lands of Laughanstown, Dublin 18, (Lands within 'Development Area 7- Macnebury', M4, located West & South of Castle Street, south of Lehaunstown Lane and North of Bishop Street. Granted (2 Dec 2022). Builds 65 three-bed homes in five three-storey blocks in Macnebury, west of Castle Street. - [DZ20A/0946](https://cherrywoodplans.com/application/DZ20A-0946.md): Lands known as Tully Park (c12.9HA), Laughanstown, Dublin 18. Granted (18 Feb 2021). Revises part of the permitted Tully Park, moving the café kiosk, redesigning the playground and adding a raised boardwalk. - [DZ15A/0813](https://cherrywoodplans.com/application/DZ15A-0813.md): Laughanstown, Dublin 18, (Tully Park). Granted (13 Jul 2016). Creates Tully Park, a 12.9-hectare public park with a playground, café kiosk and nature trails. - [DZ26A/0151/WEB](https://cherrywoodplans.com/application/DZ26A-0151-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18.. Granted (24 Jun 2026). 188 new homes, a mix of apartments, two-level units and houses, beside Tully Park off Bishop Street. - [DZ22A/0133](https://cherrywoodplans.com/application/DZ22A-0133.md): Townlands of Laughanstown and Cherrywood, Dublin 18. Granted (22 Nov 2022). Builds 163 homes, a mix of apartments, triplexes, maisonettes and houses, beside Tully Park. - [DZ25A/0044/WEB](https://cherrywoodplans.com/application/DZ25A-0044-WEB.md): In the Townlands of Laughanstown, and Brennanstown, Dublin 18. Granted (10 Jul 2025). Amends a permitted Lehaunstown scheme to add a storey to two buildings, taking it from 492 to 517 homes, with fewer car spaces. - [DZ21A/0334](https://cherrywoodplans.com/application/DZ21A-0334.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (7 Apr 2022). 482 new homes, mostly apartments in five blocks up to 5 storeys, beside Barrington's Road and the Luas in Lehaunstown. - [DZ26A/0580/WEB](https://cherrywoodplans.com/application/DZ26A-0580-WEB.md): Bishop Street (M3a), Laughanstown, Dublin 18 (Development Area 7 Macnebury - Res3 Plot). More information requested (22 Sep 2026). 32 new homes, mostly 3-bed two-level apartments, off Bishop Street in Macnebury. - [DZ17A/0161](https://cherrywoodplans.com/application/DZ17A-0161.md): Lands (site area c.0.95ha) in the townland of Laughanstown, Dublin 18. Granted (12 Dec 2017). Sets up a temporary concrete plant for 7 years to supply the building of Cherrywood. - [DZ26A/0579/WEB](https://cherrywoodplans.com/application/DZ26A-0579-WEB.md): Castle Street (M5), Laughanstown, Dublin 18 (Development Area 7 Macnebury - Res2 Plot). More information requested (22 Sep 2026). 40 new homes, mostly 3-bed two-level apartments, off Castle Street in Macnebury. - [D06A/1016](https://cherrywoodplans.com/application/D06A-1016.md): Townland of Laughanstown, Cherrywood, Loughlinstown, Co. Dublin.. Granted (28 Nov 2006). Builds a 110 kV ESB electrical transformer station in Laughanstown. - [DZ22A/0550](https://cherrywoodplans.com/application/DZ22A-0550.md): Lehaunstown Park Open Space, Laughanstown, Dublin 18. Granted (13 Apr 2023). Turns a temporary car park into Lehaunstown Park Open Space with community gardens and a play plaza. - [DZ26A/0052/WEB](https://cherrywoodplans.com/application/DZ26A-0052-WEB.md): Townland of Laughanstown, Cherrywood, Dublin 18. Granted (24 Mar 2026). Makes minor layout and landscaping changes to a permitted Tully housing scheme, moving bin stores to the front of the two-level homes. - [DZ25A/0325/WEB](https://cherrywoodplans.com/application/DZ25A-0325-WEB.md): In the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18. Granted (15 Jan 2026). 121 apartments in two blocks of 3 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ25A/0102/WEB](https://cherrywoodplans.com/application/DZ25A-0102-WEB.md): In the Townlands of Laughanstown, in Cherrywood, Dublin 18. Granted (26 May 2025). Amends a permitted 200-apartment scheme in Macnebury to drop its basement and cut car parking from 241 to 160 spaces. - [DZ24A/1024/WEB](https://cherrywoodplans.com/application/DZ24A-1024-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood,, Dublin 18. Granted (1 May 2025). Amends a permitted Macnebury apartment scheme to cut car parking from 312 to 213 spaces and add bike, bin and storage buildings, with no change to the homes. - [DZ25A/0008/WEB](https://cherrywoodplans.com/application/DZ25A-0008-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18. Refused or withdrawn (6 Feb 2025). Amends a permitted 200-apartment scheme in Macnebury to drop its basement and cut car parking from 241 to 160 spaces. - [DZ24A/1016/WEB](https://cherrywoodplans.com/application/DZ24A-1016-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18. Refused or withdrawn (3 Jan 2025). Amends a permitted Macnebury development by removing its basement and cutting car parking from 241 to 160 spaces. - [DZ24A/0017](https://cherrywoodplans.com/application/DZ24A-0017.md): Townlands of Laughanstown and Cherrywood, Macnebury - Development Area 7 - Cherrywood, Dublin 18. Granted (11 Jun 2024). 200 apartments in three blocks of 4 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ23A/0811](https://cherrywoodplans.com/application/DZ23A-0811.md): In the Townlands of Laughanstown and Cherrywood. Macnebury, Development Area 7 , Cherrywood, Dublin 18. Refused or withdrawn (4 Jan 2024). 200 apartments in three blocks of 4 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ22A/1021](https://cherrywoodplans.com/application/DZ22A-1021.md): Lands within Development Area 7 - Macnebury, including part of the Res 3 plot known as M1 located south of Bishop Street, west of Cherrywood Avenue, east and north of the proposed Beckett Road, Laughanstown, Dublin 18. Granted (27 Jun 2023). 283 new homes, mostly apartments in four blocks of 4–5 storeys, plus a crèche, south of Bishop Street in Macnebury. - [DZ21A/1042](https://cherrywoodplans.com/application/DZ21A-1042.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (30 May 2022). 122 new homes, a mix of houses, two-level units and apartments, beside Tully Park and Lehaunstown Lane. - [DZ15A/0758](https://cherrywoodplans.com/application/DZ15A-0758.md): in the townlands of Cherrywood, Laughanstown, Brennanstown, Loughlinstown and Glebe, Dublin 18. Granted (16 Aug 2016). Phase 1 roads for Cherrywood: about 5.4km of new and upgraded roads including Grand Parade, Castle Street and Bishop Street. - [DZ19A/0597](https://cherrywoodplans.com/application/DZ19A-0597.md): Development Area 8 -Tully, Cherrywood SDZ, Includes the Res 2 plots ''T9'' and ''T10''. Granted (11 Mar 2020). 184 new homes, mainly houses plus two small apartment blocks, on plots T9 and T10 in Tully. - [ABP30342919](https://cherrywoodplans.com/application/ABP30342919.md): Site (c.3.06ha) in the townlands of Laughanstown, Dublin 18 (lands generally bounded by Bishop Street to the south, the Luas green line to the east and Tully park to the north. Granted (18 Apr 2019). Builds 184 homes, a mix of apartments, two-level units and houses, between Bishop Street, the Luas line and Tully Park. - [DZ26B/0186/WEB](https://cherrywoodplans.com/application/DZ26B-0186-WEB.md): 4 Mercer Row,Laughanstown, Dublin 18, D18XH7P. Granted (25 May 2026). Three new roof windows added to the front of a house on Mercer Row. - [DZ26B/0153/WEB](https://cherrywoodplans.com/application/DZ26B-0153-WEB.md): 4 Mercer Row, Laughanstown, Dublin, D18XH7P. Refused or withdrawn (19 Mar 2026). Three new roof windows added to the front of a house on Mercer Row. - [D04A/1013](https://cherrywoodplans.com/application/D04A-1013.md): Laughanstown/Cherrywood, With Access From N11, Wyattville Road, Co. Dublin.. Refused or withdrawn (9 May 2005). Seeks to keep modified land shaping and drainage works on a 36-hectare site at Laughanstown/Cherrywood and further alter them. - [DZ20A/0585](https://cherrywoodplans.com/application/DZ20A-0585.md): on a site in the Townlands of Laughanstown and Cherrywood, Dublin 18. Refused or withdrawn (2 Jun 2021). A temporary sales and marketing suite with 8 parking spaces for just under 5 years off Gun and Drum Hill Road. - [DZ25A/0014/WEB](https://cherrywoodplans.com/application/DZ25A-0014-WEB.md): Townlands of Laughanstown & Brennanstown, Dublin 18. Granted (3 Mar 2025). Amends the permitted Tully village centre (plot T1) to shrink the basement, cutting car parking from 210 to 157 spaces. - [DZ23A/0106](https://cherrywoodplans.com/application/DZ23A-0106.md): Lands in the Townlands of Laughanstown and Brennanstown, Dublin 18. Granted (22 Sep 2023). A village centre at Tully with a supermarket, shops, cafés and 139 build-to-rent apartments in two blocks of 3–5 storeys. - [DZ25A/0489/WEB](https://cherrywoodplans.com/application/DZ25A-0489-WEB.md): 20, Domville Court, Tullyvale, Cherrywood, Dublin 18, D18VN3A. Granted (11 Aug 2025). Permission to keep a glass conservatory permanently at the back of a house on Domville Court. - [DZ25A/0480/WEB](https://cherrywoodplans.com/application/DZ25A-0480-WEB.md): 20, Domville Court, Tullyvale, Cherrywood, Dublin 18, D18VN3A. Refused or withdrawn (19 Jun 2025). Permission to keep a glass conservatory at the back of a house on Domville Court. - [DZ22A/0770](https://cherrywoodplans.com/application/DZ22A-0770.md): On Lands Development Area 8 (Tully), Cherrywood SDZ, Laughanstown, Dublin 18. Granted (22 Mar 2023). 71 homes, a crèche, shops and a community room on plot T11 west of Castle Street in Tully village centre. - [DZ26B/0366/WEB](https://cherrywoodplans.com/application/DZ26B-0366-WEB.md): 10 Domville Square, Cherrywood, Dun Laoghaire, Dublin 18, D18H7WA. Granted (14 Aug 2026). Adds a small glass conservatory to the rear of a house at Domville Square. - [DZ26B/0360/WEB](https://cherrywoodplans.com/application/DZ26B-0360-WEB.md): 10, Domville Square, Cherrywood, Dun Laoghaire, Dublin 18, D18H7WA. Refused or withdrawn (24 Jun 2026). A small glass conservatory added to the back of a house on Domville Square. - [DZ26A/0750/WEB](https://cherrywoodplans.com/application/DZ26A-0750-WEB.md): Unit B, Mercer Way, Tully Village Centre West, Dublin 18, D18C58F. Refused or withdrawn (7 Oct 2026). Combines two permitted shop units at Tully Village Centre into one convenience store with an off-licence. - [DZ26B/0241/WEB](https://cherrywoodplans.com/application/DZ26B-0241-WEB.md): 17 Domville Court, Cherrywood, Dublin 18, D18WEK6. Granted (10 Jun 2026). Permission to keep a glass conservatory permanently in the back garden of a house on Domville Court. - [DZ26B/0073/WEB](https://cherrywoodplans.com/application/DZ26B-0073-WEB.md): 17 Domville Court, Cherrywood, Dublin 18, D18WEK6. Refused or withdrawn (13 Mar 2026). Permission to keep a glass conservatory built in the back garden of a house on Domville Court. - [DZ26B/0030/WEB](https://cherrywoodplans.com/application/DZ26B-0030-WEB.md): 17 Domville Court, Tullyvale, Cherrywood, Dublin 18, D18 WEK6. Refused or withdrawn (28 Jan 2026). Permission to keep a glass conservatory built in the back garden of a house on Domville Court. - [DZ24A/0236/WEB](https://cherrywoodplans.com/application/DZ24A-0236-WEB.md): Lands in the townland of Laughanstown, between Grand Parade and Tully Park, in Domville Development Area 4, Cherrywood, Dublin 18. Refused or withdrawn (15 Apr 2024). Amends the Domville permission to raise four blocks on Grand Parade from 4 to 6 storeys, adding 58 apartments. - [DZ17A/0714](https://cherrywoodplans.com/application/DZ17A-0714.md): Lands in the townlands of Lehaunstown and Cherrywood, Dublin 18. The application relates to development in the Cherrywood Strategic Development Zone.(Domville site). Granted (7 Aug 2018). Builds 322 new homes, 242 apartments and 80 houses, plus a crèche on the Domville site in Cherrywood. - [DZ21A/0806](https://cherrywoodplans.com/application/DZ21A-0806.md): Lands in the townland of, Laughanstown, Dublin 18, located between Grand Parade and Tully Park. Granted (12 Aug 2022). Amends a permitted scheme between Grand Parade and Tully Park to add 60 apartments in three new 4-storey blocks. - [DZ22A/0623](https://cherrywoodplans.com/application/DZ22A-0623.md): On Lands Development ,Plot T 11, Area 8 (Tully), Cherrywood SDZ, Laughanstown, Dublin 18. Granted (18 Jan 2023). 49 new houses on plot T11 west of Castle Street in Tully. - [DZ24A/0291/WEB](https://cherrywoodplans.com/application/DZ24A-0291-WEB.md): Lands in the townland of Laughanstown, Dublin 18, located between Grand Parade and Tully Park., The application relates to development in Domville Development Area 4 of the Cherrywood Strategic Development Zone.. Granted (25 Mar 2025). Amends the Domville permission to raise four blocks on Grand Parade from 4 to 6 storeys, adding 58 apartments. - [DZ21A/1017](https://cherrywoodplans.com/application/DZ21A-1017.md): Townlands of Laughanstown, Glebe, and Cherrywood, Dublin 18, (also Co Dublin). Granted (11 Nov 2022). About 1.6km of new roads including Beckett Road with an underpass below the Wyattville Link Road, plus a park around an ancient wedge tomb. - [DZ23A/0455](https://cherrywoodplans.com/application/DZ23A-0455.md): Area 8 (Tully) Cherrywood SDZ Lands, Laughanstown, Dublin 18. Granted (27 Oct 2023). Amends a permitted Tully housing scheme to provide 5 three-bed houses on Mercer's Road in place of 5 homes dropped by condition. - [DZ21A/0664](https://cherrywoodplans.com/application/DZ21A-0664.md): Site in the Townlands of, Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (5 May 2022). 47 apartments in a 4-storey block off Castle Street in Tully. - [DZ25A/0161/WEB](https://cherrywoodplans.com/application/DZ25A-0161-WEB.md): Lands in the townlands of Laughanstown, Dublin 18. The application relates to development in Cherrywood Strategic Development Zone. Granted (23 Apr 2025). Completion of a 145-metre stretch of Grand Parade from Tully Vale Road towards Bishop Street. - [DZ20A/0877](https://cherrywoodplans.com/application/DZ20A-0877.md): Bishop Street, Cherrywood, Dublin 18, Co Dublin. Granted (29 Jan 2021). Installs a small gas regulator building on Bishop Street near the Luas line. ## Links - [This page on CherrywoodPlans](https://cherrywoodplans.com/application/DZ18A-0458) - [Council record, documents and conditions (DLR planning portal)](https://planning.agileapplications.ie/dunlaoghaire/application-details/78911) - [All Cherrywood applications](https://cherrywoodplans.com/applications.md) _Source: Dún Laoghaire–Rathdown County Council planning data, refreshed daily. CherrywoodPlans is an independent site, not run by the council._