# Planning application DZ18A/0499 > Lands (c.1.22ha) in the townlands of Cherrywood & Laughanstown, Dublin 18, Cherrywood, Dún Laoghaire–Rathdown. Granted (11 Jan 2019). - **Reference:** DZ18A/0499 - **Address:** Lands (c.1.22ha) in the townlands of Cherrywood & Laughanstown, Dublin 18 - **Status:** Granted (11 Jan 2019) - **Decision:** GRANT PERMISSION - **Application type:** Permission (SDZ) - **Applicant:** Hines Cherrywood Dev Fund ICAV - **Lodged:** 7 Dec 2018 - **Decided:** 11 Jan 2019 - **Location (lat, lng):** 53.246468, -6.146264 ## Proposal The application relates to lands within 'Development Area 2 - Cherrywood' of the SDZ Planning Scheme (as amended) and includes part of the Res4-plot identified in this application known as 'TC5'. The proposed development relates to a residential development comprising 146 apartments in 4 blocks with a total gross floor area (GFA) of 15,909 sqm and includes the following accommodation on a block by block basis: Block A (4,420 sqm) 45 no apartments, ancillary accommodation and associated balconies and roof terraces in a 4 storey block (comprising 10 no. 1 bed, 31 no. 2 bed and 4 no. 3 bed); Block B (5,001 sqm) 45 no. apartments, ancillary accommodation and associated balconies and roof terraces in a 4 storey block (comprising 4 no. 1 bed, 24 no. 2 bed and 17 no. 3 bed); Block C (2,845 sqm) 24 no. apartments, ancillary accommodation and associated balconies and roof terraces in a 4 storey block (comprising 1 no. 1 bed, 11 no. 2 bed and 12 no. 3 bed); Block D (3,644 sqm) 32 no. apartments, ancillary accommodation and associated balconies and roof terraces in a 4 storey block (comprising 5 no. 1 bed, 16 no. 2 bed and 11 no. 3 bed). Access is provided from a single access point from Grand Parade (A2-B) as permitted under Reg. Ref. DZ15A/0758 and the access road that forms part of this application is to be shared with the remainder of the residential plot in separate ownership (subject to future planning application). The Transport Interchange located on Grand Parade at the south-eastern end of the site is also to be provided as per Reg. Ref. DZ17A/0862 and is not affected by the current application. The 4 blocks are located above basement/below podium area (1 level) which will accommodate car parking (189 spaces), bicycle parking (166 spaces) and service areas. Permission is also sought for all hard and soft landscaping and includes all associated site and development works. ## In plain English 146 apartments in four 4-storey blocks off Grand Parade on plot TC5. - **146** apartments - **189** car parking spaces - **166** bicycle spaces - **4** storeys ### What's planned A residential development of **15,909** sq.m on about **1.22** hectares in Development Area 2 (Cherrywood). ### Residential **146** apartments in **4** blocks of **4** storeys: **20** one-bed, **82** two-bed and **44** three-bed, with balconies and roof terraces. ### Transport A single basement with **189** car spaces and **166** bicycle spaces. Access is from a single entrance on Grand Parade. _This summary was written by AI from the proposal text. Check the council record before relying on it._ ## Conditions ### Condition 2 1. The development to be carried out in its entirety in accordance with the plans, particulars and specifications lodged with the application, as amended on 07.12.2018, save as may be required by the other conditions attached hereto. Reason: To ensure that the development shall be in accordance with the permission and that effective control be maintained. 2. No residential unit shall be occupied prior to the completing, to taking in charge standards, of Tully Park as permitted under Reg. Ref. DZ15A/0813 and as amended under DZ17A/0862 (Town Centre) and Ticknick Park (circa 6 hectares) as permitted under Reg. Ref. DZ16A/0570. Reason: To ensure the proposed development is consistent with Section 7.2 (Sequence of Development) and Table 7.3 (Open Space for First Growth Area), of the Planning Scheme, as amended. 3. Prior to commencement of development the developer shall submit for the written agreement of the Planning Authority, all drawings in digital format (CAD/GIS) projected to ITM (Irish Transverse Mercator). This information shall include the following: (a) Overall site plans in DWG format (ITM projection in metres) (b) Ground floor plans of buildings in DWG format (ITM projection in metres) (c) Site sections and elevations in PDF format. Reason: To ensure consistency with Section 7.4 of the Cherrywood Planning Scheme. 4. Prior to the commencement of development on site the developer shall submit for the written agreement of the Planning Authority, full details of the proposed external finishes of all buildings including ESB substations and entrances to basement car parks, all elevational treatments including privacy screens, windows and doors, balcony/terrace and boundary treatments, and roof level materials/finishes, in the form of samples and on site mock ups. The external finishes of buildings shall; (a) Comprise durable and high quality materials. (b) Ensure harmony and visual coherence in the built environment, yet articulate interest to avoid monolithic and bulky facades along the perimeter elevations, with particular attention to the visual appearance of the streetscape and public realm and to the upper floors and roof levels. Reason: To ensure consistency with Section 2.8 'Layout' and Specific Objectives PD 7, PD 8, PD 13, PD 14, PD 19 and PD 24 of the Cherrywood Planning Scheme. 5. Notwithstanding the provisions of Part 1 of Schedule 2 of the Planning and Development Regulations 2001 (as amended), no additional services or installations over and above those shown on drawings submitted by way of further information shall be located on the roofs of the apartment blocks without a prior grant of planning permission. Reason: In the interests of visual amenity of and to ensure consistency with Specific Objective PD 19 of the Cherrywood Planning Scheme. 6. Prior to the installation of any signage the developer shall submit for the written agreement of the Planning Authority a Signage Strategy including: (a) Details of all signage, including all external signage, way-finding and directional signage. (b) Street name and numbering in accordance with Specific Objectives H6 and GI 10. (c) Full details of the location and content including background colour, lettering typeface, logos and colour (d) Materials that are high quality, modern and durable, and that respect the proportions and design of the building and its surroundings. Reason: In the interests of visual amenity and in order to comply with Specific Objectives PD 30, PD 32, H 6 and GI 10 of the Cherrywood Planning Scheme. 7. The developer shall comply with the following requirements: (a) Site development and building works shall be carried out only between the hours of 8.00am to 7.00pm Monday to Friday inclusive, 8.00am to 2.00pm Saturdays with no works permitted on site on Sundays and public holidays. Deviation from these times will only be allowed in exceptional circumstances where prior written approval has been received from the Planning Authority. This shall also be addressed in the Community Liaison Plan. (b) Construction staff shall not park on public roads. Parking for construction staff shall be provided by the Developer/Contractor within the site boundary. (c) Construction vehicles shall not be permitted to park or wait on roads outside the site boundary. All parking and waiting areas shall be provided by the Developer/Contractor within the site boundary. (d) The development shall be managed in accordance with a Final Construction Management Plan, which shall be submitted for the written approval of the Planning Authority prior to the commencement of any development on site. The Plan shall detail how all significant elements of the construction works with potential to cause significant environmental effects particularly in relation to surface water runoff, noise, lighting and air quality, will be managed in accordance with relevant environmental requirements, best practice and the planning permission including conditions. The Final Construction Management Plan shall also include a Community Liaison Plan and a Construction Traffic Management Plan. (e) Prior to commencement of development a mechanism and structure for on-site monitoring, reporting on progress and quality control to the Planning Authority in relation to construction standards, materials, as-built drawings and records shall be agreed in writing with the Planning Authority. (f) The developer/contractor shall comply with the 'Code of engineering practice for works on, near, or adjacent the Luas light rail system'. (g) Notwithstanding the taking in charge drawing (Drawing No. PP-51 Rev A) submitted, any areas proposed by the developer for Taking in Charge by the Planning Authority shall be agreed in writing with the Planning Authority prior to the commencement of development. The construction details and finishes to these areas shall also be agreed in writing with the Planning Authority prior to the commencement of development. Reason: To ensure adherence to the Planning Authority's Standards for Taking in Charge; in the interests of orderly development, proper planning and sustainable development and the residential amenity of the area; to ensure consistency with Specific Objectives GI 19, GI 52 and GI 58 and Section 2.14 of the Cherrywood Planning Scheme; to mitigate against adverse impacts on nearby residents; to ensure no adverse impact on Luas passengers, the operation and safety of the Luas, to minimise any reduction in public transport services and in the interests of public safety and amenity. 8. (a) Prior to the commencement of development or as otherwise agreed in writing with the Planning Authority, the developer shall submit the following for the written approval of the Planning Authority: (i) An Operations and Maintenance Plan for the proposed sustainable drainage systems (SuDS) components, inclusive of the attenuation structures. (ii) A Stormwater Management Plan for the construction phase. (iii) Full details of the proposed tree root structural system. (iv) All hydraulic calculations and engineering drawings of the proposed surface water layout, representative of the final detailed design. The Windes model shall be run with the hydrobrake flow control head discharge relationship (or the appropriate hydrobrake flow control chosen from the drop down list in Windes) to ensure that the storage volume is adequately analysed. Also, the control head shall be appropriate for the storage mechanism proposed. The details of the Windes model shall be commensurate with the proposed sewer network attributes as shown on drawings provided. (v) Details of the method of runoff collection at podium level, which demonstrates dissipation of runoff into a stone sub-base, or alternately how the podium level runoff is to be treated/intercepted using a SuDS component. (vi) The final detailed drainage layout, complete with contributing areas indicated. (vii) Full details of the Stormtech modular system proposed, including sectional drawings. (viii) A site investigation report, undertaken by a competent contractor at the developer's expense. The report shall assess the permeability of soil at the subject site and contain results and conclusions from appropriate testing carried out. (b) Surface waters from the subject development are directed to Pond 2B for the final level of treatment in the public realm. Prior to the commencement of development, Pond 2B shall be constructed in accordance with the development permitted under Reg. Ref. DZ15A/0758, commissioned and operational. (c) A Stormwater Audit shall be carried out at Stage 2 for the detailed design stage and at Stage 3 for the post construction/prior to opening stage in accordance with Specific Objective PI 7 of the Cherrywood Planning Scheme. All audits shall be carried out at the developer's expense. An independent audit team shall be used and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the commencement of development. The Stage 3 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the commissioning of the stormwater infrastructure. (d) Surface water discharge from the subject development shall be limited to 1 l/s/ha. (e) The hydrobrake shall be provided with a high level by-pass to allow draw down in times of blockage and also a high level alarm as a warning (or similar approved). Reason: In the interests of sustainable development, to ensure long term optimum operation of the surface water management system and to comply with the requirements of the Cherrywood Planning Scheme. 9. The developer shall comply with the following requirements: (a) The road infrastructure granted permission under Reg. Refs. DZ15A/0758 and DZ17A/0862 (listed below), shall be completed in accordance with the cross sections in the Cherrywood Planning Scheme (figure 4.4), to a standard to be taken in charge, prior to any occupation of the development proposed by this application. (i) Reconstruct existing roundabout at A to signalised 4 arm junction. (ii) Complete existing Tully Vale Road A to B in accordance with cross sections. (iii) Construct Bishop Street A1 to F1. (iv) Construct at-grade junction (left in/left out) on Wyattville Road (eastbound). (v) Construct road J to Wyattville Link Road. (vi) Construct Grand Parade A2 to B (b) A Quality Audit (which shall include a Road Safety Audit, Access Audit, Cycle Audit and Walking Audit) shall be carried out at Stage 2 for the detailed design stage. The audit shall be carried out at the developer's expense in accordance with the Design Manual for Urban Roads & Streets (DMURS) guidance and TII (Transport Infrastructure Ireland) standards. An independent audit team shall be used and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Audit report shall be submitted for the written agreement of the Planning Authority prior to the commencement of development. (c) A Quality Audit (which shall include a Road Safety Audit, Access Audit, Cycle Audit and Walking Audit) shall be carried out at Stage 3 for the post construction/prior to opening stage. The audit shall be carried out at the developer's expense in accordance with the Design Manual for Urban Roads & Streets (DMURS) guidance and TII (Transport Infrastructure Ireland) standards. An independent audit team shall be used and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 3 Audit report shall be submitted for the written agreement of the Planning Authority prior to the opening for public use/taking in charge by Dun Laoghaire Rathdown County Council. (d) Motorised vehicular access shall not be allowed from the development to Tully Vale Road. In this regard traffic bollards shall be put in place to prevent motorised vehicles from accessing Tully Vale Road from the 'Shared Surface Plaza Walk' that links Tully Vale Road and Grand Parade. This link shall be publically accessible at all times and no gates shall be erected along the route or at either end. Reason: To allow for pedestrian and cycle permeability, to restrict vehicular traffic and for consistency with the Cherrywood Planning Scheme Specific Objectives PI 14 and PI 20. 10. With regard to the roads and paved areas that are proposed for taking in charge, the provision and location of service ducts, pipes, manholes and service chambers shall be agreed with the relevant service providers prior to commencement of any road construction works. The services to be considered include electricity, water, gas, telecoms, traffic communication and public lighting. Reason: In the interests of orderly development, to ensure the inclusion of below ground service infrastructure and to avoid subsequent excavation of the newly constructed roadway; to ensure that designs shall meet with the current and future requirements of the Planning Authority (DLR Traffic and Public Lighting Sections) and the utility and service providers; and to ensure consistency with Specific Objectives PI 4, PI 14 and PI 26 of the Cherrywood Planning Scheme. 11. (a) The provision and location of charge points for electric vehicles shall be in accordance with the requirements of Section 8.2.4.12 of the Dun Laoghaire Rathdown County Development Plan 2016-2022. (b) Prior to commencement of development the detailed design of public lighting complying with 'Public Lighting Installations in Residential and Industrial Areas Guidance Document - February 2015' produced by the Local Authority shall be agreed in writing with the Planning Authority. Reason: To ensure that the provision and design of charge points for electric vehicles shall be in accordance with the requirements of the Planning Authority and to ensure that public lighting designs shall meet with the requirements of the Planning Authority and shall be consistent with the Cherrywood Planning Scheme Specific Objective PI 28 and the documents listed in Section 4.2.7. 12. (a) Prior to commencement of development the developer shall retain the services of a qualified Landscape Architect as their Landscape Consultant throughout the course of the development works and shall notify the Planning Authority of that appointment in writing. (b) The developer shall engage the Landscape Consultant to procure, oversee and supervise the landscape contract for the implementation of the permitted landscape proposals. When all landscape works are inspected and completed to the satisfaction of the Landscape Consultant, they shall prepare, sign and submit a Practical Completion Certificate (PCC) to the Planning Authority, as verification that approved landscape plans and specifications have been fully implemented. (c) Prior to commencement of development of the landscape/public realm areas, the developer shall provide, for the written agreement of the Planning Authority, hard landscape plans and construction details for all hard standing pedestrian, cycling, and vehicular areas (including adjoining footpath and road interfaces), detailing the specifications of all surface/finish materials. In this regard, samples, data sheets and on site mock ups of all materials shall be provided for the written agreement of the Planning Authority and approved control samples must be held on site at all times. All surfaces and finishes shall include materials that are consistent with Specific Objective PD 14. In particular the finishes shall comprise of durable, easily sourced and high quality materials comprising natural stone (or other materials as agreed with the Planning Authority) that harmonise and complement those within the adjoining Tully Park Greenway entrance space . (d) Prior to commencement of development, the developer shall submit for the written agreement of the Planning Authority, a Strategy and Landscape Plan for the public realm which includes the details and the locations for all vents which are visible within the public and communal spaces. Vents shall be integrated sensitively and appropriately into the surrounding landscape having regard for maintenance, public safety and visual appearance. (e) Prior to commencement of development of the landscape/public realm areas, the developer shall provide for the written agreement of the Planning Authority, the design and specifications for all SuDs/water features located within the communal open spaces including management/maintenance programme and safety audits. (f) Prior to the commencement of development, the developer shall engage the services of a qualified ecologist as an ecological consultant, from the commencement of construction for the duration of the works. The developer shall inform the Planning Authority in writing of the appointment and name of the consultant, prior to the commencement of development. The consultant shall ensure the implementation of all the recommendations within the submitted Environmental Impact assessment. (g) Prior to the commencement of landscape works the developer shall submit, for the written agreement of the Planning Authority, details of soft landscape design to include a detailed Planting Plan and Planting Schedule (as appropriate) stating species/varieties, approximate quantities, sizes, rootball presentation and spacings. Planting mixes should specify a diverse range of species/varieties/cultivars and a diversity of forms and plant sizes (multi-stems, feathered, semi-matures etc.) using both native and exotic species and pollinator-friendly native species (in accordance with the All-Ireland Pollinator Plan 2015-2020)all designed to provide vegetation that is visually-appealing, bio-diverse, and easily managed. This should include management programmes for all proposed trees, shrubs and other vegetation demonstrating long-term continuity and consistency. (h) Prior to the commencement of landscape development of residential ground level courtyards, the developer shall submit, for the written agreement of the Planning Authority: (i) Final design and details of all play opportunities and facilities (formal and/or informal as appropriate), in respect of design detailing, planting, boundaries, equipment and safety surface in accordance with Sections 4.7.1, 4.7.2 and 4.7.3 of the Amenity Space Guidance Document. All proposed equipment and ancillaries shall include specifications for same and proof that all equipment conforms to European Standards EN 1176-1-11 and EN 1177 Playground equipment and surfacing. (ii) Upon completion of each play space and prior to occupation of the residential units within the subject development, a play map in GIS format shall be submitted to the Planning Authority which details all play provision provided for within each specific community garden in accordance with 4.6.3 and 4.7.2 of the Cherrywood Amenity Space Guidance Document. The developer shall also submit a post-installation Practical Completion Certificate, in accordance with the requirements and guidelines of the Royal Society for the Prevention of Accidents (RoSPA). The Certificate shall be prepared and signed by a suitably qualified (RoSPA-approved), technical professional with expertise and experience in playground design and playground health and safety. (i) Prior to commencement of development of the landscape/public realm areas, the developer shall submit, for the written agreement of the Planning Authority, annotated scaled plans clearly illustrating delineation of the boundaries, interfaces and transitions between private space, communal space, public space including where relevant, details, sections and elevations clearly indicating the location, specification, type and height of all proposed edge restraints, structures, boundary treatments and gates. Reason: To ensure a high quality public realm; to ensure consistency with Specific Objectives PD 14, GI 7. GI 8, GI 15, GI 16, GI 46, GI 65 and GI 76 of the Planning Scheme; to ensure consistency with Section 4.1.2 of the Planning Scheme; to ensure a high quality standard of development and that adequate amenity/recreational facilities are provided on the site to meet local need; to ensure the provision and construction of safe, quality play provision in compliance with best practice and in the interest of proper planning and sustainable development of the area. 13. The temporary waste collection point adjacent to the ESB substation shall be used on a short-term basis for the collection of waste and shall not be used as a frequent or permanent bin storage point. Reason: In the interest of residential and visual amenity and the proper planning and sustainable development of the area. 14. That each apartment be used as a single dwelling unit and shall not be sub-divided in any manner or used as two or more separate habitable units. Reason: To prevent unauthorised development. 15. (a) The proposed basement car park shall be in accordance with Section 8.2.4.10 (Design of Underground and Multi-Storey Car Parks) of the County Development Plan (2016-2022) and shall comply with requirements of the Institution of Structural Engineers booklet entitled 'Design Recommendations for Multi Storey and Underground Car Park Fourth Edition' (2011). (b) The developer shall ensure that all cycle parking areas are correctly designed in accordance with the Dun Laoghaire Rathdown County Council - Standards for Cycle Parking and associated Cycling Facilities for New Developments (January 2018) http://www.dlrcoco.ie/sites/default/files/atoms/files/dlr_cycle_parking_standards_0.pdf. Adequate space shall be provided to access the proposed bicycle spaces. (c) Each apartment unit shall be allocated a minimum of one car parking space. Car parking spaces shall be clearly marked as attaching to a particular unit and allocated spaces shall not be sold or let to avoid non take up by residents who would then park elsewhere at adjoining residential estates where it will create a nuisance as well as undermining the demand management measures of parking constraint. Reason: In the interest of residential amenity and the proper planning and sustainable development of the area. 16.Prior to commencement of development the applicant shall submit full details of a properly constituted Owners Management Company for the written agreement of the Planning Authority. This shall include a layout map of the permitted development showing the area to be taken in charge and the areas to be maintained by the Owners Management Company. Confirmation that this has been set up shall be submitted to the Planning Authority prior to occupation of the first residential unit. Reason: To provide for satisfactory completion and maintenance of the development future maintenance of this development in the interest of residential amenity. 17. Prior to the commencement of development on site the developer shall submit for the written agreement of the Planning Authority: (a) A Construction Waste Management Plan, having regard to Circular WPR 07/06 - Best Practice Guidelines on the Preparation of Waste Management Plans for Construction and Demolition Projects - published by the DECLG, July 2006. This plan shall provide details including intended construction practice for the management of waste arising from the construction process and in particular recyclable materials. (b) A Waste Management Plan. This plan shall contain details for the management of waste, and in particular recyclable materials and food waste arising within the development, including the provision of facilities for the separation, storage and collection of the waste and the provision of adequate signage and lighting to facilitate the ongoing operation of these facilities. Reason: In the interests of amenities, environmental protection, public health and safety and the proper planning and sustainable development of the area. 18. Prior to commencement of development, the developer shall comply with the Dun Laoghaire Rathdown County Council Housing Strategy, drawn up in accordance with Part V, Section 96 (4) of the Planning & Development Act, 2000, as amended, and in accordance with agreement to be reached with the County Council Housing Department unless the developer shall have applied for and been granted an exemption certificate under Section 97 of the Planning and Development Act, 2000, as amended. NOTE: Where a developer opts to transfer units to the Council, this shall be subject to the availability of funding. Reason: To comply with the County Council Housing Strategy and Part V of the Planning & Development Act, 2000, as amended. 19. No development on foot of this permission shall commence until security for the provision and satisfactory completion of services (including roads, footpaths, open spaces, public lighting, sewers, watermains and drains) in accordance with the Plans and particulars lodged with the application, has been given by: a. Lodgement with the Council of an approved Insurance Company Bond in the sum of €548,100, which shall be kept in force by the Developer until such time as Roads, Open Spaces, Car Parks, Sewers, Watermains and Drains are completed to the satisfaction of the Council OR/... b. Lodgement with the Council of a Cash Sum of €334,100 to be applied by the Council at its absolute discretion if such services are not duly provided to its satisfaction on the provision and completion of such services to standard specifications. Reason: To ensure that a ready sanction may be available to the Council to induce the provision of services and prevent dis-amenity in the development. 20. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €36,822.66 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of Surface Water Public Infrastructure and Facilities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015 and as included in Table 2 of the Cherrywood Planning Scheme Development Contribution Scheme 2017-2020. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme ) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. Reason: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Public Infrastructure and Facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. Note on above Condition: Please note that with effect from 1st January, 2014 Irish Water are now the statutory body responsible for both water and waste water services. Accordingly, the contribution payable has been reduced by the amount of the contribution associated with these services. Further details/clarification can be obtained from Irish Water at Tel. 1 850 278 278. 21. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €843,266.80 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015 and is included in Table 2 of the Cherrywood Planning Scheme Development Contribution Scheme 2017-2020. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. Reason: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 22. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €547,384.66 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Community & Parks Public Infrastructure, Facilities and Amenities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015 and as included in Table 2 of the Cherrywood Planning Scheme Development Contribution Scheme 2017-2020. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. Reason: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks Public Infrastructure, Facilities and Amenities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 23. This development shall not be carried out without prior agreement, in writing, between the Applicants and the Planning Authority relating to the payment of development contributions. Reason: Investment by Dún Laoghaire-Rathdown County Council in Local Authority works has facilitated and will facilitate the proposed development. It is considered appropriate and reasonable that the developer should contribute to the cost of same. 24. A financial contribution shall be paid by the proposer to the Council towards the cost of the extension of Luas Line B from the Sandyford Depot to Cherrywood, namely Luas Line B1. This contribution to be paid prior to the commencement of the development or in such other manner as may otherwise be agreed with the Planning Authority. The rate of contribution payable shall be that pertaining to the particular year in which implementation of the Planning Permission is commenced. The Supplementary Development Contribution Scheme provides for an annual increase in the levels of contribution payable, as outlined in the scheme, by a factor of 5% compound interest per annum. The levels of contribution will be reviewed annually on the 13th of January of each year during which the scheme is in force to take account of the aforementioned increase. The rate of contribution payable in respect of this development, at current contribution rates, is € 429,164.28, and is subject to increase as outlined above. It should be noted that contributions assessed in accordance with the Supplementary Development Contribution Scheme cannot be appealed to An Bord Pleanala unless the applicant considers the levy referred to in this condition has not been properly applied in accordance with the terms of the Scheme. Reason: To part finance the extension of the Luas Line B1 from Sandyford Depot to Cherrywood, as provided for in the Supplementary Development Contribution Scheme adopted by the Council of Dun Laoghaire-Rathdown on the 13th of January, 2003. (incorporating amendments to Clause 13 as adopted by the County Council at its meeting on 13th May, 2013 - to be effective for all decisions from 14th May, 2013). 25. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of € €73,348.94, to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of Surface Water Public Infrastructure and Facilities benefiting development in the the Cherrywood Planning Scheme Area only of the Authority as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Public Infrastructure and Facilities benefiting development in the in the Cherrywood Planning Scheme area and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 26. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of € €466,773.68, to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Roads Public Infrastructure and Facilities in the Cherrywood Planning Scheme Area. This Cherrywood Planning Scheme element of the Development Contribution shall be used solely to fund infrastructure identified in the Plan, as listed in Appendix III - Cherrywood Planning Scheme Projects List, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the Cherrywood Planning Scheme Area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 27. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of € 126,695.88, to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of provision of the Community & Parks Public Infrastructure Facilities & Amenities in the Cherrywood Planning Scheme Area. This Cherrywood Planning Scheme element of the Development Contribution shall be used solely to fund infrastructure identified in the Plan, as listed in Appendix III- Cherrywood Planning Scheme Area only as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks Public Infrastructure Facilities & Amenities benefiting development in the Cherrywood Planning Scheme Area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 28.The development shall be carried out on a phased basis in accordance with a phasing schedule, which shall be submitted to and agreed in writing with the Planning Authority prior to the commencement of development on site. Reason: In the interests of clarity and orderly development. Note to Applicant 1 - It is recommended that Transport Infrastructure Ireland (TII) is consulted in the preparation of the Final Construction Management Plan. Note to Applicant 2 - The detailed design of the water supply infrastructure including details of all connections shall be in accordance with Irish Water specification and requirements. Note to Applicant 3 - The detailed design of the wastewater infrastructure including details of all connections shall be in accordance with Irish Water specification and requirements. Note to Applicant 4 - A connection agreement can be applied for by completing the connection application form available at www.water.ie/connections. Irish Water's current charges for water and wastewater connections are set out in the Water Charges Plan as approved by the Commission for Energy Regulation. ## Nearby applications - [DZ24A/1030/WEB](https://cherrywoodplans.com/application/DZ24A-1030-WEB.md): In the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18. Granted (11 Jun 2025). Amends a permitted scheme off Tully Vale Road to add 59 apartments by raising four blocks by one or two storeys. - [DZ22A/0093](https://cherrywoodplans.com/application/DZ22A-0093.md): Townland of Laughanstown, Dublin 18. Granted (1 Apr 2022). Seeks to keep two advertising signs for Cherrywood housing for 3 more years. - [DZ20A/0877](https://cherrywoodplans.com/application/DZ20A-0877.md): Bishop Street, Cherrywood, Dublin 18, Co Dublin. Granted (29 Jan 2021). Installs a small gas regulator building on Bishop Street near the Luas line. - [DZ25A/0161/WEB](https://cherrywoodplans.com/application/DZ25A-0161-WEB.md): Lands in the townlands of Laughanstown, Dublin 18. The application relates to development in Cherrywood Strategic Development Zone. Granted (23 Apr 2025). Completion of a 145-metre stretch of Grand Parade from Tully Vale Road towards Bishop Street. - [DZ22A/0952](https://cherrywoodplans.com/application/DZ22A-0952.md): The Hunt Building, Grand Parade, Cherrywood Town Centre, Dublin 18. Refused or withdrawn (1 Feb 2023). 6 mobile phone antennas and 2 dishes on the roof of The Hunt Building, Grand Parade. - [DZ22A/0796](https://cherrywoodplans.com/application/DZ22A-0796.md): The Hunt Building, Grand Parade, Cherrywood Town Centre, Dublin 18. Refused or withdrawn (23 Nov 2022). 6 mobile phone antennas and 2 dishes, finished to look like brick, on the roof of The Hunt Building, Grand Parade. - [D15A/0355](https://cherrywoodplans.com/application/D15A-0355.md): Site located in the green area at the entrance to, Druid Valley Estate, Cabinteely, Dublin 18. Refused or withdrawn (9 Jul 2015). Installs a small gas safety regulator unit on the green at the entrance to Druid Valley. - [DZ26A/0032/WEB](https://cherrywoodplans.com/application/DZ26A-0032-WEB.md): Block A1, The Tully Building, Civic Street, Cherrywood Town Centre, Dublin 18, D18WDK0. Granted (13 Mar 2026). Revised plan for 24 mobile phone antennas and 9 dishes on Block A1, The Tully Building, after an earlier compliance submission was rejected. - [DZ25A/0485/WEB](https://cherrywoodplans.com/application/DZ25A-0485-WEB.md): Block A1, Tully Buildings, Cherrywood, Dublin 18. Granted (1 Aug 2025). 24 mobile phone antennas and 9 dishes on the facade and roof of Block A1, Tully Buildings. - [DZ26B/0241/WEB](https://cherrywoodplans.com/application/DZ26B-0241-WEB.md): 17 Domville Court, Cherrywood, Dublin 18, D18WEK6. Granted (10 Jun 2026). Permission to keep a glass conservatory permanently in the back garden of a house on Domville Court. - [DZ26B/0073/WEB](https://cherrywoodplans.com/application/DZ26B-0073-WEB.md): 17 Domville Court, Cherrywood, Dublin 18, D18WEK6. Refused or withdrawn (13 Mar 2026). Permission to keep a glass conservatory built in the back garden of a house on Domville Court. - [DZ26B/0030/WEB](https://cherrywoodplans.com/application/DZ26B-0030-WEB.md): 17 Domville Court, Tullyvale, Cherrywood, Dublin 18, D18 WEK6. Refused or withdrawn (28 Jan 2026). Permission to keep a glass conservatory built in the back garden of a house on Domville Court. - [DZ25A/0489/WEB](https://cherrywoodplans.com/application/DZ25A-0489-WEB.md): 20, Domville Court, Tullyvale, Cherrywood, Dublin 18, D18VN3A. Granted (11 Aug 2025). Permission to keep a glass conservatory permanently at the back of a house on Domville Court. - [DZ25A/0480/WEB](https://cherrywoodplans.com/application/DZ25A-0480-WEB.md): 20, Domville Court, Tullyvale, Cherrywood, Dublin 18, D18VN3A. Refused or withdrawn (19 Jun 2025). Permission to keep a glass conservatory at the back of a house on Domville Court. - [DZ18A/1178](https://cherrywoodplans.com/application/DZ18A-1178.md): 2.2 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (17 Apr 2019). Amends Town Centre plot TC2 to add one apartment, expand retail and resident amenity space, and move the crèche. - [D03A/0735](https://cherrywoodplans.com/application/D03A-0735.md): Tullyvale, Druid Valley, Cherrywood, Loughlinstown, Co. Dublin.. Granted (22 Sep 2003). Changes the approved Tullyvale housing development by realigning its access road and adding a signalised pedestrian crossing. - [DZ24A/0291/WEB](https://cherrywoodplans.com/application/DZ24A-0291-WEB.md): Lands in the townland of Laughanstown, Dublin 18, located between Grand Parade and Tully Park., The application relates to development in Domville Development Area 4 of the Cherrywood Strategic Development Zone.. Granted (25 Mar 2025). Amends the Domville permission to raise four blocks on Grand Parade from 4 to 6 storeys, adding 58 apartments. - [DZ25A/0197/WEB](https://cherrywoodplans.com/application/DZ25A-0197-WEB.md): Located to the north end of the Valley Drive public road, which is a cul-de-sac, opposite the corner apartment building 97-106 E. Refused or withdrawn (18 Mar 2025). Provides a paved bin collection area at the end of Valley Drive for the Tullyvale apartments. - [DZ21A/0806](https://cherrywoodplans.com/application/DZ21A-0806.md): Lands in the townland of, Laughanstown, Dublin 18, located between Grand Parade and Tully Park. Granted (12 Aug 2022). Amends a permitted scheme between Grand Parade and Tully Park to add 60 apartments in three new 4-storey blocks. - [DZ17A/0862](https://cherrywoodplans.com/application/DZ17A-0862.md): Lands (17.01ha) in the townlands of Cherrywood, Dublin 18. Granted (29 May 2018). The original Cherrywood Town Centre permission: 15 blocks with 1,269 homes, shops, offices, two hotels and a library, plus Grand Parade. - [DZ24A/0236/WEB](https://cherrywoodplans.com/application/DZ24A-0236-WEB.md): Lands in the townland of Laughanstown, between Grand Parade and Tully Park, in Domville Development Area 4, Cherrywood, Dublin 18. Refused or withdrawn (15 Apr 2024). Amends the Domville permission to raise four blocks on Grand Parade from 4 to 6 storeys, adding 58 apartments. - [ABP30342919](https://cherrywoodplans.com/application/ABP30342919.md): Site (c.3.06ha) in the townlands of Laughanstown, Dublin 18 (lands generally bounded by Bishop Street to the south, the Luas green line to the east and Tully park to the north. Granted (18 Apr 2019). Builds 184 homes, a mix of apartments, two-level units and houses, between Bishop Street, the Luas line and Tully Park. - [DZ17A/0714](https://cherrywoodplans.com/application/DZ17A-0714.md): Lands in the townlands of Lehaunstown and Cherrywood, Dublin 18. The application relates to development in the Cherrywood Strategic Development Zone.(Domville site). Granted (7 Aug 2018). Builds 322 new homes, 242 apartments and 80 houses, plus a crèche on the Domville site in Cherrywood. - [DZ23A/0423](https://cherrywoodplans.com/application/DZ23A-0423.md): On lands (c.17.03 a) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (Also Co. Dublin). Granted (10 Aug 2023). Amends the Cherrywood Town Centre permission to add two 2-bed apartments to Block A1. - [DZ22A/0690](https://cherrywoodplans.com/application/DZ22A-0690.md): Townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (12 May 2023). Facade and balcony design changes to Cherrywood Town Centre apartment Blocks A1, A2 and A3. - [DZ22A/0747](https://cherrywoodplans.com/application/DZ22A-0747.md): Townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (30 Mar 2023). Changes of use and merging of units in Town Centre Blocks C1 and C2 to create a larger 723 sq.m shop with off-licence. - [DZ22A/0846](https://cherrywoodplans.com/application/DZ22A-0846.md): Lands (c. 17.03 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (22 Dec 2022). Removes a planned viewing platform at Block F1 in Cherrywood Town Centre, replacing it with a glass balustrade. - [DZ22A/0138](https://cherrywoodplans.com/application/DZ22A-0138.md): (c. 17.03ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (30 Aug 2022). Minor changes of use between shop and restaurant-type units in Town Centre Blocks C1 and C2, and a slightly larger crèche. - [DZ21A/0807](https://cherrywoodplans.com/application/DZ21A-0807.md): Lands (c. 17.03 ha), in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (8 Jul 2022). Amends the Cherrywood Town Centre permission to cut residential parking from 1,363 to 1,169 spaces and add 41 car-sharing spaces. - [DZ21A/0713](https://cherrywoodplans.com/application/DZ21A-0713.md): Lands (c. 17.01 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (3 Oct 2021). Design changes to the three apartment blocks A1–A3 in Cherrywood Town Centre, including taller windows and smaller roof terrace. - [DZ19A/1024](https://cherrywoodplans.com/application/DZ19A-1024.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (9 Sep 2020). Amends the Cherrywood Town Centre plan to shrink the basement under Blocks A1–A3 and reassign parking. - [DZ20A/0002](https://cherrywoodplans.com/application/DZ20A-0002.md): Lands (c.17.01ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (9 Sep 2020). Makes minor changes to electrical rooms and landscaping in Town Centre Blocks F1 and F3. - [DZ19A/0458](https://cherrywoodplans.com/application/DZ19A-0458.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (19 Jun 2020). Major redesign of Cherrywood Town Centre plot TC1, adding two supermarkets, an 11-screen cinema and much more retail space. - [DZ20A/0824](https://cherrywoodplans.com/application/DZ20A-0824.md): Lands (c. 17.01 ha), in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (11 Jan 2021). Changes the windows, balconies and frontage of Town Centre Block F2 on Cherrywood Avenue and Central Avenue. - [DZ19A/0148](https://cherrywoodplans.com/application/DZ19A-0148.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (24 Apr 2019). Amends Town Centre plot TC2 to add 47 apartments, taking Blocks C1 and C2 from 384 to 431 homes. - [DZ23A/0573](https://cherrywoodplans.com/application/DZ23A-0573.md): Lands (c. 17.03 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (19 Oct 2023). Amends the Cherrywood Town Centre permission to add 4 apartments in Blocks F2 and F3, bringing plot TC4 to 524 homes. - [D05A/1658](https://cherrywoodplans.com/application/D05A-1658.md): Tullyvale, Druids Valley, Cherrywood, Loughlinstown, Co. Dublin. Refused or withdrawn (22 Feb 2006). 396 homes in 9 buildings of 3 to 8 storeys, with a childcare facility, at Tullyvale, Druids Valley. - [DZ26A/0148/WEB](https://cherrywoodplans.com/application/DZ26A-0148-WEB.md): Townland of Laughanstown, Dublin 18, The site is bounded by Grand Parade and Western Courtyard roads. Granted (20 Jul 2026). 311 new homes and a crèche in buildings of 3 to 6 storeys between Grand Parade and Western Courtyard. - [D04A/1013](https://cherrywoodplans.com/application/D04A-1013.md): Laughanstown/Cherrywood, With Access From N11, Wyattville Road, Co. Dublin.. Refused or withdrawn (9 May 2005). Seeks to keep modified land shaping and drainage works on a 36-hectare site at Laughanstown/Cherrywood and further alter them. - [D05A/0162](https://cherrywoodplans.com/application/D05A-0162.md): Druid Valley, Cherrywood, Loughlinstown, Co, Dublin.. Refused or withdrawn (7 Apr 2005). Builds 805 apartments and homes plus a crèche across 50 buildings at Druid Valley, Cherrywood. - [DZ26A/0151/WEB](https://cherrywoodplans.com/application/DZ26A-0151-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18.. Granted (24 Jun 2026). 188 new homes, a mix of apartments, two-level units and houses, beside Tully Park off Bishop Street. - [DZ22A/0133](https://cherrywoodplans.com/application/DZ22A-0133.md): Townlands of Laughanstown and Cherrywood, Dublin 18. Granted (22 Nov 2022). Builds 163 homes, a mix of apartments, triplexes, maisonettes and houses, beside Tully Park. - [DZ25A/0152/WEB](https://cherrywoodplans.com/application/DZ25A-0152-WEB.md): Land in the townland of Laughanstown, Dublin 18, located north-west of the Tullyvale residential development.The application relates to development in. Granted (11 Jul 2025). Amends an earlier housing permission to shrink the planned basement car park to 13 spaces. - [DZ21A/0414](https://cherrywoodplans.com/application/DZ21A-0414.md): Townland of Laughanstown, Dublin 18. Granted (5 May 2022). 107 new homes, a mix of apartments and houses, north-west of Tullyvale. - [DZ15A/0758](https://cherrywoodplans.com/application/DZ15A-0758.md): in the townlands of Cherrywood, Laughanstown, Brennanstown, Loughlinstown and Glebe, Dublin 18. Granted (16 Aug 2016). Phase 1 roads for Cherrywood: about 5.4km of new and upgraded roads including Grand Parade, Castle Street and Bishop Street. - [D04A/1211](https://cherrywoodplans.com/application/D04A-1211.md): Cherrywood Road Bus Stop, (opposite Lucent), Loughlinstown, Co. Dublin. Refused or withdrawn (29 Jun 2005). Installs a steel and glass bus shelter with two lit advertising panels on Cherrywood Road. - [PC/CSDZ/013/22](https://cherrywoodplans.com/application/PC-CSDZ-013-22.md): Cherrywood Strategic Development Zone, Co. Dublin. Granted (13 Jun 2022). Creates a natural green walking route through Cherrywood from Bride's Glen to Brennanstown. - [DZ26B/0366/WEB](https://cherrywoodplans.com/application/DZ26B-0366-WEB.md): 10 Domville Square, Cherrywood, Dun Laoghaire, Dublin 18, D18H7WA. Granted (14 Aug 2026). Adds a small glass conservatory to the rear of a house at Domville Square. - [DZ26B/0360/WEB](https://cherrywoodplans.com/application/DZ26B-0360-WEB.md): 10, Domville Square, Cherrywood, Dun Laoghaire, Dublin 18, D18H7WA. Refused or withdrawn (24 Jun 2026). A small glass conservatory added to the back of a house on Domville Square. - [DZ20A/0946](https://cherrywoodplans.com/application/DZ20A-0946.md): Lands known as Tully Park (c12.9HA), Laughanstown, Dublin 18. Granted (18 Feb 2021). Revises part of the permitted Tully Park, moving the café kiosk, redesigning the playground and adding a raised boardwalk. - [DZ15A/0813](https://cherrywoodplans.com/application/DZ15A-0813.md): Laughanstown, Dublin 18, (Tully Park). Granted (13 Jul 2016). Creates Tully Park, a 12.9-hectare public park with a playground, café kiosk and nature trails. - [DZ25A/0325/WEB](https://cherrywoodplans.com/application/DZ25A-0325-WEB.md): In the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18. Granted (15 Jan 2026). 121 apartments in two blocks of 3 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ25A/0102/WEB](https://cherrywoodplans.com/application/DZ25A-0102-WEB.md): In the Townlands of Laughanstown, in Cherrywood, Dublin 18. Granted (26 May 2025). Amends a permitted 200-apartment scheme in Macnebury to drop its basement and cut car parking from 241 to 160 spaces. - [DZ24A/1024/WEB](https://cherrywoodplans.com/application/DZ24A-1024-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood,, Dublin 18. Granted (1 May 2025). Amends a permitted Macnebury apartment scheme to cut car parking from 312 to 213 spaces and add bike, bin and storage buildings, with no change to the homes. - [DZ25A/0008/WEB](https://cherrywoodplans.com/application/DZ25A-0008-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18. Refused or withdrawn (6 Feb 2025). Amends a permitted 200-apartment scheme in Macnebury to drop its basement and cut car parking from 241 to 160 spaces. - [DZ24A/1016/WEB](https://cherrywoodplans.com/application/DZ24A-1016-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18. Refused or withdrawn (3 Jan 2025). Amends a permitted Macnebury development by removing its basement and cutting car parking from 241 to 160 spaces. - [DZ24A/0017](https://cherrywoodplans.com/application/DZ24A-0017.md): Townlands of Laughanstown and Cherrywood, Macnebury - Development Area 7 - Cherrywood, Dublin 18. Granted (11 Jun 2024). 200 apartments in three blocks of 4 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ23A/0811](https://cherrywoodplans.com/application/DZ23A-0811.md): In the Townlands of Laughanstown and Cherrywood. Macnebury, Development Area 7 , Cherrywood, Dublin 18. Refused or withdrawn (4 Jan 2024). 200 apartments in three blocks of 4 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ22A/1021](https://cherrywoodplans.com/application/DZ22A-1021.md): Lands within Development Area 7 - Macnebury, including part of the Res 3 plot known as M1 located south of Bishop Street, west of Cherrywood Avenue, east and north of the proposed Beckett Road, Laughanstown, Dublin 18. Granted (27 Jun 2023). 283 new homes, mostly apartments in four blocks of 4–5 storeys, plus a crèche, south of Bishop Street in Macnebury. - [DZ25A/0543/WEB](https://cherrywoodplans.com/application/DZ25A-0543-WEB.md): Dlr Properties Limited, Hibernia House, Cherrywood Business Park, Dublin 18, D18E440. Granted (28 Aug 2025). Hibernia House in Cherrywood Business Park changes from offices to a medical centre with a pharmacy. - [DZ16A/0535](https://cherrywoodplans.com/application/DZ16A-0535.md): Hibernia House, Cherrywood Business Park, Loughlinstown, Dublin 18. Granted (9 Sep 2016). Puts up two high-level lit 'evros' signs on Hibernia House, Cherrywood Business Park. - [D09A/0146](https://cherrywoodplans.com/application/D09A-0146.md): Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (23 Apr 2009). Fills in atrium spaces in Building AA at Cherrywood Business Park, adding 269 sq.m and 5 parking spaces. - [D02A/0424](https://cherrywoodplans.com/application/D02A-0424.md): Cherrywood Science & Technology Park,, Cherrywood, Loughlinstown, Co. Dublin.. Granted (10 Jul 2002). Allows two permitted three-storey science and technology buildings, AA and AB, to be used instead for office-based industry. - [D06A/1660](https://cherrywoodplans.com/application/D06A-1660.md): Park One, Cherrywood Science And Technology Park, Loughlinstown, Co. Dublin.. Granted (6 Mar 2007). Completes the distributor road through Park One at Cherrywood Business Park, letting overhead power lines go underground. - [DZ19A/1022](https://cherrywoodplans.com/application/DZ19A-1022.md): On a site of 0.625ha, Dell Technologies, Block AB, Cherrywood Business Park, Cherrywood, Dublin 18. Granted (25 Feb 2020). Replaces two lit signs on the Dell Technologies building, Block AB, Cherrywood Business Park. - [DZ17A/0466](https://cherrywoodplans.com/application/DZ17A-0466.md): Block AB of CHerrywood, Science and Technology Park, Loughlinstown, Dublin 18. Granted (13 Jul 2017). Replaces signs at Block AB, Cherrywood Business Park, with two lit wall signs and a totem sign. - [D06A/1972](https://cherrywoodplans.com/application/D06A-1972.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Refused or withdrawn (20 Feb 2007). Builds a new eight-storey office building with a café/bar, linked to Block AC on the Wyattville Link Road. - [D04A/0924](https://cherrywoodplans.com/application/D04A-0924.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (25 Aug 2005). A gateway office building of 6 storeys rising to 10 at one end, with a bar and café, on the Wyattville Link Road at Cherrywood Science & Technology Park. - [DZ22A/0342](https://cherrywoodplans.com/application/DZ22A-0342.md): Building 3, (formerly known as Block AC), Cherrywood Business Park, Cherrywood, Dublin 18, D18TF72. Refused or withdrawn (27 Mar 2023). New design for the north facade of Building 3 in Cherrywood Business Park. - [D07A/0779](https://cherrywoodplans.com/application/D07A-0779.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin.. Refused or withdrawn (3 Mar 2008). A five-to-eight-storey office building with a café at Cherrywood Science & Technology Park. - [D07A/0620](https://cherrywoodplans.com/application/D07A-0620.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.. Refused or withdrawn (1 Jun 2007). Builds a new five-to-eight-storey office building with a café, linked to Block AC at Cherrywood Business Park. - [D06A/0630](https://cherrywoodplans.com/application/D06A-0630.md): Spar Retail Unit, Block D, Cherrywood Science & Technology Park, Loughlinstown, Dublin 18. Granted (12 Jul 2006). An off-licence counter added to the Spar shop in Block D of Cherrywood Science & Technology Park. - [DZ19A/0808](https://cherrywoodplans.com/application/DZ19A-0808.md): Cherrywood Business Park, Cherrywood & Loughlinstown, Co. Dublin, (Also Dublin 18). Granted (17 Dec 2019). Installs a small gas pressure regulator building in Cherrywood Business Park. - [DZ19A/0647](https://cherrywoodplans.com/application/DZ19A-0647.md): Cherrywood Business Park, Cherrywood & Loughlinstown, Co. Dublin, (Also Dublin 18). Refused or withdrawn (18 Sep 2019). Installs a small gas pressure regulator building in Cherrywood Business Park. - [DZ19A/0523](https://cherrywoodplans.com/application/DZ19A-0523.md): Cherrywood Business Park, Cherrywood & Loughlinstown, Co. Dublin, (Also Dublin 18). Refused or withdrawn (23 Aug 2019). Installs a small gas pressure regulator building in Cherrywood Business Park. - [D06A/0911](https://cherrywoodplans.com/application/D06A-0911.md): Block D, Cherrywood Science & Technology Park, Cherrywood, Loughlinstown, Co. Dublin. Granted (23 Aug 2006). Makes internal changes to the Block D office building, enclosing its entrance and adding a fire escape stairs. - [D08A/0687](https://cherrywoodplans.com/application/D08A-0687.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Refused or withdrawn (7 Aug 2008). Replacing Block D with a 5-storey office building with a large ground-floor shop at Cherrywood Science & Technology Park. - [D04A/0915](https://cherrywoodplans.com/application/D04A-0915.md): Block AC, Cherrywood Business Park, Loughlinstown, Co. Dublin.. Granted (10 Nov 2004). Enlarges the approved link between office Blocks AC and AB, adding 990 sq.m of floor space. - [DZ25A/0066/WEB](https://cherrywoodplans.com/application/DZ25A-0066-WEB.md): Building 7 The Campus, Cherrywood Avenue, Cherrywood (Glebe Townland), Co Dublin, Dublin 18, D18T8Y6. Granted (20 Mar 2025). Part of Building 7 at The Campus changes from offices to medical and dental use. - [DZ17A/0171](https://cherrywoodplans.com/application/DZ17A-0171.md): Cherrywood Business Park, Cherrywood, Dublin 18. Granted (21 Apr 2017). Seeks to keep the existing entrance and wayfinding signs at Cherrywood Business Park. - [DZ16A/0530](https://cherrywoodplans.com/application/DZ16A-0530.md): Units 2 & 4 Building 7 (previously 'Block D'), Cherrywood Business Park, Cherrywood, Loughlinstown, Co Dublin. Granted (9 Sep 2016). Changes two vacant units in Building 7, Cherrywood Business Park, into medical and dental use. - [D05A/1672](https://cherrywoodplans.com/application/D05A-1672.md): Block D, Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (13 Feb 2006). Makes small changes to Block D, enlarging a ground-floor shop and trimming the offices. - [DZ17A/0161](https://cherrywoodplans.com/application/DZ17A-0161.md): Lands (site area c.0.95ha) in the townland of Laughanstown, Dublin 18. Granted (12 Dec 2017). Sets up a temporary concrete plant for 7 years to supply the building of Cherrywood. ## Links - [This page on CherrywoodPlans](https://cherrywoodplans.com/application/DZ18A-0499) - [Council record, documents and conditions (DLR planning portal)](https://planning.agileapplications.ie/dunlaoghaire/application-details/79035) - [All Cherrywood applications](https://cherrywoodplans.com/applications.md) _Source: Dún Laoghaire–Rathdown County Council planning data, refreshed daily. CherrywoodPlans is an independent site, not run by the council._