# Planning application DZ18A/1129 > Site (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8), Cherrywood, Dún Laoghaire–Rathdown. Granted (4 Feb 2019). - **Reference:** DZ18A/1129 - **Address:** Site (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8) - **Status:** Granted (4 Feb 2019) - **Decision:** GRANT PERMISSION - **Application type:** Permission (SDZ) - **Applicant:** Hines Cherrywood Development Fund ICAV - **Lodged:** 3 Dec 2018 - **Decided:** 4 Feb 2019 - **Location (lat, lng):** 53.249952, -6.163614 ## Proposal All associated infrastructure connections, hard and soft landscaping with seating, boundary treatments and all associated ancillary and site development works. This application includes development within the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014, as Amended. ## In plain English Builds a drainage basin and regrades a future school site in Laughanstown. - **0.95** hectares ### What's planned A stormwater detention basin on a **0.95**-hectare site, with ground levels reshaped for a future school. ### Environment The basin drains to the Ticknick stream, a temporary pond is filled in, and a new outfall pipe serves the Beckett Park drainage system. Landscaping with seating. _This summary was written by AI from the proposal text. Check the council record before relying on it._ ## Conditions ### Condition 1 The development to be carried out in its entirety in accordance with the plans, particulars and specifications lodged with the application save as may be required by the other conditions attached hereto. Reason: To ensure that the development shall be in accordance with the permission and that effective control be maintained. 2. Prior to commencement of development the developer shall submit for the written agreement of the Planning Authority, all drawings in digital format (CAD/GIS) projected to ITM (Irish Transverse Mercator). This information should include the following: i. Overall site plans in DWG format (ITM projection in metres). ii. Site sections and elevations in PDF format. Reason: To ensure consistency with Section 7.4 of the Cherrywood Planning Scheme. 3. The proposed development shall accord with the relevant conditions of Reg. Ref. DZ15A/0758 and DZ15A/0814 except where superseded by this application. Reason: To ensure consistency with the Cherrywood Planning Scheme, in the interest of clarity, and to ensure that effective control be maintained. 4. Archaeological Monitoring of the proposed development shall be carried out. The Archaeological Monitoring shall consist of the following: (a) The developer shall engage the services of a suitably qualified archaeologist to monitor site clearance, spoil deposition and groundworks within the red line area to the west of ‘Mercer Road’ as indicated on the submitted drawing ‘CWBO-100-01-PL1’ (Site Layout Plan). (b) Should archaeological material be found during the course of monitoring, the archaeologist may have work on the site stopped pending a decision as to how best to deal with the archaeology. The developer shall consult the Department of Culture, Heritage and the Gaeltacht with regard to any necessary mitigating action (e.g. preservation in situ, and/or excavation). The developer shall facilitate the archaeologist in recording any material found. Any proposals for preservation in situ shall include appropriate proposals for associated directional signage. (c) The Planning Authority and the Department of Culture, Heritage and the Gaeltacht shall be furnished with a report describing the results of the monitoring. Reason: To ensure consistency with Specific Objective H 2 of the Planning Scheme and the continued preservation (either in situ or by record) of places, caves, sites, features or other objects of archaeological interest. 5. The developer shall comply with the following during the construction period: (a) The site development works and construction works shall be carried out in such a manner as to ensure that the adjoining public roads are kept clear of debris, soil and other material and if the need arises for cleaning works to be carried out on the adjoining public roads, the said cleaning works shall be carried out at the developer’s expense. (b) Suitable facilities for vehicle cleansing and wheel washing, to the satisfaction of the Area Engineer, shall be provided on site. (c) Adequate on-site car parking facilities, to the satisfaction of the Planning Authority, shall be made available for site workers during the course of construction. (d) All footpaths and roads affected by the development works shall be maintained in a safe and tidy condition to the satisfaction of the Area Engineer. (e) Sprinklers shall be used on any on-site mobile crusher, which shall not be used within 200 metres of sensitive receptors. (f) The spraying of any exposed earthworks shall include sufficient mobile bowser units. (g) The normal working hours within the site shall be Monday to Friday between 08:00 and 19:00 hours and Saturday between 08:00 and 14:00 hours with no working on Sunday and public holidays. The contractor will not be permitted to start work each day before 08:00 hours. Deviation from these times will only be allowed in exceptional circumstances where prior written approval has been received from the planning authority. This should be addressed in the Community Liaison Plan. (h) Construction staff shall be prohibited from parking on public roads. Parking for construction staff shall be provided by the developer/contractor within the construction site compound. (i) Construction vehicles shall not be permitted to park or wait on roads outside the site boundary. All parking and waiting areas shall be provided by the developer/contractor within the site boundary. (j) The construction of the development shall be managed in accordance with a final Construction Management Plan, which shall be submitted for the development in its entirely to the Planning Authority for agreement in writing, prior to commencement of any development. In this regard the final Construction Management Plan shall include a Community Liaison Plan, a Construction Traffic Management Plan, an Environmental Management Plan and a Construction and Demolition Waste Management Plan. (k) The site archaeologist engaged by the developer shall be consulted in writing during the drafting of the Construction Management Plan to ensure no impact on archaeological resources by spoil deposition or traffic heavy plant. (l) Prior to the commencement of development, a mechanism and structure for on-site monitoring, reporting on progress and quality control to the Planning Authority in relation to construction standards, materials, as-built drawings and records shall be agreed in writing with the Planning Authority. Reason: To ensure consistency with Section 2.14 of the Cherrywood Planning Scheme and in the interests of orderly development, proper planning, sustainable development of the area and to mitigate against adverse impacts on nearby residents. 6. The developer shall comply with the following: a) Prior to the commencement of development, or as otherwise agreed with the Planning Authority, the developer shall submit the following for agreement in writing with the Planning Authority: (i)All hydraulic calculations and engineering drawings of the proposed surface water layout, representative of the final detailed design and inclusive of the following: I.Windes design criteria, referenced and commensurate with drawings, of the storm water network. II. Details of all inflow and outflow controls, including how any surcharged outfall conditions are applied in the model. (ii) An updated operations and maintenance plan for all the proposed sustainable drainage systems (SuDS) components and drainage infrastructure to be taken in charge, with particular detail on the inverted syphon arrangement. (iii) Details on proposed methods for interception of runoff and a demonstration of compliance with Criterion 1 – River Water Quality, Table 6.3 of the GDSDS. (iv)Details on the accommodation of exceedance flows, in accordance with Specific Objective PI9 of the Cherrywood Planning Scheme. b) Discharge from the subject development shall be limited to 1 l/s/ha unless otherwise agreed with Dun Laoghaire Rathdown County Council. c) A Stormwater Audit shall be carried out at Stage 2 for the detailed design stage in accordance with PI 7 of the Cherrywood Planning scheme. The audit shall be carried out at the developer’s expense. An independent audit team shall be used and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the commencement of development, unless otherwise agreed. d) A Stormwater Audit shall be carried out at Stage 3 for the post construction / prior to commisioning stage in accordance with PI 7 of the Cherrywood Planning scheme. The audit shall be carried out at the developer’s expense. An independent audit team shall be used and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 3 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the commissioning of the outfalls. Reason: In the interests of proper stormwater management and to be in accordance with the Cherrywood Planning Scheme. 7. Taking in charge drawings shall be submitted and agreed in writing with the Planning Authority, prior to the commencement of development. The Taking in Charge drawings shall show: (i) the red line site boundary for the development, (ii) any open space areas that are proposed by the developer for taking in charge, (iii) the surface water attenuation infrastructure that is proposed by the developer for taking in charge Reason: To ensure adherence to DLRCC Standards for Taking in Charge, In the interests of orderly development, proper planning, sustainable development and the amenity of the area. 8. Prior to the commencement of development the developer shall retain the professional services of a qualified Landscape Architect, as his/her Landscape Consultant, throughout the course of the development works and shall notify the Planning Authority of that appointment in writing prior to commencement. The developer shall engage the Landscape Consultant to procure, oversee and supervise the landscape contract for the implementation of the permitted landscape proposals. When all landscape works are inspected and completed to the satisfaction of the Landscape Consultant, he/she shall prepare, sign and submit a Practical Completion Certificate (PCC), as verification that approved landscape plans and specification have actually been fully implemented. Reason: To ensure consistency with Specific Objectives GI 2, GI 3, GI 4 and GI 7 of the Cherrywood Planning Scheme. 9. Prior to commencement of development of landscape areas the developer shall provide the following for the written agreement of the Planning Authority:- (a) Revised landscape proposals in the form of soft landscaping planting plans omitting and relocating all trees/whips from the areas where underground infrastructure is proposed. Planting plans shall include for additional and appropriately located larger specimen trees (minimum size – extra heavy standard). (b) Details of soft landscape design to include detailed Planting Plan(s) and Planting Schedule - as appropriate - stating species/varieties, approximate quantities, sizes, rootball presentation and spacings. Planting mixes should specify a diverse range of species/varieties/cultivars and a diversity of forms and plant sizes (multi-stems, feathered, semi-matures, etc.) using both native and exotic species and pollinator-friendly native species (in accordance with the All-Ireland Pollinator Plan 2015-2020), all designed to provide vegetation that is visually-appealing, bio-diverse, and easily managed. (c) The Arboricultural Assessment and the Tree Protection Plan indicates retention of 2 no. ash trees. These trees are omitted from the submitted Landscape Plan layout drawing (Sheet No. 1728-BPO_PL_P_01). Prior to commencement of development a revised Landscape Plan layout drawing shall be submitted showing these ash trees retained. Reason: To ensure full and verifiable implementation of the approved landscape design proposals for the permitted development, to the approved standards and specification and to ensure consistency with the Cherrywood Planning Scheme 10. The developer shall comply with the following requirements: a) Prior to the commencement of development, the developer shall provide, for the written agreement of the Planning Authority, a detailed Construction Environmental Management Plan (CEMP). b) The construction of the development shall be managed in accordance with the CEMP. The CEMP shall be submitted for the development in its entirely or on a phased basis to the Planning Authority for agreement in writing, prior to commencement of development. c) The CEMP shall detail how all significant elements of the construction works with potential to cause significant environmental effects particularly in relation to surface water runoff, noise, lighting, air quality and traffic will be managed in accordance with relevant environmental requirements, best practice and with the planning permission including conditions. d) The CEMP shall include clear and transparent monitoring and reporting proposals with appropriate triggers levels and remedial actions to ensure that emissions do not exceed applicable standards. e) The CEMP shall also include community liaison proposals which shall show how reporting of monitoring results will be made readily available in an accessible and comprehensible format to all interested parties and on a timely basis Reason: To ensure consistency with objectives G I3 and GI 19 and the Strategic Environmental Assessment of the Cherrywood Planning Scheme. 11. Prior to the commencement of development, the developer shall engage the services of a qualified arborist as an Arboricultural Consultant for the entire period of construction. The applicant shall inform the planning authority in writing of the appointment and name of the Consultant, prior to commencement of development. The Arboricultural Consultant shall ensure the implementation of all of the recommendations in the submitted Tree Report. The applicant shall implement all the recommendations pertaining to tree retention, tree protection and tree works, as detailed in the Arboricultural Assessment and Tree Protection Plan. The arborist shall carry out a post construction tree survey and assessment on the condition of the retained trees. A Completion Certificate is to be signed off by the arborist when all permitted development works are practically complete, and in line with the recommendations of the tree report. Reason: To ensure consistency with Section 5.4.7 of the Planning Scheme and give practical effect to the retention, protection and sustainability of trees during and after construction of the permitted development. 12. Prior to the commencement of development, the developer shall engage the services of a qualified ecologist as an ecological consultant, from the commencement of construction and for the duration of the monitoring requirements as set out in section 5 of the submitted Habitat Management Plan and shall inform the Planning Authority in writing of the appointment and name of the consultant. The ecologist shall consult with the National Parks and Wildlife Services prior to the commencement of the construction works. Reason: To ensure consistency with Specific Objective GI 46 of the Planning Scheme. 13. The developer shall comply with the following: a) The development shall be carried out in accordance with the mitigation measures as detailed within Section 4 of the Fisheries Protection Method Statement. b) Any topsoil material which is to be stored on site must have mitigations in place to prevent any deleterious material entering the surface water network. Drainage from the topsoil storage area may need to be directed to a settlement area for treatment. Proposals in this regard shall be submitted to the Planning Authority for written approval together with documentary evidence of consultation between the developer and Inland Fisheries Ireland prior to submission of the compliance submission. c) Installation method statements for the permitted surface water outfalls shall be submitted to the Planning Authority for written approval together with documentary evidence of consultation between the developer and Inland Fisheries Ireland prior to submission of the compliance submission. Reasons: To ensure consistency with Specific Objectives GI 57 and GI 58 of the Cherrywood Planning Scheme, and for the proper planning and sustainable development of the area. 14. (a) The actions contained in Table 1 (Objectives and actions for habitats relevant to the HMP) of the Habitat Management Plan shall be implemented. (b) The mitigation measures set out in Section 7 (Impacts and Mitigation) of the Ecological Impact Assessment shall be carried out in full. (c) The 20 no. measures cited in Section 4 (Site Specific Actions) of the Fisheries Protection Method Statement shall be carried out in full. Reason: In the interests of the protection of flora and fauna and the proper planning and sustainable development of the area. ## Nearby applications - [DZ15A/0814](https://cherrywoodplans.com/application/DZ15A-0814.md): Laughanstown, Dublin 18, (Beckett Park). Granted (13 Jul 2016). Beckett Park: a new 5.1-hectare public park in Tully with a sports pitch, tennis courts, playground and pavilion café. - [DZ24A/0686/WEB](https://cherrywoodplans.com/application/DZ24A-0686-WEB.md): Townlands of Laughanstown, and Brennanstown, Dublin 18. Refused or withdrawn (4 Sep 2024). Amends a permitted Tully scheme to add 4 apartments by raising part of Apartment Building 1 to 4 storeys. - [DZ23A/0028](https://cherrywoodplans.com/application/DZ23A-0028.md): Townlands of Laughanstown and Brennanstown, Dublin 18. Granted (8 Dec 2023). 56 new homes and a 3-storey childcare centre on tile T13 beside Beckett Park and Castle Street in Tully. - [DZ23A/0005](https://cherrywoodplans.com/application/DZ23A-0005.md): Site in the the townlands of Laughanstown and Brennanstown, Castle Street, Barrington's Road, Dublin 18. Granted (7 Jul 2023). 89 new homes (houses and two-level apartments) and a crèche off Castle Street and Barrington's Road. - [DZ26A/0252/WEB](https://cherrywoodplans.com/application/DZ26A-0252-WEB.md): A site in the townlands of Brennanstown and Laughanstown, Dublin 18. The main development site forms part of ‘Development Area 3. Granted (7 Oct 2026). 343 apartments in 8 blocks of up to 5 storeys off Castle Street in Priorsland. - [DZ23A/0120](https://cherrywoodplans.com/application/DZ23A-0120.md): Site in the townlands of Laughanstown and Brennanstown, Castle Street, Barrington's Road, Dublin 18. Refused or withdrawn (29 Jan 2024). 240 build-to-rent apartments in 6 blocks of 2–4 storeys in Priorsland, off Castle Street. - [ABP31332222](https://cherrywoodplans.com/application/ABP31332222.md): Priorsland, Within the Townsland of Carrickmines Great and Brennanstown, Dublin 18. Refused or withdrawn (20 Nov 2024). A new village centre at Priorsland with 443 homes, a supermarket, shops, crèche and the first phase of a public park. - [DZ21A/0677](https://cherrywoodplans.com/application/DZ21A-0677.md): site of c.8.751 ha located at Priorsland, located within the townlnds of Carrickmines Great and, Brennanstown, Dublin 18. The site comprises lands north and south of the carrickmines Stream and, adjacent Carrickmines Luas Park & Ride.. Refused or withdrawn (15 Sep 2021). Builds a new village centre at Priorsland with 445 homes, a supermarket, shops, crèche and offices beside Carrickmines Luas. - [DZ20A/0399](https://cherrywoodplans.com/application/DZ20A-0399.md): Townlands of Laughanstown and Brennanstown, Tully Development Area 8, Cherrywood, Dublin 18. Granted (22 Jan 2021). 136 new homes, mostly houses and two-level apartments, in Tully between Castle Street and the Luas, plus the Castle Street extension. - [DZ24A/0696/WEB](https://cherrywoodplans.com/application/DZ24A-0696-WEB.md): Townlands of Laughanstown, and Brennanstown, Dublin 18. Granted (29 Oct 2024). Amends a permitted Tully scheme to add 4 apartments by raising part of Apartment Building 1 to 4 storeys. - [DZ23A/0812](https://cherrywoodplans.com/application/DZ23A-0812.md): Townlands of Laughanstown & Brennanstown, Dublin 18. Granted (14 Feb 2024). Amends a permitted housing scheme at L1 West to change the internal layouts of its 4-bed houses and move the site compound. - [DZ23A/0468](https://cherrywoodplans.com/application/DZ23A-0468.md): Townlands of Laughanstown and Brennanstown, Dublin 18. Granted (9 May 2024). Amends a permitted Lehaunstown scheme to rearrange units, add 4 homes (488 to 492) and move a temporary crèche. - [DZ23A/0354](https://cherrywoodplans.com/application/DZ23A-0354.md): Townlands of Laughanstown and Brennanstown, Dublin 18. Refused or withdrawn (23 Jun 2023). Amends a permitted Lehaunstown scheme to rearrange units and add 4 homes, taking it from 488 to 492. - [D10A/0104](https://cherrywoodplans.com/application/D10A-0104.md): Carrickmines Substation Barringtontowers, Brennanstown Road, Carrickmines, Co. Dublin. Refused or withdrawn (15 Apr 2010). Seeks to keep an electrical substation built to power the Luas Green Line extension near Brennanstown Road. - [DZ21A/1069](https://cherrywoodplans.com/application/DZ21A-1069.md): The overall site area of this application is approximately 8.7Ha. Townlands of Laughanstown and Brennanstown Dublin 18. Granted (2 Feb 2022). Minor changes to a permitted 136-home scheme in Tully so it can be built and occupied in phases. - [D11A/0127](https://cherrywoodplans.com/application/D11A-0127.md): Carrickmines Substation, Barrington Tower, Brennanstown Road, Cabinteely, Dublin 18. Granted (29 Nov 2011). Seeks to keep an electrical substation built to power the Luas Green Line extension near Brennanstown Road. - [DZ20A/0690](https://cherrywoodplans.com/application/DZ20A-0690.md): Site area of 9.77, in townlands of Laughanstown Brennanstown and Cherrywood, Dublin 18. Refused or withdrawn (3 Nov 2020). 152 new homes, mostly apartments plus houses, off Barrington's Road and Castle Street in Lehaunstown. - [DZ21A/0664](https://cherrywoodplans.com/application/DZ21A-0664.md): Site in the Townlands of, Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (5 May 2022). 47 apartments in a 4-storey block off Castle Street in Tully. - [DZ22A/0729](https://cherrywoodplans.com/application/DZ22A-0729.md): Townlands of, Laughanstown, Brennanstown and, Cherrywood, Dublin 18. Granted (22 Sep 2023). 57 new homes, houses and 3-bed two-level apartments, off Gun and Drum Hill Road in Tully. - [DZ22A/0623](https://cherrywoodplans.com/application/DZ22A-0623.md): On Lands Development ,Plot T 11, Area 8 (Tully), Cherrywood SDZ, Laughanstown, Dublin 18. Granted (18 Jan 2023). 49 new houses on plot T11 west of Castle Street in Tully. - [DZ26A/0750/WEB](https://cherrywoodplans.com/application/DZ26A-0750-WEB.md): Unit B, Mercer Way, Tully Village Centre West, Dublin 18, D18C58F. Refused or withdrawn (7 Oct 2026). Combines two permitted shop units at Tully Village Centre into one convenience store with an off-licence. - [DZ22A/0770](https://cherrywoodplans.com/application/DZ22A-0770.md): On Lands Development Area 8 (Tully), Cherrywood SDZ, Laughanstown, Dublin 18. Granted (22 Mar 2023). 71 homes, a crèche, shops and a community room on plot T11 west of Castle Street in Tully village centre. - [DZ23A/0455](https://cherrywoodplans.com/application/DZ23A-0455.md): Area 8 (Tully) Cherrywood SDZ Lands, Laughanstown, Dublin 18. Granted (27 Oct 2023). Amends a permitted Tully housing scheme to provide 5 three-bed houses on Mercer's Road in place of 5 homes dropped by condition. - [D07A/0161](https://cherrywoodplans.com/application/D07A-0161.md): Barrington Tower, Brennanstown Road, Cabinteely, Dublin 18. Granted (23 Jan 2008). 158 homes, mostly apartments in a 5-storey building plus houses, in the grounds of Barrington Tower on Brennanstown Road. - [DZ25A/0014/WEB](https://cherrywoodplans.com/application/DZ25A-0014-WEB.md): Townlands of Laughanstown & Brennanstown, Dublin 18. Granted (3 Mar 2025). Amends the permitted Tully village centre (plot T1) to shrink the basement, cutting car parking from 210 to 157 spaces. - [DZ23A/0106](https://cherrywoodplans.com/application/DZ23A-0106.md): Lands in the Townlands of Laughanstown and Brennanstown, Dublin 18. Granted (22 Sep 2023). A village centre at Tully with a supermarket, shops, cafés and 139 build-to-rent apartments in two blocks of 3–5 storeys. - [DZ19A/0683](https://cherrywoodplans.com/application/DZ19A-0683.md): Off Glenamuck Road, adjacent to Carrickmines roundabout, and the Carrickmines M50 interchange, Dublin. Granted (8 Nov 2019). Allows the existing 350-space Carrickmines Luas park and ride to continue for 3 more years. - [DZ16A/0585](https://cherrywoodplans.com/application/DZ16A-0585.md): Off Glenamuck Road, adjacent the Carrickmines roundabout and M50 interchange Carrickmines Dublin. Granted (26 Sep 2016). Keeping the 350-space Carrickmines park and ride for another 3 years. - [D10A/0164](https://cherrywoodplans.com/application/D10A-0164.md): Carrickmines(Priorsland), East Of Glenamuck Road, North Of M50, & South Of Luas Line B1 (Currently under construction). Granted (23 Sep 2010). A temporary 350-space park and ride beside Carrickmines roundabout to serve the Luas extension to Cherrywood. - [DZ16A/0531](https://cherrywoodplans.com/application/DZ16A-0531.md): Glenellen, Lehaunstown Lane, Cabinteely, Dublin 18. Granted (1 Sep 2016). Demolishes the house Glenellen and its outbuildings on Lehaunstown Lane. - [DZ20A/0585](https://cherrywoodplans.com/application/DZ20A-0585.md): on a site in the Townlands of Laughanstown and Cherrywood, Dublin 18. Refused or withdrawn (2 Jun 2021). A temporary sales and marketing suite with 8 parking spaces for just under 5 years off Gun and Drum Hill Road. - [D18B/0189](https://cherrywoodplans.com/application/D18B-0189.md): Jamilah, 13 Brennanstown Vale, Cabinteely, Dublin 18. Granted (14 Jun 2018). Adds a single-storey rear extension with a bay window to a house at Brennanstown Vale. - [D04B/0806](https://cherrywoodplans.com/application/D04B-0806.md): Jamilah, 13, Brennanstown Vale, Cabinteely, Dublin 18. Granted (11 Jan 2005). Two-storey side extensions and a front porch at a house on Brennanstown Vale. - [ABP31328122](https://cherrywoodplans.com/application/ABP31328122.md): site of c.3.81 ha at Winterbrook and Barrington Tower, Brennanstown Road, Dublin 18. Refused or withdrawn (12 Sep 2024). Builds 534 build-to-rent apartments in 8 blocks of up to 10 storeys at Winterbrook and Barrington Tower, restoring the tower itself. - [DZ17A/0114](https://cherrywoodplans.com/application/DZ17A-0114.md): Lands at Priorsland, Glenamuck Road North, Carrickmines, Dublin 18. Granted (8 Feb 2018). A permanent 350-space multi-storey park and ride beside Carrickmines roundabout, replacing the temporary one. ## Links - [This page on CherrywoodPlans](https://cherrywoodplans.com/application/DZ18A-1129) - [Council record, documents and conditions (DLR planning portal)](https://planning.agileapplications.ie/dunlaoghaire/application-details/81095) - [All Cherrywood applications](https://cherrywoodplans.com/applications.md) _Source: Dún Laoghaire–Rathdown County Council planning data, refreshed daily. CherrywoodPlans is an independent site, not run by the council._