# Planning application DZ19A/0458 > 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin), Cherrywood, Dún Laoghaire–Rathdown. Granted (19 Jun 2020). - **Reference:** DZ19A/0458 - **Address:** 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin) - **Status:** Granted (19 Jun 2020) - **Decision:** GRANT PERMISSION - **Application type:** Permission (SDZ) - **Applicant:** Hines Cherrywood Development Fund ICAV - **Lodged:** 12 May 2020 - **Decided:** 19 Jun 2020 - **Location (lat, lng):** 53.243908, -6.146549 ## Proposal Amendments/ modifications to the permitted development on plot TC1 and associated basement Levels BM, B1 and B2 shared with TC2 and specifically Blocks B1, B2, B5 and B6 as permitted under the Cherrywood Town Centre development Reg. Ref. DZ17A/0862 (as modified by Reg. Refs. DZ18A/1058 , DZ18A/1178 and DZ19A/0148) and includes the development of a new mixed use urban block, Blocks B3/ B4 and associated amendments at basement Levels BM, B1, B2 and provision of a new basement Level B3. No amendments/ modifications are proposed to the permitted Blocks A1 , A2 , A3 within TC1 . The overall effect of the amendments/ modifications is to reconfigure the permitted block and basement layouts and adjoining streets and squares , amend the block elevations and increase the overall gross floor area (GFA) of the development permitted within TC1 from 72,675sq.m to 95,644sq.m including increase retail GFA from 17,541sq.m to 33,737sq.m , increase High Intensity Employment (HIE) GFA from 9,026sq.m to 9,610sq.m, increase non retail GFA from 12,632sq.m to 18,689sq.m. and increase community GFA from 1,400sq.m to 1,449sq.m The permitted number of residential units (365no.) within TC1 remains unchanged . Residential GFA increases from 32,076sq.m to 32,179sq.m to accommodate revised access and lobby arrangements at Levels BM, B2 and at Level 0. The proposed revisions/ modifications are described on a block by block basis as follows : - Block B1 (14,251sq.m): Reconfiguration of previously permitted retail and non-retail units and HIE floorspace to provide 10no. retail units and associated ancillary areas totalling 6,466sq.m over 2 levels; 6no. non retail units and associated ancillary areas totalling 3,344sq.m over 2/3 levels comprising 4no. financial/ professional/ other services units totalling 341sq.m, a foodhall of 1,920sq.m and 2no. restaurant/ bar units of 727sq.m with terrace at Level 2 and all associated ancillary areas totalling 356sq.m. The revised HIE uses including revised basement and ground floor entrance and lobby areas consists of office accommodation and associated ancillary accommodation totalling 4,441sq.m in 3 levels above 2 levels of retail and non-retail uses (i.e. 5 levels in total). The reconfigured Block B1 also includes the previously permitted Park and Ride entrance/ lobby area with lift access (Ref. Ref. DZ18A/1058), revised lift/ stair cores and revised escalator/ travellator arrangements, revised floor levels within HIE floorspace at Levels 2, 3 and 4 and all associated elevational amendments. Block B2 (8,136sq.m): Reconfiguration of previously permitted retail and non-retail units to provide 13no. retail units and associated ancillary areas totalling 4,079sq.m at ground floor level, 16no. non retail units and associated ancillary areas totalling 4,415sq.m over 2 levels comprising 1no. restaurant/ bar unit of 279sq.m at ground floor level, 14no. restaurant/ bar units at Level 1 in a Foodcourt arrangement totalling 2,686sq.m and a children's play area of 230sq.m with associated ancillary areas totalling 1,220sq .m with revised lift/ stair cores and escalator arrangements and all associated elevational amendments including pedestrian link bridge to Block B6 at Level 1. Block B3/ B4 (23,247sq.m): A new mixed use urban block accommodating 2no. supermarkets with off licence sales areas (totalling 4,565sq.m net retail floorspace) and 4no. retail units and associated ancillary areas totalling 6,044sq.m, 5no. non retail units comprising 3no. restaurant/ bar units totalling 401sq.m and 2no. financial/ professional/ other services units totalling 149sq.m and all associated ancillary areas totalling 83sq.m, with associated services and loading areas and revised cycle parking and car parking layout all at basement Level B1; 2no. retail units and associated ancillary areas totalling 10,673sq.m at Level 0 and Level 1, non-retail uses comprising an 11 screen cinema of 4,354sq.m at Levels 1 and 2, a gym of 471sq.m and HIE uses comprising a management suite totalling 339sq.m all at Level 2 and all associated ancillary areas totalling 253sq.m. A new non-retail restaurant/ bar unit (20sq.m) is located within the permitted Town Square West directly to the east of Block B3/ B4 and west of Block B6. Block B5 (14,273sq.m): Reconfiguration of previously permitted retail, non-retail, HIE and community uses to provide 12no. retail units and associated ancillary areas totalling 2,663sq.m over 2 levels; HIE uses consisting of revised basement and ground floor access and lobby areas and office accommodation and ancillary accommodation totalling 4,435sq.m in 3 levels above 2 levels of retail (i.e. 5 levels in total) ; non retail uses totalling 2,655sq.m over 2 levels comprising 1no. restaurant/ bar of 282sqm, a primary care centre with associated ancillary areas totalling 2,373sq.m at Levels 0 and 1; Community uses comprising a library and exhibition space and ancillary/ circulation space totalling 1,449sq.m at ground and mezzanine floor levels and revised lift/ stair cores, escalator arrangements and all associated elevational amendments. No changes are proposed to the permitted 48no. apartments (comprising 12no. studios, 24no. 1 bed and 12no. 2 bed) over 6 storeys above 2 levels of retail (i.e. 8 levels in total). Block B6 (5,264sq.m): Reconfiguration of previously permitted retail and non-retail units to provide 18no. retail units and associated ancillary areas totalling 2,732sq.m and 2no. non retail restaurant/ bar units of 200sq.m and ancillary areas of 154sq.m all at ground floor level, 2no. non retail leisure units of 1,542sq.m, 1no. retail unit of 561sq.m and associated ancillary areas totalling 75sq.m at Level 1 with associated external terrace areas. The reconfigured Block B6 will also incorporate a pedestrian link bridge to Block B2 at Level 1 revised lift/ stair cores and escalator arrangements and all associated elevational amendments. As previously permitted the pedestrian streets between Blocks B1 to B6 are covered by a building mounted glazed roof structure providing shelter to these areas. Amendments at roof level include the reconfiguration roof lights, solar panels, plant zones and green roof areas to Blocks B1, B2, B5 and B6. Terraces are provided within Blocks B1, B5 and B6. The basement footprints have been enlarged at all levels along Cherrywood Avenue and at Level B2 at the south eastern corner of TC 1. The basement layouts are revised to reconfigure and rationalise circulation, car and cycle parking, cycle parking facilities, vertical circulation, ventilation, service yards and routes and waste management facilities. A new basement Level 83 is proposed to accommodate plant and tenant facilities. The number of car parking spaces within TC1/ TC2 basements decreases from 2,986 to 2,977no. spaces. The number of cycle parking spaces within TC1/ TC2 increases from 1,643 to 1,880 spaces comprising 1,258 basement level spaces and 622 surface level spaces. Revised proposals are provided for access to basement level cycle parking spaces and facilities via 2no. pavilions on Civic Street with associated revisions to the hard and soft landscaping within this area. The car park accesses to the shared TC1/ TC2 basements from Tully Vale Road (left-in/ left-out), the entrance/ exit on Grand Parade and a dedicated service entrance from the Wyattville Link Road (WLR) are as previously permitted. The permitted entrance/ exit ramp from Cherrywood Avenue (WLR - J) is proposed to be amended by the addition of a footpath for emergency escape. The future pedestrian bridge connection from Level 1 of Block B2 over Wyattville Link Road (WLR) to Plot TC3 will be the subject of a separate future planning application. The support column within the WLR median for this future pedestrian bridge was permitted under Reg. Ref. DZ17A/0862 and remains unchanged. Permission is also sought for all ancillary uses and all site and development works associated with the above development including service infrastructure/ public utilities, internal streets and squares, Town Centre and shopfront signage, directional signage, stairs, lifts, escalators, travellators and all associated hard and soft landscaping. ## In plain English Major redesign of Cherrywood Town Centre plot TC1, adding two supermarkets, an 11-screen cinema and much more retail space. - **95,644** sq.m floor area - **33,737** sq.m retail - **365** homes (unchanged) - **2,977** car parking spaces - **1,880** bicycle spaces ### What's planned Amendments to Blocks B1–B6 of the town centre permission, including a new shopping block (B3/B4) and an extra basement level. ### Commercial Retail grows from **17,541** to **33,737** sq.m, including **2** supermarkets. Other uses include a foodhall, a food court, restaurants, a gym, an **11**-screen cinema, a primary care centre and offices of about **9,610** sq.m. ### Community A library and exhibition space of **1,449** sq.m and a children's play area of **230** sq.m. ### Residential The permitted **365** homes in TC1 are unchanged. ### Scale Total floor area rises from **72,675** to **95,644** sq.m. The streets between blocks stay covered by a glazed roof. ### Transport Shared basement car spaces drop from **2,986** to **2,977** and bicycle spaces rise from **1,643** to **1,880**. _This summary was written by AI from the proposal text. Check the council record before relying on it._ ## Conditions ### Condition 3 First Schedule Reasons and Considerations Having regard to the 2016 -2022 County Development Plan, Cherrywood Planning Scheme, as amended, AA and EIAR screening, it is considered that subject to compliance with the conditions below, the proposed development would not seriously injure the amenities of the area and would not contravene materially the zoning of the application site or that of adjoining sites subject to (26) conditions. Appropriate Assessment Screening The proposed development has been screened for AA by the Planning Authority (Planning Authority report on file) subsequent to the receipt of further information, and it has been determined that the proposed development will not significantly impact upon a Natura 2000 site. Environmental Impact Assessment Screening An Environmental Impact Assessment Report (EIAR) was prepared as part of parent application DZ17A/0862 which had regard to and built upon the Strategic Environmental Assessment prepared with the Cherrywood Planning Scheme. The EIAR considered the likely, significant and adverse effects on the receiving environment of the original Cherrywood Town Centre development proposal, of which this amendment application relates. Mitigation measures were incorporated into the design of the proposed development and the EIAR concluded that ‘There is no material or significant environmental issues arising (from the development) which were not anticipated by the Cherrywood Planning Scheme and considered in its Strategic Environmental Assessment.’ A report prepared by CAAS on behalf of the Development Agency Project Team was received on 22.05.2020 and concludes that based on the information submitted by way of Further Information by the applicant, the proposed development is now consistent with the Planning Scheme subject to conditions. The Planning Authority concurs with this assessment. Second Schedule Conditions General 1.a) Save for amendments granted on foot of this permission, and as amended by further information on the 12th May 2020, the development shall otherwise be car-ried out in strict accordance with the terms and conditions of Planning Permission Reg. Ref.DZ17A/0862 save as may be required by the other conditions attached hereto. REASON: In the interest of the proper planning and sustainable development of the area and to ensure that the proposed development is consistent with the Cherrywood Planning Scheme. b) This permission relates solely to the development, which is detailed in the public notices, which consists of revisions / modifications to a mixed-use town centre development permitted under Reg. Ref. DZ17A/0862, other than the breakdown of quanta of sqm Gross Floor area by Block. In this regard, the permission relates solely to the floor schedules and drawings prepared by Henry J Lyons Architects, submitted by way of Further Information on 12 May 2020. REASON: In the interests of clarity and consistency with the Cherrywood Planning Scheme. 2.The developer shall comply with the following: a) Prior to the occupation of 40% of the retail and 45% of employment uses within the Town Centre as a whole, the development and delivery of Grand Parade A2-A3 shall have commenced construction. Evidence of this shall be submitted to the Planning Authority. b) Prior to the occupation of 65% of the retail and 65% of employment uses, within the Town Centre as a whole, the development and delivery of Grand Parade A2-A3 shall be completed to Taking in Charge Standard. Evidence of this shall be submitted to the Planning Authority. REASON: To ensure that the proposed development is consistent with Section 7.2.2 Infrastructure Delivery and Table 7.3: Transportation Infrastructure of the Planning Scheme and in the interest of the proper planning and sustainable development of the area. 3. Prior to the completion of development, the developer shall submit for the written agreement of the Planning Authority, all drawings in digital format (CAD/GIS) projected to ITM (Irish Transverse Mercator). These shall include those for DZ17A/0862 as amended and further amended by this permission. This information should include the following: • Overall site plans in DWG format (ITM projection in metres) • Ground floor plans of buildings in DWG format (ITM projection in metres) • Site sections and elevations in PDF format. REASON: To ensure consistency with Section 7.4 of the Cherrywood Planning Scheme. Land Use & Development Type 4.The developer shall comply with the following: a) The defined retail and non-retail uses (indicated as retail, café, restaurant uses, creche, non-retail and leisure / entertainment units) on the ground floor (& lower ground floor -1) of Blocks B1, B2, B3, B4, B5,& B6 and the upper floors of B1, B2 and B6, shall be agreed in writing with the Planning Authority, prior to the commencement of the use. In this regard a schedule of units identifying each use and accompanying drawings shall also be submitted. b) Any change in the use identified in the schedule of the units referred to in a) above, within the ground floor units of Block B1, which fronts Cherrywood Square and on the upper floors of Block B1 (Food Hall) Block B2 (Street of Restaurants) and B6 (Leisure / entertainment) shall be the subject of a separate planning application. c) No amalgamation / subdivision of any unit shall take place without prior grant of permission. d) Submit, for the written agreement of the Planning Authority, prior to occupation of the unit, revised drawings and schedules for the proposed retail Unit no. 1 of Block B1, at Ground floor fronting Cherrywood Square, to include a non-retail element which will provide animation at this corner throughout the day and evening and allow for spill out of the use into Cherrywood Square. e) Notwithstanding the provisions of the Planning and development Regulations 2001 (as amended) internal signage and advertising installations, including LED, and other digital applications and surface displays including decals and posters and other graphic applications, shall not be installed without prior written approval from the Planning Authority. REASON: To ensure an appropriate mix of uses and land use distribution which attracts a variety of users at different times of the day and ensures activity and vitality within the Retail and Civic Core consistent with Sections 2.1 ‘Land Uses’, 2.2 ‘Active Uses and Frontages’, 2.3 Principal Retail Focus and 2.4 Principal Focus and Civic Core defined within the UFDF. Urban & Built Form and Layout 5. The external finishes of the pavilions along Civic Street shall be agreed with the Planning Authority prior to their construction. In his regard the following shall be adhered to: (a) The materials shall be transparent. (b) The materials shall be of a high quality and durability to ensure the quality of the structures are continually maintained. (c) All signage for the pavilions shall be agreed in writing with the Planning Authority prior to their erection. No additional signage or stickers beyond that agreed, shall be placed on the structures without prior permission. REASON: In the interest of visual amenity and to maintain a quality public realm in accordance with Section 3.4 and Section 4 of the UFDF. 6. Prior to the commencement of development of the superstructure of the B Blocks within TC1, and for the written agreement of the Planning Authority, the developer shall submit revised drawings for the western elevation of Blocks B3/B4 (front-ing Cherrywood Avenue) and floor plans where appropriate, which further rationalise the core/exit ‘back of house’ elements. REASON: In the interest of visual amenity and consistency with Sections 3.2.2 and 3.2.4 design approach of the UFDF. 7. Prior to occupation of Unit B4, the developer shall submit revised floor plans, for the written agreement of the Planning Authority, which clearly illustrate a secondary public access route through from Cherrywood Avenue to Town Square West. REASON: To ensure consistency with Map 8 of the UFDF. 8. Prior to the commencement of development of the superstructure, the developer shall submit, for the written agreement of the Planning Authority, details of any installation of art/ design, finish and materials of the entrance/lobby areas to buildings where escalators are located. REASON: In the interest of visual amenity and consistent with Section 3.2.2 and 2.2 of the UFDF. 9. Prior to the commencement of development of the superstructure of the B Blocks within TC1, the developer shall provide, for the written agreement of the Planning Authority: (a) Details of the proposed external design/finishes of all buildings, in the form of samples and on-site mock-ups. (b) The external finishes of buildings shall include materials that are consistent with Section 3.4 of the UFDF. In particular the external finishes of buildings shall: • be of high quality, durable and attractive • At ground floor, comprise of durable and high-quality materials including natural stone or brick. • ensure harmony and visual coherence in the built environment yet articulating interest to avoid monolithic and bulky facades along the perimeter elevations, with particular attention to the upper floors. • be practical to source, erect, replace, and maintain. • demonstrate environmental performance compliant with all building regulation standards and requirements which may change during implementation of the Planning Scheme. • meet the user specification and standards, including those relating to environmental sustainability and wellness. REASON: To ensure consistency with Section 3.4 and 3.2.3 of the UFDF and Objective PD9 of the Cherrywood Planning Scheme. Microclimate 10.With regard to microclimate: (a) The glass balustrades around the perimeter of the roof top bar terrace on Block B1, the office terrace on Block B5 and the office terrace on Block B1 shall be of 1.8 metres high and consist of clear glazing where appropriate to retain views. (b) To ensure appropriate sitting conditions on the roof top bar outdoor terrace of Block B1, further wind mitigation measures, including landscaping, whilst retaining external views, shall be applied. Details of which shall be agreed with the Planning Authority prior to installation. REASON: In the interest of safety and amenity and to ensure consistency with Specific Objective PD12 of the Cherrywood Planning Scheme and Section 4.7 of the Town Centre UFDF. Pedestrian & Cycle Movement Strategy 11.Pedestrian and cycle permeability on Civic Street shall be monitored on an annual basis for 5 years or as otherwise agreed, from occupation of the Town Centre as permitted under DZ17A/0862 as amended (or at another agreed interval) by the Developer /Occupier in consultation with the Planning Authority (DLR Transportation Depart-ment). If deemed necessary, appropriate pedestrian and/or cycle permeability improvement measures shall be put in place at the Developer/Occupier’s expense. REASON: In the interests of proper planning, to ensure a satisfactory provision of cycle facilities and for consistency with Section 5.1 of the UFDF and Specific Objective PI 20 of the Cherrywood Planning Scheme. 12.With regard to cycle connections, the developer shall comply with the following requirements: (a) Revised architectural drawings that align with landscape drawings and which resolve the conflict with taxi, cycle and pedestrian facilities on Cherrywood Avenue shall be submitted to the Planning Authority for written agreement prior to the commencement of the B Blocks and associated roads infrastructure. (b)The developer shall consult with the Planning Authority (DLR Transportation Department) regarding the installation of appropriate safety measures that will alert cyclists to the possibility of vehicles crossing the cycle lane adjacent the ESB substations that front the Wyattville Link Road. The developer shall install any and all safety measures recommended by the Planning Authority and these works shall be undertaken entirely at the expense of the developer. REASON: In the interests of proper planning, to ensure a satisfactory provision of cycle facilities, to ensure the safety of cyclists and for consistency with Section 5.2.1 of the UFDF and Specific Objective PI 20 of the Cherrywood Planning Scheme. 13. With regard to cycle parking, the developer shall submit the following for the written agreement of the Planning Authority: (a) Revised drawings and a cycle parking schedule which resolve the discrepancies in the cycle parking information as shown in the submitted Parking Masterplan, in this regard, drawings and design statements shall be submitted to the Planning Authority for written agreement prior to the commencement of the B Block development. The revised drawings should take cognisance of the required level of covered short-term cycle space provision and the location of long-term cycle parking as per the Dun Laoghaire-Rathdown County Council Standards for Cycle Parking and associated Cycling Facilities for new Developments (Jan 2018 or most recent update). (b) A revised Stage 1 Quality Audit (incorporating a Stage 1 Road Safety Audit, Accessibility Audit, and Cycling Audit) based on the basement cycle parking design contained in the submitted Parking Masterplan shall be submitted to the Planning Authority for written agreement prior to the commencement of the B Block development. REASON: In the interests of proper planning, to ensure a satisfactory provision of cycle parking for residents and for consistency with Section 5.2.2 of the UFDF and Specific Objectives PI 20 and PI 22 of the Cherrywood Planning Scheme. Construction Management 14.Site development and building works shall be carried out only between the hours of 8.00am to 7.00pm Monday to Friday inclusive, 8.00am to 2.00pm Saturdays and no works permitted on site on Sundays and Public holidays. Deviations from these times will only be allowed in exceptional circumstances where prior written approval has been obtained from the Planning Authority. REASON: In order to safeguard the residential amenities of property in the vicinity. 15.Prior to the construction phase, the requirements of the Environmental Health Officer (Noise and Air) shall be ascertained and strictly adhered to. REASON: In the interest of public health. 16.With regard to staff welfare facilities, the compound site offices and welfare facilities for staff must be included in the Construction and Environment Management Plan: a) The Waste Management Plan is required to contain details for the management of domestic waste and in particular recyclable materials and food waste arising within the development. Facilities are required for separation, storage and collection of waste, ensuring that there is adequate signage and lighting to facilitate the operation of these facilities. b) The construction compound will include adequate welfare facilities such as washrooms, drying rooms, canteen and first aid room as well as foul drainage and potable water supply. Temporary discharges utilising the existing sewerage network to be agreed with DLRCC and Irish Water. REASON: In the interest of public health. EIAR 17. All monitoring and mitigation measures detailed in Appendix 17A Mitigating and Monitoring Commitments of the EIAR or the EcIAR prepared by Scott Cawley dated 12.05.2020, including the Habitat Management Report, shall be implemented and maintained throughout the construction phase of the proposed development. The results of any monitoring shall be made available to the Planning Authority, if required. REASON: In the interest of the proper planning and sustainable development of the area. Transport Infrastructure Ireland 18. The proposed development is located in close proximity to a Luas Line; the applicant should ensure there is no adverse impact on Luas operation and safety. The development shall comply with TII’s ‘Code of engineering practice for works on, near or adjacent the Luas light rail system’. REASON: In the interest of the proper planning and sustainable development of the area. Part V 19. Prior to commencement of development, the developer shall comply with the Dún Laoghaire-Rathdown County Council Housing Strategy, drawn up in accordance with Part V, Section 96(4) of the Planning & Development Act, 2000, as amended by Section 3 of the Planning & Development (Amendment) Act, 2002, and in accordance with agreement to be reached with the County Council Housing Department unless the developer shall have applied for and been granted an exemption certificate under Section 97 of the Planning and Development Act, 2000, as amended. NOTE: Where a developer opts to transfer units to the Council, this shall be subject to the availability of funding. REASON: To comply with the County Council Housing Strategy & Part V of the Planning & Development Act, 2000, as amended by Section 3 of the Planning & Development (Amendment) Act, 2002. Bonds & Contributions 20.The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €38,560.72 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of Surface Water Public Infrastructure and Facilities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015 and as included in Table 2 of the Cherrywood Planning Scheme Development Contribution Scheme 2017-2020. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme ) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Public Infrastructure and Facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. Note on above Condition: Please note that with effect from 1st January, 2014 Irish Water are now the statutory body responsible for both water and waste water services. Accordingly, the contribution payable has been reduced by the amount of the contribution associated with these services. Further details/clarification can be obtained from Irish Water at Tel. 1 850 278 278. 21.The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €883,904.78 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015 and as included in Table 2 of the Cherrywood Planning Scheme Development Contribution Scheme 2017-2020. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 22.The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €573,590.71 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Community & Parks Public Infrastructure, Facilities and Amenities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015 and as included in Table 2 of the Cherrywood Planning Scheme Development Contribution Scheme 2017-2020. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks Public Infrastructure, Facilities and Amenities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 23.The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €92,800.95 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of Surface Water Public Infrastructure and Facilities in the Cherrywood Planning Scheme Area. This Cherrywood Planning Scheme element of the Development Contribution shall be used solely to fund infrastructure identified in the Plan, as listed in Appendix III – Cherrywood Planning Scheme Projects List, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Public Infrastructure and Facilities benefiting development in the in the Cherrywood Planning Scheme area and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 24.The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €589,750.67 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Roads Public Infrastructure and Facilities in the Cherrywood Planning Scheme Area. This Cherrywood Planning Scheme element of the Development Contribution shall be used solely to fund infrastructure identified in the Plan, as listed in Appendix III – Cherrywood Planning Scheme Projects List, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the Cherrywood Planning Scheme Area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 25 The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €159,857.96 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Community & Parks Public Infrastructure Facilities in the Cherrywood Planning Scheme Area. This Cherrywood Planning Scheme element of the Development Contribution shall be used solely to fund infrastructure identified in the Plan, as listed in Appendix III - Cherrywood Planning Scheme Projects List, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks Public Infrastructure Facilities & Amenities benefiting development in the Cherrywood Planning Scheme Area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 26. A financial contribution shall be paid by the proposer to the Council towards the cost of the extension of Luas Line B from the Sandyford Depot to Cherrywood, namely Luas Line B1. This contribution to be paid prior to the commencement of the development or in such other manner as may otherwise be agreed with the Planning Authority if phasing of the payment of the Section 49 Development Contribution is proposed the developer shall submit for the written agreement of the Planning Authority the phasing of the payment of the Section 49 Development Contribution based on the gross site area of 0.588 Ha. The rate of contribution payable shall be that pertaining to the particular year in which implementation of the Planning Permission is commenced. The Supplementary Development Contribution Scheme provides for an annual increase in the levels of contribution payable, as outlined in the scheme, by a factor of 5% compound interest per annum. The levels of contribution will be reviewed annually on the 13th of January of each year during which the scheme is in force to take account of the aforementioned increase. The rate of contribution payable in respect of this development, at current contribution rates, is €471,603.64 and is subject to increase as outlined above. It should be noted that contributions assessed in accordance with the Supplementary Development Contribution Scheme cannot be appealed to An Bord Pleanala unless the applicant considers the levy referred to in this condition has not been properly applied in accordance with the terms of the Scheme. REASONS FOR CONTRIBUTIONS: To part finance the extension of the Luas Line B1 from Sandyford Depot to Cherrywood, as provided for in the Supplementary Development Contribution Scheme adopted by the Council of Dunlaoghaire-Rathdown on the 13th of January 2003. (incorporating amendments to Clause 13 as adopted by the County Council at the meeting on 13th May, 2013 – to be effective for all decisions from 14th May 2013). NOTE: That water supply and foul drainage shall be in accordance with the requirements of Irish Water. NOTE: Superstructure refers to any buildings or surface above podium level, or basement level where there is no podium, having regard to the establishment of new ground levels as referenced in Section 6.2 of the Cherrywood Planning Scheme and Section 3.2.5 of the Cherrywood Town Centre UFDF. NOTE: Where conditions refer to agreement, this is agreement in writing with the Authority referenced. NOTE: The attention of the applicant is drawn to Section 34(13) of the Planning and Development Act 2000, which relates as follows- A person shall not be entitled solely by reason of a permission under this section to carry out any development. ## Nearby applications - [DZ19A/1024](https://cherrywoodplans.com/application/DZ19A-1024.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (9 Sep 2020). Amends the Cherrywood Town Centre plan to shrink the basement under Blocks A1–A3 and reassign parking. - [DZ20A/0002](https://cherrywoodplans.com/application/DZ20A-0002.md): Lands (c.17.01ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (9 Sep 2020). Makes minor changes to electrical rooms and landscaping in Town Centre Blocks F1 and F3. - [DZ23A/0423](https://cherrywoodplans.com/application/DZ23A-0423.md): On lands (c.17.03 a) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (Also Co. Dublin). Granted (10 Aug 2023). Amends the Cherrywood Town Centre permission to add two 2-bed apartments to Block A1. - [DZ22A/0690](https://cherrywoodplans.com/application/DZ22A-0690.md): Townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (12 May 2023). Facade and balcony design changes to Cherrywood Town Centre apartment Blocks A1, A2 and A3. - [DZ22A/0747](https://cherrywoodplans.com/application/DZ22A-0747.md): Townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (30 Mar 2023). Changes of use and merging of units in Town Centre Blocks C1 and C2 to create a larger 723 sq.m shop with off-licence. - [DZ22A/0846](https://cherrywoodplans.com/application/DZ22A-0846.md): Lands (c. 17.03 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (22 Dec 2022). Removes a planned viewing platform at Block F1 in Cherrywood Town Centre, replacing it with a glass balustrade. - [DZ22A/0138](https://cherrywoodplans.com/application/DZ22A-0138.md): (c. 17.03ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (30 Aug 2022). Minor changes of use between shop and restaurant-type units in Town Centre Blocks C1 and C2, and a slightly larger crèche. - [DZ21A/0807](https://cherrywoodplans.com/application/DZ21A-0807.md): Lands (c. 17.03 ha), in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (8 Jul 2022). Amends the Cherrywood Town Centre permission to cut residential parking from 1,363 to 1,169 spaces and add 41 car-sharing spaces. - [DZ21A/0713](https://cherrywoodplans.com/application/DZ21A-0713.md): Lands (c. 17.01 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (3 Oct 2021). Design changes to the three apartment blocks A1–A3 in Cherrywood Town Centre, including taller windows and smaller roof terrace. - [DZ20A/0824](https://cherrywoodplans.com/application/DZ20A-0824.md): Lands (c. 17.01 ha), in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (11 Jan 2021). Changes the windows, balconies and frontage of Town Centre Block F2 on Cherrywood Avenue and Central Avenue. - [DZ19A/0148](https://cherrywoodplans.com/application/DZ19A-0148.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (24 Apr 2019). Amends Town Centre plot TC2 to add 47 apartments, taking Blocks C1 and C2 from 384 to 431 homes. - [DZ23A/0573](https://cherrywoodplans.com/application/DZ23A-0573.md): Lands (c. 17.03 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (19 Oct 2023). Amends the Cherrywood Town Centre permission to add 4 apartments in Blocks F2 and F3, bringing plot TC4 to 524 homes. - [DZ17A/0862](https://cherrywoodplans.com/application/DZ17A-0862.md): Lands (17.01ha) in the townlands of Cherrywood, Dublin 18. Granted (29 May 2018). The original Cherrywood Town Centre permission: 15 blocks with 1,269 homes, shops, offices, two hotels and a library, plus Grand Parade. - [DZ26A/0032/WEB](https://cherrywoodplans.com/application/DZ26A-0032-WEB.md): Block A1, The Tully Building, Civic Street, Cherrywood Town Centre, Dublin 18, D18WDK0. Granted (13 Mar 2026). Revised plan for 24 mobile phone antennas and 9 dishes on Block A1, The Tully Building, after an earlier compliance submission was rejected. - [DZ25A/0485/WEB](https://cherrywoodplans.com/application/DZ25A-0485-WEB.md): Block A1, Tully Buildings, Cherrywood, Dublin 18. Granted (1 Aug 2025). 24 mobile phone antennas and 9 dishes on the facade and roof of Block A1, Tully Buildings. - [D06A/1660](https://cherrywoodplans.com/application/D06A-1660.md): Park One, Cherrywood Science And Technology Park, Loughlinstown, Co. Dublin.. Granted (6 Mar 2007). Completes the distributor road through Park One at Cherrywood Business Park, letting overhead power lines go underground. - [DZ20A/0877](https://cherrywoodplans.com/application/DZ20A-0877.md): Bishop Street, Cherrywood, Dublin 18, Co Dublin. Granted (29 Jan 2021). Installs a small gas regulator building on Bishop Street near the Luas line. - [D04A/1013](https://cherrywoodplans.com/application/D04A-1013.md): Laughanstown/Cherrywood, With Access From N11, Wyattville Road, Co. Dublin.. Refused or withdrawn (9 May 2005). Seeks to keep modified land shaping and drainage works on a 36-hectare site at Laughanstown/Cherrywood and further alter them. - [DZ18A/1178](https://cherrywoodplans.com/application/DZ18A-1178.md): 2.2 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (17 Apr 2019). Amends Town Centre plot TC2 to add one apartment, expand retail and resident amenity space, and move the crèche. - [DZ22A/0952](https://cherrywoodplans.com/application/DZ22A-0952.md): The Hunt Building, Grand Parade, Cherrywood Town Centre, Dublin 18. Refused or withdrawn (1 Feb 2023). 6 mobile phone antennas and 2 dishes on the roof of The Hunt Building, Grand Parade. - [DZ22A/0796](https://cherrywoodplans.com/application/DZ22A-0796.md): The Hunt Building, Grand Parade, Cherrywood Town Centre, Dublin 18. Refused or withdrawn (23 Nov 2022). 6 mobile phone antennas and 2 dishes, finished to look like brick, on the roof of The Hunt Building, Grand Parade. - [DZ22A/0591](https://cherrywoodplans.com/application/DZ22A-0591.md): C. 3.71 in the Townland of Cherrywood, Block Town Centre 3 (TC3), Dublin 18. Granted (20 Jun 2023). 418 build-to-rent apartments in four blocks of up to 5 storeys at Town Centre 3, with shops, cafés and community space. - [ABP30342919](https://cherrywoodplans.com/application/ABP30342919.md): Site (c.3.06ha) in the townlands of Laughanstown, Dublin 18 (lands generally bounded by Bishop Street to the south, the Luas green line to the east and Tully park to the north. Granted (18 Apr 2019). Builds 184 homes, a mix of apartments, two-level units and houses, between Bishop Street, the Luas line and Tully Park. - [DZ24A/1030/WEB](https://cherrywoodplans.com/application/DZ24A-1030-WEB.md): In the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18. Granted (11 Jun 2025). Amends a permitted scheme off Tully Vale Road to add 59 apartments by raising four blocks by one or two storeys. - [DZ20A/0052](https://cherrywoodplans.com/application/DZ20A-0052.md): 1.86 ha in the townlands of Cherrywood, Dublin 18 (also Co. Dublin)--TC3. Granted (13 Apr 2021). A mixed-use block at Town Centre 3 with an 8-storey office building and 198 build-to-rent apartments. - [D04A/1012](https://cherrywoodplans.com/application/D04A-1012.md): Cherrywood/Glebe, (ED Rathmichael), Wyvattville Link Road, Co. Dublin.. Refused or withdrawn (9 May 2005). Reshapes and drains an 8.6-hectare site at Cherrywood/Glebe and stores topsoil on a further 5.1 hectares at Laughanstown. - [DZ22A/0093](https://cherrywoodplans.com/application/DZ22A-0093.md): Townland of Laughanstown, Dublin 18. Granted (1 Apr 2022). Seeks to keep two advertising signs for Cherrywood housing for 3 more years. - [DZ25A/0325/WEB](https://cherrywoodplans.com/application/DZ25A-0325-WEB.md): In the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18. Granted (15 Jan 2026). 121 apartments in two blocks of 3 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ25A/0102/WEB](https://cherrywoodplans.com/application/DZ25A-0102-WEB.md): In the Townlands of Laughanstown, in Cherrywood, Dublin 18. Granted (26 May 2025). Amends a permitted 200-apartment scheme in Macnebury to drop its basement and cut car parking from 241 to 160 spaces. - [DZ24A/1024/WEB](https://cherrywoodplans.com/application/DZ24A-1024-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood,, Dublin 18. Granted (1 May 2025). Amends a permitted Macnebury apartment scheme to cut car parking from 312 to 213 spaces and add bike, bin and storage buildings, with no change to the homes. - [DZ25A/0008/WEB](https://cherrywoodplans.com/application/DZ25A-0008-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18. Refused or withdrawn (6 Feb 2025). Amends a permitted 200-apartment scheme in Macnebury to drop its basement and cut car parking from 241 to 160 spaces. - [DZ24A/1016/WEB](https://cherrywoodplans.com/application/DZ24A-1016-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18. Refused or withdrawn (3 Jan 2025). Amends a permitted Macnebury development by removing its basement and cutting car parking from 241 to 160 spaces. - [DZ24A/0017](https://cherrywoodplans.com/application/DZ24A-0017.md): Townlands of Laughanstown and Cherrywood, Macnebury - Development Area 7 - Cherrywood, Dublin 18. Granted (11 Jun 2024). 200 apartments in three blocks of 4 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ23A/0811](https://cherrywoodplans.com/application/DZ23A-0811.md): In the Townlands of Laughanstown and Cherrywood. Macnebury, Development Area 7 , Cherrywood, Dublin 18. Refused or withdrawn (4 Jan 2024). 200 apartments in three blocks of 4 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ22A/1021](https://cherrywoodplans.com/application/DZ22A-1021.md): Lands within Development Area 7 - Macnebury, including part of the Res 3 plot known as M1 located south of Bishop Street, west of Cherrywood Avenue, east and north of the proposed Beckett Road, Laughanstown, Dublin 18. Granted (27 Jun 2023). 283 new homes, mostly apartments in four blocks of 4–5 storeys, plus a crèche, south of Bishop Street in Macnebury. - [DZ18A/0499](https://cherrywoodplans.com/application/DZ18A-0499.md): Lands (c.1.22ha) in the townlands of Cherrywood & Laughanstown, Dublin 18. Granted (11 Jan 2019). 146 apartments in four 4-storey blocks off Grand Parade on plot TC5. - [D07A/1770](https://cherrywoodplans.com/application/D07A-1770.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin.. Refused or withdrawn (28 Jan 2008). Builds a multi-storey car park with 1,081 spaces and 10 ground-floor shops at Cherrywood Business Park. - [DZ21A/1017](https://cherrywoodplans.com/application/DZ21A-1017.md): Townlands of Laughanstown, Glebe, and Cherrywood, Dublin 18, (also Co Dublin). Granted (11 Nov 2022). About 1.6km of new roads including Beckett Road with an underpass below the Wyattville Link Road, plus a park around an ancient wedge tomb. - [D15A/0355](https://cherrywoodplans.com/application/D15A-0355.md): Site located in the green area at the entrance to, Druid Valley Estate, Cabinteely, Dublin 18. Refused or withdrawn (9 Jul 2015). Installs a small gas safety regulator unit on the green at the entrance to Druid Valley. - [DZ26B/0241/WEB](https://cherrywoodplans.com/application/DZ26B-0241-WEB.md): 17 Domville Court, Cherrywood, Dublin 18, D18WEK6. Granted (10 Jun 2026). Permission to keep a glass conservatory permanently in the back garden of a house on Domville Court. - [DZ26B/0073/WEB](https://cherrywoodplans.com/application/DZ26B-0073-WEB.md): 17 Domville Court, Cherrywood, Dublin 18, D18WEK6. Refused or withdrawn (13 Mar 2026). Permission to keep a glass conservatory built in the back garden of a house on Domville Court. - [DZ23A/0242](https://cherrywoodplans.com/application/DZ23A-0242.md): Townland of Cherrywood Dublin 18 The site is located in the Cherrywood Planning Scheme and forms part of the south eastern porti. Granted (7 Jun 2023). Changes to the permitted basement at Town Centre 3 so it can later connect to the wider TC3 basement. - [DZ21A/0785](https://cherrywoodplans.com/application/DZ21A-0785.md): c.0.95 ha townland, Cherrywood, Dublin 18 (also Co. Dublin). Granted (30 Mar 2022). An office building of up to 8 storeys with ground-floor cafés at the corner of Town Centre 3, beside the Bride's Glen Luas stop. - [DZ26B/0030/WEB](https://cherrywoodplans.com/application/DZ26B-0030-WEB.md): 17 Domville Court, Tullyvale, Cherrywood, Dublin 18, D18 WEK6. Refused or withdrawn (28 Jan 2026). Permission to keep a glass conservatory built in the back garden of a house on Domville Court. - [DZ25A/0489/WEB](https://cherrywoodplans.com/application/DZ25A-0489-WEB.md): 20, Domville Court, Tullyvale, Cherrywood, Dublin 18, D18VN3A. Granted (11 Aug 2025). Permission to keep a glass conservatory permanently at the back of a house on Domville Court. - [DZ25A/0480/WEB](https://cherrywoodplans.com/application/DZ25A-0480-WEB.md): 20, Domville Court, Tullyvale, Cherrywood, Dublin 18, D18VN3A. Refused or withdrawn (19 Jun 2025). Permission to keep a glass conservatory at the back of a house on Domville Court. - [DZ17A/0161](https://cherrywoodplans.com/application/DZ17A-0161.md): Lands (site area c.0.95ha) in the townland of Laughanstown, Dublin 18. Granted (12 Dec 2017). Sets up a temporary concrete plant for 7 years to supply the building of Cherrywood. - [D02A/0508](https://cherrywoodplans.com/application/D02A-0508.md): Building H, Cherrywood Science & Technology Park,, Cherrywood, Loughlinstown, Co. Dublin.. Granted (22 Jul 2002). Adds 15 parking spaces to the car park serving Building H at Cherrywood Business Park. - [DZ25A/0161/WEB](https://cherrywoodplans.com/application/DZ25A-0161-WEB.md): Lands in the townlands of Laughanstown, Dublin 18. The application relates to development in Cherrywood Strategic Development Zone. Granted (23 Apr 2025). Completion of a 145-metre stretch of Grand Parade from Tully Vale Road towards Bishop Street. - [DZ26A/0001/WEB](https://cherrywoodplans.com/application/DZ26A-0001-WEB.md): Cherrywood Avenue, (Adjoining Cherrywood Business Park), Cherrywood, Dublin 18. Granted (29 Jun 2026). Amends a permitted apartment scheme on Cherrywood Avenue to go from 67 to 70 apartments, with more parking. - [DZ25A/0983/WEB](https://cherrywoodplans.com/application/DZ25A-0983-WEB.md): Cherrywood Avenue ( adjoining Cherrywood Business Park), Cherrywood, Dublin 18. Refused or withdrawn (22 Dec 2025). Amends a permitted apartment scheme on Cherrywood Avenue to go from 67 to 70 apartments, with more parking. - [D10A/0701](https://cherrywoodplans.com/application/D10A-0701.md): Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (24 May 2011). A 197-space surface park and ride car park beside the Brides Glen Luas stop. - [D03A/0479](https://cherrywoodplans.com/application/D03A-0479.md): ESB, Plot M, Cherrywood Science And Technology Park, Wyatville Link Road. Granted (14 Jul 2003). Seeks to keep an ESB 38 kV line mast already installed at Cherrywood Business Park. - [DZ22A/0681](https://cherrywoodplans.com/application/DZ22A-0681.md): Cherrywood Avenue, (Adjoining Cherrywood Business Park), Cherrywood, Dublin 18. Granted (28 Jun 2023). A 5-storey block of 70 apartments on Cherrywood Avenue, beside Cherrywood Business Park. - [DZ18A/0854](https://cherrywoodplans.com/application/DZ18A-0854.md): site (c.2.62 HA) at Cherrywood Business Park, Cherrywood Avenue, Cherrywood, Co. Dublin (also Dublin 18) (lands to the south and west of Blocks G and G2, south of Cherrywood Avenue). Granted (31 Oct 2018). Builds a three-pond drainage system with a walking and cycling route south of Cherrywood Avenue. - [DZ19A/0808](https://cherrywoodplans.com/application/DZ19A-0808.md): Cherrywood Business Park, Cherrywood & Loughlinstown, Co. Dublin, (Also Dublin 18). Granted (17 Dec 2019). Installs a small gas pressure regulator building in Cherrywood Business Park. - [DZ19A/0647](https://cherrywoodplans.com/application/DZ19A-0647.md): Cherrywood Business Park, Cherrywood & Loughlinstown, Co. Dublin, (Also Dublin 18). Refused or withdrawn (18 Sep 2019). Installs a small gas pressure regulator building in Cherrywood Business Park. - [DZ19A/0523](https://cherrywoodplans.com/application/DZ19A-0523.md): Cherrywood Business Park, Cherrywood & Loughlinstown, Co. Dublin, (Also Dublin 18). Refused or withdrawn (23 Aug 2019). Installs a small gas pressure regulator building in Cherrywood Business Park. - [DZ17A/0171](https://cherrywoodplans.com/application/DZ17A-0171.md): Cherrywood Business Park, Cherrywood, Dublin 18. Granted (21 Apr 2017). Seeks to keep the existing entrance and wayfinding signs at Cherrywood Business Park. - [DZ24A/1007/WEB](https://cherrywoodplans.com/application/DZ24A-1007-WEB.md): ‘Red Zone’ temporary surface car park, and Blocks F1-F3, ‘The Campus’, Cherrywood Avenue,, Cherrywood (Glebe Townland), Co. Dublin, Dublin 18. Granted (18 Feb 2025). Shrinking the temporary Red Zone car park on Cherrywood Avenue to about 398 spaces for another 5 years, and opening 226 basement spaces at The Campus. - [DZ22A/0728](https://cherrywoodplans.com/application/DZ22A-0728.md): Red Zone car park, Cherrywood Avenue, Cherrywood (Glebe Townland), Co Dublin/Dublin 18. Granted (14 Mar 2023). Keeping the temporary Red Zone surface car park for about 740 cars on Cherrywood Avenue for another 5 years. - [DZ20A/0477](https://cherrywoodplans.com/application/DZ20A-0477.md): Blocks F1,F2 & F3 (3no. office blocks under construction), Cherrywood Business Park, Cherrywood, Co. Dublin (also Dublin 18) & at the temporary surface car park at Cherrywood (Glebe Townland) Co. Dublin (also Dublin 18). Granted (28 Aug 2020). Allows up to 229 spaces in the basement car park of office Blocks F1–F3 to be used for temporary parking for 7 years. - [DZ17A/0417](https://cherrywoodplans.com/application/DZ17A-0417.md): Cherrywood Glebe Townland, Co Dublin ( Dublin 18) (Lands within Dev Area 6-Bride's Glen-bounded by M50 west, Cherrywood Ave & undeveloped lands to north undeveloped lands & Glencarrig res. estate east & res prop. & undev. lands off Brides Glen to south. Granted (7 Nov 2017). Uses land off Cherrywood Avenue as a temporary car park for about 740 cars for 5 years. - [DZ17A/0326](https://cherrywoodplans.com/application/DZ17A-0326.md): Cherrywood, Glebe Townland, Co Dublin (Also Dublin 18) (Lands within Dev Area 7-Macnebury-bounded by M50 to west, Cherrywood Ave & undeveloped lands to north, undeveloped lands & Glencarrig res. estate to east & undeveloped lands off Brides Glen to south. Refused or withdrawn (26 Apr 2017). Uses land off Cherrywood Avenue as a temporary car park for about 740 cars for 5 years. - [DZ25A/0543/WEB](https://cherrywoodplans.com/application/DZ25A-0543-WEB.md): Dlr Properties Limited, Hibernia House, Cherrywood Business Park, Dublin 18, D18E440. Granted (28 Aug 2025). Hibernia House in Cherrywood Business Park changes from offices to a medical centre with a pharmacy. - [DZ16A/0535](https://cherrywoodplans.com/application/DZ16A-0535.md): Hibernia House, Cherrywood Business Park, Loughlinstown, Dublin 18. Granted (9 Sep 2016). Puts up two high-level lit 'evros' signs on Hibernia House, Cherrywood Business Park. - [D06A/0911](https://cherrywoodplans.com/application/D06A-0911.md): Block D, Cherrywood Science & Technology Park, Cherrywood, Loughlinstown, Co. Dublin. Granted (23 Aug 2006). Makes internal changes to the Block D office building, enclosing its entrance and adding a fire escape stairs. - [D04A/0232](https://cherrywoodplans.com/application/D04A-0232.md): Block H, Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (23 Apr 2004). Puts up a lit corporate logo sign at Block H, Cherrywood Business Park. - [D09A/0146](https://cherrywoodplans.com/application/D09A-0146.md): Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (23 Apr 2009). Fills in atrium spaces in Building AA at Cherrywood Business Park, adding 269 sq.m and 5 parking spaces. - [D02A/0424](https://cherrywoodplans.com/application/D02A-0424.md): Cherrywood Science & Technology Park,, Cherrywood, Loughlinstown, Co. Dublin.. Granted (10 Jul 2002). Allows two permitted three-storey science and technology buildings, AA and AB, to be used instead for office-based industry. - [D08A/0687](https://cherrywoodplans.com/application/D08A-0687.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Refused or withdrawn (7 Aug 2008). Replacing Block D with a 5-storey office building with a large ground-floor shop at Cherrywood Science & Technology Park. - [D06A/0630](https://cherrywoodplans.com/application/D06A-0630.md): Spar Retail Unit, Block D, Cherrywood Science & Technology Park, Loughlinstown, Dublin 18. Granted (12 Jul 2006). An off-licence counter added to the Spar shop in Block D of Cherrywood Science & Technology Park. - [DZ22A/1025](https://cherrywoodplans.com/application/DZ22A-1025.md): Cherrywood Avenue, Lands within the townlands of Glebe and Cherrywood, Dublin 18. Granted (2 Nov 2023). Builds 44 homes, houses and two-level units, off Cherrywood Avenue. - [DZ16A/0530](https://cherrywoodplans.com/application/DZ16A-0530.md): Units 2 & 4 Building 7 (previously 'Block D'), Cherrywood Business Park, Cherrywood, Loughlinstown, Co Dublin. Granted (9 Sep 2016). Changes two vacant units in Building 7, Cherrywood Business Park, into medical and dental use. - [DZ25A/0066/WEB](https://cherrywoodplans.com/application/DZ25A-0066-WEB.md): Building 7 The Campus, Cherrywood Avenue, Cherrywood (Glebe Townland), Co Dublin, Dublin 18, D18T8Y6. Granted (20 Mar 2025). Part of Building 7 at The Campus changes from offices to medical and dental use. - [D05A/1672](https://cherrywoodplans.com/application/D05A-1672.md): Block D, Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (13 Feb 2006). Makes small changes to Block D, enlarging a ground-floor shop and trimming the offices. - [DZ24A/0291/WEB](https://cherrywoodplans.com/application/DZ24A-0291-WEB.md): Lands in the townland of Laughanstown, Dublin 18, located between Grand Parade and Tully Park., The application relates to development in Domville Development Area 4 of the Cherrywood Strategic Development Zone.. Granted (25 Mar 2025). Amends the Domville permission to raise four blocks on Grand Parade from 4 to 6 storeys, adding 58 apartments. - [DZ26A/0151/WEB](https://cherrywoodplans.com/application/DZ26A-0151-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18.. Granted (24 Jun 2026). 188 new homes, a mix of apartments, two-level units and houses, beside Tully Park off Bishop Street. - [DZ22A/0133](https://cherrywoodplans.com/application/DZ22A-0133.md): Townlands of Laughanstown and Cherrywood, Dublin 18. Granted (22 Nov 2022). Builds 163 homes, a mix of apartments, triplexes, maisonettes and houses, beside Tully Park. - [DZ17A/0731](https://cherrywoodplans.com/application/DZ17A-0731.md): G3 (west of Block G2), Cherrywood Business Park, Cherrywood, Loughlinstown, Co Dublin (within the Cherrywood Strategic Development Zone (SDZ) and subject to the Cherrywood Planning Scheme 2014). Granted (26 Jan 2018). Builds a new four-storey office building, G3, on Cherrywood Avenue in Cherrywood Business Park. - [DZ24A/0485/WEB](https://cherrywoodplans.com/application/DZ24A-0485-WEB.md): Site Known as Block G3, Cherrywood Business Park, Cherrywood, Loughlinstown, Co. Dublin. Granted (19 Dec 2024). A 4-storey science and technology office building with labs on Block G3, Cherrywood Business Park. - [DZ21A/1038](https://cherrywoodplans.com/application/DZ21A-1038.md): site 1.85 ha at Castle Street and Bishop Street, Cherrywood, Dublin 18. Granted (8 Nov 2022). Builds a new 1,000-pupil secondary school at Castle Street and Bishop Street, Cherrywood. - [D08A/0952](https://cherrywoodplans.com/application/D08A-0952.md): Cherrywood Science & Technology Park,(Block D1), Cherrywood, Loughlinstown, Co. Dublin. Refused or withdrawn (15 Oct 2008). Design changes to the approved Block D1 office building at Cherrywood Science & Technology Park. - [DZ21A/0029](https://cherrywoodplans.com/application/DZ21A-0029.md): Site of approximately 1,094 sq m at Building 8 (formerly known as Block E), Cherrywood Business Park, Cherrywood, Co. Dublin, c. Granted (29 Apr 2021). Rebuilds the front entrance of Building 8 at Cherrywood Business Park with a slightly larger lobby. - [D04A/1211](https://cherrywoodplans.com/application/D04A-1211.md): Cherrywood Road Bus Stop, (opposite Lucent), Loughlinstown, Co. Dublin. Refused or withdrawn (29 Jun 2005). Installs a steel and glass bus shelter with two lit advertising panels on Cherrywood Road. - [DZ24A/0366/WEB](https://cherrywoodplans.com/application/DZ24A-0366-WEB.md): Building 8, Cherrywood Business Park, Dublin 18, D18W319. Granted (17 Jul 2024). Adds tenant signage and a wayfinding totem at Building 8, Cherrywood Business Park. - [DZ23A/0283](https://cherrywoodplans.com/application/DZ23A-0283.md): Building 8, Cherrywood Business Park, Cherrywood, Loughlinstown, Co. Dublin, D18 W319. Granted (11 Aug 2023). Turns Building 8 at Cherrywood Business Park from offices into a private medical clinic. - [D05A/0419](https://cherrywoodplans.com/application/D05A-0419.md): Block D, Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (26 Oct 2005). Extends the existing Block D building at Cherrywood Business Park, adding 790 sq.m of shop and office space. - [D07A/0604](https://cherrywoodplans.com/application/D07A-0604.md): Cherrywood Science Technology Park,(Block D1), Loughlinstown, Co. Dublin.. Granted (2 Apr 2008). Replacing a crèche with a 4-storey office building and restaurant (Block D1) at Cherrywood Science & Technology Park. - [DZ19A/0577](https://cherrywoodplans.com/application/DZ19A-0577.md): Cherrywood Avenue South adjacent to Building 11, formally known as Building G2, Cherrywood Business Park, Loughlinstown, Dublin, D18 DH50. Granted (23 Jan 2020). A new loading bay on Cherrywood Avenue South beside Building 11 in Cherrywood Business Park. - [DZ21A/0806](https://cherrywoodplans.com/application/DZ21A-0806.md): Lands in the townland of, Laughanstown, Dublin 18, located between Grand Parade and Tully Park. Granted (12 Aug 2022). Amends a permitted scheme between Grand Parade and Tully Park to add 60 apartments in three new 4-storey blocks. - [DZ26A/0580/WEB](https://cherrywoodplans.com/application/DZ26A-0580-WEB.md): Bishop Street (M3a), Laughanstown, Dublin 18 (Development Area 7 Macnebury - Res3 Plot). More information requested (22 Sep 2026). 32 new homes, mostly 3-bed two-level apartments, off Bishop Street in Macnebury. - [DZ24A/0236/WEB](https://cherrywoodplans.com/application/DZ24A-0236-WEB.md): Lands in the townland of Laughanstown, between Grand Parade and Tully Park, in Domville Development Area 4, Cherrywood, Dublin 18. Refused or withdrawn (15 Apr 2024). Amends the Domville permission to raise four blocks on Grand Parade from 4 to 6 storeys, adding 58 apartments. - [DZ17A/0714](https://cherrywoodplans.com/application/DZ17A-0714.md): Lands in the townlands of Lehaunstown and Cherrywood, Dublin 18. The application relates to development in the Cherrywood Strategic Development Zone.(Domville site). Granted (7 Aug 2018). Builds 322 new homes, 242 apartments and 80 houses, plus a crèche on the Domville site in Cherrywood. - [D03A/0735](https://cherrywoodplans.com/application/D03A-0735.md): Tullyvale, Druid Valley, Cherrywood, Loughlinstown, Co. Dublin.. Granted (22 Sep 2003). Changes the approved Tullyvale housing development by realigning its access road and adding a signalised pedestrian crossing. - [D06A/0116](https://cherrywoodplans.com/application/D06A-0116.md): Glencarraig, Rathmichael, Co. Dublin. Granted (18 Aug 2006). 19 homes and a new access road linking Brides Glen Road to Cherrywood Science & Technology Park at Glencarraig. - [D05A/1083](https://cherrywoodplans.com/application/D05A-1083.md): Glencarrig (site At), Rathmichael, Co. Dublin. Refused or withdrawn (12 Oct 2005). Builds 73 apartments in two blocks at Glencarrig, with a new road and cycle route from Brides Glen Road to Cherrywood Business Park. - [D06A/1497](https://cherrywoodplans.com/application/D06A-1497.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (14 Dec 2006). Builds a new four-storey office building, Block G2, over a two-level car park at Cherrywood Business Park. - [DZ19A/1022](https://cherrywoodplans.com/application/DZ19A-1022.md): On a site of 0.625ha, Dell Technologies, Block AB, Cherrywood Business Park, Cherrywood, Dublin 18. Granted (25 Feb 2020). Replaces two lit signs on the Dell Technologies building, Block AB, Cherrywood Business Park. - [DZ17A/0466](https://cherrywoodplans.com/application/DZ17A-0466.md): Block AB of CHerrywood, Science and Technology Park, Loughlinstown, Dublin 18. Granted (13 Jul 2017). Replaces signs at Block AB, Cherrywood Business Park, with two lit wall signs and a totem sign. - [DZ25A/0197/WEB](https://cherrywoodplans.com/application/DZ25A-0197-WEB.md): Located to the north end of the Valley Drive public road, which is a cul-de-sac, opposite the corner apartment building 97-106 E. Refused or withdrawn (18 Mar 2025). Provides a paved bin collection area at the end of Valley Drive for the Tullyvale apartments. - [DZ20A/0611](https://cherrywoodplans.com/application/DZ20A-0611.md): Site of approximately 4,730 sq m at Building 11, (formerly known as Block G2), Cherrywood Business Park, Cherrywood, Co. Dublin, D18 DH50. Granted (19 Oct 2020). Expands the day hospital in Building 11, Cherrywood Business Park, to 1,220 sq.m. - [DZ18A/1131](https://cherrywoodplans.com/application/DZ18A-1131.md): Site of approx. 4,730 sqm at Building 11 (formerly known as Block G2), Cherrywood Business Park, Cherrywood, Dublin D18 DH50. Granted (5 Feb 2019). Turns part of the ground floor of Building 11 at Cherrywood Business Park into a 922 sq.m day hospital. - [D13A/0292](https://cherrywoodplans.com/application/D13A-0292.md): Site at Glencarrig, Brides Glen Road, Rathmichael, Co. Dublin. Granted (1 Aug 2013). Amends the earlier Glencarrig permission with a revised design for 10 five-bedroom detached houses. - [DZ17A/0649](https://cherrywoodplans.com/application/DZ17A-0649.md): Block G2, Cherrywood Business Park, Cherrywood, Co Dublin. Granted (8 Sep 2017). Adds louvred screening around rooftop plant on Block G2, Cherrywood Business Park. - [DZ16A/0935](https://cherrywoodplans.com/application/DZ16A-0935.md): Block G2, Cherrywood Business Park, Cherrywood, Co. Dublin. Granted (17 Feb 2017). Adds landscaping, a drop-off area and a sign at Block G2, Cherrywood Business Park, and keeps three glass canopies. - [DZ20A/0946](https://cherrywoodplans.com/application/DZ20A-0946.md): Lands known as Tully Park (c12.9HA), Laughanstown, Dublin 18. Granted (18 Feb 2021). Revises part of the permitted Tully Park, moving the café kiosk, redesigning the playground and adding a raised boardwalk. - [DZ15A/0813](https://cherrywoodplans.com/application/DZ15A-0813.md): Laughanstown, Dublin 18, (Tully Park). Granted (13 Jul 2016). Creates Tully Park, a 12.9-hectare public park with a playground, café kiosk and nature trails. - [DZ16A/0123](https://cherrywoodplans.com/application/DZ16A-0123.md): Units 1 & 2 Block C, Cherrywood Business Park, Cherrywood, Loughlinstown, Co Dublin. Granted (21 Apr 2016). Reconfigures two ground-floor shop units in Block C and turns one into a café/restaurant. - [DZ14A/0596](https://cherrywoodplans.com/application/DZ14A-0596.md): Unit 1 , Block C, Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co Dublin. Granted (11 Dec 2014). Changes Shop Unit 1 in Block C, Cherrywood Business Park, into a dental clinic. - [DZ16A/0816](https://cherrywoodplans.com/application/DZ16A-0816.md): Unit 4 Building 5 (previously Block C), Cherrywood Business Park, Cherrywood, Dublin 18. Granted (10 Jan 2017). Changes a vacant shop unit in Cherrywood Business Park into a bank with an ATM. - [D07A/0233](https://cherrywoodplans.com/application/D07A-0233.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.. Granted (27 Aug 2007). Extends and reworks the approved Block C leisure building, adding a double-height swimming pool hall. - [D06A/0268](https://cherrywoodplans.com/application/D06A-0268.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (16 Jun 2006). Builds a four-storey leisure and retail building (Block C) with a fitness centre and 25-metre pool at Cherrywood Business Park. - [D05A/1715](https://cherrywoodplans.com/application/D05A-1715.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Refused or withdrawn (12 Jan 2006). Builds a four-storey leisure and retail building (Block C) with a fitness centre and 20-metre pool at Cherrywood Business Park. - [DZ23A/0508](https://cherrywoodplans.com/application/DZ23A-0508.md): Unit 3 and Unit 1, Building 5, Cherrywood Business Park, Cherrywood, Loughlinstown, Co Dublin. Granted (22 Sep 2023). Two units in Building 5, Cherrywood Business Park, become a dental clinic and a café. - [D07A/0229](https://cherrywoodplans.com/application/D07A-0229.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.. Granted (28 May 2007). Adds a temporary vehicle ramp to the basement car park serving Blocks G and G2 at Cherrywood Business Park. - [D08A/0121](https://cherrywoodplans.com/application/D08A-0121.md): Block C, Cherrywood Science And Technology Park, Cherrywood, Loughlinstown, Co. Dublin. Granted (24 Jun 2008). Seeks to keep an extension to the Block C facilities building and sets out options for a front loading bay. - [D07A/1607](https://cherrywoodplans.com/application/D07A-1607.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.. Refused or withdrawn (24 Jan 2008). The top floor of Block C at Cherrywood Science & Technology Park changes from recreation use to offices. - [D07A/1503](https://cherrywoodplans.com/application/D07A-1503.md): Block C, Cherrywood Science And Technology Park, Cherrywood, Loughlinstown, Co. Dublin. Refused or withdrawn (18 Dec 2007). Keeping a 52 sq.m ground-floor extension and shopfronts at Block C, Cherrywood Science & Technology Park. ## Links - [This page on CherrywoodPlans](https://cherrywoodplans.com/application/DZ19A-0458) - [Council record, documents and conditions (DLR planning portal)](https://planning.agileapplications.ie/dunlaoghaire/application-details/83141) - [All Cherrywood applications](https://cherrywoodplans.com/applications.md) _Source: Dún Laoghaire–Rathdown County Council planning data, refreshed daily. CherrywoodPlans is an independent site, not run by the council._