# Planning application DZ19A/0597 > Development Area 8 -Tully, Cherrywood SDZ, Includes the Res 2 plots ''T9'' and ''T10'', Cherrywood, Dún Laoghaire–Rathdown. Granted (11 Mar 2020). - **Reference:** DZ19A/0597 - **Address:** Development Area 8 -Tully, Cherrywood SDZ, Includes the Res 2 plots ''T9'' and ''T10'' - **Status:** Granted (11 Mar 2020) - **Decision:** GRANT PERMISSION - **Application type:** Permission (SDZ) - **Applicant:** Cairn Homes Properties Ltd. - **Lodged:** 13 Feb 2020 - **Decided:** 11 Mar 2020 - **Location (lat, lng):** 53.245827, -6.158813 ## Proposal 184 dwellings and associated site and development works with a total gross floor area (GFA) of 22,133sqm and includes the following accommodation on a plot by plot basis:- Plot T9: 57no. 3 and 4 bed terraced and semi-detached 2 and 3 storey houses, 16no. 2 and 3 bed storey duplex units and a 4 storey apartment block with 22no. apartment units (comprising 3 no. 3 bed units 12 no. 2 bed units and 7 no. 1 bed units). Parking is provided at grade for 179 cars and the plot also accommodates 6no. bin stores and 2 no. ESB Substations. Plot T10: 55no. 3 and 4 bed terraced and semi-detached 2 and 3 storey houses, 12no. 2 and 3 bed storey 3 duplex units and a 4 storey apartment block with 22no. apartment units (comprising 3 no. 3 bed units, 12 no. 2 bed units and 7 no. 1 bed units). Parking is provided at grade for 157 cars and the plot also accommodates 4no. bin stores. Access is provided via proposed new Level 5 roads to the southeast, northwest and southwest of the plots and these new roads are accessed from Castle Street (permitted and constructed under Reg. Ref. DZ15A/0758) which forms the northeastern boundary of the plots. Surface water attenuation is provided on a ''Commercial'' plot (CU2) to the southwest of T9/T10. Foul water connection to existing services within Beckett Park (permitted under Reg. Ref. DZ15A/0814) is provided across plot (T11) to the northwest. Permission is also sought for all hard and soft landscaping, public lighting, boundary treatments and all associated site and development works. This application relates to development within the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014 (as amended). ## In plain English 184 new homes, mainly houses plus two small apartment blocks, on plots T9 and T10 in Tully. - **184** homes - **336** car parking spaces - **4** storeys max ### What's planned A housing scheme of about **22,133** sq.m on two plots off Castle Street in Development Area 8 (Tully). ### Residential **112** three- and four-bed houses of 2–3 storeys, **28** two- and three-bed two-level units, and **44** apartments in two **4**-storey blocks (14 one-bed, 24 two-bed, 6 three-bed). ### Transport Street-level parking for **336** cars (**179** on T9 and **157** on T10). New local roads link to Castle Street. ### Environment Surface water storage on a nearby plot, a foul sewer link through Beckett Park, and landscaping. _This summary was written by AI from the proposal text. Check the council record before relying on it._ ## Conditions ### Condition 2 Conditions 1. The development to be carried out in its entirety in accordance with the plans, particulars and specifications lodged with the application, as amended on 13/02/2020, save as may be required by the other conditions attached hereto. Reason: To ensure that the development shall be in accordance with the permission and that effective control be maintained. 2 .No residential unit shall be occupied prior to the completion to taking in charge standards, of Beckett Park as permitted under Reg. Ref. DZ15A/0814 and Ticknick Park (Remainder of park area) as permitted under Reg. Ref. DZ16A/0570 as per the requirements of Section 7.2 Sequence of Development and Table 7.2, Open Space for Growth Area 2 & 3 of the Planning Scheme, as amended. REASON: To ensure the proposed development is consistent with Section 7.2 (Sequence of Development) and Table 7.2 (Open Space for Growth Area 2 & 3), of the Planning Scheme, as amended. General 3. Prior to the completion of development, the developer shall submit for the written agreement of the Planning Authority, all drawings in digital format (CAD/GIS) projected to ITM (Irish Transverse Mercator). These shall include those for DZ19A/0597 and as further amended by this permission. This information should include the following : • Overall site plans in DWG format (ITM projection in metres) • Ground floor plans of buildings in DWG format (ITM projection in metres) • Site sections and elevations in PDF format. REASON: To ensure consistency with Section 7.4 of the Cherrywood Planning Scheme. Urban Design and Materials 4. With regard to finishes and materials: a. Prior to the commencement of development, the developer shall submit for the written agreement of the Planning Authority, details of the proposed external design/finishes of all buildings, in the form of samples and on site mock ups. The external finishes of buildings shall: v. be of high quality, durable and attractive vi. be practical to source, erect, replace, and maintain/demonstrate environmental performance vii. be compliant with all building regulation standards and requirements which may change during implementation of the Planning Scheme viii. meet the user specification and standards, including those relating to environmental sustainability and wellness. b. Prior to the commencement of development, the developer shall submit for the written agreement of the Planning Authority, revised drawings, including coloured CGI’s which clearly show the design detail, including height and finish of roof plant/lift over run/services/screens. In this design particular regard shall be had to ensure: iv. the height of any such structure shall be kept to a minimum; v. the external finishes be light in colour and blend with the external materials of the building or as otherwise to be agreed by the planning authority. vi. No additional development shall take place above roof level, including lift motors, air handling equipment, storage tanks, ducts or other external plant other than those shown on the drawings hereby approved, unless authorised by a prior grant of planning permission. REASON: To ensure consistency with Objective PD19 and in the interest of orderly development and the visual amenities of the area. 5. An acceptable street naming and dwelling unit numbering scheme (in both Irish and English) shall be submitted for written agreement of the Planning Authority prior to the first marketing of development or the first erection of any advertising hoardings on site, whichever comes first. In this regard, the use of street names reflecting local place names or local history would be acceptable. REASON : To ensure consistency with Specific Objective H6 of the Planning Scheme, and in the interests of orderly development, proper planning and sustainable development. Construction Management 6.The Developer shall comply with the following requirements: - i. The construction of the development shall be managed in accordance with a final Construction Management Plan, which shall be submitted for the development in its entirely to the Planning Authority for agreement in writing, prior to commencement of any development. In this regard the final Construction Management Plan shall include a Community Liaison Plan and a Construction Traffic Management Plan. j. Site development and building works shall be carried out only between the hours of 8.00am to 7.00pm Monday to Friday inclusive, 8.00am to 2.00pm Saturdays and no works permitted on site on Sundays and public holidays. Deviation from these times will only be allowed in exceptional circumstances where prior written approval has been received from the planning authority. This should be addressed in the Community Liaison Plan. k. Construction staff shall be prohibited from parking on public roads. Parking for construction staff shall be provided by the Developer/Contractor within the site boundary. l. Construction vehicles shall not be permitted to park or wait on roads outside the site boundary. All parking and waiting areas shall be provided Developer/Contractor within the site boundary. m. Prior to commencement of development a mechanism and structure for on-site monitoring, reporting on progress and quality control to the Planning Authority in relation to construction standards, materials, as-built drawings and records shall be agreed in writing with the Planning Authority. o. Prior to commencement of development, proposals will be submitted for the written approval of the Planning Authority that demonstrate how it is proposed to maintain the existing road network permitted under DZ15A/0758 to an acceptable standard during the construction phase of the proposed development. p. For the duration of this development, from commencement of construction works (inclusive of enabling works) to completion of construction works, the developer shall undertake continuous monitoring of the road network to be utilised for construction access to this development. In this regard and at a minimum, an independent condition survey of the roads constructed under DZ15A/0758 that are to be utilised for construction access to this development shall be undertaken by suitably qualified engineers/ surveyors appointed by the developer, at the developer’s expense, both prior to commencement of development and prior to occupation of the final phase of the development. The appointment of the enigneers/surveyors shall be agreed in advance and in writing with the Planning Authority and they shall be independent of the Developer and the Developer’s design and construction teams. The condition survey(s) produced are to be submitted for the written agreement of the Planning Authority. Damage, including structural defects, damage to the wearing course, footpaths, kerbs, road markings etc, to the road network that is identified in the condition survey(s) shall be rectified/replaced by the developer, at the developer’s expense and to a taking in charge standard of development which is to the satisfaction of the Planning Authority. REASON: To ensure consistency with Section 2.14 of the Cherrywood Planning Scheme and in the interests of orderly development, proper planning and sustainable development. Archaeology 7. Prior to the commencement of any construction works, the Applicant shall submit an Archaeological Impact Assessment as follows : d. The Applicant shall engage the services of a suitably qualified archaeologist to address the deficiencies in the archaeological assessment of the development site. No sub-surface work shall be undertaken in the absence of the archaeologist without his/her express consent. e. The archaeologist shall carry out relevant documentary research and inspect the site. Test excavations will be expanded in the vicinity of the four archaeological areas already identified in order to clarify the extent of such remains and to identify what impact the proposed development will have on them. f. Having completed the work, the archaeologist shall submit a written report outlining clear archaeological mitigation measures in relation to archaeological material already identified and on any further archaeological impacts that may arise. Where archaeological material/features are shown to be present, preservation in situ, preservation by record (excavation) or monitoring may be required. REASON: To ensure consistency with Section 3.2.4 of the Planning Scheme. Water Supply, Wastewater Infrastructure and Surface Water 8. The detailed design of the water supply infrastructure including details of all connections shall be in accordance with Irish Water specification and requirements. REASON: In the interests of sustainable development and in the interests of consistency with PI 4 of the Planning Scheme. 9.Prior to the commencement of development, the developer shall submit the following for the written agreement of the Planning Authority: a. The full detailed design details for the tree pits proposed in this development inclusive of their interception characteristics and the top water level proposed in their drainage layer given proximity to housing. b. Full detailed design details for the proposed surface water collection system, including the design of the gullies and grilles to be located in permeable/porous paving and comprehensive detail relating to the dissipation of the surface water flow through the stone matrix subgrade and subsequent collection in the surface water sewer network. c. As the ground is unsuitable for infiltration, the collection of runoff from the gardens of the housing units to prevent potential flooding in extreme rainfall events shall be considered in the surface water detailed design process and incorporated into the design if deemed necessary. d. Calculations that demonstrate that the plot level attenuation tanks are sized to accommodate future flow from the adjacent plot CU2. e. All hydraulic calculations and engineering drawings of the proposed surface water layout, representative of the final detailed design and inclusive of the following: • Microdrainage calculations • Catchment areas and calculations • full input data to show the design criteria adopted f. A Stormwater Management Plan for the construction phase g. A detailed operations and maintenance plan for all the proposed SuDS components, inclusive of the attenuation structures. REASON: In the interests of sustainable development; to ensure long term optimum operation of the surface water management system; and to comply with the requirements of the Cherrywood Planning Scheme. 10. The developer shall submit: a. A Stormwater Audit shall be carried out at Stage 2 for the detailed design stage in accordance with PI 7 of the Cherrywood Planning scheme. All audits shall be carried out at the developer’s expense. An independent audit team shall be used and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the commencement of development. b. A Stormwater Audit shall be carried out at Stage 3 for the post construction / prior to opening stage in accordance with PI 7 of the Cherrywood Planning scheme. All audits shall be carried out at the developer’s expense. An independent audit team shall be used and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 3 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the commissioning of the Stormwater infrastructure. REASON: To ensure that the proposed development is consistent with Specific Objective PI 7 of the Cherrywood Planning Scheme and in the interest of the proper planning and sustainable development of the area. 11. The proposed development is considered to be consistent with the Cherrywood Planning Scheme subject to the following conditions: - a. Surface Water discharge from the subject development shall be limited to 1 l/s/ha. b. Prior to the commencement of development or as otherwise agreed in writing with the Planning Authority, the developer shall submit an operations and maintenance plan for the proposed SuDS components, inclusive of the attenuation structures and green roofs, for the written approval of the Planning Authority. REASON: In the interests of sustainable development, to ensure long term optimum operation of the surface water management system and to comply with the requirements of the Cherrywood Planning Scheme. 12. The detailed design of the wastewater infrastructure including details of all connections shall be in accordance with Irish Water specification and requirements. REASON: In the interests of sustainable development and in the interests of consistency with PI 12 of the Planning Scheme. Transportation 13. The neighbourhood roads permitted under this planning application and Castle Street (K5-F1), Bishops Street (F1- A1) shall be constructed in full, inclusive of footpaths on either side, in accordance with the relative cross sections as illustrated under Figure 4.4 of the Planning Scheme. REASON: In order to ensure that the proposed development is consistent with the Planning Scheme and in the interest of the proper planning and sustainable development of the area. 14.Prior to the occupation of the development: c. The developer shall design and implement appropriate traffic management measures for the proposed bus turnabout route through the development to ensure that proposed bus movements are safe for all road users and are not unduly impeded. The measures shall be implemented on a phased basis as required at the developer’s expense. d. The developer shall design and implement appropriate traffic management measures for the proposed internal estate roads and homezone areas of the development to ensure that service and emergency vehicle movements are safe for all road users and are not unduly impeded. The measures shall be implemented on a phased basis as required at the developer’s expense REASON: To safeguard the bus turnabout route through the development and to ensure traffic safety for all road users and to ensure that the proposed development is consistent with the objectives of Planning Scheme. 15. The developer shall comply with the following: d. The developer shall, prior to the commencement of development and for the written agreement of the Planning Authority, submit appropriate plans and drawings show the required road network, signal controls and traffic management measures required to safely facilitate the alternative construction access route to the proposed development. e. A Quality Audit (which shall include a Road Safety Audit, Access Audit, Cycle Audit and Walking Audit) shall be carried out at Stage 2 for the detailed design stage. The audit shall be carried out at the developer’s expense in accordance with the Design Manual for Urban Roads & Streets (DMURS) guidance and TII (Transport Infrastructure Ireland) standards. An independent audit team shall be used and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Audit report shall be submitted for the written agreement of the Planning Authority prior to the commencement of development. f. A Quality Audit (which shall include a Road Safety Audit, Access Audit, Cycle Audit and Walking Audit) shall be carried out at Stage 3 for the post construction / prior to occupation stage. The audit shall be carried out at the developer’s expense in accordance with the Design Manual for Urban Roads & Streets (DMURS) guidance and TII (Transport Infrastructure Ireland) standards. An independent audit team shall be used and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 3 Audit report shall be submitted for the written agreement of the Planning Authority prior to the the occupation of the development. The developer shall ensure that permeable and connecting walking and cycling routes are completed and operational to allow future residents of this development to access public transport, recreational facilities, schools, retail facilities and other key destinations in Cherrywood. Any identified deficiencies identified by the Stage 3 Quality Audit in this regard shall be completed at the developer’s expense to link the development site to the existing public transport infrastructure, recreational facilities, schools, retail facilities and other key destinations in Cherrywood. REASON: To allow for pedestrian and cycle permeability for consistency with the Cherrywood Planning Scheme Table 7.3 and specific objectives PI 14 and PI 20. the developer shall ensure that permeable and connecting walking and cycling routes are completed and operational to allow future residents of this development to access public transport, recreational facilities, schools, retail facilities 16. In the event that Roads Phase 1 is complete, during the construction phase of the proposed development, the alternative construction access route shall revert to the construction route as outlined in Table 6.8.2 of the Planning Scheme upon completion of the Roads Phase 1 as permitted under DZ15A/0758 to taking in charge standard, inclusive of the implementation of the bus gate. In this regard: d. The developer shall submit a construction management plan prior to commencement of work on site for the written agreement of the Planning Authority. e. The construction management plan shall include measures to frequently monitor and review the construction access route until such time that the construction route as outlined in Table 6.8.2 of the Planning Scheme becomes available. f. With regard to the alternative and/or any future construction access serving the site, the construction management plan shall address and continually monitor road and traffic safety impacts, environmental impacts, and impacts on residential amenity. REASON: In order to ensure that the proposed development is consistent with the Planning Scheme and in the interest of the proper planning and sustainable development of the area. 17. On the completion of Roads Phase 1 as permitted under DZ15A/0758 and operational, the occupational access route to the subject development site shall revert to that as indicated in the Planning Scheme. Through traffic of vehicles, with the exception of buses and emergency services, shall be restricted from accessing Castle Street from Bishops Street at Junction F1 and vice versa in order to accommodate bus priority as envisaged in the Planning Scheme and provide a safe an calm environment form the movement of pedestrians and cyclist due to the presence of a bus gate. All purchasers of property in the proposed development shall be made aware of this condition at the point of sale. REASON: In order to ensure that the proposed development is consistent with the Planning Scheme and in the interest of the proper planning and sustainable development of the area 18. To ensure that the future sustainable targets as set out in Table 4.1 of the Cherrywood Planning Scheme are achieved, the Travel Plan for this development is to be reviewed on an Annual Basis. This review should include updated annual travel surveys of resident’s mode share, a review of available sustainable infrastructure to inform the mode share targets and to develop SMART measures for the development on site. This updated report should be submitted to the Planning Authority/ Area Wide Travel Plan Coordinator for review and comments and any actions arising from the review are to be then implemented by the nominated Travel Plan Coordinator. This shall be undertaken until such time that Roads Phase 1 is complete, taken in charge and operational, and the bus gate on Castle Street is operational. REASON: In order to ensure that the proposed development is consistent with the Planning Scheme and in the interest of the proper planning and sustainable development of the area. 19. The elements of Roads Phase 1 as permitted under DZ15A/0758 which serve the proposed development for construction and occupation access, shall not be a public road and shall remain as a private road until such time as Taken in Charge by the Planning Authority in accordance with DZ15A/0758. REASON: In order to ensure that the road materials and specifications meet with the requirements of the Planning Authority and in the interests of the proper planning and sustainable development of the area. 20. Prior to the commencement of development, the developer shall submit revised details and drawings for the proposed bicycle parking and motor cycle parking provision for the written approval of the Planning Authority. In this regard, the developer shall note that parking capacity of the proposed bike stores requires confirmation and that 4 motor cycle spaces per 100 car parking spaces should be provided for the development as per the requirements of the Planning Scheme. REASON: To ensure that the adequate levels of cycle and motorcycle parking are provided to meet the needs of future residents and visitors alike and for compliance with PI 22 of the Planning Scheme 21. With regard to the roads and paved areas that are proposed for taking in charge, the provision and location of service ducts, pipes, manholes and service chambers shall be agreed with the relevant service providers prior to commencement of the road construction works. The services to be considered include electricity, water, gas, telecoms, traffic communication, public lighting. REASON: In the interests of orderly development, to ensure the inclusion of below ground service infrastructure and to avoid subsequent excavation of the newly constructed roadway; to ensure that designs shall meet with the current and future requirements of the Planning Authority (DLR Traffic Section) and the utility and service providers; and to ensure consistency with PI 4, PI 14, PI 26 of the Cherrywood Planning Scheme. Green Infrastructure 22. With regard to landscaping detail: c. Prior to the commencement of development, the developer shall retain the professional services of a qualified Landscape Architect, as his/her Landscape Consultant, throughout the course of the development works; and shall notify the Planning Authority of that appointment in writing prior to commencement. The developer shall engage the Landscape Consultant to procure, oversee and supervise the landscape contract for the implementation of the permitted landscape proposals. When all landscape works are inspected and completed to the satisfaction of the Landscape Consultant, he/she shall prepare, sign and submit a Practical Completion Certificate (PCC), as verification that approved landscape plans and specification have actually been fully implemented. d. Prior to commencement of development of landscape / public realm areas, the developer shall provide the following for the written agreement of the Planning Authority:-Hard landscape plans and construction details for all hard standing pedestrian, cycling, vehicular / maintenance areas and proposed street furniture detailing the specifications of all furniture and surface/finish materials. In this regard, samples, data sheets and or / on site mock ups of all materials shall be provided for the agreement of the written Planning Authority and approved control samples must be held on site at all times. All surfaces and finishes shall include materials that are consistent PD 14. In particular the finishes shall comprise of durable, easily sourced and high quality materials (materials as agreed with the Planning Authority) that harmonise and complement those within the adjoining Linear Park. REASON: To ensure consistency with Specific Objectives PD 14, GI7 and GI 16 of the Cherrywood Planning Scheme. 23. Prior to the commencement of landscape works the following shall be submitted for the written agreement of the Planning Authority: b. Details of Soft Landscape Design to include detailed Planting Plan and Planting Schedule (as appropriate)- stating species/varieties, approximate quantities, sizes, rootball presentation and spacings. Planting mixes should specify a diverse range of species/varieties/cultivars and a diversity of forms and plant sizes (multi-stems, feathered, semi-matures, etc.) using both native and exotic species and pollinator-friendly native species (in accordance with the All-Ireland Pollinator Plan 2015-2020), all designed to provide vegetation that is visually-appealing, bio-diverse, and easily managed. This should include management programmes for all proposed trees, shrubs and other vegetation demonstrating long-term continuity and consistency. REASON: To ensure consistency with Objective GI 65 and Section 5.5 of the Cherrywood Planning Scheme 24. Prior to the commencement of landscape development of residential open spaces, the following shall be submitted for the written agreement of the Planning Authority: c. Final design and details of all play opportunities and facilities (formal and/or informal as appropriate), in respect of design detailing, planting, boundaries, equipment and safety surface in accordance with section 4.7.1, 4.7.2, and 4.7.3 of the Amenity Space Guidance Document. All proposed equipment and ancillaries shall include specifications for the same and proof that all equipment conforms to European Standards EN 1176-1-11 and EN 1177 Playground equipment and surfacing. d. Upon completion of each play space and prior to occupation of the residential units within the subject development, a play map in GIS format which details all play provision provided for within each specific community garden in accordance with 4.6.3 & 4.7.2 of the Cherrywood Amenity Space Guidance Document. The Applicant shall also submit a post-installation Practical Completion Certificate, in accordance with the requirements and guidelines of the Royal Society for the Prevention of Accidents (RoSPA). The Certificate shall be prepared and signed by a suitably qualified (RoSPA-approved), technical professional with expertise and experience in playground design and playground health and safety. REASON: to ensure the provision and construction of safe, quality play provision in compliance with best practice and reputable guidance; and GI 72 of the Cherrywood Planning Scheme and Sections 4.6.3, 4.7.1 & 4.7.2 of the Cherrywood Amenity Space Guidance Document. 25. Prior to the commencement of development and for the written agreement of the Planning Authority the developer shall submit revised landscape proposals omitting proposed trees and hedgerow from the future access point for Plot CU2 as indicated on Map 6.7 of the Planning Scheme. The Planning Authority require that unobstructed future access is ensured between the subject site and adjoining park lands at this access point. REASON: To ensure consistency with Specific Objectives GI 15 of the Cherrywood Planning Scheme. 26. Prior to commencement of development of the landscape / public realm areas, the developer shall provide the following for the written agreement of the Planning Authority:- c. Annotated scaled plans illustrating clear a delineation of the boundaries, interfaces and transitions between private space, communal space, public space including where relevant, details, sections & elevations clearly indicating the location, specification, type & height of all proposed street furniture, edge restraints, structures, boundary treatments and gates in accordance with Objective GI 76 of the Cherrywood Planning Scheme . d. Revised landscape plans, elevations and sections detailing boundaries and interfaces located along building edges and pedestrian /public spaces having regard to Lehaunstown Park boundary and the junction of the future Tully Village. REASON: To ensure consistency with Specific Objective GI 7, GI 8, GI 76, PD 14 of the Cherrywood Planning Scheme. 27. Prior to the commencement of development, the developer shall engage the services of a qualified arborist as an arboricultural consultant, for the entire period of construction activity. The applicant shall inform the Planning Authority in writing of the appointment and name of the consultant, prior to commencement of development. The consultant shall visit the site on a monthly basis, to ensure the implementation of the all of the recommendations in the submitted application. REASON: To ensure consistency with section 5.4.7 of the Cherrywood Planning Scheme. 28. Prior to the commencement of development, the developer shall engage the services of a qualified ecologist as an ecological consultant, from the commencement of construction for the duration of the works. The developer shall inform the Planning Authority in writing of the appointment and name of the consultant, prior to the commencement of development. The consultant shall ensure the implementation of all the recommendations within the submitted Ecological Impact Statement and Bat Assessment. REASON: To ensure consistency with Specific Objective GI 46, GI50 and GI51 of the Planning Scheme 29. Prior to commencement of development, the developer shall submit for the written agreement of the Planning Authority a Method Statement in order to ensure consistency of repairs and finished treatment along the entire length of the boundary wall around Lehaunstown Park House (the granite stone wall to the south of the application site). If the wall is not in the Applicant's ownership then the Applicant is requested to submit information to satisfy the Conservation Officer that the works, namely the construction of the new access road will not lead to further de-stabilisation of the boundary wall of Lehaunstown Park, and give details of mitigation measures to ensure the walls protection as part of the future development. Reason: in order to protect the architectural heritage of the area. 30. Prior to commencement of development, the developer shall comply with the Dun Laoghaire Rathdown County Council Housing Strategy, drawn up in accordance with Part V, Section 96 (4) of the Planning & Development Act, 2000, as amended, and in accordance with agreement to be reached with the County Council Housing Department unless the developer shall have applied for and been granted an exemption certificate under Section 97 of the Planning and Development Act, 2000, as amended. NOTE: Where a developer opts to transfer units to the Council, this shall be subject to the availability of funding. Reason: To comply with the County Council Housing Strategy and Part V of the Planning & Development Act, 2000, as amended. 31. A specification and layout for public lighting shall be submitted to the Planning Authority and agreed in writing before development commences. Public lighting shall be available and operational as each house is occupied. The specification and layout shall comply with the standard as set out in the latest edition of the Council's Development Works in Residential and Industrial Estates or as otherwise agreed by the Planning Authority. REASON: To ensure a satisfactory standard of public lighting. 32. That all necessary measures be taken by the contractor to prevent the spillage or deposit of clay, rubble or other debris on adjoining roads during the course of the works. REASON: To protect the amenities of the area. 33. The location of charge points for electric vehicles shall be in accordance with the requirements of the Planning Authority. Copies of the final detail design shall be provided to the Planning Authorityin writing prior to commencement of development or as otherwise agreed. REASON: To ensure that designs shall be in accordance with the planning scheme Objectives PI 29 and PI 31. 34. All roads shown to be taken in charge shall be designed and constructed to meet Dún Laoghaire-Rathdown County Council's 'Taking-in-Charge' requirements 'Taking In Charge Policy Document (September, 2011 - updated April, 2016)': http://www.dlrcoco.ie/media/media,7464,en.doc and 'Taking in Charge Procedure Document': http://www.dlrcoco.ie/media/media,10719,en.pdf, and all to the satisfaction of the Planning Authority at the developers' own expense. REASON: In the interests of orderly development and the proper planning and sustainable development of the area. 35. Prior to commencement of development the applicant shall submit full details of a properly constituted Owners’ Management Company for the written agreement of the Planning Authority. This shall include a layout map of the permitted development showing the areas to be taken in charge and those areas to be maintained by the Owners’ Management Company. Membership of this Company shall be compulsory for all purchasers of property in the development. Confirmation that this Company has been set up shall be submitted to the Planning Authority prior to the occupation of the first residential unit. Reason: To provide for the satisfactory completion and maintenance of the development in the interest of residential amenity. 36. No additional development shall take place above roof parapet level, including lift motor enclosures, air handling equipment, storage tanks, ducts or other external plant, telecommunication aerials, antennas or equipment, unless authorised by a further grant of planning permission. REASON: To protect the residential amenities of property in the vicinity and the visual amenities of the area. 37. No development on foot of this permission shall commence until security for the provision and satisfactory completion of services (including roads, footpaths, open spaces, public lighting, sewers, watermains and drains) in accordance with the Plans and particulars lodged with the application, has been given by: a.Lodgement with the Council of an approved Insurance Company Bond in the sum of €650,400.00, which shall be kept in force by the Developer until such time as Roads, Open Spaces, Car Parks, Sewers, Watermains and Drains are completed to the satisfaction of the Council OR/... b.Lodgement with the Council of a Cash Sum of €396,800.00, to be applied by the Council at its absolute discretion if such services are not duly provided to its satisfaction on the provision and completion of such services to standard specifications. Reason: To ensure that a ready sanction may be available to the Council to induce the provision of services and prevent dis-amenity in the development. 38.The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €48,125.94, to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of Surface Water Public Infrastructure and Facilities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015 and as included in Table 2 of the Cherrywood Planning Scheme Development Contribution Scheme 2017-2020. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. Reason: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Public Infrastructure and Facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. Note on above Condition: Please note that with effect from 1st January, 2014 Irish Water are now the statutory body responsible for both water and waste water services. Accordingly, the contribution payable has been reduced by the amount of the contribution associated with these services. Further details/clarification can be obtained from Irish Water at Tel. 1 850 278 278. 39. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €1,102,103.00, to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015 and as included in Table 2 of the Cherrywood Planning Scheme Development Contribution Scheme 2017-2020. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. Reason: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 40. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €715,402.14, to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Community & Parks Public Infrastructure, Facilities and Amenities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015 and as included in Table 2 of the Cherrywood Planning Scheme Development Contribution Scheme 2017-2020. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. Reason: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks Public Infrastructure, Facilities and Amenities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 41. This development shall not be carried out without prior agreement, in writing, between the Applicants and the Planning Authority relating to the payment of development contributions. Reason: Investment by Dún Laoghaire-Rathdown County Council in Local Authority works has facilitated and will facilitate the proposed development. It is considered appropriate and reasonable that the developer should contribute to the cost of same. 42.A financial contribution shall be paid by the proposer to the Council towards the cost of the extension of Luas Line B from the Sandyford Depot to Cherrywood, namely Luas Line B1. This contribution to be paid prior to the commencement of the development or in such other manner as may otherwise be agreed with the Planning Authority. The rate of contribution payable shall be that pertaining to the particular year in which implementation of the Planning Permission is commenced. The Supplementary Development Contribution Scheme provides for an annual increase in the levels of contribution payable, as outlined in the scheme, by a factor of 5% compound interest per annum. The levels of contribution will be reviewed annually on the 13th of January of each year during which the scheme is in force to take account of the aforementioned increase. The rate of contribution payable in respect of this development, at current contribution rates, is €1,243,521.09, and is subject to increase as outlined above. It should be noted that contributions assessed in accordance with the Supplementary Development Contribution Scheme cannot be appealed to An Bord Pleanala unless the applicant considers the levy referred to in this condition has not been properly applied in accordance with the terms of the Scheme. Reason: To part finance the extension of the Luas Line B1 from Sandyford Depot to Cherrywood, as provided for in the Supplementary Development Contribution Scheme adopted by the Council of Dun Laoghaire-Rathdown on the 13th of January, 2003. (incorporating amendments to Clause 13 as adopted by the County Council at its meeting on 13th May, 2013 – to be effective for all decisions from 14th May, 2013). 43. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €95,863.45, to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of Surface Water Public Infrastructure and Facilities benefiting development in the the Cherrywood Planning Scheme Area only of the Authority as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. Reason: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Public Infrastructure and Facilities benefiting development in the in the Cherrywood Planning Scheme area and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 44. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €610,048.11, to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Roads Public Infrastructure and Facilities in the Cherrywood Planning Scheme Area. This Cherrywood Planning Scheme element of the Development Contribution shall be used solely to fund infrastructure identified in the Plan, as listed in Appendix III – Cherrywood Planning Scheme Projects List, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. Reason: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the Cherrywood Planning Scheme Area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 45. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €165,583.95, to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of provision of the Community & Parks Public Infrastructure Facilities & Amenities in the Cherrywood Planning Scheme Area. This Cherrywood Planning Scheme element of the Development Contribution shall be used solely to fund infrastructure identified in the Plan, as listed in Appendix III- Cherrywood Planning Scheme Area only as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. Reason: It is considered reasonable that the payment of a contribution be required in respect of the provision of the community and parks, public infrastructure facilities, and amenities benefitting development in Cherrywood Planning Scheme area of the Planning Authority and that is provided, or that is intended will be provided, by or behalf of the Local Authority. ## Nearby applications - [DZ26B/0186/WEB](https://cherrywoodplans.com/application/DZ26B-0186-WEB.md): 4 Mercer Row,Laughanstown, Dublin 18, D18XH7P. Granted (25 May 2026). Three new roof windows added to the front of a house on Mercer Row. - [DZ26B/0153/WEB](https://cherrywoodplans.com/application/DZ26B-0153-WEB.md): 4 Mercer Row, Laughanstown, Dublin, D18XH7P. Refused or withdrawn (19 Mar 2026). Three new roof windows added to the front of a house on Mercer Row. - [DZ23A/0455](https://cherrywoodplans.com/application/DZ23A-0455.md): Area 8 (Tully) Cherrywood SDZ Lands, Laughanstown, Dublin 18. Granted (27 Oct 2023). Amends a permitted Tully housing scheme to provide 5 three-bed houses on Mercer's Road in place of 5 homes dropped by condition. - [DZ21A/0699](https://cherrywoodplans.com/application/DZ21A-0699.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (23 Sep 2021). Smaller first-floor bathroom windows on 33 permitted houses in Tully. - [DZ20A/0552](https://cherrywoodplans.com/application/DZ20A-0552.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18,. Granted (11 Mar 2021). 163 new homes, mostly houses, between Castle Street and Tully Park. - [DZ22A/0820](https://cherrywoodplans.com/application/DZ22A-0820.md): Townlands of Laughanstown, Brennanstown and Cherrywood,, Dublin 18. Granted (12 Dec 2022). Makes minor changes to the already-permitted 168-home scheme in Tully, swapping the designs of 12 houses and altering some roofs. - [DZ22A/0403](https://cherrywoodplans.com/application/DZ22A-0403.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Refused or withdrawn (22 Jul 2022). Makes minor changes to the already-permitted 168-home scheme in Tully, swapping the designs of 12 houses and altering some roofs. - [DZ22A/0623](https://cherrywoodplans.com/application/DZ22A-0623.md): On Lands Development ,Plot T 11, Area 8 (Tully), Cherrywood SDZ, Laughanstown, Dublin 18. Granted (18 Jan 2023). 49 new houses on plot T11 west of Castle Street in Tully. - [DZ22A/0770](https://cherrywoodplans.com/application/DZ22A-0770.md): On Lands Development Area 8 (Tully), Cherrywood SDZ, Laughanstown, Dublin 18. Granted (22 Mar 2023). 71 homes, a crèche, shops and a community room on plot T11 west of Castle Street in Tully village centre. - [DZ22A/0550](https://cherrywoodplans.com/application/DZ22A-0550.md): Lehaunstown Park Open Space, Laughanstown, Dublin 18. Granted (13 Apr 2023). Turns a temporary car park into Lehaunstown Park Open Space with community gardens and a play plaza. - [DZ26A/0750/WEB](https://cherrywoodplans.com/application/DZ26A-0750-WEB.md): Unit B, Mercer Way, Tully Village Centre West, Dublin 18, D18C58F. Refused or withdrawn (7 Oct 2026). Combines two permitted shop units at Tully Village Centre into one convenience store with an off-licence. - [DZ25A/0044/WEB](https://cherrywoodplans.com/application/DZ25A-0044-WEB.md): In the Townlands of Laughanstown, and Brennanstown, Dublin 18. Granted (10 Jul 2025). Amends a permitted Lehaunstown scheme to add a storey to two buildings, taking it from 492 to 517 homes, with fewer car spaces. - [DZ21A/0334](https://cherrywoodplans.com/application/DZ21A-0334.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (7 Apr 2022). 482 new homes, mostly apartments in five blocks up to 5 storeys, beside Barrington's Road and the Luas in Lehaunstown. - [DZ20A/0585](https://cherrywoodplans.com/application/DZ20A-0585.md): on a site in the Townlands of Laughanstown and Cherrywood, Dublin 18. Refused or withdrawn (2 Jun 2021). A temporary sales and marketing suite with 8 parking spaces for just under 5 years off Gun and Drum Hill Road. - [REF20225](https://cherrywoodplans.com/application/REF20225.md): Lehaunstown Park House, Laughanstown, Co Dublin, (A Protected Structure). Granted (23 Jan 2026). Minor internal changes to the stable building at Lehaunstown Park House, a protected structure. - [DZ23A/0359](https://cherrywoodplans.com/application/DZ23A-0359.md): Lehaunstown Park House, Lehaunstown Co Dublin. Granted (17 May 2024). Restores Lehaunstown Park House and its tower house, converts the stables to shops, and builds a large garden centre. - [DZ25A/0014/WEB](https://cherrywoodplans.com/application/DZ25A-0014-WEB.md): Townlands of Laughanstown & Brennanstown, Dublin 18. Granted (3 Mar 2025). Amends the permitted Tully village centre (plot T1) to shrink the basement, cutting car parking from 210 to 157 spaces. - [DZ23A/0106](https://cherrywoodplans.com/application/DZ23A-0106.md): Lands in the Townlands of Laughanstown and Brennanstown, Dublin 18. Granted (22 Sep 2023). A village centre at Tully with a supermarket, shops, cafés and 139 build-to-rent apartments in two blocks of 3–5 storeys. - [DZ26A/0052/WEB](https://cherrywoodplans.com/application/DZ26A-0052-WEB.md): Townland of Laughanstown, Cherrywood, Dublin 18. Granted (24 Mar 2026). Makes minor layout and landscaping changes to a permitted Tully housing scheme, moving bin stores to the front of the two-level homes. - [DZ18A/0458](https://cherrywoodplans.com/application/DZ18A-0458.md): on lands (c.0.74 HA) in the townland of Laughanstown, Dublin 18 (Development Area 8 - Tully). Granted (11 Jul 2018). Builds a new primary school with 24 classrooms plus a special needs unit, south-west of Tully Park. - [DZ21A/1042](https://cherrywoodplans.com/application/DZ21A-1042.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (30 May 2022). 122 new homes, a mix of houses, two-level units and apartments, beside Tully Park and Lehaunstown Lane. - [DZ24A/0696/WEB](https://cherrywoodplans.com/application/DZ24A-0696-WEB.md): Townlands of Laughanstown, and Brennanstown, Dublin 18. Granted (29 Oct 2024). Amends a permitted Tully scheme to add 4 apartments by raising part of Apartment Building 1 to 4 storeys. - [DZ21A/0664](https://cherrywoodplans.com/application/DZ21A-0664.md): Site in the Townlands of, Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (5 May 2022). 47 apartments in a 4-storey block off Castle Street in Tully. - [D06A/1016](https://cherrywoodplans.com/application/D06A-1016.md): Townland of Laughanstown, Cherrywood, Loughlinstown, Co. Dublin.. Granted (28 Nov 2006). Builds a 110 kV ESB electrical transformer station in Laughanstown. - [DZ23A/0443](https://cherrywoodplans.com/application/DZ23A-0443.md): Lands in the townlands of Laughanstown, Dublin 18, (Lands within 'Development Area 7- Macnebury', including part of the Res 2 plot known as 'M4, located West & South of Castle Street, south of Lehaunstown Lane and North of Bishop Street. Granted (7 Nov 2023). Changes a condition so 66 permitted homes in Macnebury can be occupied before the Cherrywood Avenue/Beckett Road underpass is built. - [DZ21A/1085](https://cherrywoodplans.com/application/DZ21A-1085.md): Lands of Laughanstown, Dublin 18, (Lands within 'Development Area 7- Macnebury', M4, located West & South of Castle Street, south of Lehaunstown Lane and North of Bishop Street. Granted (2 Dec 2022). Builds 65 three-bed homes in five three-storey blocks in Macnebury, west of Castle Street. - [DZ26A/0579/WEB](https://cherrywoodplans.com/application/DZ26A-0579-WEB.md): Castle Street (M5), Laughanstown, Dublin 18 (Development Area 7 Macnebury - Res2 Plot). More information requested (22 Sep 2026). 40 new homes, mostly 3-bed two-level apartments, off Castle Street in Macnebury. - [DZ24A/0686/WEB](https://cherrywoodplans.com/application/DZ24A-0686-WEB.md): Townlands of Laughanstown, and Brennanstown, Dublin 18. Refused or withdrawn (4 Sep 2024). Amends a permitted Tully scheme to add 4 apartments by raising part of Apartment Building 1 to 4 storeys. - [DZ23A/0028](https://cherrywoodplans.com/application/DZ23A-0028.md): Townlands of Laughanstown and Brennanstown, Dublin 18. Granted (8 Dec 2023). 56 new homes and a 3-storey childcare centre on tile T13 beside Beckett Park and Castle Street in Tully. - [DZ15A/0814](https://cherrywoodplans.com/application/DZ15A-0814.md): Laughanstown, Dublin 18, (Beckett Park). Granted (13 Jul 2016). Beckett Park: a new 5.1-hectare public park in Tully with a sports pitch, tennis courts, playground and pavilion café. - [DZ22A/0729](https://cherrywoodplans.com/application/DZ22A-0729.md): Townlands of, Laughanstown, Brennanstown and, Cherrywood, Dublin 18. Granted (22 Sep 2023). 57 new homes, houses and 3-bed two-level apartments, off Gun and Drum Hill Road in Tully. - [DZ21A/1038](https://cherrywoodplans.com/application/DZ21A-1038.md): site 1.85 ha at Castle Street and Bishop Street, Cherrywood, Dublin 18. Granted (8 Nov 2022). Builds a new 1,000-pupil secondary school at Castle Street and Bishop Street, Cherrywood. - [DZ17A/0172](https://cherrywoodplans.com/application/DZ17A-0172.md): Site in the townlands of Laughanstown and Tiknick, Shankill, Co. Dublin. Granted (13 Apr 2017). Lets two existing 110 kV overhead power lines in Laughanstown and Tiknick stay for five more years. - [DZ16A/0995](https://cherrywoodplans.com/application/DZ16A-0995.md): Laughanstown and Tiknick, Shankill, Co. Dublin. Refused or withdrawn (22 Feb 2017). ESB seeks to keep two existing 110kV overhead power lines near Cherrywood substation for another five years. - [DZ20A/0946](https://cherrywoodplans.com/application/DZ20A-0946.md): Lands known as Tully Park (c12.9HA), Laughanstown, Dublin 18. Granted (18 Feb 2021). Revises part of the permitted Tully Park, moving the café kiosk, redesigning the playground and adding a raised boardwalk. - [DZ21A/1069](https://cherrywoodplans.com/application/DZ21A-1069.md): The overall site area of this application is approximately 8.7Ha. Townlands of Laughanstown and Brennanstown Dublin 18. Granted (2 Feb 2022). Minor changes to a permitted 136-home scheme in Tully so it can be built and occupied in phases. - [DZ15A/0813](https://cherrywoodplans.com/application/DZ15A-0813.md): Laughanstown, Dublin 18, (Tully Park). Granted (13 Jul 2016). Creates Tully Park, a 12.9-hectare public park with a playground, café kiosk and nature trails. - [DZ20A/0399](https://cherrywoodplans.com/application/DZ20A-0399.md): Townlands of Laughanstown and Brennanstown, Tully Development Area 8, Cherrywood, Dublin 18. Granted (22 Jan 2021). 136 new homes, mostly houses and two-level apartments, in Tully between Castle Street and the Luas, plus the Castle Street extension. - [DZ26A/0151/WEB](https://cherrywoodplans.com/application/DZ26A-0151-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18.. Granted (24 Jun 2026). 188 new homes, a mix of apartments, two-level units and houses, beside Tully Park off Bishop Street. - [DZ22A/0133](https://cherrywoodplans.com/application/DZ22A-0133.md): Townlands of Laughanstown and Cherrywood, Dublin 18. Granted (22 Nov 2022). Builds 163 homes, a mix of apartments, triplexes, maisonettes and houses, beside Tully Park. - [DZ26A/0580/WEB](https://cherrywoodplans.com/application/DZ26A-0580-WEB.md): Bishop Street (M3a), Laughanstown, Dublin 18 (Development Area 7 Macnebury - Res3 Plot). More information requested (22 Sep 2026). 32 new homes, mostly 3-bed two-level apartments, off Bishop Street in Macnebury. - [DZ15A/0758](https://cherrywoodplans.com/application/DZ15A-0758.md): in the townlands of Cherrywood, Laughanstown, Brennanstown, Loughlinstown and Glebe, Dublin 18. Granted (16 Aug 2016). Phase 1 roads for Cherrywood: about 5.4km of new and upgraded roads including Grand Parade, Castle Street and Bishop Street. ## Links - [This page on CherrywoodPlans](https://cherrywoodplans.com/application/DZ19A-0597) - [Council record, documents and conditions (DLR planning portal)](https://planning.agileapplications.ie/dunlaoghaire/application-details/83636) - [All Cherrywood applications](https://cherrywoodplans.com/applications.md) _Source: Dún Laoghaire–Rathdown County Council planning data, refreshed daily. CherrywoodPlans is an independent site, not run by the council._