# Planning application DZ19A/0622 > Beech Park, Bray Road, Cabinteely, Dublin 18 / Loughlinstown, County Dublin, Cherrywood, Dún Laoghaire–Rathdown. Granted (17 Oct 2019). - **Reference:** DZ19A/0622 - **Address:** Beech Park, Bray Road, Cabinteely, Dublin 18 / Loughlinstown, County Dublin - **Status:** Granted (17 Oct 2019) - **Decision:** GRANT PERMISSION - **Application type:** Permission (SDZ) - **Applicant:** O'Flynn Construction (Cabinteely) Limited - **Lodged:** 23 Aug 2019 - **Decided:** 17 Oct 2019 - **Location (lat, lng):** 53.253747, -6.145642 ## Proposal The reconfiguration of Apartment Blocks D, E and F, comprising; amendments to the internal layout of the 78 No. permitted apartments; the provision of (minor) associated alterations to the facade designs and treatments, circulation areas and lift cores, the parking layout at undercroft level of Blocks D, E and F and associated landscaped areas, including amendments to the permitted roof and solar panels; the provision of a Residents' Fitness Centre at the undercroft level of Block F (c.80 sq m); and all other associated site excavation, and infrastructural and site development works above and below ground. The proposed development comprises a reduction in the permitted floor area of Block D (c.33.5 sq m at Undercroft Car Park Level and c.53.5 sq m at each level from permitted Ground to permitted Fourth Floor levels (resulting in the removal of some 301 sq m). (Due to the reconfiguration of part of the permitted building, the proposed development will result in the provision of 63 No. two-bedroom apartments and 15 No. one-bedroom apartments. (66 No. two-bedroom apartments and 12 No. one-bed apartments are permitted under Application Reg. Ref. D15A/0385 (An Bord Pleanala Ref. ABP300194-17). However, the total number of residential units permitted on site will not change.) Since the granting of Permission in June 2018. Dun Laoghaire-Rathdown County Council has acquired some 0.83 hectares of the site to facilitate the new roadway known as P-Q in the Cherrywood SDZ Planning Scheme 2014, currently under construction, and additional lands within the parent permission outside the Planning Scheme area. The Application also seeks to decouple those lands and other Council-owned lands from the site area to facilitate potential future revised applications not reliant on the Local Authority's agreement to include such lands. this would result in two landholdings of c.0.98 and c.4.315 ha from the original c.5.295 hectares as shown on Tom Phillips + Associates Drawing No. 2019-BP-1897-002 that forms part of the Application. ## In plain English Amends the permitted Beech Park scheme to reconfigure 78 apartments and split off land taken by the Council for a new road. - **78** apartments - **80** sq.m gym - **5.295** hectares ### What's planned An amendment to an earlier permission (D15A/0385) for Blocks D, E and F at Beech Park. The total number of homes does not change. ### Residential The **78** apartments become **63** two-beds and **15** one-beds (previously **66** and **12**). Block D shrinks by about **301** sq.m, and an **80** sq.m residents' fitness centre is added. ### Scale The Council acquired about **0.83** hectares for the new P-Q road. The **5.295**-hectare site would be split into holdings of about **0.98** and **4.315** hectares. _This summary was written by AI from the proposal text. Check the council record before relying on it._ ## Conditions ### Condition 1 1. Save for the amendments granted on foot of this permission, the development shall otherwise be carried out in strict accordance with the terms and conditions of Planning Permission Reg. Ref. D15A/0385/ ABP300194-17 save as may be required by the other conditions attached hereto. Reason: In the interest of the proper planning and sustainable development of the area and in the interest of the effective management of development and to ensure that the development is consistent with the Cherrywood Planning Scheme. 2. This permission relates solely to the proposed reconfiguration of Apartment Blocks D, E and F comprising amendments to the internal layout of the 78 no. apartments, the provision of associated alterations to the façade designs and treatments, circulation areas and lift cores, the parking layout at under-croft level beneath Block D, E and F and associated landscaped areas (as shown in the red hatched line on drawing no. P2-S-B-201), including amendments to the permitted roof and solar panels. It does not include the decoupled lands (as shown on drawing no. 2019-BP-1897-002). The red line boundary of the application site shall be maintained in accordance with the red line boundary of the residential development granted planning permission under Reg. Ref. D15A/0385 / ABP300194-17. REASON: In the interest of clarity and, to ensure that the development shall be in accordance with the parent permission and that effective control be maintained and to ensure access to the residential development. 3. The proposed Resident’s Fitness Centre at under-croft level shall be omitted. Prior to commencement of development the applicant shall submit full details of the proposed revised under-croft car park beneath blocks D, E and F (as shown in the red hatched line on drawing no. P2-S-B-201) to the Planning Authority for its written agreement. In this regard all under-croft car parking spaces should be capable of accommodating electrical charge points. REASON: In the interest of proper planning and sustainable development. 4. The Applicant shall ensure the allocation of a minimum of 1 standard car parking space for each residential apartment unit. All spaces for residents and visitors shall be in accordance with Dun Laoghaire Rathdown County Council 2016-2022 County Development Plan Section 8.2.4.5. The car parking spaces for the residential apartment units must be sold off with the units and not sold separately or let to avoid non take up by residents who would then park elsewhere at adjoining residential estates, undermining the demand management measures of parking constraint. The Applicants shall give an undertaking to the Planning Authority in this respect in writing prior to the commencement of development. REASON: In the interest of the proper planning and sustainable development of the area. 5. Prior to the commencement of development the applicant is requested to demonstrate vehicle manoeuvres for access to and from proposed amended undercroft car parking spaces to the Planning Authority for its written agreement. The Applicant shall show the above on a detailed layout drawing by using a Computer Aided Design (CAD) software such as Autoturn or similar computerised design software. The proposed basement car park shall be in accordance with Dun Laoghaire-Rathdown County Development Plan (2016-2022) Section 8.2.4.10 and comply with requirements of the Institution of Structural Engineers booklet entitled ‘Design Recommendations for Multi Storey and Underground Car Park Fourth Edition’ (2011). Reason: In the interest of proper planning and vehicular traffic and pedestrian safety. 6. Prior to the commencement of development the applicant is requested to submit drawings to the Planning Authority for its written agreement showing that all cycle parking areas and facilities are correctly designed to requirements of Section 8.2.4.7 of the 2016-2022 Dun Laoghaire-Rathdown County Development Plan and the Dun Laoghaire Rathdown County Council – Standards for Cycle Parking and associated Cycling Facilities for New Developments (January 2018). https://www.dlrcoco.ie/en/travel-transport/traffic-management/cycling. The Applicant shall ensure adequate space to access all proposed bicycle spaces. Reason: In the interest of proper planning and promoting sustainable modes of transport. 7. Prior to the commencement of development the applicant is requested to submitted full dimensioned details to the Planning Authority for its written agreement of the location (covered/uncovered) and area of all proposed Apartment Block cycle parking spaces (resident and visitor cycle parking). Access routes to and from bicycle parking shall also be demonstrated. Reason: In the interest of proper planning and promoting sustainable modes of transport. 8. Prior to the commencement of development, the applicant is requested to submit full details of the proposed Bauder BioSolar/Green Roof to the Planning Authority for its written agreement. Details shall include a construction plan and a post-construction maintenance specification and schedule. Maintenance contractors with specialist training in green roof care should be used, where possible. Thereafter the works shall be carried out in accordance with the agreed details and the green roof shall be maintained at all times in accordance the post-construction maintenance specification and schedule. Reason: In the interest of public health. 9. Prior to the commencement of development the applicant shall submit for the written agreement of the Planning Authority full details of the proposed external finishes including materials, colours and textures. Reason: In the interest of visual amenity. 10. Prior to commencement of development, the developer shall comply with the Dún Laoghaire-Rathdown County Council Housing Strategy, drawn up in accordance with Part V, Section 96(4) of the Planning & Development Act, 2000, as amended by Section 3 of the Planning & Development (Amendment) Act, 2002, and in accordance with agreement to be reached with the County Council Housing Department unless the developer shall have applied for and been granted an exemption certificate under Section 97 of the Planning and Development Act, 2000, as amended. REASON: To comply with the County Council Housing Strategy & Part V of the Planning & Development Act, 2000, as amended by Section 3 of the Planning & Development (Amendment) Act, 2002. 11. All financial contributions are to be paid on foot of conditions of Planning permission Register Reference D15A/0385/ ABP300194-17. Reason: It is considered reasonable that payment of a contribution be required in respect of the provision of public infrastructure and facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. ## Nearby applications - [DZ20A/0491](https://cherrywoodplans.com/application/DZ20A-0491.md): Site of c. 5.295 hectares, located at Beech Park (also known as Beechpark), Bray Road, Cabinteely, Dublin 18/Loughlinstown, County Dublin. Granted (19 Oct 2020). Amends a permitted Beech Park apartment block, raising it from 65 to 70 homes with no change in parking. - [DZ20A/0362](https://cherrywoodplans.com/application/DZ20A-0362.md): On a site of c. 5.295 hectares, Beech Park (also known as Beechpark), Bray Road, Cabinteely, Dublin 18, Loughlinstown, County Dublin. Granted (31 Aug 2020). Amends the Beech Park scheme on Bray Road to add 3 apartments to Block F, a gym and a pet room, and more bike parking. - [DZ20A/0056](https://cherrywoodplans.com/application/DZ20A-0056.md): Beech Park (also known as Beechpark), Bray Road, Cabinteely, Dublin 18/Loughlinstown, County Dublin. Granted (18 Mar 2020). Amends the permitted Beech Park scheme to reconfigure 78 apartments in Blocks D, E and F. - [DZ19A/0768](https://cherrywoodplans.com/application/DZ19A-0768.md): Beech Park, Bray Road, Cabinteely, Dublin 18, Loughlinstown, Co. Dublin. Granted (29 Nov 2019). Amends the permitted Beech Park scheme to reconfigure 78 apartments in Blocks D, E and F and add a residents' gym. - [D15A/0385](https://cherrywoodplans.com/application/D15A-0385.md): Site of 5.295 ha approximately at Beech Park, Cabinteely, Dublin 18 / Loughlinstown, Co Dublin and its connection with the N11.. Granted (18 Oct 2017). 164 homes, mostly houses and two-level apartments, at Beech Park, Cabinteely, plus the first stretch of the Druid's Glen Road. - [DZ20A/0073](https://cherrywoodplans.com/application/DZ20A-0073.md): At a site of c. 5.295 hectares, Beech Park, Bray Road, Cabinteely, Dublin 18, Loughlinstown, Co. Dublin. Granted (30 Jun 2020). Redesign of three permitted apartment blocks at Beech Park, Bray Road, changing the unit mix but keeping 65 apartments. - [DZ16A/0587](https://cherrywoodplans.com/application/DZ16A-0587.md): Site of 2.79 ha approx. at Beech Park, Bray Road, Cabinteely, Dublin 18/Loughlinstown, Co Dublin. Granted (21 Dec 2016). 34 houses at Beech Park, Bray Road, replacing six homes, plus part of the Druid's Glen Road and bridge. - [DZ19A/0863](https://cherrywoodplans.com/application/DZ19A-0863.md): Site is generally bounded by Lehaunstown Lane to the west, Carrickmines Stream (partly) to the south and, Cabinteely Stream (partly) to the east and is located within the townland of, Brennanstown, Dublin 18. Granted (14 Jan 2020). 342 new homes in Druid's Glen, Brennanstown, with a crèche and part of the Druid's Glen road and bridge. - [DZ26A/0245/WEB](https://cherrywoodplans.com/application/DZ26A-0245-WEB.md): Lands within the Townland of, Brennanstown, Dublin 18. Granted (30 Jul 2026). Amends a permitted Druid's Glen scheme, adding 18 apartments and enlarging the childcare facility. - [DZ25A/0515/WEB](https://cherrywoodplans.com/application/DZ25A-0515-WEB.md): Lands within the Townland of, Brennanstown, Dublin 18. Granted (4 Dec 2025). Amends Phases 2 and 3 of a permitted Druid's Glen scheme, swapping unit types and adding 7 homes (346 to 353). - [DZ24A/0621/WEB](https://cherrywoodplans.com/application/DZ24A-0621-WEB.md): Lands within the Townland of Brennanstown, Brennanstown, Dublin 18. Granted (21 Jan 2025). Amends Phase 1 of a permitted Druid's Glen scheme, adding 4 homes to bring the total from 342 to 346. - [DZ24A/0585/WEB](https://cherrywoodplans.com/application/DZ24A-0585-WEB.md): Lands within the Townland of Brennanstown, Brennanstown, Dublin 18. Refused or withdrawn (8 Aug 2024). Amends Phase 1 of a permitted Druid's Glen scheme, adding 4 homes to bring the total from 342 to 346. - [PC/IC/02/16](https://cherrywoodplans.com/application/PC-IC-02-16.md): N11, Cabinteely, Dublin 18. Granted (12 Jun 2017). Builds a new signalised junction on the N11 at Cabinteely with crossings, bus stops and landscaping. - [D04A/0988](https://cherrywoodplans.com/application/D04A-0988.md): BRENNANSTOWN, CABINTEELY, DUBLIN 18.. Refused or withdrawn (22 Oct 2004). A large Brennanstown development of 702 homes in 26 buildings of 3 to 8 storeys, with a school building, shop and community hall. - [DZ18A/0208](https://cherrywoodplans.com/application/DZ18A-0208.md): Site approx. 6.57ha in area and generally bounded by, Lehaunstown Lane to the west, Carrickmines Stream (partly) to the south, and Cabinteely Stream, (partly) to the east that is, located within the townland of, Brennanstown, Dublin 18. Granted (4 Feb 2020). Builds 367 homes, a mix of apartments, two-level units and houses, plus a childcare facility in Brennanstown. - [PC/CSDZ/005/2021](https://cherrywoodplans.com/application/PC-CSDZ-005-2021.md): Cherrywood Strategic Development Zone, Townland of Laughanstown, County Dublin. Granted (5 Jul 2021). A council plan for a regional storm water pond (Pond 2A) in Laughanstown, draining to the Cabinteely River. - [D22A/0350](https://cherrywoodplans.com/application/D22A-0350.md): Circle K Centenary Service Station, Bray Road, Dublin 18, D18AK58. Granted (25 Aug 2022). Shop revamp at the Circle K service station on Bray Road, adding a deli and enlarging the retail area. - [D06A/0452](https://cherrywoodplans.com/application/D06A-0452.md): Centenary Service Station, Bray Road, Cabinteely, Dublin 18.. Granted (26 May 2006). Lets part of the approved shop at Centenary Service Station, Cabinteely, operate as an off-licence. - [D05A/0567](https://cherrywoodplans.com/application/D05A-0567.md): Centenary Service Station, Bray Road, Cabinteely, Dublin 18.. Granted (20 Jan 2006). Upgrades the shop and car wash at Centenary Service Station, Cabinteely, adding a hot food deli. - [D05A/0322](https://cherrywoodplans.com/application/D05A-0322.md): Centenary Service Station, Bray Road, Cabinteely, Dublin 18.. Refused or withdrawn (19 Apr 2005). Upgrades the shop and car wash at Centenary Service Station, Cabinteely, adding a hot food deli. - [D18A/0590](https://cherrywoodplans.com/application/D18A-0590.md): The Pines, Lehaunstown Lane, Cabinteely, Dublin 18, D18 E3X7. Granted (11 Sep 2018). Replaces a septic tank with a modern wastewater treatment system at The Pines, Lehaunstown Lane. - [D15A/0716](https://cherrywoodplans.com/application/D15A-0716.md): Cartref and Ards, Old Bray Road, Cabinteely, Dublin 18. Refused or withdrawn (19 Jan 2016). 51 homes, apartments and houses, at Cartref and Ards on the Old Bray Road. - [D06A/0557](https://cherrywoodplans.com/application/D06A-0557.md): Grounds and Dwellings Ards & Cartref, Old Bray Road, Cabinteely, Dublin 18. Granted (9 Nov 2006). 77 apartments and two-level homes in 3 blocks of 2 to 5 storeys at Ards and Cartref, Old Bray Road. - [D08A/0717](https://cherrywoodplans.com/application/D08A-0717.md): Ards, Cartref and Foxley, Old Bray Road, Cabinteely, Dublin 18.. Refused or withdrawn (14 Aug 2008). 127 apartments, penthouses and two-level homes in 4 buildings at Ards, Cartref and Foxley, Old Bray Road. - [D18A/0551](https://cherrywoodplans.com/application/D18A-0551.md): Site (c.1.46ha) at Ards, Cartref and lands to the rear of Foxley, Old Bray Road, Cabinteely, Dublin 18. Granted (23 Jan 2019). 72 homes, apartments and houses, at Ards, Cartref and behind Foxley on the Old Bray Road. - [D08A/1293](https://cherrywoodplans.com/application/D08A-1293.md): Lehaunstown House, Lehaunstown, Cabinteely, Dublin 18. Refused or withdrawn (30 Jan 2009). Extensions to Lehaunstown House, Cabinteely, making it a 5-bedroom home with a sunroom and pool. - [D08A/0728](https://cherrywoodplans.com/application/D08A-0728.md): Lahaunstown House, Lahaunstown, Cabinteely, Dublin 18.. Refused or withdrawn (31 Jul 2008). A new 4-bedroom, two-storey house beside Lahaunstown House, Cabinteely. - [DZ25A/0318/WEB](https://cherrywoodplans.com/application/DZ25A-0318-WEB.md): Lands within the townland of Brennanstown, Dublin 18. Granted (20 Aug 2025). 24 new two-storey houses off the Druid's Glen road in Brennanstown. - [DZ23A/0083](https://cherrywoodplans.com/application/DZ23A-0083.md): Druid House & Glendruid House (protected structure), Lehaunestown Lane, Brennanstown Road, Brennanstown, Dublin 18. Granted (20 Oct 2023). Rebuilding a boundary wall on Lehaunstown Lane and a new access road to prepare for the permitted Druid's Glen Road. - [D02A/0317](https://cherrywoodplans.com/application/D02A-0317.md): Site (walled garden) Glendruid, Brennanstown Road,, Cabinteely, Dublin 18.. Granted (10 Jun 2002). Builds a two-storey, four-bedroom house with a garage and stables in the walled garden at Glendruid, a protected structure. - [DZ21A/0414](https://cherrywoodplans.com/application/DZ21A-0414.md): Townland of Laughanstown, Dublin 18. Granted (5 May 2022). 107 new homes, a mix of apartments and houses, north-west of Tullyvale. - [DZ25A/0152/WEB](https://cherrywoodplans.com/application/DZ25A-0152-WEB.md): Land in the townland of Laughanstown, Dublin 18, located north-west of the Tullyvale residential development.The application relates to development in. Granted (11 Jul 2025). Amends an earlier housing permission to shrink the planned basement car park to 13 spaces. - [D13A/0545](https://cherrywoodplans.com/application/D13A-0545.md): Tablick, Lehaunstown, Cabinteely, Co Dublin. Granted (24 Jan 2014). Extends and alters a dormer bungalow at Tablick, Lehaunstown, adding a larger kitchen and an ensuite. - [D10A/0262](https://cherrywoodplans.com/application/D10A-0262.md): Talblich, Lehaunstown Lane, Cabinteely, Dublin 18. Refused or withdrawn (8 Jul 2010). 13 new houses replacing a house at Talblich, Lehaunstown Lane. - [D06A/1367](https://cherrywoodplans.com/application/D06A-1367.md): Navarone & Tablick, Brennanstown Road / Lehaunstown Lane, Cabinteely, Dublin 18.. Granted (7 Feb 2008). 76 apartments and townhouses in two blocks of up to 5 storeys at Navarone and Tablick, Brennanstown Road. - [D05A/0162](https://cherrywoodplans.com/application/D05A-0162.md): Druid Valley, Cherrywood, Loughlinstown, Co, Dublin.. Refused or withdrawn (7 Apr 2005). Builds 805 apartments and homes plus a crèche across 50 buildings at Druid Valley, Cherrywood. - [D04A/0926](https://cherrywoodplans.com/application/D04A-0926.md): Brennanstown Avenue, Brennanstown, Cabinteely, Co. Dublin. Granted (11 Oct 2004). Adds a 26 sq.m single-storey rear extension to each of 11 approved houses on Brennanstown Avenue. - [D15A/0228](https://cherrywoodplans.com/application/D15A-0228.md): Navarone, Brennanstown Road, Cabinteely, Dublin 18. Refused or withdrawn (28 May 2015). Either 7 or 9 new large houses in the grounds of Navarone, Brennanstown Road. ## Links - [This page on CherrywoodPlans](https://cherrywoodplans.com/application/DZ19A-0622) - [Council record, documents and conditions (DLR planning portal)](https://planning.agileapplications.ie/dunlaoghaire/application-details/83782) - [All Cherrywood applications](https://cherrywoodplans.com/applications.md) _Source: Dún Laoghaire–Rathdown County Council planning data, refreshed daily. CherrywoodPlans is an independent site, not run by the council._