# Planning application DZ19A/0874 > Tiknick, Co. Dublin, and Laughanstown, Dublin 18, Cherrywood, Dún Laoghaire–Rathdown. Granted (14 Jan 2020). - **Reference:** DZ19A/0874 - **Address:** Tiknick, Co. Dublin, and Laughanstown, Dublin 18 - **Status:** Granted (14 Jan 2020) - **Decision:** GRANT PERMISSION & REFUSE PERMISSION - **Application type:** Permission (SDZ) - **Applicant:** Hines Cherrywood Development Fund ICAV - **Lodged:** 12 Nov 2019 - **Decided:** 14 Jan 2020 - **Location (lat, lng):** 53.23749, -6.164202 ## Proposal (A) Revised proposals for the previously permitted pavilion building within Ticknick Park (a public park under construction under Reg. Ref. DZ16A/0570). The revised design is for a single storey building of 179sqm gross floor area comprising changing room facilities, toilets, storage and ancillary accommodation and associated external works including cycle parking facilities, landscaping and site and development works on lands (c0.25HA). The previously permitted building was c.1,367sqm gross floor area; (B) Provision of a temporary carpark on lands (c0.67HA) west of Lehaunstown Park (for approximately 75 cars and 3 coaches), with vehicular access from Lehaunstown Lane and pathways to connect Ticknick Park (under construction per Reg. Ref: DZ16A/0570) via Lehaunstown Lane and the existing M50 overbridge, landscaping and associated site and development works. The proposed development includes provision for access to future Level 5 road to the north of the plot (subject to a separate application Reg. Ref. DZ19A/0597). ## In plain English Shrinks the planned Ticknick Park pavilion to a small changing building and adds a temporary car park for about 75 cars. - **179** sq.m pavilion - **75** car spaces - **3** coach spaces ### What's planned Revised plans for the pavilion in Ticknick Park (under construction) and a temporary car park. ### Community The pavilion becomes a single-storey **179** sq.m building with changing rooms, toilets and storage, replacing the **1,367** sq.m building permitted before. ### Transport A temporary car park on **0.67** hectares west of Lehaunstown Park for about **75** cars and **3** coaches, accessed from Lehaunstown Lane, with paths to the park over the M50 bridge. Cycle parking at the pavilion. ### Environment Includes landscaping. _This summary was written by AI from the proposal text. Check the council record before relying on it._ ## Conditions ### Condition 2 1.Save for amendments granted on foot of this permission, the development shall otherwise be carried out in strict accordance with the terms and conditions of Planning Permission Reg. Ref.DZ16A/570, save as may be required by the other conditions attached hereto. f REASON: In the interest of the proper planning and sustainable development of the area and to ensure that the proposed development is consistent with the Cherrywood Planning Scheme. 2.Prior to completion of development the developer shall submit for the written agreement of the Planning Authority, all drawings in digital format (CAD/GIS) projected to ITM (Irish Transverse Mercator). This information should include the following: a)Overall site plans in DWG format (ITM projection in metres) b)Ground floor plans of buildings in DWG format (ITM projection in metres) c)Site sections and elevations in PDF format. REASON: To ensure consistency with Section 7.4 of the Cherrywood Planning Scheme. 3.Prior to the commencement of development of the Sports Pavilion , the applicant shall submit, for the written approval of the Planning Authority, an engineering report and drawings showing how the proposed pavilion building is to connect to the local water supply network on Ballycorus Road, or via another viable alternative connection. An up to date pre-connection enquiry should be made with Irish Water in relation to this water supply connection and this, together with Irish Water's acceptance or otherwise of same should be appended to the requested Engineering report. REASON: In the interest of the proper planning and sustainable development of the area, to ensure the provision of a water supply to the development to meet fire safety, sanitary and other needs. and to ensure that the proposed development is consistent with Section 4.2 and Specific Objective PI 1 of the Planning Scheme and to ensure compliance with Irish Water requirements and specification. 4.All amendments herein permitted to the development shall be carried out within the life of the parent permission DZ16A/0570. REASON: In the interest of clarity and orderly development. 5.Prior to the operation of the Sports Pavilion Building the applicant shall submit for the written agreement of the Planning Authority a proposed maintenance regime for the on-site treatment plant for the pavilion building, specifically addressing how maintenance contractors are to access the site for periodic maintenance including de-sludging, and how often access would be required. REASON: To ensure that the proposed development is consistent with Section 4.1.3 of the Planning Scheme. 6.With regard to the revised sports pavilion building, a) A Stormwater Audit shall be carried out at Stage 2 for the detailed design stage in accordance with PI 7 of the Cherrywood Planning scheme. All audits shall be carried out at the developer's expense. An independent audit team shall be used and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the commencement of development. b) A Stormwater Audit shall be carried out at Stage 3 for the post construction / prior to opening stage in accordance with PI 7 of the Cherrywood Planning scheme. All audits shall be carried out at the developer's expense. An independent audit team shall be used and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 3 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the commissioning of the Stormwater infrastructure. REASON: In the interest of orderly and sustainable development, proper management of flood risk and master planning and to prevent blockages, to ensure long term optimum operation of the surface water management system and to ensure consistency with Specific Objective PI7 of the Planning Scheme. 7.Details of the proposed signage on the Pavilion building shall be submitted for the written agreement of the Planning Authority prior to the commencement of development of the Pavilion Building. REASON: In the interest of clarity, visual amenity and in order to ensure that the proposed development is consistent with Specific Objectives PD 30 and PD 32 pf the Cherrywood Planning Scheme 8.Notwithstanding the provision of Part 1 of Schedule 2 of the Planning and Development Regulations 2001 ( as amended), no additional services or installations shall be located on the roof of the pavilion building with a prior grant of permission. REASON: In the interest of visual amenity and to ensure consistency with Section 2.8.2 and Specific Objectives PD18 and pd19 of the Cherrywood Planning Scheme. 9.Prior to the commencement of development of the sports pavilion the applicant shall submit for the written agreement of the Planning Authority, detailed design, samples and specifications of all elements and finishes of the sports building. The glazing elements shall be further reviewed for potential vandalism and suitable protection put in place as required - electronic roller shutter or equivalent type system. All finishes shall be durable and of a high quality which are low in maintenance. REASON: To ensure that designs, materials and specifications shall meet with the requirements of the Planning Authority and in the interests of proper planning and sustainable development. 10.Within 3 months of the date of this grant of planning permission the Applicant shall submit a schedule for the completion of both the proposed pavilion construction and landscape scheme to be agreed in writing with the Planning Authority. REASON: To ensure consistency with the Cherrywood Planning Scheme and in the interest of the proper planning and sustainable development of the area. 11.The Applicant shall comply with the requirements of the Environmental Health Officer These requirements include: a)The development must be in compliance with the Planning and Development Act 2000 Fourth Schedule, 10 (g) the development should 'not be prejudicial to public health'. b)Adequate storage shall be provided for Waste Disposal and Recycling facilities serving the Pavilion to the satisfaction of the County Council. Such storage facilities must be pest proof and secure, the area should be located so that it does not cause nuisance by way of smell, noise or attraction of vermin or animals to any area or neighbouring area. Bin storage facilities should be adequately serviced with a water supply, drainage and ventilation. c)A Construction Management plan to be submitted to the Planning Authority. The plan should address adverse impacts from construction on the environment and control any temporary emissions during the construction phase to prevent nuisance or adverse health effects. The plan should take into account the following: Waste Management, Staff welfare facilities, Pest Control Management, Dust impacts, Excessive noise and emissions to Surface/Ground Water. REASON: In the interest of public health. ## Nearby applications - [DZ16A/0570](https://cherrywoodplans.com/application/DZ16A-0570.md): Lands (c.19.1 ha) in the townlands of Ticknick, Co Dublin and Laughanstown, Dublin 18. Granted (3 Nov 2016). Creates Ticknick Park, a 19-hectare public park with four playing pitches and a pavilion. - [DZ20A/0478](https://cherrywoodplans.com/application/DZ20A-0478.md): Laughanstown and Cherrywood, Dublin 18. Granted (30 Nov 2020). A temporary car park for about 75 cars and 3 coaches to serve Ticknick Park, for up to 3 years. - [DZ19A/0765](https://cherrywoodplans.com/application/DZ19A-0765.md): Tiknick, Co. Dublin, and Laughanstown, Dublin 18. Refused or withdrawn (5 Dec 2019). Extends Ticknick Park by about 42 hectares, creating a 61.5-hectare public park with trails, meadows and woodland. - [D15A/0770](https://cherrywoodplans.com/application/D15A-0770.md): Grove Dale House, Ballycorus Road, Kilternan, Co. Dublin. Granted (5 Apr 2016). Replacing and relocating the septic tank at Grove Dale House, Ballycorus Road. - [REF14526](https://cherrywoodplans.com/application/REF14526.md): Carrickmines Equestrian Centre, Springfield Lane, Carrickmines, Dublin 18, D18R922. Refused or withdrawn (12 Oct 2026). Bringing in clean soil to level a field at Carrickmines Equestrian Centre. ## Links - [This page on CherrywoodPlans](https://cherrywoodplans.com/application/DZ19A-0874) - [Council record, documents and conditions (DLR planning portal)](https://planning.agileapplications.ie/dunlaoghaire/application-details/84521) - [All Cherrywood applications](https://cherrywoodplans.com/applications.md) _Source: Dún Laoghaire–Rathdown County Council planning data, refreshed daily. CherrywoodPlans is an independent site, not run by the council._