# Planning application DZ20A/0491 > Site of c. 5.295 hectares, located at Beech Park (also known as Beechpark), Bray Road, Cabinteely, Dublin 18/Loughlinstown, County Dublin, Cherrywood, Dún Laoghaire–Rathdown. Granted (19 Oct 2020). - **Reference:** DZ20A/0491 - **Address:** Site of c. 5.295 hectares, located at Beech Park (also known as Beechpark), Bray Road, Cabinteely, Dublin 18/Loughlinstown, County Dublin - **Status:** Granted (19 Oct 2020) - **Decision:** GRANT PERMISSION - **Application type:** Permission (SDZ) - **Applicant:** O'Flynn Construction (Cabinteely) Limited - **Lodged:** 23 Sep 2020 - **Decided:** 19 Oct 2020 - **Location (lat, lng):** 53.253747, -6.145642 ## Proposal The extension of the permitted third floor level of Block A by some 59 sq m (from 1262 sq m to 1321 sq m) to facilitate the reconfiguration and extension of that floor, providing 7 No. onebedroom apartments and associated elevational changes following the reconfiguration of 4 No. previously permitted apartments (3 No. two-bedroom and 1 No. one-bedroom) and the provision of 3 No. additional apartments; the extension of the permitted fourth floor level of Block A by some 59 sq m (from 748 sq m to 807 sq m) to facilitate the reconfiguration and extension of that floor, providing 7 No. one-bedroom apartments and associated elevational changed following the reconfiguration of 4 No. previously permitted apartments (3 No. two-bedroom and 1 No. onebedroom) and the provision of 3 No. additional apartments; the omission of 1 No. one-bedroom apartment (of 54 sq m) at Undercroft Level and its replacement by 3 No. residential amenity rooms (a communal reception area including a reception (18 sq m), administration area ( 16.5 sq m), parcel store (13.5 sq m), kitchen (6.5 sq m) , dining area (15 sq m), lounge (34 sq m) and WC (4 sq m), store room ( 8 sq m), and a communal office/meeting room (45 sq m), as facilitated by the extension of the permitted Undercroft Level by some 13 sq m (from 1158 sq m to 1171 sq m) (to facilitate the reconfiguration of permitted covered car parking (reducing from 38 No. to 31 No. car park spaces, but with a corresponding reconfiguration and increase in external car parking provision from 27 No. to 34 No. spaces, with the previously permitted overall car parking provision for Block ABC remaining at 65 No. spaces); the reconfiguration of bicycle parking (increased from 60 No. to 68 No. spaces) bin storage (increased from 27 sq m to 58 sq m), and circulation arrangements at Undercroft Level of Blocks A and B, and the addition of a sprinkler tank room ( 25 sq m); alterations to permitted facade treatments and elevations of Undercroft, Third and Fourth Floor Levels; and all other associated site excavation, and infrastructural and site development works, both above and below ground. the amendments of Block ABC will result in the provision of 49 No. two-bedroom apartments and 21 No. one-bedroom apartments. (55 No. two-bedroom apartments and 10 No. one-bedroom apartments are permitted under Application Reg. Ref. D20A/0073; 54 No. two-bedroom apartments and 11 No. one-bed apartments are permitted under Application Reg. Ref. D15A/0385 (ABP Ref. ABP-300194-17). The number of units in Block ABC will change from 65 No. permitted to 70 No. units.) ## In plain English Amends a permitted Beech Park apartment block, raising it from 65 to 70 homes with no change in parking. - **70** apartments - **5** extra apartments - **65** car spaces - **68** bicycle spaces ### What's planned An amendment to an earlier permission for Block ABC at Beech Park on the N11. ### Residential The third and fourth floors each grow by **59** sq.m and are reworked into **7** one-bed apartments. One apartment becomes residents' reception, lounge and office space. The block will have **49** two-beds and **21** one-beds. ### Transport Parking stays at **65** spaces (covered down from **38** to **31**, outdoor up from **27** to **34**). Bike spaces rise from **60** to **68**. _This summary was written by AI from the proposal text. Check the council record before relying on it._ ## Conditions ### Condition 2 First Schedule Reasons and Considerations Having regard to the residential zoning of the site as set out in the 2016 - 2022 Dun Laoghaire - Rathdown County Development Plan, and the Cherrywood Planning Scheme, as amended, it is considered that the proposed development will not detract from the residential amenity of the area and is consistent with the provisions of the current development plan. The proposed development is considered to be in accordance with the proper planning and sustainable development of the area. Appropriate Assessment Screening Having regard to the nature and scale of the proposed development, as clarified by way of Further Information received on 23rd September 2020, it has been determined that the proposed development would not significantly impact upon a Natura 2000 Site. Environmental Impact Assessment Screening Having regard to the nature and scale of the proposed development, as clarified by way of Further Information received on 23rd September 2020, it is considered that no real likelihood of significant effects on the environment would arise from the proposed development. Second Schedule Conditions 1. The development shall be carried out in its entirety in accordance with the plans, particulars and specifications lodged with the application, as amended by Further Information received on 23/09/2020, save as may be required by the other conditions attached hereto. REASON: To ensure that the development shall be in accordance with the permission and that effective control be maintained. 2. The Undercroft Car Parking Level Block ABC shall accord with Drawing: Undercroft Car Park Level Plan Revisions to Car Parking – Option A, Drawing number P6-10-B-203 submitted on the 23/9/2020, save as may be required by the other conditions attached hereto. REASON: To ensure that the development shall be in accordance with the permission and that effective control be maintained. 3. Save for amendments granted on foot of this permission, the development shall otherwise be carried out in strict accordance with the terms and conditions of Planning Permission Reg. Ref. D15A/0385 / ABP300194-17 and DZ20A/0073, save as may be required by other conditions attached hereto. REASON: In the interest of the effective management of development and to ensure that the development is consistent with the Cherrywood Planning Scheme. 4. Prior to commencement of development revised proposals for bicycle parking, shall be submitted to and agreed in writing with the Planning Authority. The revised proposals shall include the following: (a) The proposed designated visitor bicycle parking spaces adjacent to the upper level car park entrance shall be omitted, (b) Alternative locations and details of short stay cycle parking in the vicinity of Block A-F pedestrian entrances, with particular consideration of the eastern building frontage to facilitate cycle access options for the development. (c) Direct access to the proposed cycle parking area in Block A provided via the proposed Amenity Space entrance, (d) Alternative bicycle parking racking system. REASON: In the interest of proper planning and sustainable development. Note on above Condition: The details set out in 'Standards for Cycle Parking and associated Cycling Facilities for New Developments' as noted by the DLR Councillors, are the preferred option. ‘Sheffield’ type Stands are DLRCC cycle standards preference. A footprint of at least 2m x 0.5m for each bicycle space is recommended and provision for cycle users at all stages of life and ability should be accommodated. 5.Adequate storage shall be provided for Waste Disposal and Recycling Facilities on site to the satisfaction of the County Council. REASON: In the interest of public health and proper planning and sustainable development of the area. 6. Prior to the commencement of development, the applicant shall submit for the written agreement of the Planning Authority full details of the proposed external finishes including materials, colours and textures. REASON: In the interest of visual amenity. 7. Details of the signage shall be submitted to and agreed in writing with the Planning Authority prior to commencement of development. REASON: In the interest of the proper planning and sustainable development of the area. 8. Prior to commencement of development, the developer shall comply with the Dún Laoghaire-Rathdown County Council Housing Strategy, drawn up in accordance with Part V, Section 96(4) of the Planning & Development Act, 2000, as amended by Section 3 of the Planning & Development (Amendment) Act, 2002, and in accordance with agreement to be reached with the County Council Housing Department unless the developer shall have applied for and been granted an exemption certificate under Section 97 of the Planning and Development Act, 2000, as amended. REASON: To comply with the County Council Housing Strategy & Part V of the Planning & Development Act, 2000, as amended by Section 3 of the Planning & Development (Amendment) Act, 2002. 9. All financial contributions are to be paid on foot of conditions of Planning permission Register Reference D15A/0385/ ABP300194-17. REASON: It is considered reasonable that payment of a contribution be required in respect of the provision of public infrastructure and facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 10. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €1,344.30 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of Surface Water Public Infrastructure and Facilities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015 and as included in Table 2 of the Cherrywood Planning Scheme Development Contribution Scheme 2017-2020. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme ) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Public Infrastructure and Facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. Note on above Condition: Please note that with effect from 1st January, 2014 Irish Water are now the statutory body responsible for both water and waste water services. Accordingly, the contribution payable has been reduced by the amount of the contribution associated with these services. Further details/clarification can be obtained from Irish Water at Tel. 1 850 278 278. 11. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €30,785.00 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015 and as included in Table 2 of the Cherrywood Planning Scheme Development Contribution Scheme 2017-2020. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 12. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €19,983.30 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Community & Parks Public Infrastructure, Facilities and Amenities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015 and as included in Table 2 of the Cherrywood Planning Scheme Development Contribution Scheme 2017-2020. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks Public Infrastructure, Facilities and Amenities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 13. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €2,677.75 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of Surface Water Public Infrastructure and Facilities in the Cherrywood Planning Scheme Area. This Cherrywood Planning Scheme element of the Development Contribution shall be used solely to fund infrastructure identified in the Plan, as listed in Appendix III – Cherrywood Planning Scheme Projects List, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Public Infrastructure and Facilities benefiting development in the in the Cherrywood Planning Scheme area and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 14. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €17,040.45 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Roads Public Infrastructure and Facilities in the Cherrywood Planning Scheme Area. This Cherrywood Planning Scheme element of the Development Contribution shall be used solely to fund infrastructure identified in the Plan, as listed in Appendix III – Cherrywood Planning Scheme Projects List, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the Cherrywood Planning Scheme Area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 15. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €4,625.25 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Community & Parks Public Infrastructure Facilities in the Cherrywood Planning Scheme Area. This Cherrywood Planning Scheme element of the Development Contribution shall be used solely to fund infrastructure identified in the Plan, as listed in Appendix III - Cherrywood Planning Scheme Projects List, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks Public Infrastructure Facilities & Amenities benefiting development in the Cherrywood Planning Scheme Area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 16. This development shall not be carried out without prior agreement, in writing, between the Applicant and the Planning Authority relating to the payment of development contributions. REASON: Investment by Dún Laoghaire-Rathdown County Council in Local Authority works has facilitated and will facilitate the proposed development. It is considered appropriate and reasonable that the developer should contribute to the cost of same. 17. No development on foot of this permission shall commence until security for the provision and satisfactory completion of services (including roads, footpaths, open spaces, public lighting, sewers, watermains and drains) in accordance with the Plans and particulars lodged with the application, has been given by:- a) Lodgement with the Council of an approved Insurance Company Bond in the sum of €15,500.00 which shall be kept in force by the Developer until such time as Roads, Open Spaces, Car Parks, Sewers, Watermains and Drains are completed to the satisfaction of the Council OR/... b) Lodgement with the Council of a Cash Sum of €9,500.00 to be applied by the Council at its absolute discretion if such services are not duly provided to its satisfaction on the provision and completion of such services to standard specifications. REASON: To ensure that a ready sanction may be available to the Council to induce the provision of services and prevent disamenity in the development. ## Nearby applications - [DZ20A/0362](https://cherrywoodplans.com/application/DZ20A-0362.md): On a site of c. 5.295 hectares, Beech Park (also known as Beechpark), Bray Road, Cabinteely, Dublin 18, Loughlinstown, County Dublin. Granted (31 Aug 2020). Amends the Beech Park scheme on Bray Road to add 3 apartments to Block F, a gym and a pet room, and more bike parking. - [DZ20A/0056](https://cherrywoodplans.com/application/DZ20A-0056.md): Beech Park (also known as Beechpark), Bray Road, Cabinteely, Dublin 18/Loughlinstown, County Dublin. Granted (18 Mar 2020). Amends the permitted Beech Park scheme to reconfigure 78 apartments in Blocks D, E and F. - [DZ19A/0768](https://cherrywoodplans.com/application/DZ19A-0768.md): Beech Park, Bray Road, Cabinteely, Dublin 18, Loughlinstown, Co. Dublin. Granted (29 Nov 2019). Amends the permitted Beech Park scheme to reconfigure 78 apartments in Blocks D, E and F and add a residents' gym. - [DZ19A/0622](https://cherrywoodplans.com/application/DZ19A-0622.md): Beech Park, Bray Road, Cabinteely, Dublin 18 / Loughlinstown, County Dublin. Granted (17 Oct 2019). Amends the permitted Beech Park scheme to reconfigure 78 apartments and split off land taken by the Council for a new road. - [D15A/0385](https://cherrywoodplans.com/application/D15A-0385.md): Site of 5.295 ha approximately at Beech Park, Cabinteely, Dublin 18 / Loughlinstown, Co Dublin and its connection with the N11.. Granted (18 Oct 2017). 164 homes, mostly houses and two-level apartments, at Beech Park, Cabinteely, plus the first stretch of the Druid's Glen Road. - [DZ20A/0073](https://cherrywoodplans.com/application/DZ20A-0073.md): At a site of c. 5.295 hectares, Beech Park, Bray Road, Cabinteely, Dublin 18, Loughlinstown, Co. Dublin. Granted (30 Jun 2020). Redesign of three permitted apartment blocks at Beech Park, Bray Road, changing the unit mix but keeping 65 apartments. - [DZ16A/0587](https://cherrywoodplans.com/application/DZ16A-0587.md): Site of 2.79 ha approx. at Beech Park, Bray Road, Cabinteely, Dublin 18/Loughlinstown, Co Dublin. Granted (21 Dec 2016). 34 houses at Beech Park, Bray Road, replacing six homes, plus part of the Druid's Glen Road and bridge. - [DZ19A/0863](https://cherrywoodplans.com/application/DZ19A-0863.md): Site is generally bounded by Lehaunstown Lane to the west, Carrickmines Stream (partly) to the south and, Cabinteely Stream (partly) to the east and is located within the townland of, Brennanstown, Dublin 18. Granted (14 Jan 2020). 342 new homes in Druid's Glen, Brennanstown, with a crèche and part of the Druid's Glen road and bridge. - [DZ26A/0245/WEB](https://cherrywoodplans.com/application/DZ26A-0245-WEB.md): Lands within the Townland of, Brennanstown, Dublin 18. Granted (30 Jul 2026). Amends a permitted Druid's Glen scheme, adding 18 apartments and enlarging the childcare facility. - [DZ25A/0515/WEB](https://cherrywoodplans.com/application/DZ25A-0515-WEB.md): Lands within the Townland of, Brennanstown, Dublin 18. Granted (4 Dec 2025). Amends Phases 2 and 3 of a permitted Druid's Glen scheme, swapping unit types and adding 7 homes (346 to 353). - [DZ24A/0621/WEB](https://cherrywoodplans.com/application/DZ24A-0621-WEB.md): Lands within the Townland of Brennanstown, Brennanstown, Dublin 18. Granted (21 Jan 2025). Amends Phase 1 of a permitted Druid's Glen scheme, adding 4 homes to bring the total from 342 to 346. - [DZ24A/0585/WEB](https://cherrywoodplans.com/application/DZ24A-0585-WEB.md): Lands within the Townland of Brennanstown, Brennanstown, Dublin 18. Refused or withdrawn (8 Aug 2024). Amends Phase 1 of a permitted Druid's Glen scheme, adding 4 homes to bring the total from 342 to 346. - [PC/IC/02/16](https://cherrywoodplans.com/application/PC-IC-02-16.md): N11, Cabinteely, Dublin 18. Granted (12 Jun 2017). Builds a new signalised junction on the N11 at Cabinteely with crossings, bus stops and landscaping. - [D04A/0988](https://cherrywoodplans.com/application/D04A-0988.md): BRENNANSTOWN, CABINTEELY, DUBLIN 18.. Refused or withdrawn (22 Oct 2004). A large Brennanstown development of 702 homes in 26 buildings of 3 to 8 storeys, with a school building, shop and community hall. - [DZ18A/0208](https://cherrywoodplans.com/application/DZ18A-0208.md): Site approx. 6.57ha in area and generally bounded by, Lehaunstown Lane to the west, Carrickmines Stream (partly) to the south, and Cabinteely Stream, (partly) to the east that is, located within the townland of, Brennanstown, Dublin 18. Granted (4 Feb 2020). Builds 367 homes, a mix of apartments, two-level units and houses, plus a childcare facility in Brennanstown. - [PC/CSDZ/005/2021](https://cherrywoodplans.com/application/PC-CSDZ-005-2021.md): Cherrywood Strategic Development Zone, Townland of Laughanstown, County Dublin. Granted (5 Jul 2021). A council plan for a regional storm water pond (Pond 2A) in Laughanstown, draining to the Cabinteely River. - [D22A/0350](https://cherrywoodplans.com/application/D22A-0350.md): Circle K Centenary Service Station, Bray Road, Dublin 18, D18AK58. Granted (25 Aug 2022). Shop revamp at the Circle K service station on Bray Road, adding a deli and enlarging the retail area. - [D06A/0452](https://cherrywoodplans.com/application/D06A-0452.md): Centenary Service Station, Bray Road, Cabinteely, Dublin 18.. Granted (26 May 2006). Lets part of the approved shop at Centenary Service Station, Cabinteely, operate as an off-licence. - [D05A/0567](https://cherrywoodplans.com/application/D05A-0567.md): Centenary Service Station, Bray Road, Cabinteely, Dublin 18.. Granted (20 Jan 2006). Upgrades the shop and car wash at Centenary Service Station, Cabinteely, adding a hot food deli. - [D05A/0322](https://cherrywoodplans.com/application/D05A-0322.md): Centenary Service Station, Bray Road, Cabinteely, Dublin 18.. Refused or withdrawn (19 Apr 2005). Upgrades the shop and car wash at Centenary Service Station, Cabinteely, adding a hot food deli. - [D18A/0590](https://cherrywoodplans.com/application/D18A-0590.md): The Pines, Lehaunstown Lane, Cabinteely, Dublin 18, D18 E3X7. Granted (11 Sep 2018). Replaces a septic tank with a modern wastewater treatment system at The Pines, Lehaunstown Lane. - [D15A/0716](https://cherrywoodplans.com/application/D15A-0716.md): Cartref and Ards, Old Bray Road, Cabinteely, Dublin 18. Refused or withdrawn (19 Jan 2016). 51 homes, apartments and houses, at Cartref and Ards on the Old Bray Road. - [D06A/0557](https://cherrywoodplans.com/application/D06A-0557.md): Grounds and Dwellings Ards & Cartref, Old Bray Road, Cabinteely, Dublin 18. Granted (9 Nov 2006). 77 apartments and two-level homes in 3 blocks of 2 to 5 storeys at Ards and Cartref, Old Bray Road. - [D08A/0717](https://cherrywoodplans.com/application/D08A-0717.md): Ards, Cartref and Foxley, Old Bray Road, Cabinteely, Dublin 18.. Refused or withdrawn (14 Aug 2008). 127 apartments, penthouses and two-level homes in 4 buildings at Ards, Cartref and Foxley, Old Bray Road. - [D18A/0551](https://cherrywoodplans.com/application/D18A-0551.md): Site (c.1.46ha) at Ards, Cartref and lands to the rear of Foxley, Old Bray Road, Cabinteely, Dublin 18. Granted (23 Jan 2019). 72 homes, apartments and houses, at Ards, Cartref and behind Foxley on the Old Bray Road. - [D08A/1293](https://cherrywoodplans.com/application/D08A-1293.md): Lehaunstown House, Lehaunstown, Cabinteely, Dublin 18. Refused or withdrawn (30 Jan 2009). Extensions to Lehaunstown House, Cabinteely, making it a 5-bedroom home with a sunroom and pool. - [D08A/0728](https://cherrywoodplans.com/application/D08A-0728.md): Lahaunstown House, Lahaunstown, Cabinteely, Dublin 18.. Refused or withdrawn (31 Jul 2008). A new 4-bedroom, two-storey house beside Lahaunstown House, Cabinteely. - [DZ25A/0318/WEB](https://cherrywoodplans.com/application/DZ25A-0318-WEB.md): Lands within the townland of Brennanstown, Dublin 18. Granted (20 Aug 2025). 24 new two-storey houses off the Druid's Glen road in Brennanstown. - [DZ23A/0083](https://cherrywoodplans.com/application/DZ23A-0083.md): Druid House & Glendruid House (protected structure), Lehaunestown Lane, Brennanstown Road, Brennanstown, Dublin 18. Granted (20 Oct 2023). Rebuilding a boundary wall on Lehaunstown Lane and a new access road to prepare for the permitted Druid's Glen Road. - [D02A/0317](https://cherrywoodplans.com/application/D02A-0317.md): Site (walled garden) Glendruid, Brennanstown Road,, Cabinteely, Dublin 18.. Granted (10 Jun 2002). Builds a two-storey, four-bedroom house with a garage and stables in the walled garden at Glendruid, a protected structure. - [DZ21A/0414](https://cherrywoodplans.com/application/DZ21A-0414.md): Townland of Laughanstown, Dublin 18. Granted (5 May 2022). 107 new homes, a mix of apartments and houses, north-west of Tullyvale. - [DZ25A/0152/WEB](https://cherrywoodplans.com/application/DZ25A-0152-WEB.md): Land in the townland of Laughanstown, Dublin 18, located north-west of the Tullyvale residential development.The application relates to development in. Granted (11 Jul 2025). Amends an earlier housing permission to shrink the planned basement car park to 13 spaces. - [D13A/0545](https://cherrywoodplans.com/application/D13A-0545.md): Tablick, Lehaunstown, Cabinteely, Co Dublin. Granted (24 Jan 2014). Extends and alters a dormer bungalow at Tablick, Lehaunstown, adding a larger kitchen and an ensuite. - [D10A/0262](https://cherrywoodplans.com/application/D10A-0262.md): Talblich, Lehaunstown Lane, Cabinteely, Dublin 18. Refused or withdrawn (8 Jul 2010). 13 new houses replacing a house at Talblich, Lehaunstown Lane. - [D06A/1367](https://cherrywoodplans.com/application/D06A-1367.md): Navarone & Tablick, Brennanstown Road / Lehaunstown Lane, Cabinteely, Dublin 18.. Granted (7 Feb 2008). 76 apartments and townhouses in two blocks of up to 5 storeys at Navarone and Tablick, Brennanstown Road. - [D05A/0162](https://cherrywoodplans.com/application/D05A-0162.md): Druid Valley, Cherrywood, Loughlinstown, Co, Dublin.. Refused or withdrawn (7 Apr 2005). Builds 805 apartments and homes plus a crèche across 50 buildings at Druid Valley, Cherrywood. - [D04A/0926](https://cherrywoodplans.com/application/D04A-0926.md): Brennanstown Avenue, Brennanstown, Cabinteely, Co. Dublin. Granted (11 Oct 2004). Adds a 26 sq.m single-storey rear extension to each of 11 approved houses on Brennanstown Avenue. - [D15A/0228](https://cherrywoodplans.com/application/D15A-0228.md): Navarone, Brennanstown Road, Cabinteely, Dublin 18. Refused or withdrawn (28 May 2015). Either 7 or 9 new large houses in the grounds of Navarone, Brennanstown Road. ## Links - [This page on CherrywoodPlans](https://cherrywoodplans.com/application/DZ20A-0491) - [Council record, documents and conditions (DLR planning portal)](https://planning.agileapplications.ie/dunlaoghaire/application-details/86680) - [All Cherrywood applications](https://cherrywoodplans.com/applications.md) _Source: Dún Laoghaire–Rathdown County Council planning data, refreshed daily. CherrywoodPlans is an independent site, not run by the council._