# Planning application DZ21A/0806 > Lands in the townland of, Laughanstown, Dublin 18, located between Grand Parade and Tully Park, Cherrywood, Dún Laoghaire–Rathdown. Granted (12 Aug 2022). - **Reference:** DZ21A/0806 - **Address:** Lands in the townland of, Laughanstown, Dublin 18, located between Grand Parade and Tully Park - **Status:** Granted (12 Aug 2022) - **Decision:** GRANT PERMISSION - **Application type:** Permission (SDZ) - **Applicant:** William Neville & Sons Unlimited Company - **Lodged:** 19 Jul 2022 - **Decided:** 12 Aug 2022 - **Location (lat, lng):** 53.247604, -6.149883 ## Proposal Modifications to the permission granted under planning Reg. Ref. DZ17A/0714 (under construction). The modifications provide for additional residential blocks on the part of the site that was identified for future development under DZ17A/0714 and for amendments to the basement car parks. The development will consist of:- Construction of 3 no. 4-storey residential blocks (annotated Blocks C, D and F on plans) in place of permitted temporary landscaping to accommodate 60 no. apartments with associated private balconies/terraces. Block C will accommodate 16 no. apartments comprising 5 no. 1-bedroom and 11 no. 2-bedroom units. Block D will accommodate 28 no. apartments comprising 9 no. 1-bedroom and 19 no. 2-bedroom units. Block F will accommodate 16 no. apartments comprising 5 no. 1-bedroom and 11 no. 2-bedroom units. Enlargement and reconfiguration of the 2 no. permitted basements. The revised basements will accommodate 228 car parking spaces, cycle parking, refuse stores and plant rooms. Landscaping, substations and all associated site works and services. ## In plain English Amends a permitted scheme between Grand Parade and Tully Park to add 60 apartments in three new 4-storey blocks. - **60** apartments - **228** car parking spaces - **4** storeys ### What's planned Changes to the scheme permitted under DZ17A/0714, building on land previously set aside for future development and temporary landscaping. ### Residential **3** new **4**-storey blocks with **60** apartments (**19** one-bed and **41** two-bed): Block C and Block F have 16 each, Block D has 28. ### Transport The two permitted basements are enlarged to hold **228** car spaces plus bicycle parking. _This summary was written by AI from the proposal text. Check the council record before relying on it._ ## Conditions ### Condition 3 First Schedule Reasons and Considerations Having regard to the ‘Residential’ land use of the site as set out in the Cherrywood Planning Scheme, as amended, and 2022-2028 Dún Laoghaire - Rathdown County Development Plan, it is considered that subject to compliance with the conditions below, the proposed development would not seriously injure the amenities of the area and would not contravene materially the zoning of the application site or that of adjoining sites, subject to conditions. Appropriate Assessment (AA) Screening Having regard to the nature and scale of the proposed development, as clarified by way of Clarification of Further Information received on 19.07.22, it has been determined that the proposed development would not significantly impact upon a Natura 2000 Site. Environmental Impact Assessment (EIA) Screening Having regard to the nature and scale of the proposed development, as clarified by way of Clarification of Further Information received on 19.07.22, there is no real likelihood of significant effects on the environment arising from the proposed development. Second Schedule Conditions 1. (a)The development shall be carried out in its entirety in accordance with the plans, particulars and specifications lodged with the application, as amended by Further Information received on 13.04.22, and by Clarification of Further Information on 19.07.22, save as may be required by the other conditions attached hereto. REASON: To ensure that the development shall be in accordance with the permission and that effective control be maintained. (b) Save for amendments granted on foot of this permission, the development shall otherwise be carried out in strict accordance with the terms and conditions of Planning Permissions DZ17A/0714, as amended, save as may be required by the other conditions attached hereto. REASON: In the interest of the proper planning and sustainable development of the area and to ensure that the proposed development is consistent with the Cherrywood Planning Scheme. 2. This permission relates solely to amendment of permitted development Reg. Ref. DZ17A/0714 to facilitate the construction of 3 no. additional residential blocks on the part of the site that was identified for future development under DZ17A/0714 and for amendments to the basement car parks, landscaping, substations and all associated site works and services. Note: The permission does not include any other amendments/revision details that may be present on the respective plans/layout/drawings submitted with this subject application. REASON: In the interest of clarity and, to ensure that the development shall be in accordance with the permission and that effective control be maintained. 3. Prior to commencement of development the Applicant/Developer shall submit for the written agreement of the Planning Authority, all drawings in digital format (CAD/GIS) projected to ITM (Irish Transverse Mercator). This information should include the following: • Overall site plans in DWG format (ITM projection in metres) • Ground floor plans of buildings in DWG format (ITM projection in metres) • Site sections and elevations in PDF format. REASON: To ensure consistency with Section 7.4 of the Cherrywood Planning Scheme. PHASING & SEQUENCING 4. Residential units permitted under this permission (Reg. Ref. DZ21A/0806) shall not be occupied prior to the completion of both Tully Park (provided by permission DZ15A/0813, as amended by DZ20A/0946, or as per subsequent amendments to these permissions) and Ticknick Park (circa 6 ha provided by permission DZ16A/0570 (and Extension of Duration permission DZ16A/0570/E) or as per subsequent amendments to this permission) to Taking in Charge Standard and at such time when the Parks are made available to the public. REASON: To ensure consistency with the Phasing and Sequencing requirements of Table 7.2 ‘Open Space’ of the Cherrywood planning Scheme. 5. The following shall be complied with: (i) With regard to Internal bus infrastructure (bus route to Cherrywood Luas Station, traffic management, RTPI signs, bus shelters, Cherrywood Luas stop interchange facility), the residential units the subject of the proposed development, shall not be occupied prior to the completion of the internal bus infrastructure as detailed in Planning Scheme Table 7.3 to a taking in charge standard, or as otherwise agreed with the Planning Authority. (ii) With regard to Roads Phase 1: Junction at A, roads I1-A-A1-B-L-P2-C-D-D1-K1-K-F1-J-A2-A1 and road B-A2, Residential units shall not be occupied prior to the completion of Roads Phase 1: Junction at A, roads I1-A-A1-B-L-P2-C-D-D1-K1-K-F1-J-A2-A1 and road B-A2 (provided by permission DZ15A/0758 (and Extension of Duration Permission DZ15A/0758/E) and as amended by DZ17A/0862) to Taking in Charge Standard and at such time when the roads are made available to the public. (iii) The road network elements as permitted under DZ15A/0758 (and Extension of Duration Permission DZ15A/0758/E) that have not been Taken In Charge and which serve the proposed development for construction and occupation access, shall not be a public road and shall remain as a private road until such time as Taken in Charge by the Planning Authority in accordance with DZ15A/0758 and DZ17A/0862. REASON: To ensure consistency with the Phasing and Sequencing requirements of Cherrywood Planning Scheme Table 7.3 Transportation Infrastructure, to ensure that the road materials and specifications meet with the requirements of the Planning Authority and in the interests of the proper planning and sustainable development of the area. URBAN FORM 6. Each residential unit at the ground floor levels of Blocks C, Block D and Block F shall provide the main own-door access for each respective residential unit via the living/kitchen/dining area of the apartment consistent with Section 3.36 of the Sustainable Urban Housing Design Standards for New Apartments (December 2020). REASON: To ensure consistency with Specific Objective PD 5 of the Cherrywood Planning Scheme. 7. Prior to the commencement of development, the Applicant, or any other person with an interest in the land to which the application relates, shall comply with requirements of Part V, Section 96 of the Planning and Development Act 2000, as amended, and in accordance with agreement to be reached with the County Council’s Housing Department, unless the Applicant shall have applied for and been granted an exemption certificate under Section 97 of the Planning & Development Act, 2000, as amended. In this regard, the Applicant shall submit a detailed submission to include, inter alia, existing and development use land values, construction, development and any attributable costs associated with the development. REASON: To comply with Part V of the Planning and Development Act, 2000, as amended. 8. Prior to the commencement of the development, or as otherwise agreed in writing with the Planning Authority, the Applicant/Developer shall submit for the written agreement of the Planning Authority, full details of the proposed external finishes of buildings C, D and F including ESB substations and entrances to basement car parks, all elevational treatments including brick details, windows and doors, balcony/terrace and boundary treatments, and roof surface materials/finishes, in the form of samples and on-site mock ups. The applicant is advised that the proposed brick colour and spandrel panels as shown on the submitted drawings are not considered to be acceptable as they do not establish sufficient interest and variety with excessive use of singular material within the overall development. The external finishes of buildings shall; (i) At ground floor, comprise of durable and high-quality materials including natural stone or brick. (ii) Ensure harmony and visual coherence in the built environment, with the use of materials that identifies it as a distinct neighbourhood, yet articulate interest to avoid monolithic and bulky facades along the perimeter elevations, with particular attention to the upper floors and roofs. (iii) Rooftop materials and treatments, including screening, shall be light in colour. REASON: To ensure consistency with Section 2.8 ‘Layout’ and Objectives PD 7, PD 14 and PD 15 of the Cherrywood Planning Scheme. 9. Prior to the commencement of development and the erection of any advertising hoardings on site, or as otherwise agreed in writing with the Planning Authority, the Applicant/Developer shall submit the following for the written agreement of the Planning Authority: (i) An acceptable naming and numbering scheme shall be submitted for the written agreement of the Planning Authority prior to the commencement of development or the erection of any advertising hoardings on site. In this regard, the use of street names and public spaces reflecting local place names or local history would be acceptable. Note: The development names as annotated on the drawings submitted as part of this planning application, for example on the Site Layout Masterplan -1 dated the 01/06/2017, Drawing P16-319D-RAU-ZZ-00-DR-A-31010 Rev, P03.07, are not considered to be acceptable. (ii) Details of all signage, including all external signage, way-finding and directional signage. (iii) Full details of the location and content including background colour, lettering typeface, logos and colour (iv) Materials that are high quality, modern and durable, and that respect the proportions and design of the building and its surroundings. REASON: In the interests of visual amenity and clarity and to ensure consistency with Specific Objective H6, PD30 and PD32 of the Cherrywood Planning Scheme and the Cherrywood Wayfinding & Directional Signage Guidance 2021. CONSTRUCTION MANAGEMENT 10. The Applicant/Developer shall comply with the following requirements: - (i) The construction of the development shall be managed in accordance with a final Construction Management Plan, which shall be submitted for the development in its entirety to the Planning Authority for agreement in writing, prior to commencement of any development. In this regard the final Construction Management Plan shall include a Community Liaison Plan and a Construction Traffic Management Plan. (ii) Site development and building works shall be carried out only between the hours of 7.00am to 7.00pm Monday to Friday inclusive, 8.00am to 2.00pm Saturdays and no works permitted on site on Sundays and public holidays. Deviation from these times will only be allowed in exceptional circumstances where prior written approval has been received from the Planning Authority. This should be addressed in the Community Liaison Plan. (iii) Construction staff shall be prohibited from parking on public roads. Parking for construction staff shall be provided by the Developer/Contractor within the site boundary and shall not be provided in an off-site location. (iv) Construction vehicles shall not be permitted to park or wait on roads outside the site boundary. All parking and waiting areas shall be provided Developer/Contractor within the site boundary. (v) Prior to commencement of development a mechanism and structure for on-site monitoring, reporting on progress and quality control to the Planning Authority in relation to construction standards, materials, as-built drawings and records shall be agreed in writing with the Planning Authority. (vi) Prior to commencement of development, proposals will be submitted for the written approval of the Planning Authority that demonstrate how it is proposed to maintain the existing road network permitted under DZ15A/0758 to an acceptable standard during the construction phase of the proposed development. (vii) The Luas operator/TII will require 24hr access to Luas infrastructure. Prior to the commencement of development, the applicant/developer shall enter into an access and maintenance agreement with TII. (viii) All deliveries made to the development site, including during the construction phase, shall be made to limit interference with Luas operations. (ix) The proposed development is located in close proximity to a Luas Line; the Applicant/Developer shall ensure there is no adverse impact on Luas operation and safety. The development shall comply with TII’s 'Code of engineering practice for works on, near, or adjacent the Luas light rail system'. (x) Works are proposed to be carried out in close proximity to the Luas Overhead Conductor System (OCS). The Applicant, Developer or Contractor will be required to apply for a works permit from the Luas Operator by virtue of the Light Railway (Regulation of Works) Bye-laws 2004 (S.I. number 101 of 2004) which regulates works occurring close to the Luas infrastructure in accordance with TII's 'Code of engineering practice for works on, near, or adjacent the Luas light rail system'. The Developer shall be liable for all of TII's costs associated with the removal and reinstatement of Luas related building fixings and infrastructure. The permit application will require prior consultation, facilitated by the Luas operator, Transdev. (xi) Prior to commencement of development, a demolition and/or construction method statement shall be submitted for the written agreement of the Planning Authority with written approval by TII. The method statement shall resolve all Luas interface issues and shall: (a) identify all Luas alignment interfaces, (b) contain a risk assessment for works associated with the interfaces, and (c) mitigation measures for unacceptably high risks, including vibration and settlement monitoring regime if necessary. The method statement shall be in accordance with TII’s 'Code of engineering practice for works on, near or adjacent the Luas light rail system'. REASON: To ensure consistency with Section 2.14 of the Cherrywood Planning Scheme, to ensure compliance with the requirements of Transport Infrastructure Ireland (TII), and in the interests of orderly development, proper planning and sustainable development. WATER & DRAINAGE 11. The Applicant/Developer shall comply with the following: (i) The Applicant/Developer shall facilitate the delivery of the Bride’s Glen watermain upgrade works in agreement with Irish Water. (ii) All water & waste infrastructure required to service this development shall align with Irish Water masterplans for the area. (iii) The Applicant shall sign a connection agreement with Irish Water (IW) prior to any works commencing and connecting to their network (water and wastewater). (iv) All development is to be carried out in compliance with Irish Water Standards codes and practices. (v) All infrastructure (water and wastewater) shall be designed and installed in accordance with the Irish Water Codes of Practice and Standard Details. REASON: In the interests of sustainable development and in the interests of consistency with PI 4, PI 5 and PI 12 of the Planning Scheme. To ensure agreement with Irish Water for the applicant’s design proposals and to ensure the adequate provision of water and wastewater. 12. Prior to the commencement of development, the Applicant/Developer shall submit the following details for written agreement of the Planning Authority: (i) The Applicant/Developer shall provide a catchment overview drawing to incorporate all hardstanding areas within the proposed development. In this regard the Applicant/Developer shall provide fully detailed surface water and SuDS proposals including the detailed design drawings outlining proposals to intercept, treat and control runoff to a rate of 1 l/s/ha for all hardstanding areas within the red line boundary. The SuDS measures shall be consistent with any detailed design measures required by the Hydrogeological Risk Assessment (HRA) for phase 2/apartments of the Domville Development. (ii) The Applicant/Developer shall provide a breakdown of areas to confirm that the proposals for interception (deemed to satisfy contributing areas) are in compliance with table 24.6 of CIRIA 753. Interception storage proposals shall satisfy suitable SuDS measure as outlined in table 24.6 of CIRIA C753. The designer shall demonstrate by way of providing calculations there are sufficient SuDS surfaces to meet interception losses requirements (no runoff from site for rainfall depths up to 5mm for the majority of rainfall events). (iii) A detailed operations and maintenance plan for all proposed SuDS components within the subject development. (iv) A detailed construction stage surface water management plan. (v) The Applicant/Developer shall submit drainage details for basement 1 and 2 prior to commencement of development. Basement drainage must be discharged to the foul system via petrol/oil interceptors in accordance with the requirements of the GDSDS. (vi) Discharge from the subject development shall be limited to 1 l/s/ha unless otherwise agreed with Dun Laoghaire Rathdown County Council. REASON: In the interests of sustainable development, to ensure long term optimum operation of the surface water management system; and to comply with the requirements of PI 6 of the Cherrywood Planning Scheme. 13. The Applicant/Developer shall comply with the following: (i) A Stormwater Audit shall be carried out at Stage 2 for the detailed design stage in accordance with PI 7 of the Cherrywood Planning scheme. The audit shall be carried out at the Applicant/Developer’s expense. An independent audit team shall be used and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the commencement of development, unless otherwise agreed. The Stage 2 Stormwater Audit reports shall address any and all phased construction and occupation proposals for the development. (ii) For any proposed partial commissioning of surface water infrastructure associated with any phased construction /occupation of the development, interim Stage 3 Stormwater Audits shall be carried out for the post construction / prior to commissioning phases, in accordance with PI 7 of the Cherrywood Planning Scheme and at phases pre-agreed with the Planning Authority as part of the Stage 2 Audit process. These audits shall be carried out at the Applicant/Developer’s expense. An independent audit team shall be used and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. (iii) A Stormwater Audit shall be carried out at Stage 3 for the post construction / prior to commissioning stage in accordance with PI 7 of the Cherrywood Planning scheme. The audit shall be carried out at the Applicant/Developer’s expense. An independent audit team shall be used and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 3 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the final commissioning of the full surface water network for the development. REASON: In the interests of sustainable development and to comply with the requirements of PI 7 of the Cherrywood Planning Scheme. 14. At detailed design stage the applicant is requested to ensure that the surface water management system at the Luas Line is further investigated and appropriate design detail is prepared to suitably manage exceedance flow that may reach the Luas Line. The applicant is requested to provide details at detailed design stage for assessment as part of a Stage 2 Storm Water Audit. REASON: To ensure consistency with Specific Objective PI9 of the Cherrywood Planning Scheme. MOVEMENT AND TRANSPORTATION 15. The Applicant/Developer shall comply with the following: (i) Prior to the commencement of development, a Stage 2 Quality Audit (which shall include a Road Safety Audit, Access Audit, Cycle Audit and Walking Audit) shall be carried out for the detailed design stage and shall be submitted for the written agreement of the Planning Authority. The audit shall be carried out at the Applicant/Developer’s expense in accordance with the Design Manual for Urban Roads & Streets (DMURS) guidance and TII (Transport Infrastructure Ireland) standards. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Quality Audit reports shall address any and all phased construction and occupation proposals for the development. The Applicant/Developer shall ensure that the construction / occupation phased stages proposed do not result in adverse safety conditions for future residents. (ii) For any proposed phased construction /occupation stages of the development, interim Stage 3 Quality Audits shall be carried out for the post construction / prior to occupation stages, at phased stages pre-agreed with the Planning Authority as part of the Stage 2 Quality Audit process. These audits shall be carried out at the Applicant/Developer’s expense. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Applicant/Developer shall ensure that permeable and connecting walking and cycling routes are completed and operational at each construction / occupation phase to allow future residents of this development to safely access public transport, recreational facilities, schools, retail facilities and other key destinations in Cherrywood. Any identified deficiencies identified by the interim Stage 3 Quality Audits in this regard shall be completed at the developer’s expense to safely link the development site to the existing public transport infrastructure, recreational facilities, schools, retail facilities and other key destinations in Cherrywood. (iii) Prior to the final occupation stage of the development in its entirety, a Stage 3 Quality Audit (which shall include a Road Safety Audit, Access Audit, Cycle Audit and Walking Audit) shall be carried out for the post construction / prior to occupation stage and shall be submitted for the written agreement of the Planning Authority. The audit shall be carried out at the Applicant/Developer’s expense in accordance with the Design Manual for Urban Roads & Streets (DMURS) guidance and TII (Transport Infrastructure Ireland) standards. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Applicant/Developer shall ensure that permeable and connecting walking and cycling routes are completed and operational to allow future residents of this development to access public transport, recreational facilities, schools, retail facilities and other key destinations in Cherrywood. Any identified deficiencies identified by the Stage 3 Quality Audit in this regard shall be completed at the developer’s expense to link the development site to the existing public transport infrastructure, recreational facilities, schools, retail facilities and other key destinations in Cherrywood. REASON: In the interests of orderly and sustainable development; To allow for pedestrian and cycle permeability; To ensure Fire tenders can adequately serve the subject development; and in the interests of consistency with PI 14 and PI 20 of the Cherrywood Planning Scheme. 16. The Applicant/Developer shall comply with the following; (i) A car parking management strategy shall be prepared by the Applicant/Developer and submitted for agreement, in writing, to the Planning Authority prior to the occupation of any development proposed by this application. This car parking management strategy shall include a comprehensive car parking operation and monitoring regime which clearly shows the operation of the residential car parking for the proposed development and how this will be implemented and managed. In addition, this car parking management strategy shall set out an operation and monitoring regime for the car sharing space. (ii) The car sharing spaces provided shall be managed by the subject development’s management company for the sole use of residents of the subject development to ensure residents of this development have access to a car sharing facility. (iii) One car parking space shall be allocated to each apartment within the subject development. The remaining car parking spaces other than the shared spaces, shall be made available or sold in attachment to residential units of the subject development permitted under this application only and shall not be sold separately or let to any other persons or businesses unattached to the development as permitted under this application. Prior to the commencement of development, the Applicant/Developer shall submit for the written agreement of the Planning Authority a schedule outlining the residential car parking spaces attaching to particular units within the development. (iv) A minimum of one car parking space per five car parking spaces shall be equipped with one fully functional EV Charging Point in line with the requirements of the Dun Laoghaire Rathdown County Development Plan, 2022-2028. Ducting for every car parking space shall also be provided. REASON: In the interests of orderly development and proper planning and the sustainable development of the area, to encourage the use of electric vehicles in line with council and national policy and for consistency with the Cherrywood Planning Scheme PI 21. 17. The Applicant/Developer shall comply with the following: (i) Prior to commencement of development and for the agreement of the Planning Authority, the Applicant/Developer shall submit the detailed design drawings for all cycle parking spaces located within basement carpark 1 and basement carpark 2 for the subject development. The detailed design drawings shall also clearly indicate all short-term cycle parking locations and the cycle parking reserved for the creche facility. (ii) The Applicant/Developer shall provide full details of the development’s proposed tiered bicycle parking system prior to commencement of development for the written agreement of the Planning Authority. (iii) The Applicant/Developer shall provide full details of proposed measures to protect cyclists from motor vehicles along the access ramps to basements 1 and 2 for written agreement of the Planning Authority prior to the commencement of the development. Measures shall include details of warning signs and markings. (iv) Prior to commencement of development, the Applicant/Developer shall prepare a cycle parking management strategy for the development for the written agreement of the Planning Authority. This cycle parking management strategy shall include a comprehensive cycle parking operation and monitoring regime which clearly shows how the operation and maintenance for the development’s cycle parking will be implemented and managed, including routine and annual maintenance of the stacked cycle parking, and how demand for cycle parking will be monitored. This cycle parking management strategy shall also outline how the provisions for future demand will be implemented if required for the subject development. REASON: In the interests of orderly development and proper planning and the sustainable development of the area and for consistency with the Cherrywood Planning Scheme PI 22. 18. The Applicant/Developer shall comply with the following; (i) The Applicant/Developer shall ensure that adequate separation distances are provided within the development between utility service ducts and surface water, water and foul infrastructure to ensure access for future operation and maintenance activities as may be required. (ii) Detailed design of the electricity supply network shall be agreed (in writing) with ESB Networks/ESBI. (iii) Detailed design of the telecoms network shall be agreed (in writing) with the telecoms providers. REASON: In the interests of orderly development the inclusion of infrastructure and connections would avoid subsequent excavation of newly constructed roadway; To ensure that designs shall meet with the current and future requirements of the telecoms providers, ESB Networks/ESBI; and to ensure consistency with Section 4.3.1, and PI 26 of the Planning Scheme. 19. The Applicant/Developer shall provide a drawing detailing the proposed location for bin storage on waste collection days for agreement with the Planning Authority. REASON: In the interests of sustainable development; and in the interests of consistency with PI 32 of the Cherrywood Planning Scheme. 20. Prior to commencement of development, or as otherwise agreed in writing with the Planning Authority, the Applicant/Developer shall submit for the written agreement of the Planning Authority revised drawings showing the following: (i) Measures to ensure that vehicular access between road and pedestrian surfaces will be restricted, and ensure House Number 25, Type 5, in Zone 1 (Lehaunstown Court) is not detrimentally impacted by the amended proposals by providing an appropriate buffer between the proposed private, public and communal spaces. REASON: To ensure pedestrian safety and retain a high-quality interface between public and private space. 21. Prior to the commencement of development under this permission: (i) The Applicant/Developer shall engage the services of a qualified ecologist as an ecological consultant, for the duration of the monitoring requirements. The Applicant/Developer shall inform the Planning Authority, in writing, prior to commencement of development, of the appointment and name of the Consultant. (ii) The Consultant shall submit an updated Ecological Impact Assessment report which shall take account of the updated Hydrogeological Risk Assessment (HRA) and ensure the implementation of all conditions as required by the parent permission. REASON: In the interests of proper planning and sustainable development. BIODIVERSITY 22. The updated Domville Biodiversity Mitigation Plan_Phase 1+ 2 _ Revision 3 June 2022 will be implemented. Actions required to be undertaken by the Applicant as a result of the recommendations of monitoring will be reported to the Planning Authority. REASON: To assist the Planning Authority in ensuring the appropriate monitoring and preservation of the sensitive habitats and ecological characters identified by the Biodiversity Plan, and to ensure that the application is compliant with all relevant aspects of the Cherrywood Biodiversity Plan. CONSTRUCTION WASTE & ENVIRONMENTAL MANAGEMENT 23 Prior to the commencement of development, the Applicant / Developer shall submit the following for the written agreement of the Planning Authority (Environmental Enforcement Section): (a)(i) a Detailed Construction Waste Management Plan together with a detailed ‘Environmental Management Construction Plan’ consistent with ‘The DLR Guidance Notes for Environmental Management of Construction Projects’ regarding the segregation of waste within apartment units and the management of waste within the curtilage of the development, as required by ‘Dún Laoghaire-Rathdown County Council (Segregation, Storage And Presentation Of Household And Commercial Waste) Bye-Laws, 2019’. (ii) The updated Construction Environmental Management Plan Revision [CEMP] dated 04/07/22 shall be implemented including the monitoring programme. Actions required to be undertaken by the Applicant as a result of the recommendations of monitoring will be reported to the Planning Authority. (b)The Applicant shall submit a Noise Plan for the development, following the methodology set out in ProPG: Planning & Noise - Professional Practice Guidance on Planning & Noise issued by the Institute of Acoustics. (c)Prior to the commencement of the proposed site works noise, vibration and dust monitoring stations shall be installed and maintained to provide continuous monitoring at proposed monitoring stations to measure and record the impact of site activities on local receptors. All monitoring data shall be compiled into a weekly technical monitoring report which will include a full assessment of the environmental impacts arising from site construction activities. Measures to ensure that where levels exceed specified limit values, nuisance generating activities cease and alternative working methods are identified and implemented. (i) A programme of continuous noise monitoring shall be carried out for the duration of the development along the site boundary/ noise sensitive location(s) and by an appropriately qualified and experienced acoustic technician. Should any noise assessment identify the noise limits being exceeded, further investigation will be carried out and mitigation measures implemented to ensure compliance. Copies of the monitoring shall be made available to the Environmental Health Officers Air & Noise Unit on request. (ii) Noise due to the normal construction and operation of this development shall not cause a noise nuisance to nearby noise sensitive location shall not exceed the background level by 10dB (A) or more or exceed the NG4 limits, whichever is lesser. o Daytime (07:00 to 19:00 hrs.) – 55dB o Evening (19:00 to 23:00 hrs.) – 50dB o Night-time (23:00 to 07:00 hrs.) – 45dB As measured from nearest noise sensitive location/s. Clearly audible and impulsive tones at noise sensitive locations during evening and night shall be avoided irrespective of the noise level. (iii) During the construction phase all necessary steps shall be taken to contain dust and airborne pollutants arising from the site and to prevent nuisance to persons in the locality. This shall include, i) covering skips, ii) covering slack heaps, iii) netting of scaffolding, iv) regular road and pavement damping and sweeping, v) use of water spray to suppress dust, vi) proper paved or hard stand access for trucks and vehicles to and from the site to prevent dirt and dust from the site being carried from the site on to public roads etc. (d) The Applicant shall submit a materials source and management plan illustrating design for maintenance and replacement in addition to type of materials/proportion of re-use/recycled materials to be used. (e) The Applicant shall submit an appropriate rodent/pest control plan which shall be put in place for the overall development. (f) The Applicant shall submit an operational waste management plan demonstrating segregation and handling of waste within the curtilage of the development REASON: To protect and monitor biodiversity and the environment and to undertake any remedies if required and in the interest of proper planning and sustainable development of the area. MANAGEMENT COMPANY 24. Prior to commencement of development the applicant shall submit full details of a properly constituted Owners' Management Company for the written agreement of the Planning Authority. This shall include a layout map of the permitted development showing the areas to be taken in charge and those areas to be maintained by the Owners' Management Company. Membership of this Company shall be compulsory for all purchasers of property in the development. Confirmation that this Company has been set up shall be submitted to the Planning Authority prior to the occupation of the first residential unit. REASON: To provide for the satisfactory completion and maintenance of the development in the interest of residential amenity TAKING-IN-CHARGE 25. The applicant shall complete, within a period to be specified in writing to the Applicant by the Planning Authority, all infrastructural works (including Roads, Footpaths, Car Parks, Open Spaces, Sewers, Watermains, Drains & Public Lighting) to the standards in the Council's Guidance Document on Development Works in Residential and Industrial Areas. REASON: To ensure the development is carried out in accordance with the County Council's Standards and in the interests of the proper planning and sustainable development of the area in which the development is located. ROADS MAINTENANCE SECTION 26. For the duration of this development, from commencement of the construction works (inclusive of enabling works) to the completion of construction works, the developer shall undertake continuous monitoring of the road network to be utilised for the construction access to this development. In this regard and at a minimum, an independent condition survey of the roads constructed under DZ15A/0758 and DZ17A/0862 that are to be utilised for the construction access to this development shall be undertaken by suitably qualified engineers/surveyors appointed by the developer, at the developer’s expense, both prior to commencement of development and prior to occupation of the final phase of the development. The appointment of the engineers/surveyors shall be agreed in advance and in writing with the Planning Authority and they shall be independent of the Developers and Developers Design and construction team. The condition survey(s) produced are to be submitted for the written agreement of the Planning Authority. Damage, including structural defects, damage to the wearing course, footpaths, kerbs, road markings etc, to the road network that is identified in the condition survey(s) shall be rectified/replaced by the developer, at the developer’s expense and to a taking in charge standard of development which is to the satisfaction of the Planning Authority. REASON: To ensure that a ready sanction may be available to the County Council to induce the provision of services and prevent disamenity in the development. 27. To ensure adequate financial provision is on hand to rectify any damaged caused to the road network associated with DZ15A/0758 and DZ17A/0862, as part of the condition survey that shall be submitted to the Planning Authority prior to commencement (inclusive of enabling works) under condition number 26 (ie above condition) shall include a detailed map that shows all routes that will be utilised for construction traffic associated with this development from commencement (inclusive of enabling works) to occupation of all units within this development. This detailed map shall include the area of roadway in meters square to be utilised for construction traffic, this measurement will be used to calculate the value of a cash security or insurance bond for the value of €30/m2 of roadway utilised, to be lodged with the Planning Authority. No works shall take place (inclusive of enabling works) until this bond or cash security has been agreed and accepted by the Planning Authority. This bond will be refunded on satisfactory completion and certification by the Developer of any works identified in the condition survey, to be completed after occupation of all units within the development, and with written agreement from the Planning Authority that those works are carried out to Taking in Charge Standard. Failure to comply with the above condition may lead to the insurance bond/cash security being sequestered by the Planning Authority to complete any outstanding works. REASON: To ensure that a ready sanction may be available to the County Council to induce the provision of services and prevent disamenity in the development. FINANCIAL CONTRIBUTIONS 28. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €17,766.60 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of Surface Water Public Infrastructure and Facilities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015 and as included in Table 2 of the Cherrywood Planning Scheme Development Contribution Scheme 2017-2020. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme ) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Public Infrastructure and Facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. Note on above Condition: Please note that with effect from 1st January, 2014 Irish Water are now the statutory body responsible for both water and waste water services. Accordingly, the contribution payable has been reduced by the amount of the contribution associated with these services. Further details/clarification can be obtained from Irish Water at Tel. 1 850 278 278. 29. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €406,858.20 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015 and as included in Table 2 of the Cherrywood Planning Scheme Development Contribution Scheme 2017-2020. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 30. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €264,102.00 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Community & Parks Public Infrastructure, Facilities and Amenities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015 and as included in Table 2 of the Cherrywood Planning Scheme Development Contribution Scheme 2017-2020. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks Public Infrastructure, Facilities and Amenities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 31.The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €35,389.20 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of Surface Water Public Infrastructure and Facilities benefiting development in the Cherrywood Planning Scheme area only of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Public Infrastructure and Facilities benefiting development in the in the Cherrywood Planning Scheme area and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 32. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €225,208.20 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Roads Public Infrastructure and Facilities in the Cherrywood Planning Scheme Area. This Cherrywood Planning Scheme element of the Development Contribution shall be used solely to fund infrastructure identified in the Plan, as listed in Appendix III – Cherrywood Planning Scheme Projects List, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the Cherrywood Planning Scheme Area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 33. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €61,128.00 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Community & Parks Public Infrastructure Facilities & Amenities in the Cherrywood Planning Scheme Area. This Cherrywood Planning Scheme element of the Development Contribution shall be used solely to fund infrastructure identified in the Plan, as listed in Appendix III - Cherrywood Planning Scheme Area Only, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks Public Infrastructure Facilities & Amenities benefiting development in the Cherrywood Planning Scheme Area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 34. No development on foot of this permission shall commence until security for the provision and satisfactory completion of services (including roads, footpaths, open spaces, public lighting, sewers, watermains and drains) in accordance with the Plans and particulars lodged with the application, has been given by:- a) Lodgement with the Council of an approved Insurance Company Bond in the sum of €294,400.00 which shall be kept in force by the Developer until such time as Roads, Open Spaces, Car Parks, Sewers, Watermains and Drains are completed to the satisfaction of the Council OR/... b) Lodgement with the Council of a Cash Sum of €182,000.00 to be applied by the Council at its absolute discretion if such services are not duly provided to its satisfaction on the provision and completion of such services to standard specifications. REASON: To ensure that a ready sanction may be available to the Council to induce the provision of services and prevent disamenity in the development. 35. This development shall not be carried out without prior agreement, in writing, between the Applicant & the Planning Authority relating to the payment of development contributions. REASON:Investment by Dún Laoghaire-Rathdown County Council in Local Authority works has facilitated and will facilitate the proposed development. It is considered appropriate and reasonable that the developer should contribute to the cost of same. NOTE 1: The proposed development shall accord with the requirements of Irish Water. NOTE 2: The attention of the applicant is drawn to Section 34(13) of the Planning and Development Act 2000, as amended, which relates as follows- ‘A person shall not be entitled solely by reason of a permission under this section to carry out any development’. ## Nearby applications - [DZ24A/0236/WEB](https://cherrywoodplans.com/application/DZ24A-0236-WEB.md): Lands in the townland of Laughanstown, between Grand Parade and Tully Park, in Domville Development Area 4, Cherrywood, Dublin 18. Refused or withdrawn (15 Apr 2024). Amends the Domville permission to raise four blocks on Grand Parade from 4 to 6 storeys, adding 58 apartments. - [DZ17A/0714](https://cherrywoodplans.com/application/DZ17A-0714.md): Lands in the townlands of Lehaunstown and Cherrywood, Dublin 18. The application relates to development in the Cherrywood Strategic Development Zone.(Domville site). Granted (7 Aug 2018). Builds 322 new homes, 242 apartments and 80 houses, plus a crèche on the Domville site in Cherrywood. - [DZ24A/0291/WEB](https://cherrywoodplans.com/application/DZ24A-0291-WEB.md): Lands in the townland of Laughanstown, Dublin 18, located between Grand Parade and Tully Park., The application relates to development in Domville Development Area 4 of the Cherrywood Strategic Development Zone.. Granted (25 Mar 2025). Amends the Domville permission to raise four blocks on Grand Parade from 4 to 6 storeys, adding 58 apartments. - [DZ25A/0489/WEB](https://cherrywoodplans.com/application/DZ25A-0489-WEB.md): 20, Domville Court, Tullyvale, Cherrywood, Dublin 18, D18VN3A. Granted (11 Aug 2025). Permission to keep a glass conservatory permanently at the back of a house on Domville Court. - [DZ25A/0480/WEB](https://cherrywoodplans.com/application/DZ25A-0480-WEB.md): 20, Domville Court, Tullyvale, Cherrywood, Dublin 18, D18VN3A. Refused or withdrawn (19 Jun 2025). Permission to keep a glass conservatory at the back of a house on Domville Court. - [DZ15A/0758](https://cherrywoodplans.com/application/DZ15A-0758.md): in the townlands of Cherrywood, Laughanstown, Brennanstown, Loughlinstown and Glebe, Dublin 18. Granted (16 Aug 2016). Phase 1 roads for Cherrywood: about 5.4km of new and upgraded roads including Grand Parade, Castle Street and Bishop Street. - [DZ26B/0366/WEB](https://cherrywoodplans.com/application/DZ26B-0366-WEB.md): 10 Domville Square, Cherrywood, Dun Laoghaire, Dublin 18, D18H7WA. Granted (14 Aug 2026). Adds a small glass conservatory to the rear of a house at Domville Square. - [DZ26B/0360/WEB](https://cherrywoodplans.com/application/DZ26B-0360-WEB.md): 10, Domville Square, Cherrywood, Dun Laoghaire, Dublin 18, D18H7WA. Refused or withdrawn (24 Jun 2026). A small glass conservatory added to the back of a house on Domville Square. - [D03A/0735](https://cherrywoodplans.com/application/D03A-0735.md): Tullyvale, Druid Valley, Cherrywood, Loughlinstown, Co. Dublin.. Granted (22 Sep 2003). Changes the approved Tullyvale housing development by realigning its access road and adding a signalised pedestrian crossing. - [DZ26B/0030/WEB](https://cherrywoodplans.com/application/DZ26B-0030-WEB.md): 17 Domville Court, Tullyvale, Cherrywood, Dublin 18, D18 WEK6. Refused or withdrawn (28 Jan 2026). Permission to keep a glass conservatory built in the back garden of a house on Domville Court. - [DZ26B/0241/WEB](https://cherrywoodplans.com/application/DZ26B-0241-WEB.md): 17 Domville Court, Cherrywood, Dublin 18, D18WEK6. Granted (10 Jun 2026). Permission to keep a glass conservatory permanently in the back garden of a house on Domville Court. - [DZ26B/0073/WEB](https://cherrywoodplans.com/application/DZ26B-0073-WEB.md): 17 Domville Court, Cherrywood, Dublin 18, D18WEK6. Refused or withdrawn (13 Mar 2026). Permission to keep a glass conservatory built in the back garden of a house on Domville Court. - [DZ25A/0161/WEB](https://cherrywoodplans.com/application/DZ25A-0161-WEB.md): Lands in the townlands of Laughanstown, Dublin 18. The application relates to development in Cherrywood Strategic Development Zone. Granted (23 Apr 2025). Completion of a 145-metre stretch of Grand Parade from Tully Vale Road towards Bishop Street. - [D05A/1658](https://cherrywoodplans.com/application/D05A-1658.md): Tullyvale, Druids Valley, Cherrywood, Loughlinstown, Co. Dublin. Refused or withdrawn (22 Feb 2006). 396 homes in 9 buildings of 3 to 8 storeys, with a childcare facility, at Tullyvale, Druids Valley. - [DZ26A/0148/WEB](https://cherrywoodplans.com/application/DZ26A-0148-WEB.md): Townland of Laughanstown, Dublin 18, The site is bounded by Grand Parade and Western Courtyard roads. Granted (20 Jul 2026). 311 new homes and a crèche in buildings of 3 to 6 storeys between Grand Parade and Western Courtyard. - [DZ26A/0151/WEB](https://cherrywoodplans.com/application/DZ26A-0151-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18.. Granted (24 Jun 2026). 188 new homes, a mix of apartments, two-level units and houses, beside Tully Park off Bishop Street. - [DZ22A/0133](https://cherrywoodplans.com/application/DZ22A-0133.md): Townlands of Laughanstown and Cherrywood, Dublin 18. Granted (22 Nov 2022). Builds 163 homes, a mix of apartments, triplexes, maisonettes and houses, beside Tully Park. - [DZ15A/0813](https://cherrywoodplans.com/application/DZ15A-0813.md): Laughanstown, Dublin 18, (Tully Park). Granted (13 Jul 2016). Creates Tully Park, a 12.9-hectare public park with a playground, café kiosk and nature trails. - [DZ20A/0946](https://cherrywoodplans.com/application/DZ20A-0946.md): Lands known as Tully Park (c12.9HA), Laughanstown, Dublin 18. Granted (18 Feb 2021). Revises part of the permitted Tully Park, moving the café kiosk, redesigning the playground and adding a raised boardwalk. - [D05A/0162](https://cherrywoodplans.com/application/D05A-0162.md): Druid Valley, Cherrywood, Loughlinstown, Co, Dublin.. Refused or withdrawn (7 Apr 2005). Builds 805 apartments and homes plus a crèche across 50 buildings at Druid Valley, Cherrywood. - [ABP30342919](https://cherrywoodplans.com/application/ABP30342919.md): Site (c.3.06ha) in the townlands of Laughanstown, Dublin 18 (lands generally bounded by Bishop Street to the south, the Luas green line to the east and Tully park to the north. Granted (18 Apr 2019). Builds 184 homes, a mix of apartments, two-level units and houses, between Bishop Street, the Luas line and Tully Park. - [DZ18A/0499](https://cherrywoodplans.com/application/DZ18A-0499.md): Lands (c.1.22ha) in the townlands of Cherrywood & Laughanstown, Dublin 18. Granted (11 Jan 2019). 146 apartments in four 4-storey blocks off Grand Parade on plot TC5. - [DZ24A/1030/WEB](https://cherrywoodplans.com/application/DZ24A-1030-WEB.md): In the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18. Granted (11 Jun 2025). Amends a permitted scheme off Tully Vale Road to add 59 apartments by raising four blocks by one or two storeys. - [DZ20A/0877](https://cherrywoodplans.com/application/DZ20A-0877.md): Bishop Street, Cherrywood, Dublin 18, Co Dublin. Granted (29 Jan 2021). Installs a small gas regulator building on Bishop Street near the Luas line. - [DZ25A/0152/WEB](https://cherrywoodplans.com/application/DZ25A-0152-WEB.md): Land in the townland of Laughanstown, Dublin 18, located north-west of the Tullyvale residential development.The application relates to development in. Granted (11 Jul 2025). Amends an earlier housing permission to shrink the planned basement car park to 13 spaces. - [DZ21A/0414](https://cherrywoodplans.com/application/DZ21A-0414.md): Townland of Laughanstown, Dublin 18. Granted (5 May 2022). 107 new homes, a mix of apartments and houses, north-west of Tullyvale. - [DZ22A/0093](https://cherrywoodplans.com/application/DZ22A-0093.md): Townland of Laughanstown, Dublin 18. Granted (1 Apr 2022). Seeks to keep two advertising signs for Cherrywood housing for 3 more years. - [DZ26A/0032/WEB](https://cherrywoodplans.com/application/DZ26A-0032-WEB.md): Block A1, The Tully Building, Civic Street, Cherrywood Town Centre, Dublin 18, D18WDK0. Granted (13 Mar 2026). Revised plan for 24 mobile phone antennas and 9 dishes on Block A1, The Tully Building, after an earlier compliance submission was rejected. - [DZ25A/0485/WEB](https://cherrywoodplans.com/application/DZ25A-0485-WEB.md): Block A1, Tully Buildings, Cherrywood, Dublin 18. Granted (1 Aug 2025). 24 mobile phone antennas and 9 dishes on the facade and roof of Block A1, Tully Buildings. - [DZ21A/1042](https://cherrywoodplans.com/application/DZ21A-1042.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (30 May 2022). 122 new homes, a mix of houses, two-level units and apartments, beside Tully Park and Lehaunstown Lane. - [D04A/1013](https://cherrywoodplans.com/application/D04A-1013.md): Laughanstown/Cherrywood, With Access From N11, Wyattville Road, Co. Dublin.. Refused or withdrawn (9 May 2005). Seeks to keep modified land shaping and drainage works on a 36-hectare site at Laughanstown/Cherrywood and further alter them. - [DZ22A/0952](https://cherrywoodplans.com/application/DZ22A-0952.md): The Hunt Building, Grand Parade, Cherrywood Town Centre, Dublin 18. Refused or withdrawn (1 Feb 2023). 6 mobile phone antennas and 2 dishes on the roof of The Hunt Building, Grand Parade. - [DZ22A/0796](https://cherrywoodplans.com/application/DZ22A-0796.md): The Hunt Building, Grand Parade, Cherrywood Town Centre, Dublin 18. Refused or withdrawn (23 Nov 2022). 6 mobile phone antennas and 2 dishes, finished to look like brick, on the roof of The Hunt Building, Grand Parade. - [DZ18A/0458](https://cherrywoodplans.com/application/DZ18A-0458.md): on lands (c.0.74 HA) in the townland of Laughanstown, Dublin 18 (Development Area 8 - Tully). Granted (11 Jul 2018). Builds a new primary school with 24 classrooms plus a special needs unit, south-west of Tully Park. - [D15A/0355](https://cherrywoodplans.com/application/D15A-0355.md): Site located in the green area at the entrance to, Druid Valley Estate, Cabinteely, Dublin 18. Refused or withdrawn (9 Jul 2015). Installs a small gas safety regulator unit on the green at the entrance to Druid Valley. - [DZ21A/1038](https://cherrywoodplans.com/application/DZ21A-1038.md): site 1.85 ha at Castle Street and Bishop Street, Cherrywood, Dublin 18. Granted (8 Nov 2022). Builds a new 1,000-pupil secondary school at Castle Street and Bishop Street, Cherrywood. - [DZ26A/0052/WEB](https://cherrywoodplans.com/application/DZ26A-0052-WEB.md): Townland of Laughanstown, Cherrywood, Dublin 18. Granted (24 Mar 2026). Makes minor layout and landscaping changes to a permitted Tully housing scheme, moving bin stores to the front of the two-level homes. - [DZ25A/0325/WEB](https://cherrywoodplans.com/application/DZ25A-0325-WEB.md): In the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18. Granted (15 Jan 2026). 121 apartments in two blocks of 3 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ25A/0102/WEB](https://cherrywoodplans.com/application/DZ25A-0102-WEB.md): In the Townlands of Laughanstown, in Cherrywood, Dublin 18. Granted (26 May 2025). Amends a permitted 200-apartment scheme in Macnebury to drop its basement and cut car parking from 241 to 160 spaces. - [DZ24A/1024/WEB](https://cherrywoodplans.com/application/DZ24A-1024-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood,, Dublin 18. Granted (1 May 2025). Amends a permitted Macnebury apartment scheme to cut car parking from 312 to 213 spaces and add bike, bin and storage buildings, with no change to the homes. - [DZ25A/0008/WEB](https://cherrywoodplans.com/application/DZ25A-0008-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18. Refused or withdrawn (6 Feb 2025). Amends a permitted 200-apartment scheme in Macnebury to drop its basement and cut car parking from 241 to 160 spaces. - [DZ24A/1016/WEB](https://cherrywoodplans.com/application/DZ24A-1016-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18. Refused or withdrawn (3 Jan 2025). Amends a permitted Macnebury development by removing its basement and cutting car parking from 241 to 160 spaces. - [DZ24A/0017](https://cherrywoodplans.com/application/DZ24A-0017.md): Townlands of Laughanstown and Cherrywood, Macnebury - Development Area 7 - Cherrywood, Dublin 18. Granted (11 Jun 2024). 200 apartments in three blocks of 4 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ23A/0811](https://cherrywoodplans.com/application/DZ23A-0811.md): In the Townlands of Laughanstown and Cherrywood. Macnebury, Development Area 7 , Cherrywood, Dublin 18. Refused or withdrawn (4 Jan 2024). 200 apartments in three blocks of 4 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ22A/1021](https://cherrywoodplans.com/application/DZ22A-1021.md): Lands within Development Area 7 - Macnebury, including part of the Res 3 plot known as M1 located south of Bishop Street, west of Cherrywood Avenue, east and north of the proposed Beckett Road, Laughanstown, Dublin 18. Granted (27 Jun 2023). 283 new homes, mostly apartments in four blocks of 4–5 storeys, plus a crèche, south of Bishop Street in Macnebury. - [DZ25A/0044/WEB](https://cherrywoodplans.com/application/DZ25A-0044-WEB.md): In the Townlands of Laughanstown, and Brennanstown, Dublin 18. Granted (10 Jul 2025). Amends a permitted Lehaunstown scheme to add a storey to two buildings, taking it from 492 to 517 homes, with fewer car spaces. - [DZ21A/0334](https://cherrywoodplans.com/application/DZ21A-0334.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (7 Apr 2022). 482 new homes, mostly apartments in five blocks up to 5 storeys, beside Barrington's Road and the Luas in Lehaunstown. - [D07A/1723](https://cherrywoodplans.com/application/D07A-1723.md): Lehaunstown Bungalow, Lehaunstown Lane, Cabinteely, Co. Dublin. Refused or withdrawn (11 Feb 2008). Demolishes Lehaunstown Bungalow and builds a replacement house. - [DZ25A/0197/WEB](https://cherrywoodplans.com/application/DZ25A-0197-WEB.md): Located to the north end of the Valley Drive public road, which is a cul-de-sac, opposite the corner apartment building 97-106 E. Refused or withdrawn (18 Mar 2025). Provides a paved bin collection area at the end of Valley Drive for the Tullyvale apartments. - [DZ22A/0820](https://cherrywoodplans.com/application/DZ22A-0820.md): Townlands of Laughanstown, Brennanstown and Cherrywood,, Dublin 18. Granted (12 Dec 2022). Makes minor changes to the already-permitted 168-home scheme in Tully, swapping the designs of 12 houses and altering some roofs. - [DZ22A/0403](https://cherrywoodplans.com/application/DZ22A-0403.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Refused or withdrawn (22 Jul 2022). Makes minor changes to the already-permitted 168-home scheme in Tully, swapping the designs of 12 houses and altering some roofs. - [DZ21A/0699](https://cherrywoodplans.com/application/DZ21A-0699.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (23 Sep 2021). Smaller first-floor bathroom windows on 33 permitted houses in Tully. - [DZ20A/0552](https://cherrywoodplans.com/application/DZ20A-0552.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18,. Granted (11 Mar 2021). 163 new homes, mostly houses, between Castle Street and Tully Park. - [DZ23A/0423](https://cherrywoodplans.com/application/DZ23A-0423.md): On lands (c.17.03 a) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (Also Co. Dublin). Granted (10 Aug 2023). Amends the Cherrywood Town Centre permission to add two 2-bed apartments to Block A1. - [DZ22A/0690](https://cherrywoodplans.com/application/DZ22A-0690.md): Townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (12 May 2023). Facade and balcony design changes to Cherrywood Town Centre apartment Blocks A1, A2 and A3. - [DZ22A/0747](https://cherrywoodplans.com/application/DZ22A-0747.md): Townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (30 Mar 2023). Changes of use and merging of units in Town Centre Blocks C1 and C2 to create a larger 723 sq.m shop with off-licence. - [DZ22A/0846](https://cherrywoodplans.com/application/DZ22A-0846.md): Lands (c. 17.03 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (22 Dec 2022). Removes a planned viewing platform at Block F1 in Cherrywood Town Centre, replacing it with a glass balustrade. - [DZ22A/0138](https://cherrywoodplans.com/application/DZ22A-0138.md): (c. 17.03ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (30 Aug 2022). Minor changes of use between shop and restaurant-type units in Town Centre Blocks C1 and C2, and a slightly larger crèche. - [DZ21A/0807](https://cherrywoodplans.com/application/DZ21A-0807.md): Lands (c. 17.03 ha), in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (8 Jul 2022). Amends the Cherrywood Town Centre permission to cut residential parking from 1,363 to 1,169 spaces and add 41 car-sharing spaces. - [DZ21A/0713](https://cherrywoodplans.com/application/DZ21A-0713.md): Lands (c. 17.01 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (3 Oct 2021). Design changes to the three apartment blocks A1–A3 in Cherrywood Town Centre, including taller windows and smaller roof terrace. - [DZ19A/1024](https://cherrywoodplans.com/application/DZ19A-1024.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (9 Sep 2020). Amends the Cherrywood Town Centre plan to shrink the basement under Blocks A1–A3 and reassign parking. - [DZ20A/0002](https://cherrywoodplans.com/application/DZ20A-0002.md): Lands (c.17.01ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (9 Sep 2020). Makes minor changes to electrical rooms and landscaping in Town Centre Blocks F1 and F3. - [DZ19A/0458](https://cherrywoodplans.com/application/DZ19A-0458.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (19 Jun 2020). Major redesign of Cherrywood Town Centre plot TC1, adding two supermarkets, an 11-screen cinema and much more retail space. - [DZ18A/1178](https://cherrywoodplans.com/application/DZ18A-1178.md): 2.2 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (17 Apr 2019). Amends Town Centre plot TC2 to add one apartment, expand retail and resident amenity space, and move the crèche. - [DZ17A/0161](https://cherrywoodplans.com/application/DZ17A-0161.md): Lands (site area c.0.95ha) in the townland of Laughanstown, Dublin 18. Granted (12 Dec 2017). Sets up a temporary concrete plant for 7 years to supply the building of Cherrywood. - [PC/CSDZ/005/2021](https://cherrywoodplans.com/application/PC-CSDZ-005-2021.md): Cherrywood Strategic Development Zone, Townland of Laughanstown, County Dublin. Granted (5 Jul 2021). A council plan for a regional storm water pond (Pond 2A) in Laughanstown, draining to the Cabinteely River. - [DZ20A/0824](https://cherrywoodplans.com/application/DZ20A-0824.md): Lands (c. 17.01 ha), in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (11 Jan 2021). Changes the windows, balconies and frontage of Town Centre Block F2 on Cherrywood Avenue and Central Avenue. - [DZ19A/0148](https://cherrywoodplans.com/application/DZ19A-0148.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (24 Apr 2019). Amends Town Centre plot TC2 to add 47 apartments, taking Blocks C1 and C2 from 384 to 431 homes. - [DZ23A/0573](https://cherrywoodplans.com/application/DZ23A-0573.md): Lands (c. 17.03 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (19 Oct 2023). Amends the Cherrywood Town Centre permission to add 4 apartments in Blocks F2 and F3, bringing plot TC4 to 524 homes. ## Links - [This page on CherrywoodPlans](https://cherrywoodplans.com/application/DZ21A-0806) - [Council record, documents and conditions (DLR planning portal)](https://planning.agileapplications.ie/dunlaoghaire/application-details/90693) - [All Cherrywood applications](https://cherrywoodplans.com/applications.md) _Source: Dún Laoghaire–Rathdown County Council planning data, refreshed daily. CherrywoodPlans is an independent site, not run by the council._