# Planning application DZ21A/1017 > Townlands of Laughanstown, Glebe, and Cherrywood, Dublin 18, (also Co Dublin), Cherrywood, Dún Laoghaire–Rathdown. Granted (11 Nov 2022). - **Reference:** DZ21A/1017 - **Address:** Townlands of Laughanstown, Glebe, and Cherrywood, Dublin 18, (also Co Dublin) - **Status:** Granted (11 Nov 2022) - **Decision:** GRANT PERMISSION - **Application type:** Permission (SDZ) - **Applicant:** Quintain Developments Ireland Limited - **Lodged:** 17 Oct 2022 - **Decided:** 11 Nov 2022 - **Location (lat, lng):** 53.242168, -6.150156 ## Proposal Roads and infrastructure to form part of public road network providing access and services for the future development if the adjoining SDZ lands and linking to the previously permitted roads and infrastructure as approved under the Cherrywood SDZ Planning Scheme 2014 (as amended), as follows:- Beckett Road from Junctions E2 to F and F to G including a c.42-metre-long underpass below the Wyattville Link Road (WLR). The construction of the underpass will require temporary diversion and reinstatement of c.0.3km of the Wyattville Link Road to the east of Junction 16 of the M50; Proposals for Lehaunstown Lane Greenway crossing incorporating universal access including retaining walls and hard and soft landscaping; Part of Bishop Street from Junctions F to F1 to tie-in with Bishop Street permitted under Reg. Ref. DZ15A/0758; Cherrywood Avenue from Junction G to H with associated tie-in to Cherrywood Avenue H to A3 permitted under Reg. Ref. DZ17A/0862 and tie-in to Cherrywood Avenue H to WLR; Part of Gun and Drum Hill Road extending north east of Junction E2 to connect to Mercer's Road's permitted under Reg. ref. DZ19A/0597; Surface water drainage infrastructure for lands north of Lehaunstown Lane includes a temporary attenuation tank west of the junction Gun and Drum Hill and Mercer's Road and connection to the permitted pipe network under Reg. Ref. DZ19A/0597. The lands to the south of Lehaunstown Lane connect to the existing surface water network within Cherrywood Avenue; The development includes proposals for the Class 2 open space area / pocket park (c.0.7ha) surrounding a Protected Structure 'Wedge Tomb DU026-024' (National Monument No. 216) and 'Cairn DU026-153'. The total road length proposed is c.1.6kms, of which c.1.3kms is new road, c.0.2kms is new spurs and c.0.1kms relates to works to existing roads i.e. Cherrywood Avenue, Bishop Street and Lehaunstown Lane. Permission is also sought for associated footpaths and pedestrian crossing points, cycle lanes. hard and soft landscaping including screen fencing, public lighting, traffic signals, directional signage, underground services (surface and foul water drainage and watermain supply) and ducting for telecoms and all associated ancillary site and development works. ## In plain English About 1.6km of new roads including Beckett Road with an underpass below the Wyattville Link Road, plus a park around an ancient wedge tomb. - **1.6** km of road - **42** metre underpass - **0.7** hectare park ### What's planned New public roads and services to open up land in the Cherrywood SDZ, linking to roads already permitted. ### Transport Beckett Road, including a **42**m underpass below the Wyattville Link Road (requiring a temporary diversion of about **0.3**km), plus sections of Bishop Street, Cherrywood Avenue and Gun and Drum Hill Road, and a Lehaunstown Lane greenway crossing. Footpaths, cycle lanes and traffic signals included. ### Heritage A pocket park of about **0.7** hectares around a wedge tomb, a protected structure (a legally protected historic building) and national monument, and a cairn. ### Environment Surface water drainage including a temporary storm water tank, plus landscaping. _This summary was written by AI from the proposal text. Check the council record before relying on it._ ## Conditions ### Condition 3 First Schedule Reasons and Considerations Having regard to the zoning of the site as set out in the Cherrywood Planning Scheme, as amended, and 2022 - 2028 Dún Laoghaire - Rathdown County Development Plan, it is considered that subject to compliance with the conditions below, the proposed development would not seriously injure the amenities of the area and would not contravene materially the zoning of the application site or that of adjoining sites, subject to conditions and accords with the Planning Scheme. Appropriate Assessment Screening Having regard to the nature and scale of the proposed development, as clarified by way of Further Information received on 15/08/2022 and Clarification of Further Information received on 17/10/2022 it has been determined by the Planning Authority, that the proposed development would not significantly impact upon a Natura 2000 Site. Environmental Impact Assessment Screening Having regard to the nature and scale of the proposed development, as clarified by way of Further Information received on 15/08/2022 and Clarification of Further Information received on 17/10/2022 that no real likelihood of significant effects on the environment would arise from the proposed development. Second Schedule Conditions 1. The development shall be carried out in its entirety in accordance with the plans, particulars and specifications lodged with the application, as amended by Further Information received on 15/08/2022, and by Clarification of Further Information on 17 /10/2022, save as may be required by the other conditions attached hereto. Reason: To ensure that the development shall be in accordance with the permission and that effective control be maintained. 2. Prior to the commencement of development, the Applicant/Developer shall submit updated letters of consent from the relevant property owners, to enable the development hereby permitted to be completed. Reason: In the interests of clarity and to ensure the delivery and completion of the proposed works. General/Miscellaneous 3. Prior to the completion of development, the developer shall submit for the written agreement of the Planning Authority, all drawings in digital format (CAD/GIS) projected to ITM (Irish Transverse Mercator). These shall include those for DZ21A/1017 and as further amended by this permission. This information should include the following: • Overall site plans in DWG format (ITM projection in metres) • Ground floor plans of buildings in DWG format (ITM projection in metres) • Site sections and elevations in PDF format. Reason: To ensure consistency with Section 7.4 of the Cherrywood Planning Scheme. Materials/Finishes 4. Prior to commencement of development the developer shall submit, for the written agreement of the Planning Authority, details of all hard landscape and bridge/ abutment details in the form of landscape drawings, samples and on site mock ups where appropriate, or as otherwise agreed with the Planning Authority. In doing so, consideration shall be had to quality, durability, maintenance and sourcing. Reason: In the interest of visual amenity and consistency with Objective PD 14 of the Cherrywood Planning Scheme as amended. 5. Prior to commencement of development the developer shall submit, for the written agreement of the Planning Authority, details of all ancillary services and street furniture, including litter bins. In doing so ancillary development shall be located in accordance with the requirements of the Utilities providers and consideration shall be given to any likely visual clutter. Reason: In the interest of visual amenity and consistency with Objective PD 15 of the Cherrywood Planning Scheme as amended. Cultural and Built Heritage 6. Archaeological monitoring shall consist of the following; a) The applicant is required to employ a suitably qualified, licenced archaeologist to monitor all topsoil stripping required for this development. There remains the potential to encounter unrecorded archaeology, based on density of known archaeology in the area. Due to proximity of National Monument No. 216, DU026-024--- Wedge Tomb, an application for a S14 Ministerial Consent will be required for this development. Please allow 5-6 weeks to facilitate the consideration of the Ministerial Consent. No topsoil removal or groundworks is to take place in the absence of the archaeologist. b) Monitoring is to take place to uppermost archaeological horizons only (where they survive) and topsoil/sod layers shall only be removed using a machine with a toothless bucket. Should archaeological material be found during the course of the archaeological monitoring, the archaeologist shall stop all work in the vicinity of the archaeological material on the site pending a decision as how best to deal with the archaeology. c) The developer shall be prepared to be advised by the National Monuments Service with regard to any necessary mitigation action e.g. redesign to allow for preservation in situ, and/or excavation (both may be required in terms of buffer and testing/excavation). The applicant/developer shall facilitate the archaeologist in recording any material. d) A Management Plan will be developed for the National Monument No. 216 in order to maintain the green space and ensure the maintenance of the space in the future years. This will be carried out in consultation with the National Monuments Service and the Office of Public Works. e) The National Monuments Service and the Planning Authority shall be furnished with report describing the results of the monitoring and the Management Plan. Reason: To ensure the continued preservations (either in situ or by record) of places, caves, sites, features or other objects of archaeological interest. Construction Management Plan 7. The Applicant/Developer shall comply with the following requirements: - a) The construction of the development shall be managed in accordance with a final Construction Management Plan, which shall be submitted for the development in its entirely to the Planning Authority for agreement in writing, prior to commencement of any development. In this regard the final Construction Management Plan shall include a Community Liaison Plan, inclusive of a nominated Project Liaison Officer (PLO) to manage all public relations issues relating to the construction works, and a Construction Traffic Management Plan that ensures access to all existing properties / other development sites will be maintained throughout the entire construction period for the subject development. The final construction management plan shall also include a detailed method statement demonstrating sufficient working zones are available within the red line boundary proposed by this application for all necessary construction works. b) Site development and building works shall be carried out only between the hours of 7.00am to 7.00pm Monday to Friday inclusive, 8.00am to 2.00pm Saturdays and no works permitted on site on Sundays and public holidays. Deviation from these times will only be allowed in exceptional circumstances where prior written approval has been received from the Planning Authority. This shall be addressed in the Community Liaison Plan. c) Construction staff shall be prohibited from parking on public roads. d) Construction vehicles shall not be permitted to park or wait on roads outside the site boundary. All parking and waiting areas shall be provided Developer/Contractor within the site boundary. e) Prior to commencement of development a mechanism and structure for on-site monitoring, reporting on progress and quality control to the Planning Authority in relation to construction standards, materials, as-built drawings and records shall be agreed in writing with the Planning Authority. f) The Luas operator/TII will require 24hr access to Luas infrastructure. Prior to the commencement of development, the Applicant/Developer shall enter into an access and maintenance agreement with TII. g) All deliveries made to the development site, including during the construction phase, shall be made to limit interference with Luas operations. h) Prior to commencement of development, a Site Monitoring Engineer shall be appointed at the Developer's expense for independent on-site monitoring on behalf of the Planning Authority (Municipal Services Department) and for reporting on progress and quality control to the Planning Authority (Municipal Services Department) with regard to all elements to be taken in charge. The appointment of the Site Monitoring Engineer shall be agreed in advance and in writing with the Planning Authority, shall be independent of the Developer and the Developer's design and construction teams and shall report exclusively and directly to the Planning Authority (Municipal Services Department) only. With regard to the Beckett Road Underpass, the Site Monitoring Engineer shall have specialist knowledge and experience in the design and construction of bridge structures. i) As per the requirements of the Environmental Enforcement / Waste Management Section the detailed Construction Management Plan shall include a waste management plan which meets the requirements ofthe DoEHLG Best Practice Guidelines on the Preparation of Waste Management Plans for Construction & Demolition Projects (DoEHLG, 2006a). Reason: To ensure consistency with Section 2.14 of the Cherrywood Planning Scheme, to ensure compliance with the requirements of Transport Infrastructure Ireland (TII), and in the interests of orderly development, proper planning and sustainable development. Water Supply and Wastewater 8. The Applicant/Developer shall comply with the following requirements: - a) The detailed design of the water supply infrastructure including details of all connections shall be in accordance with Irish Water specification and requirements. The water supply infrastructure layout and design for the full development shall be in accordance with Irish Water's overall water supply masterplan for Cherrywood SDZ and Irish Water's standards and codes of practice. The Applicant/Developer's designs shall be consistent with designs permitted under planning reference DZ15A/0758 and the Planning Scheme or as otherwise agreed with Irish Water. b) The detailed design of the wastewater infrastructure including details of all connections shall be in accordance with Irish Water specification and requirements. The wastewater infrastructure layout and design for the full development shall be in accordance with Irish Water's overall wastewater masterplan for Cherrywood SDZ and Irish Water's standards and codes of practice. The Applicant/Developer's designs shall be consistent with designs permitted under planning reference DZ15A/0758 and the Planning Scheme or as otherwise agreed with Irish Water. c) The Applicant/Developer shall facilitate the delivery of the Brides Glen watermain upgrade works in agreement with Irish Water. Reason: In the interests of sustainable development and in the interests of consistency with PI 4, PI 5 and PI 12 of the Planning Scheme. Surface Water 9. The Applicant/Developer shall comply with the following requirements: - a) Prior to the commencement of development or at an alternative time as agreed in writing with the Planning Authority in advance of the commencement of development, the Developer shall submit the following for the written approval of the Planning Authority: i. Full detailed design of the surface water drainage infrastructure for the subject development shall be submitted and agreed with the Planning Authority. This shall include detailed calculations, including area allocations and design input details and results, for all hydraulic calculations; as well as the detailed design for all SuDS components for the development, including tree pit proposals and linear detention basins, and including full detail of interception volumes provided. This detailed design for surface water infrastructure, including SuDS measures, shall correspond with all landscape detailed designs. The detailed design shall also incorporate an oil separator to GDSDS standards in addition to the SuDS measures. ii. A final operations and maintenance plan for the proposed SuDS components, inclusive of the attenuation structures. b) Measures to address the appropriate management of surface water throughout the construction phase(s) of the subject development shall be implemented by the applicant / developer. Prior to the commencement of development or at an alternative time as agreed in writing with the Planning Authority in advance of the commencement of development, the applicant / developer shall submit a detailed Stormwater Management Plan for the construction phase(s), including measures to manage the subject development's surface water prior to completion and commissioning of Pond 5A, for the written agreement of the Planning Authority. c) Prior to the completion of the southern catchment of this road infrastructure development (from Lehaunstown Lane junction to Junction H), Pond 5A and the associated public surface water sewers and infrastructure, granted permission under DZ18A/0854, shall be constructed, commissioned and operational. In this regard, the Applicant / Developer shall facilitate the installation of an upgraded surface water sewer within Cherrywood Avenue that forms part of the delivery of Pond 5A, permitted under DZ18A/0854, and shall agree a works programme for the surface water sewer upgrade with the Planning Authority (Development Agency Project Team). d) Surface Water discharge from the subject development shall be limited to 1 l/s/ha. e) Upon delivery and commissioning of the future Pond 1A and associated permanent infrastructure for Beckett Road E-E2, the temporary pond that is the subject of this permission shall be fully decommissioned and the surface water network for the northern catchment of this road infrastructure development (Lehaunstown Lane junction to Junction E2) that is the subject of this permission shall be connected (north of manhole ref: SW1.008) to the permanent surface water network for Beckett Road E-E2 as per the methodology outlined in the subject development proposals and as per the requirements of the Planning Scheme. f) Prior to the commencement of development, the applicant / developer shall submit for the written agreement of the Planning Authority confirmation that Pond 2B's volumetric capacity is sufficient to cater for the addition of the section of Bishop Street that is the subject of these development proposals. g) Prior to the commencement of development, the applicant/developer shall submit for the written agreement of the Planning Authority confirmation that the Lehaunstown Park network has been designed to cater for run off from the universal access ramp, including evidence that the adjoining landowner consents to its inclusion within the park network. h) Prior to the commencement of development, the developer shall ensure that flows from the subject development have been suitably catered for within the design for Pond 5A, including controlled outflows and provide the local authority with evidence of same. i) A Stormwater Audit shall be carried out at Stage 2 for the detailed design stage in accordance with PI 7 of the Cherrywood Planning scheme. The audit shall be carried out at the Developer's expense. An independent audit team shall be used and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the commencement of development, unless otherwise agreed. The Stage 2 Stormwater Audit reports shall address any and all phased construction proposals for the development. j) For any proposed partial commissioning of surface water infrastructure associated with any phased construction of the development, interim Stage 3 Stormwater Audits shall be carried out for the post construction / prior to commissioning phases, in accordance with PI 7 of the Cherrywood Planning Scheme and at phases pre-agreed with the Planning Authority as part of the Stage 2 Audit process. These audits shall be carried out at the Developer's expense. An independent audit team shall be used and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. k) A Stormwater Audit shall be carried out at Stage 3 for the post construction / prior to commissioning stage in accordance with PI 7 of the Cherrywood Planning scheme. The audit shall be carried out at the Developer's expense. An independent audit team shall be used and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 3 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the final commissioning of the full surface water network for the development. l) Prior to the commencement of development, or at an alternative time as agreed in writing with the Planning Authority in advance of the commencement of development, the Applicant / Developer shall submit for the written agreement of the Planning Authority, a detailed traffic management strategy for the Beckett Road Underpass that will be implemented in the event of an extreme storm event (in excess of the 1 in 100 year + climate change event) occurring prior to the roads infrastructure that is the subject of this permission being Taken In Charge by the Roads Authority. This strategy shall identify suitable route(s) to divert traffic from the Beckett Road Underpass and shall confirm adequate applicant/developer resources and equipment shall be available to implement the strategy during an extreme storm event. Reason: In the interests of sustainable development, to ensure long term optimum operation of the surface water management system, to ensure that the proposed development can discharge surface water via a connection to the public surface water network, in the interests of mitigating health and safety risk during extreme storm events, and to comply with the requirements of PI 6, PI 7, PI 8, PI 9 and PI 10 of the Cherrywood Planning Scheme. Transportation 10. The Applicant/Developer shall comply with the following requirements: - a) The Applicant / Developer shall submit the detailed design for the extent of Beckett Road (E2 - F - G), Cherrywood Avenue (G - H) and Bishop Street (F- F1), as set out in the application and in accordance with Fig 4.4 of the Planning Scheme, inclusive of drawings and cross sections that detail all levels, the location of service ducts, pipes, SuDs infrastructure, manholes and service chambers, for the written agreement of the Planning Authority prior to commencement of development or at an alternative time as agreed in writing with the Planning Authority in advance of the commencement of development. The provision and location of service ducts, pipes, SuDs infrastructure, manholes and service chambers shall be agreed with the relevant service providers and the Planning Authority prior to commencement of the road construction works. The services to be considered include electricity, surface water, wastewater, water, gas, telecoms, traffic communication, and public lighting. Full details for the physical, structural and visual tie in to the existing Cherrywood Avenue, the existing Bishop Street (granted permission under DZ17A/0862) and Mercer's Road (granted permission under DZ19A/0597) shall form part of the detailed design and as-built surveys of these existing roads shall be undertaken by the Applicant / Developer to inform the detailed design. This detailed design for Beckett Road, shall correspond with all surface water infrastructure (including SuDS measures), water supply infrastructure and landscape design proposals. b) The Applicant / Developer shall submit detailed pavement construction details for Beckett Road (E2 - F - G) and Cherrywood Avenue (G - H) as set out in the application, including all levels and the specification of the proposed finish materials, for the written agreement of the Planning Authority prior to commencement of development or at an alternative time as agreed in writing with the Planning Authority in advance of the commencement of development. The pavement construction details for Bishop Street F-F1 shall align with the engineering details of the permitted Bishop Street under DZ17A/0862. c) The detailed design of the extent of road drainage to be installed in Cherrywood Avenue as part of this development, inclusive of tree pits detail and tie in detail, shall be submitted by the Applicant / Developer to the Planning Authority (Water Services and the Development Agency Project Team) for written agreement prior to the commencement of development, or at an alternative time as agreed in writing with the Planning Authority in advance of the commencement of development. d) The Applicant / Developer shall submit a full phasing schedule for the construction of the extent of Beckett Road (E2 - F - G) and Cherrywood Avenue (G - H) as set out in the application for the written agreement of the Planning Authority prior to commencement of development, or at an alternative time as agreed in writing with the Planning Authority in advance of the commencement of development. Reason: In the interests of orderly development, maintaining consistency with PI 6, PI 10, PI 12, PI 14, Map 4.1, Map 4.2, Map 4.4, Map 4.5, Map 4.7 and Map 4.8 of the Planning Scheme and to ensure the timely progression of the Cherrywood Road network. 11. The Applicant/Developer shall comply with the following requirements: - a) Prior to the commencement of development, a Stage 2 Quality Audit (which shall include a Road Safety Audit, Access Audit, Cycle Audit and Walking Audit) shall be carried out for the detailed design stage and shall be submitted for the written agreement of the Planning Authority. The audit shall be carried out at the Applicant/Developer's expense in accordance with the Design Manual for Urban Roads & Streets (DMURS) guidance, TII (Transport Infrastructure Ireland) standards and the National Guidance and Standards (NGS) Circular 3 of 2022 - Quality Audits and Road Safety Audits on Public Roads in Ireland. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Quality Audit report shall address any and all phased construction proposals for the development and shall assess potential measures to further increase safety for all users, including further speed calming measures appropriate for implementation and prohibition of turning movements at junctions if necessary. The Stage 2 Quality Audit report shall also address the merits of separate signal stages for cyclists at all junctions. b) For all proposed phased construction stages of the development, interim Stage 3 Quality Audits shall be carried out for the post construction stages, at phased stages pre-agreed with the Planning Authority as part of the Stage 2 Quality Audit process. These audits shall be carried out at the Developer's expense. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. Any identified deficiencies identified by the interim Stage 3 Quality Audits in this regard shall be completed at the developer's expense. c) Immediately following the completion of construction of the development in its entirety, a Stage 3 Quality Audit (which shall include a Road Safety Audit, Access Audit, Cycle Audit and Walking Audit) shall be carried out for the post construction stage and shall be submitted for the written agreement of the Planning Authority. The audit shall be carried out at the Applicant/Developer's expense in accordance with the Design Manual for Urban Roads & Streets (DMURS) guidance, TII (Transport Infrastructure Ireland) standards and the National Guidance and Standards (NGS) Circular 3 of 2022 - Quality Audits and Road Safety Audits on Public Roads in Ireland. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. Any identified deficiencies identified by the Stage 3 Quality Audit in this regard shall be completed at the developer's expense. d) Post opening of this roads infrastructure development, a Stage 4 Road Safety Audit shall be carried out for the early operation stage and shall be submitted for the written agreement of the Planning Authority. The audit shall be carried out at the Applicant/Developer's expense in accordance with the Design Manual for Urban Roads & Streets (DMURS) guidance, TII (Transport Infrastructure Ireland) standards and the National Guidance and Standards (NGS) Circular 3 of 2022 - Quality Audits and Road Safety Audits on Public Roads in Ireland. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. Any identified deficiencies identified by the Stage 3 Quality Audit in this regard shall be completed at the developer's expense. Reason: In the interests of orderly and sustainable development; In the interests of road safety; and in the interests of consistency with PI 14, Section 4.2.7 and PI 20 of the Cherrywood Planning Scheme. 12. The Applicant/Developer shall comply with the following: a) The proposed development shall be undertaken in accordance with the adopted amendment to the Cherrywood Planning Scheme for Beckett Road, including the accompanying Background Technical Notes by AECOM. b) The development of the proposed bridge design associated with the Beckett Road shall be undertaken strictly in accordance with the Technical Acceptance Report (TAR), REV05 dated 02 August 2022. c) To avoid future disruption of the proposed development and to ensure minimal impact on the operation and safety of the national road network, the developer shall submit a detailed construction management plan and construction traffic management plan for the written agreement of the Planning Authority subject to the written agreement of TII. The Plans shall ensure: i. The specific construction traffic and construction management requirements of the Technical Acceptance Report (TAR) are included. ii. Minimal and limited closures to Junction 16 Lehaunstown which must be agreed with TII and the Roads Authority in advance in accordance with standard procedures. TII advises that these will be undertaken at the developer's expense and shall only occur at times agreed with TII, over weekends at non-peak times of the year to ensure minimal disruption to the operation of the national road network. d) TII will entertain no future claims in respect of impacts (e.g. air, noise and visual etc) on the proposed development due to the presence of the existing road or any new road scheme which is currently in planning. Reason: In the interests of orderly and sustainable development; to comply with the requirements of Transport Infrastructure Ireland (TII); and in the interests of consistency with PI 15 of the Cherrywood Planning Scheme. 13. The Applicant/Developer shall comply with the following requirements: - a) As part of the detailed design process, the Applicant / Developer shall assess further protection measures for right turning cyclist movements, including the inclusion of separate signal stages for cyclists, at Junctions H and F. The Applicant / Developer shall submit this assessment to the Planning Authority, inclusive of engineering drawings, for written agreement prior to the commencement of development, or at an alternative time as agreed in writing with the Planning Authority in advance of the commencement of development. b) The Applicant / Developer shall adhere with ESB requirements regarding the interface of the subject development with ESB infrastructure throughout the detailed design and construction stages of this development. c) Prior to the commencement of development, or at an alternative time as agreed in writing with the Planning Authority in advance of the commencement of development, the Applicant / Developer shall submit the detailed design for the toucan crossing of Beckett Road (connecting Lehaunstown Lane and the M50 overpass) to the Planning Authority for written agreement. This detailed design shall include all details for the tie in of the interface to existing infrastructure, including levels and gradients, and shall include full detail on all local speed mitigation measures to be included on the future greenway to which it will connect. Reason: In order to maximise safe, segregated travel; to comply with ESB requirements; and in the interests of consistency with PI 20 of the Cherrywood Planning Scheme. Utilities and Services 14. Prior to the commencement of development, or at an alternative time as agreed in writing with the Planning Authority in advance of the commencement of development, the detailed design for the route alignment of high voltage ducting to facilitate the future undergrounding of ESB cables shall be submitted by the Applicant / Developer to the Planning Authority for written agreement and shall be in accordance with underground cable route alignment detailed on Planning Scheme Map 4.7, or as otherwise agreed in writing and in consultation with the Planning Authority and ESB. Reason: In the interests of sustainable development and for compliance with Section 4.3.1 of the Planning Scheme. 15. Prior to the commencement of development, the Applicant / Developer shall submit the detailed design for the underground utilities and services within the proposed road infrastructure to the Planning Authority for written agreement, noting that this detailed design shall demonstrate that the location and number of service ducts/pipes are compatible with all other elements of the road design. Reason: In the interests of orderly and sustainable development and for compliance with PI 25 and PI 26 of the Planning Scheme. GREEN INFRASTRUCTURE 16. The Applicant/Developer shall provide the following for the written agreement of the Planning Authority: - A Maintenance Plan for the landscaped areas and embankments located either side of the proposed underpass, the plan shall be prior agreed with the Planning Authority (DLR Roads Maintenance and DLR Parks Departments). Reason: To ensure consistency with Objective GI 7 of the Cherrywood Planning Scheme. 17. The Applicant/Developer shall provide the following for the written agreement of the Planning Authority: - a) The Applicant/Developer shall retain the services of a qualified Landscape Architect, as his/her Landscape Consultant, throughout the course of the development works, and shall notify the Planning Authority of that appointment in writing prior to the commencement of development. b) The Applicant/Developer shall engage the Landscape Consultant to procure, oversee and supervise the landscape contract for the implementation of the permitted landscape proposals. When all landscape works are inspected and completed to the satisfaction of the Landscape Consultant, he/she shall prepare, sign and submit a Practical Completion Certificate (PCC) to the Planning Authority, as verification that approved landscape plans and specifications have been fully implemented. Reason: To ensure a high-quality public realm and consistency with the Cherrywood Planning Scheme and in the interest of proper planning and sustainable development of the area. 18. Prior to commencement of development of the landscape/public realm areas, the Applicant/Developer shall provide the following for the written agreement of the Planning Authority: - a) Hard landscape plans and construction details for all hard-standing pedestrian, cycling, and vehicular areas (including adjoining footpath and road interfaces), detailing the specifications of all surface/finish materials. b) Samples, data sheets and on-site mock-ups of all materials shall be provided for the written agreement of the Planning Authority. Approved control samples must be held on site at all times. c) All surfaces and finishes shall include materials that are consistent with PD 14. In particular the finishes shall comprise of durable, easily sourced and high-quality materials, comprising of natural stone (or other materials as agreed with the Planning Authority) Reason: To ensure consistency with the Cherrywood Planning Scheme, Objective PD 14, DA46, DA47, GI7, GI26 19. Prior to the commencement of development, the Applicant/Developer shall; a) Engage the services of a qualified Arborist as an Arboricultural Consultant, for the entire period of construction activity to oversee the tree protection measures and tree removal as outlined in the Tree Survey Report. The Applicant/Developer shall inform the Planning Authority in writing, of the appointment and name of the Consultant. b) At Practical Completion of the development, the Consultant shall carry out a Post-construction Arboricultural Assessment of all retained trees and submit to the Planning Authority - a signed Arboricultural Completion Certificate stating that all Tree Works have been satisfactorily completed in accordance with his/her recommendations, highlighting any residual concerns arising from the Post-construction Assessment. Reason: To ensure consistency with Section 5.4.7 (Trees & Hedgerows) of the Cherrywood Planning Scheme and give practical effect to the retention, protection and sustainability of trees during and after construction of the permitted development. 20. The applicant shall ensure the following; a) Works to Trees and Vegetation shall be carried out in accordance with the approved Arboricultural information. b) Hedgerow planting and the enhancement of the ecological buffer zone for Lehaunstown Lane shall take the form of a double line of native tree species, supplemented with native shrub species in accordance with BP 12 of the Cherrywood Biodiversity Plan. c) The developer shall limit the use of tree species populus tremula to larger open areas and omit it from planting proposed in highly trafficked public spaces. Reason: To ensure consistency with Specific Objective GI 43 of the Cherrywood Planning Scheme. 21. Prior to the commencement of development, the Applicant/Developer shall; a) Engage the services of a qualified ecologist as an ecological consultant, for the duration of the works. The Applicant/Developer shall inform the Planning Authority in writing, of this appointment and the name of the Consultant. b) The Consultant shall ensure the implementation of the measures outlines in Section 6.3.2 (Mitigation Measures) of the submitted EcIA, Section 4 (Mitigation Measures) of the submitted Fisheries Protection Method Statement and the Habitat Management Plan. Reason: To ensure consistency with Specific Objective GI 46 of the Cherrywood Planning Scheme. 22. Prior to commencement of development, the Applicant shall submit, for the written approval of the Planning Authority, a revised lighting plan demonstrating the how the proposed lighting in close proximity to Lehaunstown Lane is designed to limit light spill with directional illumination and to the minimum lux level consistent with this need. Reason: Ensure that the design of all development takes account of the sensitivities of retained habitats and greenways and avoids adverse impacts resulting from noise, lighting and other types of disturbance 23. Prior to the commencement of landscape works the following shall be submitted for the written agreement of the Planning Authority: a) Details of Soft Landscape Design to include detailed Planting Plan and Planting Schedule - stating species/varieties, approximate quantities, sizes, rootball presentation and spacings. Planting mixes should specify a diverse range of species/varieties/cultivars and a diversity of forms and plant sizes (multi-stems, feathered, semi-matures, etc.) using both native and exotic species and pollinator-friendly native species (in accordance with the All-Ireland Pollinator Plan 2015-2020), all designed to provide vegetation that is visually appealing, bio-diverse, and easily managed. This should include management programmes for all proposed trees, shrubs and other vegetation demonstrating long-term continuity and consistency. b) Details of landscaping treatment to address the crossing points identified figure 10 of the Biodiversity Plan, ensuring the connection of landscaped grassy verges and hedgerow habitats and designed to take account of the sensitivity of some species to light and disturbance, in accordance with BP10 of the Cherrywood Biodiversity Plan. Reason: To ensure consistency with Objective BP10, GI 65 and Section 5.5 of the Cherrywood Planning Scheme. Traffic and Road Safety 24. The design of the cycle facilities shall be reviewed in the context of any relevant new standards (e.g. a new version of the National Cycle Manual). Prior to the commencement of development i. any changes which can reasonably be accommodated shall be submitted for the written agreement of the Planning Authority (Traffic and Road Safety Section). ii. the detailed design of all traffic signals, including Toucan crossings shall be submitted for the written agreement of the Planning Authority (Traffic and Road Safety Section) Reason: In the interest of Traffic and Road Safety and the proper planning and sustainable development of the area. Waste Management and Circular Economy 25. The development shall be carried out in accordance with the submitted Resource & Waste Management Plan to ensure compliance measures in relation to the implementation of the circular economy. Reason: In the interest of proper planning and sustainable development of the area. Biodiversity 26. The protection of Biodiversity shall be in accordance with the requirements of the Planning Authority as follows: a) Prior to the commencement of development the developer shall: i. engage the services of a qualified Ecologist as an ecological consultant from the commencement of construction and for the duration of the monitoring requirements. The developer shall inform the Planning Authority in writing of the appointment and name of the consultant, prior to the commencement of development. The consultant shall ensure the implementation of the mitigation measures and recommendations in the submitted Ecological Impact Assessment and shall consult with DLR's Biodiversity Officer for the written agreement in relation this. ii. Submit a site specific Invasive Species Plan by an invasive species specialist for the written agreement of the Planning Authority (DLR's Biodiversity Officer) for three-cornered leek and will include mapping of all areas containing three-cornered leek, specific details of the proposed management and/or removal options of three-cornered leek, biosecurity measures prior to and during construction and the provision of a monitoring programme and reporting by the invasive species specialist. iii. Ensure that the project ecologist checks the landscape planting list to ensure that Cornus sericea is not used as it is an emerging invasive that has been noted in wet woods in Ireland where it threatens biodiversity (Kelly, 1990). In consultation with the project ecologist alternative planting shall be submitted for the written agreement of the Planning Authority (DLR's Biodiversity Officer). iv. Submit for the written agreement of the Planning Authority (DLR's Biodiversity Officer) details of the proposed monitoring during operation in particular in relation to mitigation measures including the new wetland and also for invasive species. v. Submit an updated CEMP which will include a Biodiversity and an Invasive species section for the implementation of mitigation during construction. The CEMP will also include the role of an Ecological Clerk of Works (EcOW) and an Invasive Species Specialist in consultation with DLR's Biodiversity Officer. The CEMP will include for reporting and monitoring to Dún Laoghaire-Rathdown County Council by the Project Ecologist. vi. Submit a programme of reporting and monitoring for the written agreement of the Planning Authority (DLR's Biodiversity Officer). Reason: To protect Biodiversity and to ensure the implementation of mitigation measures and monitoring for Biodiversity. Fisheries 27. The following measures shall be implemented: a) Best practice at all times regarding activities that may impact surface water. b) Protection of fisheries habitat regarded as good for all salmonoid life stages throughout much of the system. c) Any topsoil or demolition material which is to be stored on site must have mitigations in place to prevent deleterious material entering the surface water network. d) The underpass is expected to be below groundwater levels. Any dewatering of ground water during works must be treated by infiltration over land or into an attenuation area before being discharged off site. e) It is essential that the receiving storm water infrastructure has adequate capacity to accept predicted volumes from this development with no negative repercussions for quality of treatment, final effluent quality and the quality of receiving waters. f) The owner to enter into an annual maintenance contract in respect of the efficient operation of the petrol / oil interceptor and silt traps. g) Mitigation measures outlined under Chapter 6.3.2.2 of the Ecological Impact Assessment for water quality impacts. h) All discharges must be in compliance with the European Communities (Surface Water) Regulations 2009 and the European Communities (Groundwater) Regulations 2010. Reason: To prevent any pollution of the Carrickmines / Shanganagh system. Taking in Charge - Infrastructural Works 28. The applicant shall complete, within a period to be specified in writing to the Applicant by the Planning Authority, all infrastructural works to the Council's taking in charge standards. Reason: To ensure the development is carried out in accordance with the County Council's Standards and in the interests of the proper planning and sustainable development of the area in which the development is located. Site Development 29. Site development and building works shall be carried out only between the hours of 7.00am to 7.00pm Monday to Friday inclusive, 8.00am to 2.00pm Saturdays and no works permitted on site on Sundays and Public holidays. Deviations from these times will only be allowed in exceptional circumstances where prior written approval has been obtained from the Planning Authority. Reason: In order to safeguard the residential amenities of property in the vicinity. Roads Maintenance 30. Prior to commencement of development, proposals will be submitted for the written approval of the Planning Authority that demonstrate how it is proposed to maintain the existing road network permitted under DZ15A/0758 (and Extension of Duration Permission DZ15A/0758/E) and DZ17A/0862 to an acceptable standard during the construction phase of the proposed development. In this regard, for the duration of this development, from commencement of the construction works (inclusive of enabling works) to the completion of construction works, the developer shall under take continuous monitoring of the road network to be utilised for the construction access to this development. In this regard and at a minimum, an independent condition survey of the roads constructed under DZ15A/0758 and DZ17A/0862 that are to be utilised for the construction access to this development shall be undertaken by suitably qualified engineers/surveyors appointed by the developer, at the developer's expense, both prior to commencement of development and prior to occupation of the final phase of the development. The appointment of the engineers/surveyors shall be agreed in advance and in writing with the Planning Authority and they shall be independent of the Developers and Developers Design and construction team. The condition survey(s) produced are to be submitted for the written agreement of the Planning Authority. Damage, including structural defects, damage to the wearing course, footpaths, kerbs, road markings etc, to the road network that is identified in the condition survey(s) shall be rectified/replaced by the developer, at the developer's expense and to a taking in charge standard of development which is to the satisfaction of the Planning Authority. REASON: To ensure that a ready sanction may be available to the County Council to induce the provision of services and prevent disamenity in the development. 31. To ensure adequate financial provision is on hand to rectify any damaged caused to the road network associated with DZ15A/0758 and DZ17A/0862, as part of the condition survey that shall be submitted to the Planning Authority prior to commencement (inclusive of enabling works) under condition number 30 (ie above condition) shall include a detailed map that shows all routes that will be utilised for construction traffic associated with this development from commencement (inclusive of enabling works) to occupation of all units within this development. This detailed map shall include the area of roadway in meters square to be utilised for construction traffic, this measurement will be used to calculate the value of a cash security or insurance bond for the value of €30/m2 of roadway utilised, to be lodged with the Planning Authority. No works shall take place (inclusive of enabling works) until this bond or cash security has been agreed and accepted by the Planning Authority. This bond will be refunded on satisfactory completion and certification by the Developer of any works identified in the condition survey, to be completed after occupation of all units within the development, and with written agreement from the Planning Authority that those works are carried out to Taking in Charge Standard. Failure to comply with the above condition may lead to the insurance bond/cash security being sequestered by the Planning Authority to complete any outstanding works REASON: To ensure that a ready sanction may be available to the County Council to induce the provision of services and prevent disamenity in the development. Bond Requirement 32. No development on foot of this permission shall commence until security for the provision and satisfactory completion of services in accordance with the plans and particulars lodged with the application, has been given by:- a) Lodgement with the Council of an approved Insurance Company Bond in the sum of €2,028,812.50 which shall be renewed by the developer from time to time as required during the course of the development and kept in force until such time as Roads, Open Spaces, Sewers, Watermains and Drains are completed to the satisfaction of the Council OR/... b) Lodgement with the Council of a Cash Sum of €2,028,812.50 to be applied by the Council at its absolute discretion if such services are not duly provided to its satisfaction on the provision and completion of such services to standard specifications. OR/... c) Lodgement with the Planning Authority of a Letter of Guarantee by any body approved by the Planning Authority for the purpose in respect of the proposed development in accordance with the guarantee scheme agreed with the Planning Authority and such lodgement in any case has been acknowledged in writing by the Council. This condition is to mitigate the risk to the Local Authority of the proposed development not being completed. The applicant may submit an alternative method of mitigating the risk to the Local Authority, which the Local Authority will consider, but in the absence of agreement the condition, as set out above, is applicable. REASON: To ensure that a ready sanction may be available to the Council to induce the provision of services and prevent disamenity in the development. NOTE: The applicant is advised that in the event of encroachment or oversailing of the adjoining property, the consent of the adjoining property owner is required. If this written agreement is not obtained the proposed development shall be modified only insofar as is required to do this. NOTE: The attention of the applicant is drawn to Section 34(13) of the Planning and Development Act 2000, as amended, which relates as follows- 'A person shall not be entitled solely by reason of a permission under this section to carry out any development'. ## Nearby applications - [DZ25A/0325/WEB](https://cherrywoodplans.com/application/DZ25A-0325-WEB.md): In the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18. Granted (15 Jan 2026). 121 apartments in two blocks of 3 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ25A/0102/WEB](https://cherrywoodplans.com/application/DZ25A-0102-WEB.md): In the Townlands of Laughanstown, in Cherrywood, Dublin 18. Granted (26 May 2025). Amends a permitted 200-apartment scheme in Macnebury to drop its basement and cut car parking from 241 to 160 spaces. - [DZ24A/1024/WEB](https://cherrywoodplans.com/application/DZ24A-1024-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood,, Dublin 18. Granted (1 May 2025). Amends a permitted Macnebury apartment scheme to cut car parking from 312 to 213 spaces and add bike, bin and storage buildings, with no change to the homes. - [DZ25A/0008/WEB](https://cherrywoodplans.com/application/DZ25A-0008-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18. Refused or withdrawn (6 Feb 2025). Amends a permitted 200-apartment scheme in Macnebury to drop its basement and cut car parking from 241 to 160 spaces. - [DZ24A/1016/WEB](https://cherrywoodplans.com/application/DZ24A-1016-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18. Refused or withdrawn (3 Jan 2025). Amends a permitted Macnebury development by removing its basement and cutting car parking from 241 to 160 spaces. - [DZ24A/0017](https://cherrywoodplans.com/application/DZ24A-0017.md): Townlands of Laughanstown and Cherrywood, Macnebury - Development Area 7 - Cherrywood, Dublin 18. Granted (11 Jun 2024). 200 apartments in three blocks of 4 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ23A/0811](https://cherrywoodplans.com/application/DZ23A-0811.md): In the Townlands of Laughanstown and Cherrywood. Macnebury, Development Area 7 , Cherrywood, Dublin 18. Refused or withdrawn (4 Jan 2024). 200 apartments in three blocks of 4 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ22A/1021](https://cherrywoodplans.com/application/DZ22A-1021.md): Lands within Development Area 7 - Macnebury, including part of the Res 3 plot known as M1 located south of Bishop Street, west of Cherrywood Avenue, east and north of the proposed Beckett Road, Laughanstown, Dublin 18. Granted (27 Jun 2023). 283 new homes, mostly apartments in four blocks of 4–5 storeys, plus a crèche, south of Bishop Street in Macnebury. - [DZ17A/0161](https://cherrywoodplans.com/application/DZ17A-0161.md): Lands (site area c.0.95ha) in the townland of Laughanstown, Dublin 18. Granted (12 Dec 2017). Sets up a temporary concrete plant for 7 years to supply the building of Cherrywood. - [D06A/1660](https://cherrywoodplans.com/application/D06A-1660.md): Park One, Cherrywood Science And Technology Park, Loughlinstown, Co. Dublin.. Granted (6 Mar 2007). Completes the distributor road through Park One at Cherrywood Business Park, letting overhead power lines go underground. - [D04A/1013](https://cherrywoodplans.com/application/D04A-1013.md): Laughanstown/Cherrywood, With Access From N11, Wyattville Road, Co. Dublin.. Refused or withdrawn (9 May 2005). Seeks to keep modified land shaping and drainage works on a 36-hectare site at Laughanstown/Cherrywood and further alter them. - [DZ26A/0580/WEB](https://cherrywoodplans.com/application/DZ26A-0580-WEB.md): Bishop Street (M3a), Laughanstown, Dublin 18 (Development Area 7 Macnebury - Res3 Plot). More information requested (22 Sep 2026). 32 new homes, mostly 3-bed two-level apartments, off Bishop Street in Macnebury. - [D04A/1012](https://cherrywoodplans.com/application/D04A-1012.md): Cherrywood/Glebe, (ED Rathmichael), Wyvattville Link Road, Co. Dublin.. Refused or withdrawn (9 May 2005). Reshapes and drains an 8.6-hectare site at Cherrywood/Glebe and stores topsoil on a further 5.1 hectares at Laughanstown. - [DZ23A/0423](https://cherrywoodplans.com/application/DZ23A-0423.md): On lands (c.17.03 a) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (Also Co. Dublin). Granted (10 Aug 2023). Amends the Cherrywood Town Centre permission to add two 2-bed apartments to Block A1. - [DZ22A/0690](https://cherrywoodplans.com/application/DZ22A-0690.md): Townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (12 May 2023). Facade and balcony design changes to Cherrywood Town Centre apartment Blocks A1, A2 and A3. - [DZ22A/0747](https://cherrywoodplans.com/application/DZ22A-0747.md): Townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (30 Mar 2023). Changes of use and merging of units in Town Centre Blocks C1 and C2 to create a larger 723 sq.m shop with off-licence. - [DZ22A/0846](https://cherrywoodplans.com/application/DZ22A-0846.md): Lands (c. 17.03 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (22 Dec 2022). Removes a planned viewing platform at Block F1 in Cherrywood Town Centre, replacing it with a glass balustrade. - [DZ22A/0138](https://cherrywoodplans.com/application/DZ22A-0138.md): (c. 17.03ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (30 Aug 2022). Minor changes of use between shop and restaurant-type units in Town Centre Blocks C1 and C2, and a slightly larger crèche. - [DZ21A/0807](https://cherrywoodplans.com/application/DZ21A-0807.md): Lands (c. 17.03 ha), in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (8 Jul 2022). Amends the Cherrywood Town Centre permission to cut residential parking from 1,363 to 1,169 spaces and add 41 car-sharing spaces. - [DZ21A/0713](https://cherrywoodplans.com/application/DZ21A-0713.md): Lands (c. 17.01 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (3 Oct 2021). Design changes to the three apartment blocks A1–A3 in Cherrywood Town Centre, including taller windows and smaller roof terrace. - [DZ19A/1024](https://cherrywoodplans.com/application/DZ19A-1024.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (9 Sep 2020). Amends the Cherrywood Town Centre plan to shrink the basement under Blocks A1–A3 and reassign parking. - [DZ20A/0002](https://cherrywoodplans.com/application/DZ20A-0002.md): Lands (c.17.01ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (9 Sep 2020). Makes minor changes to electrical rooms and landscaping in Town Centre Blocks F1 and F3. - [DZ19A/0458](https://cherrywoodplans.com/application/DZ19A-0458.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (19 Jun 2020). Major redesign of Cherrywood Town Centre plot TC1, adding two supermarkets, an 11-screen cinema and much more retail space. - [DZ21A/1038](https://cherrywoodplans.com/application/DZ21A-1038.md): site 1.85 ha at Castle Street and Bishop Street, Cherrywood, Dublin 18. Granted (8 Nov 2022). Builds a new 1,000-pupil secondary school at Castle Street and Bishop Street, Cherrywood. - [DZ20A/0824](https://cherrywoodplans.com/application/DZ20A-0824.md): Lands (c. 17.01 ha), in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (11 Jan 2021). Changes the windows, balconies and frontage of Town Centre Block F2 on Cherrywood Avenue and Central Avenue. - [DZ19A/0148](https://cherrywoodplans.com/application/DZ19A-0148.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (24 Apr 2019). Amends Town Centre plot TC2 to add 47 apartments, taking Blocks C1 and C2 from 384 to 431 homes. - [DZ22A/0591](https://cherrywoodplans.com/application/DZ22A-0591.md): C. 3.71 in the Townland of Cherrywood, Block Town Centre 3 (TC3), Dublin 18. Granted (20 Jun 2023). 418 build-to-rent apartments in four blocks of up to 5 storeys at Town Centre 3, with shops, cafés and community space. - [DZ23A/0573](https://cherrywoodplans.com/application/DZ23A-0573.md): Lands (c. 17.03 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (19 Oct 2023). Amends the Cherrywood Town Centre permission to add 4 apartments in Blocks F2 and F3, bringing plot TC4 to 524 homes. - [ABP30342919](https://cherrywoodplans.com/application/ABP30342919.md): Site (c.3.06ha) in the townlands of Laughanstown, Dublin 18 (lands generally bounded by Bishop Street to the south, the Luas green line to the east and Tully park to the north. Granted (18 Apr 2019). Builds 184 homes, a mix of apartments, two-level units and houses, between Bishop Street, the Luas line and Tully Park. - [DZ16A/0597](https://cherrywoodplans.com/application/DZ16A-0597.md): Lands (c.1.87 ha) in the townland of Laughanstown, Dublin 18. Granted (5 Oct 2016). Builds an above-ground gas pipeline facility with a new 601-metre access route off Lehaunstown Lane. - [DZ21A/1085](https://cherrywoodplans.com/application/DZ21A-1085.md): Lands of Laughanstown, Dublin 18, (Lands within 'Development Area 7- Macnebury', M4, located West & South of Castle Street, south of Lehaunstown Lane and North of Bishop Street. Granted (2 Dec 2022). Builds 65 three-bed homes in five three-storey blocks in Macnebury, west of Castle Street. - [DZ23A/0443](https://cherrywoodplans.com/application/DZ23A-0443.md): Lands in the townlands of Laughanstown, Dublin 18, (Lands within 'Development Area 7- Macnebury', including part of the Res 2 plot known as 'M4, located West & South of Castle Street, south of Lehaunstown Lane and North of Bishop Street. Granted (7 Nov 2023). Changes a condition so 66 permitted homes in Macnebury can be occupied before the Cherrywood Avenue/Beckett Road underpass is built. - [DZ20A/0477](https://cherrywoodplans.com/application/DZ20A-0477.md): Blocks F1,F2 & F3 (3no. office blocks under construction), Cherrywood Business Park, Cherrywood, Co. Dublin (also Dublin 18) & at the temporary surface car park at Cherrywood (Glebe Townland) Co. Dublin (also Dublin 18). Granted (28 Aug 2020). Allows up to 229 spaces in the basement car park of office Blocks F1–F3 to be used for temporary parking for 7 years. - [DZ17A/0417](https://cherrywoodplans.com/application/DZ17A-0417.md): Cherrywood Glebe Townland, Co Dublin ( Dublin 18) (Lands within Dev Area 6-Bride's Glen-bounded by M50 west, Cherrywood Ave & undeveloped lands to north undeveloped lands & Glencarrig res. estate east & res prop. & undev. lands off Brides Glen to south. Granted (7 Nov 2017). Uses land off Cherrywood Avenue as a temporary car park for about 740 cars for 5 years. - [DZ17A/0326](https://cherrywoodplans.com/application/DZ17A-0326.md): Cherrywood, Glebe Townland, Co Dublin (Also Dublin 18) (Lands within Dev Area 7-Macnebury-bounded by M50 to west, Cherrywood Ave & undeveloped lands to north, undeveloped lands & Glencarrig res. estate to east & undeveloped lands off Brides Glen to south. Refused or withdrawn (26 Apr 2017). Uses land off Cherrywood Avenue as a temporary car park for about 740 cars for 5 years. - [DZ24A/1007/WEB](https://cherrywoodplans.com/application/DZ24A-1007-WEB.md): ‘Red Zone’ temporary surface car park, and Blocks F1-F3, ‘The Campus’, Cherrywood Avenue,, Cherrywood (Glebe Townland), Co. Dublin, Dublin 18. Granted (18 Feb 2025). Shrinking the temporary Red Zone car park on Cherrywood Avenue to about 398 spaces for another 5 years, and opening 226 basement spaces at The Campus. - [DZ22A/0728](https://cherrywoodplans.com/application/DZ22A-0728.md): Red Zone car park, Cherrywood Avenue, Cherrywood (Glebe Townland), Co Dublin/Dublin 18. Granted (14 Mar 2023). Keeping the temporary Red Zone surface car park for about 740 cars on Cherrywood Avenue for another 5 years. - [D07A/1770](https://cherrywoodplans.com/application/D07A-1770.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin.. Refused or withdrawn (28 Jan 2008). Builds a multi-storey car park with 1,081 spaces and 10 ground-floor shops at Cherrywood Business Park. - [DZ26A/0579/WEB](https://cherrywoodplans.com/application/DZ26A-0579-WEB.md): Castle Street (M5), Laughanstown, Dublin 18 (Development Area 7 Macnebury - Res2 Plot). More information requested (22 Sep 2026). 40 new homes, mostly 3-bed two-level apartments, off Castle Street in Macnebury. - [DZ20A/0052](https://cherrywoodplans.com/application/DZ20A-0052.md): 1.86 ha in the townlands of Cherrywood, Dublin 18 (also Co. Dublin)--TC3. Granted (13 Apr 2021). A mixed-use block at Town Centre 3 with an 8-storey office building and 198 build-to-rent apartments. - [DZ17A/0862](https://cherrywoodplans.com/application/DZ17A-0862.md): Lands (17.01ha) in the townlands of Cherrywood, Dublin 18. Granted (29 May 2018). The original Cherrywood Town Centre permission: 15 blocks with 1,269 homes, shops, offices, two hotels and a library, plus Grand Parade. - [DZ26A/0032/WEB](https://cherrywoodplans.com/application/DZ26A-0032-WEB.md): Block A1, The Tully Building, Civic Street, Cherrywood Town Centre, Dublin 18, D18WDK0. Granted (13 Mar 2026). Revised plan for 24 mobile phone antennas and 9 dishes on Block A1, The Tully Building, after an earlier compliance submission was rejected. - [DZ25A/0485/WEB](https://cherrywoodplans.com/application/DZ25A-0485-WEB.md): Block A1, Tully Buildings, Cherrywood, Dublin 18. Granted (1 Aug 2025). 24 mobile phone antennas and 9 dishes on the facade and roof of Block A1, Tully Buildings. - [DZ20A/0877](https://cherrywoodplans.com/application/DZ20A-0877.md): Bishop Street, Cherrywood, Dublin 18, Co Dublin. Granted (29 Jan 2021). Installs a small gas regulator building on Bishop Street near the Luas line. - [DZ18A/0458](https://cherrywoodplans.com/application/DZ18A-0458.md): on lands (c.0.74 HA) in the townland of Laughanstown, Dublin 18 (Development Area 8 - Tully). Granted (11 Jul 2018). Builds a new primary school with 24 classrooms plus a special needs unit, south-west of Tully Park. - [DZ22A/1025](https://cherrywoodplans.com/application/DZ22A-1025.md): Cherrywood Avenue, Lands within the townlands of Glebe and Cherrywood, Dublin 18. Granted (2 Nov 2023). Builds 44 homes, houses and two-level units, off Cherrywood Avenue. - [DZ26A/0001/WEB](https://cherrywoodplans.com/application/DZ26A-0001-WEB.md): Cherrywood Avenue, (Adjoining Cherrywood Business Park), Cherrywood, Dublin 18. Granted (29 Jun 2026). Amends a permitted apartment scheme on Cherrywood Avenue to go from 67 to 70 apartments, with more parking. - [DZ25A/0983/WEB](https://cherrywoodplans.com/application/DZ25A-0983-WEB.md): Cherrywood Avenue ( adjoining Cherrywood Business Park), Cherrywood, Dublin 18. Refused or withdrawn (22 Dec 2025). Amends a permitted apartment scheme on Cherrywood Avenue to go from 67 to 70 apartments, with more parking. - [D06A/1016](https://cherrywoodplans.com/application/D06A-1016.md): Townland of Laughanstown, Cherrywood, Loughlinstown, Co. Dublin.. Granted (28 Nov 2006). Builds a 110 kV ESB electrical transformer station in Laughanstown. - [DZ23A/0242](https://cherrywoodplans.com/application/DZ23A-0242.md): Townland of Cherrywood Dublin 18 The site is located in the Cherrywood Planning Scheme and forms part of the south eastern porti. Granted (7 Jun 2023). Changes to the permitted basement at Town Centre 3 so it can later connect to the wider TC3 basement. - [DZ21A/0785](https://cherrywoodplans.com/application/DZ21A-0785.md): c.0.95 ha townland, Cherrywood, Dublin 18 (also Co. Dublin). Granted (30 Mar 2022). An office building of up to 8 storeys with ground-floor cafés at the corner of Town Centre 3, beside the Bride's Glen Luas stop. - [DZ26A/0151/WEB](https://cherrywoodplans.com/application/DZ26A-0151-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18.. Granted (24 Jun 2026). 188 new homes, a mix of apartments, two-level units and houses, beside Tully Park off Bishop Street. - [DZ22A/0133](https://cherrywoodplans.com/application/DZ22A-0133.md): Townlands of Laughanstown and Cherrywood, Dublin 18. Granted (22 Nov 2022). Builds 163 homes, a mix of apartments, triplexes, maisonettes and houses, beside Tully Park. - [DZ22A/0681](https://cherrywoodplans.com/application/DZ22A-0681.md): Cherrywood Avenue, (Adjoining Cherrywood Business Park), Cherrywood, Dublin 18. Granted (28 Jun 2023). A 5-storey block of 70 apartments on Cherrywood Avenue, beside Cherrywood Business Park. - [DZ26B/0241/WEB](https://cherrywoodplans.com/application/DZ26B-0241-WEB.md): 17 Domville Court, Cherrywood, Dublin 18, D18WEK6. Granted (10 Jun 2026). Permission to keep a glass conservatory permanently in the back garden of a house on Domville Court. - [DZ26B/0073/WEB](https://cherrywoodplans.com/application/DZ26B-0073-WEB.md): 17 Domville Court, Cherrywood, Dublin 18, D18WEK6. Refused or withdrawn (13 Mar 2026). Permission to keep a glass conservatory built in the back garden of a house on Domville Court. - [DZ18A/0854](https://cherrywoodplans.com/application/DZ18A-0854.md): site (c.2.62 HA) at Cherrywood Business Park, Cherrywood Avenue, Cherrywood, Co. Dublin (also Dublin 18) (lands to the south and west of Blocks G and G2, south of Cherrywood Avenue). Granted (31 Oct 2018). Builds a three-pond drainage system with a walking and cycling route south of Cherrywood Avenue. - [DZ26B/0030/WEB](https://cherrywoodplans.com/application/DZ26B-0030-WEB.md): 17 Domville Court, Tullyvale, Cherrywood, Dublin 18, D18 WEK6. Refused or withdrawn (28 Jan 2026). Permission to keep a glass conservatory built in the back garden of a house on Domville Court. - [DZ25A/0489/WEB](https://cherrywoodplans.com/application/DZ25A-0489-WEB.md): 20, Domville Court, Tullyvale, Cherrywood, Dublin 18, D18VN3A. Granted (11 Aug 2025). Permission to keep a glass conservatory permanently at the back of a house on Domville Court. - [DZ25A/0480/WEB](https://cherrywoodplans.com/application/DZ25A-0480-WEB.md): 20, Domville Court, Tullyvale, Cherrywood, Dublin 18, D18VN3A. Refused or withdrawn (19 Jun 2025). Permission to keep a glass conservatory at the back of a house on Domville Court. ## Links - [This page on CherrywoodPlans](https://cherrywoodplans.com/application/DZ21A-1017) - [Council record, documents and conditions (DLR planning portal)](https://planning.agileapplications.ie/dunlaoghaire/application-details/91425) - [All Cherrywood applications](https://cherrywoodplans.com/applications.md) _Source: Dún Laoghaire–Rathdown County Council planning data, refreshed daily. CherrywoodPlans is an independent site, not run by the council._