# Planning application DZ21A/1038 > site 1.85 ha at Castle Street and Bishop Street, Cherrywood, Dublin 18, Cherrywood, Dún Laoghaire–Rathdown. Granted (8 Nov 2022). - **Reference:** DZ21A/1038 - **Address:** site 1.85 ha at Castle Street and Bishop Street, Cherrywood, Dublin 18 - **Status:** Granted (8 Nov 2022) - **Decision:** GRANT PERMISSION - **Application type:** Permission (SDZ) - **Applicant:** Department of Education - **Lodged:** 12 Oct 2022 - **Decided:** 8 Nov 2022 - **Location (lat, lng):** 53.244385, -6.153254 ## Proposal Ing of a part three storey, part two storey 1000 pupil Post Primary School, including PE Hall, 4 Classroom Special Educational Needs Unit, and all ancillary teacher and pupil facilities with a gross floor area of 11,536 sqm. The proposed development also incorporates a vehicular access from Castle Street, associated staff car parking, delivery and emergency vehicle access, pedestrian and bicycle access, bicycle parking, construction of 6 No. external ball courts, landscaping and boundary treatments, signage, 3 No. flagpoles, connection to public services, 181 sqm of photovoltaic panels on the roof, external store, ESB sub-station and all associated site works above and below ground. ## In plain English Builds a new 1,000-pupil secondary school at Castle Street and Bishop Street, Cherrywood. - **1,000** pupils - **11,536** sq.m floor area - **6** ball courts - **1.85** hectares ### What's planned A new post-primary school of **2**–**3** storeys on a **1.85**-hectare site. ### Community Space for **1,000** pupils, a PE hall, a **4**-classroom special educational needs unit and **6** outdoor ball courts. Total floor area **11,536** sq.m. ### Transport Vehicle access from Castle Street, staff parking, and pedestrian and bicycle access with bike parking. ### Environment **181** sq.m of rooftop solar panels and landscaping. _This summary was written by AI from the proposal text. Check the council record before relying on it._ ## Conditions ### Condition 2 First Schedule Reasons and Considerations Having regard to the policies and objectives as set out in the 2022-2028 Dún Laoghaire-Rathdown County Development Plan, and the relevant policies and objectives of the adopted Cherrywood SDZ Planning Scheme, 2014, as amended, it is considered that the development would not detract from the amenities of the area and is therefore considered to be in accordance with the proper planning and sustainable development of the area subject to 33 conditions. Appropriate Assessment Screening The proposed development has been screened for AA and it has been determined that the development would not significantly impact upon a Natura 2000 Site. Environmental Impact Assessment Screening Having regard to the nature and scale of the proposed development, it is considered that there is no real likelihood of significant effects on the environment arising from the proposed development. The need for environmental impact assessment can, therefore, be excluded at preliminary examination and as such a screening determination is not required. Second Schedule Conditions 1. The development shall be carried out in its entirety in accordance with the plans, particulars and specifications lodged with the application, as amended by Further Information received on 12 October 2022, save as may be required by the other conditions attached hereto. REASON: To ensure that the development shall be in accordance with the permission and that effective control be maintained. 2. Prior to commencement of development the Applicant/Developer shall submit for the written agreement of the Planning Authority, all drawings in digital format (CAD/GIS) projected to ITM (Irish Transverse Mercator). This information should include the following: Overall site plans in DWG format (ITM projection in metres) Ground floor plans of buildings in DWG format (ITM projection in metres) Site sections and elevations in PDF format. REASON: To ensure consistency with Section 7.4 of the Cherrywood Planning Scheme 3. Prior to the commencement of development, the applicant / developer shall submit a revised vehicular operational egress route design and a revised construction egress route design for the subject development, for the written agreement of the Planning Authority. The revised vehicular operational egress route and the revised construction egress route designs shall not utilise junction F1 as the Castle Street Bus Gate is to be located at this junction F1, as per the permitted Roads and Infrastructure Phase 1 DZ15A/0758 and will facilitate vehicular access and egress from the southern end of Castle Street to Bishop Street for buses only. REASON: To ensure no impediment to the implementation of the Castle Street Bus Gate and in the interests of proper planning and sustainable development. Built Form 4. The Developer shall comply with the following: (a) Prior to the commencement of development, the Applicant/Developer shall submit, for the written agreement of the Planning Authority, details of the proposed external design/finishes of all buildings including; façade materials, windows and doors, lighting, ESB substations, Bike and Bin Stores and staging areas, roof services/plant and any associated screening, in the form of on-site mock-ups for inspection and viewing, followed subsequently by submission of the samples in the format of sample boards, or the like. The external finishes and detailed design of buildings shall be: - of high quality, durable, sustainable and attractive. Any render shall be silicone based, or similar, to ensure durability and avoid staining. - at ground floor, comprise of durable and high-quality materials including natural stone or brick, - ensure harmony and visual coherence in the built environment yet articulating interest to avoid monolithic and bulky facades along the perimeter elevations, with particular attention to the upper floors, - be practical to source, erect, replace, and maintain, and meet the user specification and standards, including those relating to environmental sustainability and wellness, and - the proposed brick material finishes shall provide a visual harmonious coherence, but also provide for an element of visual distinctiveness, with adjoining permitted developments. The external finishes and detailed design of school building shall enhance the quality, visual interest and articulation of the school building elevations and roof profile. (b) Prior to the commencement of development, or as otherwise agreed in writing with the Planning Authority, the Developer shall submit for the written agreement of the Planning Authority, details of the proposed mural, or other external wall-mounted public art, including the specific image or piece, as well as details of location, size, construction and maintenance. The developer shall engage in writing with the DLRCC Arts Office prior to agreement with the Planning Authority. REASON: To ensure consistency with Specific Objectives PD8, PD9, PD12, PD14, and PD19 of the Cherrywood Planning Scheme. 5. Prior to the commencement of development, or as otherwise agreed in writing with the Planning Authority, the developer shall submit for the written agreement of the Planning Authority, details of the proposed detention basin access arrangements, including access location, access requirements and associated management regime, and also detailed design such as associated dropped kerbs and surface treatments. Where the indicative access cannot be achieved, suitable alternative access arrangements, including through the school site, if required, shall be provided, with detailed design of cycle parking, landscaping, school gate and gate operation, as well as surface treatments to be agreed with the Planning Authority. REASON: To ensure consistency with Specific Objectives PI6 and PD15 of the Cherrywood Planning Scheme. 6. The Developer shall comply with the following: (a) Prior to the completion of development the Developer shall submit, for the written agreement of the Planning Authority a Wayfinding & Directional Signage Strategy which shall include: Details of all external wayfinding & directional signage, and the proposed school naming signs, including in terms of colours, materials, scale and finishes, and consistent with the Cherrywood Wayfinding & Directional Signage Guidance. Materials shall be of high quality, modern and durable and respect the proportions and design of the building and its surroundings. REASON: In the interests of visual amenity and in order to comply with Specific Objectives PD 32 of the Cherrywood Planning Scheme. (b) Prior to the operation of the school, or as otherwise agreed in writing with the Planning Authority, an appropriate name for the school having regard to Objective H6 of the Cherrywood Planning Scheme, and the associated Cherrywood SDZ Wayfinding & Directional Signage Guidance, shall be submitted for the written agreement of the Planning Authority. REASON: To ensure consistency with Specific Objective H6 of the Cherrywood Planning Scheme 7. In relation to operational noise impacts, the developer shall implement in full the acoustic design requirements set out in Section 6 ‘Building Envelope Design’ of the report submitted as part of the Response to Further Information - ‘Noise Impact Assessment, Cherrywood Post Primary School’ prepared by Amplitude Acoustics and dated 10 October 2022. REASON: To ensure consistency with Section 2.13 of the Cherrywood Planning Scheme, as amended and in the interests of proper planning and sustainable development. 8. The Applicant/Developer shall comply with the following requirements: (a) The construction of the development shall be managed in accordance with a final Construction Management Plan, which shall be submitted for the development in its entirely to the Planning Authority for agreement in writing, prior to commencement of any development. The final Construction Management Plan shall also include a Community Liaison Plan, a construction environmental management plan and a Construction Traffic Management Plan. The final construction management plan shall address any measures required to maintain safety for the proposed phased construction and occupation of the development. (b) Prior to the commencement of development, the Applicant/Developer shall prepare a Construction and Demolition Resource Waste Management Plan (RWMP) as set out in the Best Practice Guidelines for the Preparation of Resource and Waste Management Plans for C&D Projects (2021) including demonstration of proposals to adhere to best practice and protocols. The RWMP shall include specific proposals as to how the RWMP will be measured and monitored for effectiveness; these details shall be placed on the file and retained as part of the public record. The RWMP must be submitted to the Planning Authority for written agreement prior to the commencement of development. All records (including for waste and all resources) pursuant to the agreed RWMP shall be made available for inspection at the site office at all times. (c) Site development and building works shall be carried out only between the hours of 7.00am to 7.00pm Monday to Friday inclusive, 8.00am to 2.00pm Saturdays and no works permitted on site on Sundays and public holidays. Deviation from these times will only be allowed in exceptional circumstances where prior written approval has been received from the Planning Authority. This should be addressed in the Community Liaison Plan. (d) Construction staff shall be prohibited from parking on public roads. Parking for construction staff shall be provided by the Developer/Contractor within the site boundary and shall not be provided in an off-site location. (e) Construction vehicles shall not be permitted to park or wait on roads outside the site boundary. All parking and waiting areas shall be provided Developer/Contractor within the site boundary. (f) Prior to commencement of development a mechanism and structure for on-site monitoring, reporting on progress and quality control to the Planning Authority in relation to construction standards, materials, as-built drawings and records shall be agreed in writing with the Planning Authority. (g) Prior to commencement of development, proposals will be submitted for the written approval of the Planning Authority that demonstrate how it is proposed to maintain the existing road network permitted under DZ15A/0758, and as extended by permission DZ15A/0758/E, to an acceptable standard during the construction phase of the proposed development. (h) Prior to the commencement of the proposed site works noise, vibration and dust monitoring stations to be installed and maintained to provide continuous monitoring to measure and record the impact of site activities on local receptors. Noise monitoring to demonstrate compliance with the recommendations contained in BS 5228 shall be installed, monitored and reported on at weekly intervals by a suitable qualified specialist company for the duration of the contract. All monitoring data to be compiled into a weekly technical monitoring report which shall identify remedial measures where levels exceed relevant limit values. (i) Any dewatering of ground water during construction must be treated by infiltration over land or into an attenuation area before being discharged off site. (j) Any topsoil or demolition material which is to be stored on site must have mitigations in place to prevent any deleterious material entering the surface water network. (k) Comprehensive surface water management measures must be implemented at the construction and operational stage to prevent any pollution of local surface waters. SuDS mechanisms and class 1 petrol/oil interception should be in place on surface water discharges to protect receiving freshwaters in terms of water quality. Precautions must be taken to ensure there is no entry of solids, during the connection of pipe-work, to the existing surface water system. (l) The applicant shall submit a site-specific method statement demonstrating how pollution of watercourses during and after the construction period will be prevented and/or mitigated, in consultation relevant river authorities or fisheries boards prior to the commencement of the development. (m) An appropriate rodent/pest control plan shall be developed and implemented for the duration of the works on site. (n) Records shall be available for inspection on site demonstrating tracking of all waste generated to final destination. A Materials Source and Management Plan shall be developed and implemented identifying type of materials/proportion of re-use/recycled materials and future maintenance to support the implementation of Government and EU circular economy policy). REASON: In the interests of residential amenity and to ensure consistency with Section 2.14 of the Cherrywood Planning Scheme 9. The Developer shall comply with the following requirements: (a) The proposed mitigation measures as set out on pages 53 and 54 of the Cultural Heritage Impact Assessment Report prepared by Moore Archaeological & Environmental Services Limited and submitted with the application be undertaken by the developer. This includes a programme of archaeological monitoring to be carried out by a suitably qualified archaeologist during topsoil stripping in the northeast portion of the project area, as illustrated in Figure 16 of the above report. (b) In the event of the discovery of archaeological finds or remains the National Monuments Service of the Department of Housing, Local Government and Heritage shall be notified immediately. (c) Should archaeological material be found during the course of archaeological monitoring, the archaeologist shall stop all work on the site pending a decision as to how best to deal with the archaeology. The Applicant/Developer shall be prepared to be advised by the Department of Housing, Local Government and Heritage with regard to any necessary mitigating action e.g. redesign to allow for preservation in situ and/or excavation (both may be required in terms of buffer and testing/excavation). The applicant/developer shall facilitate the archaeologist in recording any material found. Where preservation in situ cannot be achieved, then a programme of full archaeological excavation will be implemented of the portion of the site directly affected in consultation with the National Monuments Service of the DoCHG. (d) The Department of Housing, Local Government and Heritage and the Planning Authority shall be furnished with a report describing the results of the monitoring. REASON: To ensure consistency with Specific Objective H1 of the Cherrywood Planning Scheme. 10. The Developer shall comply with the following: (a) All water & waste infrastructure required to service this development shall align with the masterplan for the area. (b) The applicant is required to provide a contribution (to Irish Water), of a relevant portion, towards the costs for the required necessary water supply upgrade works necessary to facilitate the development. (c) At connection application stage, the applicant shall demonstrate that the design is in compliance with Cherrywood Planning Scheme and that all relevant core water and wastewater infrastructures within the Zone have adequate capacity, integrity and connectivity with Irish Water networks (water and wastewater). (d) The applicant shall sign a connection agreement with Irish Water prior to any works commencing and connecting to their network (water and wastewater). (e) Irish Water does not permit any build over of its assets and separation distances as per Irish Waters Standards Codes and Practices must be achieved. (a) Where any proposals by the applicant to build over or divert existing water or wastewater services subsequently occurs the applicant shall submit details to Irish Water Irish Water for assessment of feasibility and have written confirmation of feasibility of diversion(s) from Irish Water prior to connection agreement. (f) All development is to be carried out in compliance with Irish Water Standards codes and practices. (g) All infrastructure (water and wastewater) should be designed and installed in accordance with the Irish Water Codes of Practice and Standard Details. (h) The Applicant/Developer shall submit a Statement of Design Acceptance to the planning Authority confirming the development proposal designs and layouts (for water and wastewater) are in compliance with IWs standards & Codes of Practice prior to commencement of works. REASON: In the interests of sustainable development and in the interests of consistency with PI 4, PI 5 and PI 12 of the Planning Scheme and to ensure agreement with Irish Water on design proposals and to ensure the adequate provision of water and wastewater. Note: Irish Water advise in their submission dated 5th January 2022 that, in order to accommodate the proposed connection at the development site, upgrade works are required to increase the capacity of the water network. These works include the Bride Glen Upgrades, as identified in the planning scheme for the SDZ. Irish Water advise that they do not currently have any plans to carry out the works required to provide the necessary upgrade and capacity, and should the applicant wish to have such upgrade works progressed, Irish Water will require the applicant to provide a contribution of a relevant portion of the costs for the required upgrades. 11. The Developer shall comply with the following: (a) Prior to the commencement of development, the Applicant/Developer shall submit the following for the written agreement of the Planning Authority: (i) Hydraulic calculations and engineering drawings for the proposed surface water network, representative of the final detailed design and inclusive of the following: - Surface water network calculations and storm simulations for the 1 in 30 and 100 year event incorporating climate change - inclusive of the full contributing catchment area, which are fully commensurate with the surface water design drawings. - full input data to show the design criteria adopted - Calculations for the attenuation storage requirements for the 1 in 100 year event including climate change and locations for the full site area - Detailed design drawings for all SuDS measures including green roofs. Drawings shall include, plans, cross sections and details incorporating any overflows to the storm network. - The design details provided should demonstrate how the flow control opening on the green roofs are protected from blockage. - A means of managing overflow and exceedance should be identified. (ii) A final construction surface water management plan. Comprehensive surface water management measures must be implemented at the construction stage to prevent any pollution of local surface waters. Any topsoil or demolition material which is stored on site must have mitigations in place to prevent any deleterious entering the surface water network. Any dewatering of ground water during excavation works must be treated by infiltration over land or into an attenuation area being discharged from site. (iii) A detailed operations and maintenance plan for all the proposed SuDS components, inclusive of the petrol and oil interceptors. (b) The Applicant/Developer shall ensure that interception and treatment of at least 5mm of runoff is provided on the subject site during all phases of the proposed construction and occupation of the development. Surface water runoff from the site shall pass through at least one level of treatment using a SuDS measure prior to discharge into the public realm. (c) The provision and design of green roofs for the subject development shall adhere to the requirements of the latest DLRCC green roof policy document 2022. REASON: In the interests of sustainable development, to ensure long term optimum operation of the surface water management system; and to comply with the requirements of PI 6 of the Cherrywood Planning Scheme and Dun Laoghaire Rathdown County Council’s County Development Plan. 12. The Developer shall comply with the following: (a) A Stormwater Audit shall be carried out at Stage 2 for the detailed design stage in accordance with PI 7 of the Cherrywood Planning scheme. The audit shall be carried out at the Developer’s expense. An independent audit team shall be used and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the commencement of development, unless otherwise agreed. The Stage 2 Stormwater Audit reports shall address any and all phased construction and occupation proposals for the development. (b) For any proposed partial commissioning of surface water infrastructure associated with any phased construction /occupation of the development, interim Stage 3 Stormwater Audits shall be carried out for the post construction / prior to commissioning phases, in accordance with PI 7 of the Cherrywood Planning Scheme and at phases pre-agreed with the Planning Authority as part of the Stage 2 Audit process. These audits shall be carried out at the Developer’s expense. An independent audit team shall be used and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. (c) A Stormwater Audit shall be carried out at Stage 3 for the post construction / prior to commissioning stage in accordance with PI 7 of the Cherrywood Planning scheme. The audit shall be carried out at the Developer’s expense. An independent audit team shall be used and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 3 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the final commissioning of the full surface water network for the development. REASON: In the interests of sustainable development and to comply with the requirements of PI 7 of the Cherrywood Planning Scheme. 13. The Developer shall comply with the following: (a) Any upgrade works and subsequent reinstatement works to existing Cherrywood common infrastructure as proposed by the subject application will be at the Applicant/Developer’s expense. All reinstatement works to existing Cherrywood common infrastructure shall accord with permitted infrastructure designs under DZ15A/0758 and DZ15A/0758/E. REASON: In the interests of sustainable development; and in the interests of consistency with PI 12 and PI 14 of the Cherrywood Planning Scheme, to ensure agreement with Irish Water for the applicant’s design proposals and ensure the adequate provision of water and wastewater. 14. The Developer shall comply with the following: (a) Prior to the commencement of development, the applicant/ developer is requested to nominate an initial travel plan co-ordinator for the proposed School Development and submit to the planning authority for agreement. The applicant is requested to demonstrate consideration of the future Bus Gate along Castle St at Junction F1 (and the limitations to through traffic) as permitted under Planning Reference DZ15A/0758 within its proposed school travel plan, and how this may contribute to the sustainable transport targets of bus mode for the school. (b) To ensure that the future sustainable targets as set out in Table 4.1 of the Cherrywood Planning Scheme are achieved, the School Travel Plan is to be reviewed on an Annual Basis. This review should include updated annual travel surveys of the school’s mode share, a review of available sustainable infrastructure to inform the mode share targets and to develop SMART measures for the school. This updated report should be submitted to the Area Wide Travel Plan Coordinator for review and comments and any actions arising from the review are to be then implemented by the nominated Travel Plan Coordinator. This shall be undertaken until such time that Roads Phase 1 is complete, taken in charge and operational. REASON: In the interests of sustainable development; and in the interests of consistency with PI 13 of the Cherrywood Planning Scheme. 15. The Developer shall comply with the following: (a) Prior to the commencement of development, a Stage 2 Quality Audit (which shall include a Road Safety Audit, Access Audit, Cycle Audit and Walking Audit) shall be carried out for the detailed design stage and shall be submitted for the written agreement of the Planning Authority. The audit shall be carried out at the Applicant/Developer’s expense in accordance with the Design Manual for Urban Roads & Streets (DMURS) guidance and TII (Transport Infrastructure Ireland) standards. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Quality Audit reports shall address any and all phased construction and occupation proposals for the development. The Applicant/Developer shall ensure that the construction / occupation phased stages proposed do not result in adverse safety conditions for future residents. (b) Prior to the final occupation stage of the development in its entirety, a Stage 3 Quality Audit (which shall include a Road Safety Audit, Access Audit, Cycle Audit and Walking Audit) shall be carried out for the post construction / prior to occupation stage and shall be submitted for the written agreement of the Planning Authority. The audit shall be carried out at the Developer’s expense in accordance with the Design Manual for Urban Roads & Streets (DMURS) guidance and TII (Transport Infrastructure Ireland) standards. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. REASON: In the interests of sustainable development; and in the interests of consistency with PI 14 of the Cherrywood Planning Scheme. 16. Prior to the commencement of development, or as otherwise agreed in writing with the Planning Authority, the applicant/developer shall submit for the written agreement of the Planning Authority the detailed design of the proposed boundary wall along the eastern edge of the development including final design levels and wall dimensions including retaining elements. The detailed design of the wall should be co-ordinated with the developer of the adjacent developments Reg. Ref. DZ22A/0133 regarding the proposed access road and detailed design of same, including any requirement for retaining wall elements. REASON: In the interests of orderly development and proper planning and the sustainable development of the area and for consistency with the Cherrywood Planning Scheme PI 14. 17. The Developer shall comply with the following: (a) One car parking space per five car parking spaces shall be equipped with one fully functional EV Charging Point. (b) Prior to the occupation of the subject development the applicant/developer shall provide a drop-off management plan to promote efficient use of the drop off area within the subject development. (c) The applicant/developer shall provide cycle parking and associated facilities in accordance with the requirements of the DLRCC standard for cycle parking and associated facilities for new developments 2018 or amendment thereof. A minimum of 50% of short-term cycle parking should be covered unless otherwise agreed with the Planning Authority. REASON: In the interests of orderly development and proper planning and the sustainable development of the area and for consistency with the Cherrywood Planning Scheme PI 21 and PI 22. 18. The decommissioning/diversion of any existing ESB underground cables within the site shall be agreed with ESB Networks prior to commencement of development. Any works required to divert ESB underground cables within the site boundary to facilitate the development in line with ESB requirements will be at the applicant’s expense. The Applicant/Developer shall ensure that adequate separation distances are provided within the development between utility service ducts and surface water, water and foul infrastructure to ensure access for future operation and maintenance activities as may be required. Detailed design of the electricity supply infrastructure for the development shall be agreed (in writing) with ESB Networks/ESBI. REASON: In the interests of orderly development the inclusion of infrastructure and connections would avoid subsequent excavation of newly constructed roadway, and to ensure that designs shall meet with the current and future requirements ESB Networks/ESBI and to ensure consistency with Section 4.3.1 of the Planning Scheme. 19. The Applicant/Developer shall ensure that adequate separation distances are provided within the development between utility service ducts and surface water, water and foul infrastructure to ensure access for future operation and maintenance activities as may be required. Detailed design of the gas supply infrastructure for the development shall be agreed (in writing) with Gas Networks Ireland. REASON: In the interests of orderly development the inclusion of infrastructure and connections would avoid subsequent excavation of newly constructed roadway; To ensure that designs shall meet with the current and future requirements Gas Networks Ireland and to ensure consistency with PI 25 of the Planning Scheme. 20. The Applicant/Developer shall ensure that adequate separation distances are provided within the development between utility service ducts and surface water, water and foul infrastructure to ensure access for future operation and maintenance activities as may be required. Detailed design of the telecoms network for the development shall be agreed (in writing) with the telecoms providers. REASON: In the interests of orderly development the inclusion of infrastructure and connections would avoid subsequent excavation of newly constructed roadway; To ensure that designs shall meet with the current and future requirements of the telecoms providers, and to ensure consistency with PI 26 of the Planning Scheme. 21. A detailed construction and demolition waste management plan shall be provided to the Planning Authority for its written agreement prior to the commencement of development. REASON: In the interests of sustainable development; and in the interests of consistency with PI 32 of the Cherrywood Planning Scheme. 22. The Applicant/Developer shall provide the following for the written agreement of the Planning Authority: (a) The Applicant/Developer shall retain the services of a qualified Landscape Architect, as his/her Landscape Consultant, throughout the course of the development works, and shall notify the Planning Authority of that appointment in writing prior to the commencement of development. (b) The Applicant/Developer shall engage the Landscape Consultant to procure, oversee and supervise the landscape contract for the implementation of the permitted landscape proposals. When all landscape works are inspected and completed to the satisfaction of the Landscape Consultant, he/she shall prepare, sign and submit a Practical Completion Certificate (PCC) to the Planning Authority, as verification that approved landscape plans and specifications have been fully implemented. REASON: To ensure a high-quality public realm and consistency with the Cherrywood Planning Scheme and in the interest of proper planning and sustainable development of the area. 23. Prior to commencement of development of the landscape/public realm areas, the Applicant/Developer shall provide the following for the written agreement of the Planning Authority: (a) Hard landscape plans and construction details for all hard-standing pedestrian, cycling, and vehicular areas (including adjoining footpath and road interfaces), detailing the specifications of all surface/finish materials. In this regard, samples, data sheets and on-site mock-ups of all materials shall be provided for the written agreement of the Planning Authority. Approved control samples must be held on site at all times. (b) All surfaces and finishes shall include materials that are consistent with PD 14. In particular the finishes shall comprise of durable, easily sourced and high-quality materials, comprising of natural stone (or other materials as agreed with the Planning Authority) that harmonise and complement those on the adjoining boundaries of Castle Street, Bishops Street, Lehaunstown Lane, Tully Park and TC6. REASON: To ensure consistency with the Cherrywood Planning Scheme, Objective PD 14 and GI 7. 24. The applicant shall deliver the entrance space from Lehaunstown Lane as per drawing number 142-CWD-DD-01 (rev C) noting the inconsistency presented within View 5 of the verified photomontages submitted as part of the Response to Further Information (‘Verified Photomontages of Proposed Cherrywood Post Primary School October 2022’ prepared by G-Net3D. REASON: In the interests of orderly development, and to ensure consistency with Specific Objective GI of the Cherrywood Planning Scheme. 25. Prior to commencement of landscape works, or as otherwise agreed in writing with the Planning Authority, the Applicant/Developer shall provide the following for the written agreement of the Planning Authority: (a) Detail design and specifications for all play and sports related items within the application areas. The SNU space and ballcourts shall be designed and constructed to EN1176 playground and equipment standards. REASON: To ensure consistency with Specific Objectives GI 6 and GI 18 of the Cherrywood Planning Scheme. 26. The Developer shall comply with the following: (a) Prior to the commencement of development, the Applicant/Developer shall engage the services of a qualified Arborist as an Arboricultural Consultant, for the entire period of construction activity to oversee the tree protection measures and tree removal as outlined in the Tree Survey Report. The Applicant/Developer shall inform the Planning Authority in writing, of the appointment and name of the Consultant. (b) At Practical Completion of the development, the Consultant shall carry out a Post-construction Arboricultural Assessment of all retained trees and submit to the Planning Authority - a signed Arboricultural Completion Certificate stating that all Tree Works have been satisfactorily completed in accordance with his/her recommendations, highlighting any residual concerns arising from the Post-construction Assessment. REASON: To ensure consistency with Section 5.4.7 (Trees & Hedgerows) of the Cherrywood Planning Scheme and give practical effect to the retention, protection and sustainability of trees during and after construction of the permitted development. 27. The Developer shall comply with the following: (a) Prior to the commencement of development, the Applicant/Developer shall engage the services of a qualified ecologist as an ecological consultant, for the duration of the works. The Applicant/Developer shall inform the Planning Authority in writing, of this appointment and the name of the Consultant. (b) The Consultant shall ensure the implementation the construction and operational controls outlined in Table 8 (Sensitive Receptors/Impacts and mitigation measures) of the submitted EcIA, dated 10/10/22, prepared by Altemar, Marine & Environmental Consultancy as well as the recommendations outlined in the submitted Habitat Management Plan. REASON: To ensure consistency with Specific Objective GI 46 of the Cherrywood Planning Scheme. 28. Prior to the commencement of development, the following shall be submitted for the written agreement of the Planning Authority: (a) To assist the Planning Authority in ensuring that all significant elements of the construction works with potential to cause significant environmental effects will be managed accordingly, the Applicant shall submit a site-specific method statement demonstrating how pollution of watercourses during and after the construction period will be prevented and/or mitigated.), in consultation relevant river authorities or fisheries boards prior to the commencement of the development. (b) The site-specific method statement should align with measures included in the various document provided by the applicant including the Ecological Impact Assessment and Construction Environment Management Plan. The scope of the plan shall include but not be limited to: - the location of all surface water protection measures, including monitoring points and treatment facilities. - monitoring, including appropriate trigger levels and remedial actions. - reporting proposals to be agreed with the council. REASON: To ensure all significant elements of the construction works with potential to cause significant environmental effects will be managed in accordance with relevant environmental requirements and best practice. 29. Prior to the commencement of landscape works the following shall be submitted for the written agreement of the Planning Authority: (a) Details of Soft Landscape Design to include detailed Planting Plan and Planting Schedule - stating species/varieties, approximate quantities, sizes, rootball presentation and spacings. Planting mixes should specify a diverse range of species/varieties/cultivars and a diversity of forms and plant sizes (multi-stems, feathered, semi-matures, etc.) using both native and exotic species and pollinator-friendly native species (in accordance with the All-Ireland Pollinator Plan 2015-2020), all designed to provide vegetation that is visually appealing, bio-diverse, and easily managed. This should include management programmes for all proposed trees, shrubs and other vegetation demonstrating long-term continuity and consistency. REASON: To ensure consistency with Objective GI 65 and Section 5.5 of the Cherrywood Planning Scheme. 30. Prior to the commencement of landscape development, the Applicant/Developer shall submit the following for the written agreement of the Planning Authority:- (a) Details, specifications and samples for all boundaries, interfaces and transitions between private space, communal space and public space having regard to the need to ensure a coherent and complementary palette of materials and finishes across the application site, and with Tully Park, as permitted under Planning Reg. Ref. DZ15A/0813. REASON: To ensure consistency with Specific Objectives GI 8, GI 77 and PD 14 of the Cherrywood Planning Scheme. 31. Dual function use of the sports hall, outdoor ball courts and sports facilities, and indoor spaces within the school, outside of school operation hours, shall be agree in writing with the Planning Authority. REASON: To ensure consistency with Section 12.3.2.5 School Development of the 2022-2028 County Development Plan. 32. For the duration of this development, from commencement of the construction works (inclusive of enabling works) to the completion of construction works, the developer shall under take continuous monitoring of the road network to be utilised for the construction access to this development. In this regard and at a minimum, an independent condition survey of the roads constructed under DZ15A/0758 and DZ17A/0862 that are to be utilised for the construction access to this development shall be undertaken by suitably qualified engineers/surveyors appointed by the developer, at the developer’s expense, both prior to commencement of development and prior to occupation of the final phase of the development. The appointment of the engineers/surveyors shall be agreed in advance and in writing with the Planning Authority and they shall be independent of the Developers and Developers Design and construction team. The condition survey(s) produced are to be submitted for the written agreement of the Planning Authority. Damage, including structural defects, damage to the wearing course, footpaths, kerbs, road markings etc, to the road network that is identified in the condition survey(s) shall be rectified/replaced by the developer, at the developer’s expense and to a taking in charge standard of development which is to the satisfaction of the Planning Authority. REASON: To ensure that a ready sanction may be available to the County Council to induce the provision of services and prevent disamenity in the development. 33. To ensure adequate financial provision is on hand to rectify any damaged caused to the road network associated with DZ15A/0758 and DZ17A/0862, as part of the condition survey that shall be submitted to the Planning Authority prior to commencement (inclusive of enabling works) under condition number 32 shall include a detailed map that shows all routes that will be utilised for construction traffic associated with this development from commencement (inclusive of enabling works) to occupation of all units within this development. This detailed map shall include the area of roadway in meters square to be utilised for construction traffic, this measurement will be used to calculate the value of a cash security or insurance bond for the value of €30/m2 of roadway utilised, to be lodged with the Planning Authority. No works shall take place (inclusive of enabling works) until this bond or cash security has been agreed and accepted by the Planning Authority. This bond will be refunded on satisfactory completion and certification by the Developer of any works identified in the condition survey, to be completed after occupation of all units within the development, and with written agreement from the Planning Authority that those works are carried out to Taking in Charge Standard. Failure to comply with the above condition may lead to the insurance bond/cash security being sequestered by the Planning Authority to complete any outstanding works. REASON: To ensure that a ready sanction may be available to the County Council to induce the provision of services and prevent disamenity in the development. NOTE 1: The following requirements of Irish Water shall be complied with in the proposed development: - The applicant must sign a connection agreement with Irish Water prior to any works commencing and connecting to our network. - Irish Water does not permit any build over of its assets and separation distances as per Irish Waters Standards Codes and Practices must be achieved. Where any proposals by the applicant to build over or divert existing water or wastewater services subsequently occurs the applicant submit details to Irish Water for assessment of feasibility and have written confirmation of feasibility of diversion(s) from Irish Water prior to connection agreement. - All development is to be carried out in compliance with Irish Water Standards codes and practices. NOTE 2: The attention of the applicant is drawn to Section 34(13) of the Planning and Development Act 2000, which relates as follows, 'A person shall not be entitled solely by reason of a permission under this section to carry out any development'. NOTE 3: The Applicant is advised that all/any requirements of the Environmental Health Office shall be ascertained and strictly adhered to. NOTE 4: The Applicant is advised that all/any requirements of the Environmental Health Office – Air Pollution and Noise Control Unit shall be ascertained and strictly adhered to. NOTE 5: The Applicant is advised that all/any requirements of Inland Fisheries Ireland shall be ascertained and strictly adhered to. ## Nearby applications - [DZ18A/0458](https://cherrywoodplans.com/application/DZ18A-0458.md): on lands (c.0.74 HA) in the townland of Laughanstown, Dublin 18 (Development Area 8 - Tully). Granted (11 Jul 2018). Builds a new primary school with 24 classrooms plus a special needs unit, south-west of Tully Park. - [DZ17A/0161](https://cherrywoodplans.com/application/DZ17A-0161.md): Lands (site area c.0.95ha) in the townland of Laughanstown, Dublin 18. Granted (12 Dec 2017). Sets up a temporary concrete plant for 7 years to supply the building of Cherrywood. - [DZ26A/0580/WEB](https://cherrywoodplans.com/application/DZ26A-0580-WEB.md): Bishop Street (M3a), Laughanstown, Dublin 18 (Development Area 7 Macnebury - Res3 Plot). More information requested (22 Sep 2026). 32 new homes, mostly 3-bed two-level apartments, off Bishop Street in Macnebury. - [DZ21A/1085](https://cherrywoodplans.com/application/DZ21A-1085.md): Lands of Laughanstown, Dublin 18, (Lands within 'Development Area 7- Macnebury', M4, located West & South of Castle Street, south of Lehaunstown Lane and North of Bishop Street. Granted (2 Dec 2022). Builds 65 three-bed homes in five three-storey blocks in Macnebury, west of Castle Street. - [DZ23A/0443](https://cherrywoodplans.com/application/DZ23A-0443.md): Lands in the townlands of Laughanstown, Dublin 18, (Lands within 'Development Area 7- Macnebury', including part of the Res 2 plot known as 'M4, located West & South of Castle Street, south of Lehaunstown Lane and North of Bishop Street. Granted (7 Nov 2023). Changes a condition so 66 permitted homes in Macnebury can be occupied before the Cherrywood Avenue/Beckett Road underpass is built. - [DZ25A/0325/WEB](https://cherrywoodplans.com/application/DZ25A-0325-WEB.md): In the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18. Granted (15 Jan 2026). 121 apartments in two blocks of 3 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ25A/0102/WEB](https://cherrywoodplans.com/application/DZ25A-0102-WEB.md): In the Townlands of Laughanstown, in Cherrywood, Dublin 18. Granted (26 May 2025). Amends a permitted 200-apartment scheme in Macnebury to drop its basement and cut car parking from 241 to 160 spaces. - [DZ24A/1024/WEB](https://cherrywoodplans.com/application/DZ24A-1024-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood,, Dublin 18. Granted (1 May 2025). Amends a permitted Macnebury apartment scheme to cut car parking from 312 to 213 spaces and add bike, bin and storage buildings, with no change to the homes. - [DZ25A/0008/WEB](https://cherrywoodplans.com/application/DZ25A-0008-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18. Refused or withdrawn (6 Feb 2025). Amends a permitted 200-apartment scheme in Macnebury to drop its basement and cut car parking from 241 to 160 spaces. - [DZ24A/1016/WEB](https://cherrywoodplans.com/application/DZ24A-1016-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18. Refused or withdrawn (3 Jan 2025). Amends a permitted Macnebury development by removing its basement and cutting car parking from 241 to 160 spaces. - [DZ24A/0017](https://cherrywoodplans.com/application/DZ24A-0017.md): Townlands of Laughanstown and Cherrywood, Macnebury - Development Area 7 - Cherrywood, Dublin 18. Granted (11 Jun 2024). 200 apartments in three blocks of 4 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ23A/0811](https://cherrywoodplans.com/application/DZ23A-0811.md): In the Townlands of Laughanstown and Cherrywood. Macnebury, Development Area 7 , Cherrywood, Dublin 18. Refused or withdrawn (4 Jan 2024). 200 apartments in three blocks of 4 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ22A/1021](https://cherrywoodplans.com/application/DZ22A-1021.md): Lands within Development Area 7 - Macnebury, including part of the Res 3 plot known as M1 located south of Bishop Street, west of Cherrywood Avenue, east and north of the proposed Beckett Road, Laughanstown, Dublin 18. Granted (27 Jun 2023). 283 new homes, mostly apartments in four blocks of 4–5 storeys, plus a crèche, south of Bishop Street in Macnebury. - [DZ26A/0579/WEB](https://cherrywoodplans.com/application/DZ26A-0579-WEB.md): Castle Street (M5), Laughanstown, Dublin 18 (Development Area 7 Macnebury - Res2 Plot). More information requested (22 Sep 2026). 40 new homes, mostly 3-bed two-level apartments, off Castle Street in Macnebury. - [DZ26A/0151/WEB](https://cherrywoodplans.com/application/DZ26A-0151-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18.. Granted (24 Jun 2026). 188 new homes, a mix of apartments, two-level units and houses, beside Tully Park off Bishop Street. - [DZ22A/0133](https://cherrywoodplans.com/application/DZ22A-0133.md): Townlands of Laughanstown and Cherrywood, Dublin 18. Granted (22 Nov 2022). Builds 163 homes, a mix of apartments, triplexes, maisonettes and houses, beside Tully Park. - [REF20225](https://cherrywoodplans.com/application/REF20225.md): Lehaunstown Park House, Laughanstown, Co Dublin, (A Protected Structure). Granted (23 Jan 2026). Minor internal changes to the stable building at Lehaunstown Park House, a protected structure. - [DZ23A/0359](https://cherrywoodplans.com/application/DZ23A-0359.md): Lehaunstown Park House, Lehaunstown Co Dublin. Granted (17 May 2024). Restores Lehaunstown Park House and its tower house, converts the stables to shops, and builds a large garden centre. - [D04A/1013](https://cherrywoodplans.com/application/D04A-1013.md): Laughanstown/Cherrywood, With Access From N11, Wyattville Road, Co. Dublin.. Refused or withdrawn (9 May 2005). Seeks to keep modified land shaping and drainage works on a 36-hectare site at Laughanstown/Cherrywood and further alter them. - [DZ20A/0946](https://cherrywoodplans.com/application/DZ20A-0946.md): Lands known as Tully Park (c12.9HA), Laughanstown, Dublin 18. Granted (18 Feb 2021). Revises part of the permitted Tully Park, moving the café kiosk, redesigning the playground and adding a raised boardwalk. - [ABP30342919](https://cherrywoodplans.com/application/ABP30342919.md): Site (c.3.06ha) in the townlands of Laughanstown, Dublin 18 (lands generally bounded by Bishop Street to the south, the Luas green line to the east and Tully park to the north. Granted (18 Apr 2019). Builds 184 homes, a mix of apartments, two-level units and houses, between Bishop Street, the Luas line and Tully Park. - [DZ15A/0813](https://cherrywoodplans.com/application/DZ15A-0813.md): Laughanstown, Dublin 18, (Tully Park). Granted (13 Jul 2016). Creates Tully Park, a 12.9-hectare public park with a playground, café kiosk and nature trails. - [D06A/1016](https://cherrywoodplans.com/application/D06A-1016.md): Townland of Laughanstown, Cherrywood, Loughlinstown, Co. Dublin.. Granted (28 Nov 2006). Builds a 110 kV ESB electrical transformer station in Laughanstown. - [DZ21A/0699](https://cherrywoodplans.com/application/DZ21A-0699.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (23 Sep 2021). Smaller first-floor bathroom windows on 33 permitted houses in Tully. - [DZ20A/0552](https://cherrywoodplans.com/application/DZ20A-0552.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18,. Granted (11 Mar 2021). 163 new homes, mostly houses, between Castle Street and Tully Park. - [DZ22A/0820](https://cherrywoodplans.com/application/DZ22A-0820.md): Townlands of Laughanstown, Brennanstown and Cherrywood,, Dublin 18. Granted (12 Dec 2022). Makes minor changes to the already-permitted 168-home scheme in Tully, swapping the designs of 12 houses and altering some roofs. - [DZ22A/0403](https://cherrywoodplans.com/application/DZ22A-0403.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Refused or withdrawn (22 Jul 2022). Makes minor changes to the already-permitted 168-home scheme in Tully, swapping the designs of 12 houses and altering some roofs. - [DZ21A/1017](https://cherrywoodplans.com/application/DZ21A-1017.md): Townlands of Laughanstown, Glebe, and Cherrywood, Dublin 18, (also Co Dublin). Granted (11 Nov 2022). About 1.6km of new roads including Beckett Road with an underpass below the Wyattville Link Road, plus a park around an ancient wedge tomb. - [DZ22A/0550](https://cherrywoodplans.com/application/DZ22A-0550.md): Lehaunstown Park Open Space, Laughanstown, Dublin 18. Granted (13 Apr 2023). Turns a temporary car park into Lehaunstown Park Open Space with community gardens and a play plaza. - [DZ15A/0758](https://cherrywoodplans.com/application/DZ15A-0758.md): in the townlands of Cherrywood, Laughanstown, Brennanstown, Loughlinstown and Glebe, Dublin 18. Granted (16 Aug 2016). Phase 1 roads for Cherrywood: about 5.4km of new and upgraded roads including Grand Parade, Castle Street and Bishop Street. - [DZ25A/0044/WEB](https://cherrywoodplans.com/application/DZ25A-0044-WEB.md): In the Townlands of Laughanstown, and Brennanstown, Dublin 18. Granted (10 Jul 2025). Amends a permitted Lehaunstown scheme to add a storey to two buildings, taking it from 492 to 517 homes, with fewer car spaces. - [DZ21A/0334](https://cherrywoodplans.com/application/DZ21A-0334.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (7 Apr 2022). 482 new homes, mostly apartments in five blocks up to 5 storeys, beside Barrington's Road and the Luas in Lehaunstown. - [DZ25A/0489/WEB](https://cherrywoodplans.com/application/DZ25A-0489-WEB.md): 20, Domville Court, Tullyvale, Cherrywood, Dublin 18, D18VN3A. Granted (11 Aug 2025). Permission to keep a glass conservatory permanently at the back of a house on Domville Court. - [DZ25A/0480/WEB](https://cherrywoodplans.com/application/DZ25A-0480-WEB.md): 20, Domville Court, Tullyvale, Cherrywood, Dublin 18, D18VN3A. Refused or withdrawn (19 Jun 2025). Permission to keep a glass conservatory at the back of a house on Domville Court. - [DZ26B/0241/WEB](https://cherrywoodplans.com/application/DZ26B-0241-WEB.md): 17 Domville Court, Cherrywood, Dublin 18, D18WEK6. Granted (10 Jun 2026). Permission to keep a glass conservatory permanently in the back garden of a house on Domville Court. - [DZ26B/0073/WEB](https://cherrywoodplans.com/application/DZ26B-0073-WEB.md): 17 Domville Court, Cherrywood, Dublin 18, D18WEK6. Refused or withdrawn (13 Mar 2026). Permission to keep a glass conservatory built in the back garden of a house on Domville Court. - [DZ26B/0030/WEB](https://cherrywoodplans.com/application/DZ26B-0030-WEB.md): 17 Domville Court, Tullyvale, Cherrywood, Dublin 18, D18 WEK6. Refused or withdrawn (28 Jan 2026). Permission to keep a glass conservatory built in the back garden of a house on Domville Court. - [DZ21A/1042](https://cherrywoodplans.com/application/DZ21A-1042.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (30 May 2022). 122 new homes, a mix of houses, two-level units and apartments, beside Tully Park and Lehaunstown Lane. - [DZ26A/0052/WEB](https://cherrywoodplans.com/application/DZ26A-0052-WEB.md): Townland of Laughanstown, Cherrywood, Dublin 18. Granted (24 Mar 2026). Makes minor layout and landscaping changes to a permitted Tully housing scheme, moving bin stores to the front of the two-level homes. - [DZ19A/0597](https://cherrywoodplans.com/application/DZ19A-0597.md): Development Area 8 -Tully, Cherrywood SDZ, Includes the Res 2 plots ''T9'' and ''T10''. Granted (11 Mar 2020). 184 new homes, mainly houses plus two small apartment blocks, on plots T9 and T10 in Tully. - [DZ24A/0236/WEB](https://cherrywoodplans.com/application/DZ24A-0236-WEB.md): Lands in the townland of Laughanstown, between Grand Parade and Tully Park, in Domville Development Area 4, Cherrywood, Dublin 18. Refused or withdrawn (15 Apr 2024). Amends the Domville permission to raise four blocks on Grand Parade from 4 to 6 storeys, adding 58 apartments. - [DZ17A/0714](https://cherrywoodplans.com/application/DZ17A-0714.md): Lands in the townlands of Lehaunstown and Cherrywood, Dublin 18. The application relates to development in the Cherrywood Strategic Development Zone.(Domville site). Granted (7 Aug 2018). Builds 322 new homes, 242 apartments and 80 houses, plus a crèche on the Domville site in Cherrywood. - [DZ21A/0806](https://cherrywoodplans.com/application/DZ21A-0806.md): Lands in the townland of, Laughanstown, Dublin 18, located between Grand Parade and Tully Park. Granted (12 Aug 2022). Amends a permitted scheme between Grand Parade and Tully Park to add 60 apartments in three new 4-storey blocks. - [DZ26B/0186/WEB](https://cherrywoodplans.com/application/DZ26B-0186-WEB.md): 4 Mercer Row,Laughanstown, Dublin 18, D18XH7P. Granted (25 May 2026). Three new roof windows added to the front of a house on Mercer Row. - [DZ26B/0153/WEB](https://cherrywoodplans.com/application/DZ26B-0153-WEB.md): 4 Mercer Row, Laughanstown, Dublin, D18XH7P. Refused or withdrawn (19 Mar 2026). Three new roof windows added to the front of a house on Mercer Row. - [DZ24A/0291/WEB](https://cherrywoodplans.com/application/DZ24A-0291-WEB.md): Lands in the townland of Laughanstown, Dublin 18, located between Grand Parade and Tully Park., The application relates to development in Domville Development Area 4 of the Cherrywood Strategic Development Zone.. Granted (25 Mar 2025). Amends the Domville permission to raise four blocks on Grand Parade from 4 to 6 storeys, adding 58 apartments. - [DZ20A/0877](https://cherrywoodplans.com/application/DZ20A-0877.md): Bishop Street, Cherrywood, Dublin 18, Co Dublin. Granted (29 Jan 2021). Installs a small gas regulator building on Bishop Street near the Luas line. - [DZ26B/0366/WEB](https://cherrywoodplans.com/application/DZ26B-0366-WEB.md): 10 Domville Square, Cherrywood, Dun Laoghaire, Dublin 18, D18H7WA. Granted (14 Aug 2026). Adds a small glass conservatory to the rear of a house at Domville Square. - [DZ26B/0360/WEB](https://cherrywoodplans.com/application/DZ26B-0360-WEB.md): 10, Domville Square, Cherrywood, Dun Laoghaire, Dublin 18, D18H7WA. Refused or withdrawn (24 Jun 2026). A small glass conservatory added to the back of a house on Domville Square. - [DZ23A/0423](https://cherrywoodplans.com/application/DZ23A-0423.md): On lands (c.17.03 a) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (Also Co. Dublin). Granted (10 Aug 2023). Amends the Cherrywood Town Centre permission to add two 2-bed apartments to Block A1. - [DZ22A/0690](https://cherrywoodplans.com/application/DZ22A-0690.md): Townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (12 May 2023). Facade and balcony design changes to Cherrywood Town Centre apartment Blocks A1, A2 and A3. - [DZ22A/0747](https://cherrywoodplans.com/application/DZ22A-0747.md): Townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (30 Mar 2023). Changes of use and merging of units in Town Centre Blocks C1 and C2 to create a larger 723 sq.m shop with off-licence. - [DZ22A/0846](https://cherrywoodplans.com/application/DZ22A-0846.md): Lands (c. 17.03 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (22 Dec 2022). Removes a planned viewing platform at Block F1 in Cherrywood Town Centre, replacing it with a glass balustrade. - [DZ22A/0138](https://cherrywoodplans.com/application/DZ22A-0138.md): (c. 17.03ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (30 Aug 2022). Minor changes of use between shop and restaurant-type units in Town Centre Blocks C1 and C2, and a slightly larger crèche. - [DZ21A/0807](https://cherrywoodplans.com/application/DZ21A-0807.md): Lands (c. 17.03 ha), in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (8 Jul 2022). Amends the Cherrywood Town Centre permission to cut residential parking from 1,363 to 1,169 spaces and add 41 car-sharing spaces. - [DZ21A/0713](https://cherrywoodplans.com/application/DZ21A-0713.md): Lands (c. 17.01 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (3 Oct 2021). Design changes to the three apartment blocks A1–A3 in Cherrywood Town Centre, including taller windows and smaller roof terrace. - [DZ19A/1024](https://cherrywoodplans.com/application/DZ19A-1024.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (9 Sep 2020). Amends the Cherrywood Town Centre plan to shrink the basement under Blocks A1–A3 and reassign parking. - [DZ20A/0002](https://cherrywoodplans.com/application/DZ20A-0002.md): Lands (c.17.01ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (9 Sep 2020). Makes minor changes to electrical rooms and landscaping in Town Centre Blocks F1 and F3. - [DZ19A/0458](https://cherrywoodplans.com/application/DZ19A-0458.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (19 Jun 2020). Major redesign of Cherrywood Town Centre plot TC1, adding two supermarkets, an 11-screen cinema and much more retail space. - [DZ26A/0032/WEB](https://cherrywoodplans.com/application/DZ26A-0032-WEB.md): Block A1, The Tully Building, Civic Street, Cherrywood Town Centre, Dublin 18, D18WDK0. Granted (13 Mar 2026). Revised plan for 24 mobile phone antennas and 9 dishes on Block A1, The Tully Building, after an earlier compliance submission was rejected. - [DZ25A/0485/WEB](https://cherrywoodplans.com/application/DZ25A-0485-WEB.md): Block A1, Tully Buildings, Cherrywood, Dublin 18. Granted (1 Aug 2025). 24 mobile phone antennas and 9 dishes on the facade and roof of Block A1, Tully Buildings. - [DZ25A/0161/WEB](https://cherrywoodplans.com/application/DZ25A-0161-WEB.md): Lands in the townlands of Laughanstown, Dublin 18. The application relates to development in Cherrywood Strategic Development Zone. Granted (23 Apr 2025). Completion of a 145-metre stretch of Grand Parade from Tully Vale Road towards Bishop Street. - [DZ20A/0585](https://cherrywoodplans.com/application/DZ20A-0585.md): on a site in the Townlands of Laughanstown and Cherrywood, Dublin 18. Refused or withdrawn (2 Jun 2021). A temporary sales and marketing suite with 8 parking spaces for just under 5 years off Gun and Drum Hill Road. - [D06A/1660](https://cherrywoodplans.com/application/D06A-1660.md): Park One, Cherrywood Science And Technology Park, Loughlinstown, Co. Dublin.. Granted (6 Mar 2007). Completes the distributor road through Park One at Cherrywood Business Park, letting overhead power lines go underground. - [DZ20A/0824](https://cherrywoodplans.com/application/DZ20A-0824.md): Lands (c. 17.01 ha), in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (11 Jan 2021). Changes the windows, balconies and frontage of Town Centre Block F2 on Cherrywood Avenue and Central Avenue. - [DZ19A/0148](https://cherrywoodplans.com/application/DZ19A-0148.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (24 Apr 2019). Amends Town Centre plot TC2 to add 47 apartments, taking Blocks C1 and C2 from 384 to 431 homes. - [DZ23A/0573](https://cherrywoodplans.com/application/DZ23A-0573.md): Lands (c. 17.03 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (19 Oct 2023). Amends the Cherrywood Town Centre permission to add 4 apartments in Blocks F2 and F3, bringing plot TC4 to 524 homes. - [DZ25A/0014/WEB](https://cherrywoodplans.com/application/DZ25A-0014-WEB.md): Townlands of Laughanstown & Brennanstown, Dublin 18. Granted (3 Mar 2025). Amends the permitted Tully village centre (plot T1) to shrink the basement, cutting car parking from 210 to 157 spaces. - [DZ23A/0106](https://cherrywoodplans.com/application/DZ23A-0106.md): Lands in the Townlands of Laughanstown and Brennanstown, Dublin 18. Granted (22 Sep 2023). A village centre at Tully with a supermarket, shops, cafés and 139 build-to-rent apartments in two blocks of 3–5 storeys. ## Links - [This page on CherrywoodPlans](https://cherrywoodplans.com/application/DZ21A-1038) - [Council record, documents and conditions (DLR planning portal)](https://planning.agileapplications.ie/dunlaoghaire/application-details/91466) - [All Cherrywood applications](https://cherrywoodplans.com/applications.md) _Source: Dún Laoghaire–Rathdown County Council planning data, refreshed daily. CherrywoodPlans is an independent site, not run by the council._