# Planning application DZ22A/0133 > Townlands of Laughanstown and Cherrywood, Dublin 18, Cherrywood, Dún Laoghaire–Rathdown. Granted (22 Nov 2022). - **Reference:** DZ22A/0133 - **Address:** Townlands of Laughanstown and Cherrywood, Dublin 18 - **Status:** Granted (22 Nov 2022) - **Decision:** GRANT PERMISSION - **Application type:** Permission - **Applicant:** LSREF V Eden TC6 Limited - **Lodged:** 28 Sep 2022 - **Decided:** 22 Nov 2022 - **Location (lat, lng):** 53.246207, -6.151821 ## Proposal 163 no. residential units (total gross floor area of 18,942 sq. m) in a mixture of apartments, houses, triplexes and maisonettes, in a range of buildings 2 to 3 floors in height, partially over undercroft accommodation/ single level podium basement on a net development area of approximately 2.73 Ha.The overall development proposed comprises of the following: 57no. apartments in 2no. blocks comprising: Block A - 25no. units (13no. 1-bed, 2no. 2- bed three persons and 10no. 2-bed four persons), Block B - 32no. units (18no. 1-bed, 13no. 2-bed four persons and 1no. 3-bed), 56no. 3 storey 3 bedroom triplexes, 19no. 2 storey 2 bedroom maisonettes, 31no. 3 storey 4 bedroom houses. Provision of 223no. car parking spaces allocated to the proposed development. The single level podium accommodates 134no. car parking spaces and 89no. spaces are accommodated at surface level. 8no. of these spaces are accessible and 16no. are for electric vehicles. 207no. bicycle parking spaces located at both surface and basement levels, of which 163no. are long stay and 44no. are short stay, and 9no. motorcycle parking located at basement are also being provided. Provision of level 5 local neighbourhood road, previously permitted and which is being modified by this application, which will link with the existing access point at Bishop Street permitted under Reg Ref: DZ15A/0758. Vehicular access is provided from a single access point from Bishop Street (A2 -F1) as permitted under Reg. Ref. DZ15A/0758. Provision of a pedestrian 'green link' pedestrian accessway to run north/south through the site, connecting Tully Park with Bishop Street. All associated and ancillary site development and infrastructural works, including the provision of bike stores and bin stores, 2no single storey pavilion buildings containing an ESB sub-station and electrical switch room, stair and lift access to basement and short stay bicycle parking spaces in each, hard and soft landscaping and boundary treatment works. The proposed development consists of revisions/modifications to approximately 0.75ha only of the works permitted at Tully Park development (approximately 12.9 Ha overall) (permitted pursuant to Reg Ref DZ15A/0813 and amended by Reg Ref DZ17A/0714, Reg Ref DZ17A/0862, Reg Ref DZ18A/0458 and Reg Ref DZ20A/0946) to comprise of: modifications to the Level 5 local neighbourhood road along boundary with Tully Park immediately adjoining the development. The inclusion of a Part M compliant footpath in the Greenway located alongside the permitted Cherrywood Square / Tully Park Link Access Route linking Bishop Street with Tully Park, amendment to entrance details to 2 no. Tully Park entrances along the Level 5 local neighbourhood road. Tully Park itself, currently under construction, is not affected by the development being proposed. No works are proposed to or in the vicinity of Tully Church Graveyard or within its grounds (Ref: DU026023001 -2; National Monument No. 225) or to the National Monument including the high crosses (Ref: DU026023003, 4, 7: National Monument NO.216) The proposed development will also utilise the existing road at Bishop Street and the Pond 2B surface water infrastructure (permitted under Reg.Ref DZ15A/0758) and also a permitted road under construction at Cherrywood Avenue (Reg Ref. DZ17A/0862). These already permitted roads and infrastructure amount to approximately 3.14 Ha ## In plain English Builds 163 homes, a mix of apartments, triplexes, maisonettes and houses, beside Tully Park. - **163** homes - **223** car spaces - **207** bicycle spaces - **3** storeys max - **2.73** hectares ### What's planned A residential scheme of **163** homes on about **2.73** hectares between Bishop Street and Tully Park. ### Residential **57** apartments in **2** blocks, **56** three-bed triplexes, **19** two-bed maisonettes and **31** four-bed houses, in buildings of **2**–**3** floors. Total floor area **18,942** sq.m. ### Transport **223** car spaces (**134** in an undercroft car park, **8** accessible, **16** EV), **207** bike and **9** motorcycle spaces. Access from Bishop Street via a modified local road. ### Community A north–south walking 'green link' connects Tully Park with Bishop Street. Tully Park and Tully Church's national monuments are not affected. _This summary was written by AI from the proposal text. Check the council record before relying on it._ ## Conditions ### Condition 2 First Schedule Reasons and Considerations Having regard to the ‘Residential’ zoning of the site as set out in the Cherrywood Planning Scheme, as amended, and 2022 - 2028 Dún Laoghaire - Rathdown County Development Plan, it is considered that subject to compliance with the conditions below, the proposed development would not seriously injure the amenities of the area and would not contravene materially the zoning of the application site or that of adjoining sites, subject to conditions and accords with the Planning Scheme. Appropriate Assessment Screening Having regard to nature and scale of the proposed development, as clarified by way of Further Information received on 28/09/2022, it has been determined that the proposed development would not significantly impact upon a Natura 2000 Site. Environmental Impact Assessment As part of the Further Information response, the Applicant submitted an Environmental Impact Assessment Report. The Planning Authority completed an environmental impact assessment in relation to the proposed development and concluded that subject to the implementation of the mitigation measures proposed, as set out in each relevant chapter of the EIAR and subject to compliance with the conditions set out herein, the effects on the environment of the proposed development by itself and in combination with other development in the vicinity would be acceptable. Second Schedule Conditions 1. The development shall be carried out in its entirety in accordance with: (a) the plans, particulars and specifications lodged with the application, as amended by Further Information received on 28/09/2022 and; (b) the proposed mitigation measures contained in the EIAR; save as may be required by the other conditions attached hereto. REASON : To ensure that the development shall be in accordance with the permission and that effective control be maintained. PHASING AND SEQUENCING 2. Residential units shall not be occupied prior to the completion of both Tully Park (provided by permission DZ15A/0813 or subsequent amendments to this permission) and Ticknick Park (circa 6 ha provided by permission DZ16A/0570 or subsequent amendments to this permission) to Taking in Charge Standard and at such time when the Parks are made available to the public. REASON: To ensure consistency with the Phasing and Sequencing requirements of Table 7.2 ‘Open Space’ of the Cherrywood planning Scheme 3. a) With regard to Internal bus infrastructure (bus route to Cherrywood Luas Station, traffic management, RTPI signs, bus shelters, Cherrywood Luas stop interchange facility) the residential units the subject of the proposed development, shall not be occupied prior to the completion of the internal bus infrastructure as detailed in Planning Scheme Table 7.3 to a taking in charge standard, or as otherwise agreed with the Planning Authority. b) With regard to Roads Phase 1: Junction at A, roads I1-A-A1-B-L-P2-C-D-D1-K1-K-F1-J-A2-A1 and road B-A2, Residential units shall not be occupied prior to the completion of Roads Phase 1: Junction at A, roads I1-A-A1-B-L-P2-C-D-D1-K1-K-F1-J-A2-A1 and road B-A2 (provided by permission DZ15A/0758 and as amended by DZ17A/0862) to Taking in Charge Standard and at such time when the roads are made available to the public. c) The road network elements as permitted under DZ15A/0758 that have not been Taken In Charge and which serve the proposed development for construction and occupation access, shall not be a public road and shall remain as a private road until such time as Taken in Charge by the Planning Authority in accordance with DZ15A/0758 and DZ17A/0862. REASON: To ensure consistency with the Phasing and Sequencing requirements of Cherrywood Planning Scheme Table 7.3 Transportation Infrastructure, to ensure that the road materials and specifications meet with the requirements of the Planning Authority and in the interests of the proper planning and sustainable development of the area. GENERAL/MISCELLANEOUS 4. Prior to the completion of development, the developer shall submit for the written agreement of the Planning Authority, all drawings in digital format (CAD/GIS) projected to ITM (Irish Transverse Mercator). This information should include the following: • Overall site plans in DWG format (ITM projection in metres) • Ground floor plans of buildings in DWG format (ITM projection in metres) • Site sections and elevations in PDF format. REASON: To ensure consistency with Section 7.4 of the Cherrywood Planning Scheme. 5. Prior to the commencement of development, the applicant, or any other person with an interest in the land to which the application relates, shall comply with requirements of Part V, Section 96 of the Planning and Development Act 2000, as amended, and in accordance with agreement to be reached with the County Council’s Housing Department, unless the applicant shall have applied for and been granted an exemption certificate under Section 97 of the Planning & Development Act, 2000, as amended. In this regard, the Applicant shall submit a detailed submission to include, inter alia, existing and development use land values, construction, development and any attributable costs associated with the development. REASON: To comply with Part V of the Planning and Development Act, 2000, as amended. URBAN FORM AND DEVELOPMENT OBJECTIVES 6. Prior to the commencement of development, the developer shall provide, for the written agreement of the Planning Authority : a) Details of the proposed external design/finishes of all buildings including; façade materials, windows and doors, balcony/terrace and boundary treatments, any under croft screening, lighting, ESB substations, entrance to basement car parks, Bike and Bin Stores and staging areas, roof services/plant and associated screening, and microclimate screening mechanisms, in the form of on-site mock-ups for inspection and viewing, followed subsequently by submission of the samples in the format of sample boards, or the like. b) The external finishes of buildings shall include materials that are: • of high quality, durable, sustainable and attractive, with the avoidance of render where feasible. Any render shall be silicone based, or similar, to ensure durability and avoid staining. • at ground floor, comprise of durable and high-quality materials including natural stone or brick, • ensure harmony and visual coherence in the built environment yet articulating interest to avoid monolithic and bulky facades along the perimeter elevations, with particular attention to the upper floors, • be practical to source, erect, replace, and maintain, and meet the user specification and standards, including those relating to environmental sustainability and wellness. REASON: To ensure consistency with Objectives PD 9, PD12, PD 14 and PD 19 of the Cherrywood Planning Scheme. 7. Prior to the commence of development above basement level, the applicant/Developer is requested to submit, for the written agreement of the Planning Authority, revised drawings clearly indicating the location of service boxes, including meter boxes, vents and other similar ancillary provision, within the curtilage of development ensuring they act as a positive design feature that enhances the local streetscape and do not register as visual clutter. REASON: To reduce visual clutter within the public realm consistent with Section 2.8 Urban Form and Objective PD 15 of the Cherrywood Planning Scheme. 8. Prior to the commencement of development the applicant shall submit, for the written agreement of the Planning Authority, revised drawings which show the design details of the roof structures, including the details of the height and scale and materials of the lift over runs. In this design particular regard shall be had to ensure: a) External finishes shall be light in colour and blend with the external finishes of the building façade and shall be included in any required mock-ups/samples of materials to be provided by way of compliance with related conditions. b) No additional development shall take place above roof level, including lift motors, air handling equipment, storage tanks, ducts or other external plant other than those shown on the drawings hereby approved, unless authorised by a prior grant of planning permission. REASON: To ensure consistency with Section 2.8.2 and PD 19 of the Cherrywood planning Scheme and in the interests of visual and residential amenity. SIGNAGE 9. Prior to the installation of any signage associated with the proposed development, the developer shall submit for the written agreement of the Planning Authority a Signage Strategy including: a) Details of all signage, including all external signage, way-finding and directional signage in accordance with the Cherrywood SDZ Wayfinding and Directional Signage Guidance 2021 and shall be agreed in writing with the Planning Authority. b) Street name and numbering in accordance with H6 and GI 10. c) Full details of the location and content including background colour, lettering typeface, logos and colour d) Materials that are high quality, modern and durable, and that respect the proportions and design of the building and its surroundings. REASON: In the interests of visual amenity and in order to comply with Specific Objectives PD 30 and PD 32 of the Cherrywood Planning Scheme and the Cherrywood SDZ Wayfinding and Directional Signage Guidance 2021. CULTURAL AND BUILT HERITAGE 10. Prior to the commencement of any construction works, a) The Applicant shall engage the services of a suitably qualified archaeologist to carry out archaeological monitoring at the development site. No sub-surface work shall be undertaken in the absence of the archaeologist without his/her express consent. b) Should significant archaeological features be found, any works which would affect them shall cease pending agreement with the National Monument Service as to how they are to be dealt with. c) Having completed the work, the archaeologist shall submit a written report to the Planning Authority and to the National Monuments Service of the Department of Culture, Heritage and the Gaeltacht. Where archaeological material/features are shown to be present, preservation in situ, preservation by record (excavation) or monitoring may be required, and this shall be agreed with the National Monuments Service. d) All remaining topsoil stripping associated with the proposed development shall be monitored by a suitably qualified archaeologist and works should include a programme of metal detection which will require a licence from the National Monuments Service of the DoHLGH. e) The archaeologist is required to notify the Department of Housing, Local Government and Heritage in writing at least four weeks prior to the commencement of any site preparations. This will allow the archaeologist sufficient time to obtain a licence to carry out the work. f) The archaeologist shall excavate additional test trenches, if necessary, at locations chosen by the archaeologist (licensed under the National Monuments Act, 1930, as amended) having consulted the site drawings and geophysical survey results. REASON: To ensure the continued preservation (either in situ or by record) of places, caves, sites, features or other objects of archaeological interest and to ensure that the proposed development is consistent with Section 3.2.4 of the Planning Scheme. CONSTRUCTION MANAGEMENT PLAN 11. The Developer shall comply with the following requirements: - a) The construction of the development shall be managed in accordance with a final detailed Construction and Environmental Management Plan and construction and demolition waste management plan, which shall be submitted for the development in its entirely to the Planning Authority for agreement in writing, prior to commencement of any development. In this regard the final Construction and Environmental Management Plan shall include a Community Liaison Plan and a Construction Traffic Management Plan. b) Prior to the commencement of development, the applicant/developer shall prepare a Construction and Demolition Resource Waste Management Plan (RWMP) as set out in the Best Practice Guidelines for the Preparation of Resource and Waste Management Plans for C&D Projects (2021) including demonstration of proposals to adhere to best practice and protocols. The RWMP shall include specific proposals as to how the RWMP will be measured and monitored for effectiveness; these details shall be placed on the file and retained as part of the public record. The RWMP must be submitted to the planning authority for written agreement prior to the commencement of development. All records (including for waste and all resources) pursuant to the agreed RWMP shall be made available for inspection at the site office at all times. c) Site development and building works shall be carried out only between the hours of 7.00am to 7.00pm Monday to Friday inclusive, 7.00am to 2.00pm Saturdays and no works permitted on site on Sundays and public holidays. Deviation from these times will only be allowed in exceptional circumstances where prior written approval has been received from the planning authority. This should be addressed in the Community Liaison Plan. d) Construction staff shall be prohibited from parking on public roads. Parking for construction staff shall be provided by the Developer/Contractor within the site boundary. e) Construction vehicles shall not be permitted to park or wait on roads outside the site boundary. All parking and waiting areas shall be provided Developer/Contractor within the site boundary and shall not be provided in an off-site location. f) Prior to commencement of development a mechanism and structure for on-site monitoring, reporting on progress and quality control to the Planning Authority in relation to construction standards, materials, as-built drawings and records shall be agreed in writing with the Planning Authority. g) Prior to commencement of development, or as otherwise agreed with the Planning Authority, a vibration and settlement monitoring regime for existing roads and utility infrastructure to the south of the subject development shall be submitted for the written agreement of the Planning Authority. This monitoring regime shall include proposed regime operation and mitigation responses. The monitoring regime is required to ensure existing infrastructure is not adversely affected during adjacent temporary earthworks and shall be wholly carried out at the developer’s expense. h) For the duration of this development, from commencement of construction works (inclusive of enabling works) to completion of construction works, the Applicant/Developer shall undertake continuous monitoring of the road network to be utilised for construction access to this development. In this regard and at a minimum, an independent condition survey of the roads constructed under DZ15A/0758 and DZ17A/0862 that are utilised for construction access to this development shall be undertaken by suitably qualified engineers/surveyors appointed by the Applicant/Developer, at the Applicant/Developer’s expense, both prior to commencement of development and prior to occupation of the final phase of the development. The appointment of the engineers/surveyors shall be agreed in advance and in writing with the Planning Authority and they shall be independent of the Developer and the Developer’s design and construction teams. The condition survey(s) produced are to be submitted for the written agreement of the Planning Authority. Damage including structural defects, damage to the wearing course, footpaths, kerbs, road marking etc, to the road network that is identified in the condition survey(s) shall be rectified/replaced by the developer, at the developer’s expense and to a taking in charge standard of development which is to the satisfaction of the Planning Authority. i) The applicant/developer shall manage the development works in accordance with a final construction surface water management plan to be agreed with the Planning Authority prior to commencement of development. Any topsoil or demolition material to be stored on site must have mitigations in place to prevent any deleterious material entering the surface water network. Any dewatering of ground water during the excavation of the basement must be treated by infiltration over land or into an attenuation area before being discharged off site. j) The proposed development is located in close proximity to a Luas line; the applicant shall ensure there is no adverse impact on Luas operation and safety. The development shall comply with TII’s ‘Code of practice for works on, near, or adjacent the Luas light rail system’. k) Prior to commencement of development, a Construction Traffic Management Plan including access to services, shall be submitted for the written agreement of the Planning Authority subject to the written agreement of TII. The Construction Traffic Management Plan shall identify mitigation measures to protect operational Luas infrastructure. All deliveries made to the development site, including during the construction phase, shall be made to limit interference with Luas operations. l) The developer shall be responsible for any loss of Luas revenue or any other costs associated with a suspension of passenger services which may arise out of, or in consequence of, the design or construction of the development or the presence on the site and any construction access areas and/or the Luas system of any of the developer’s contractors, sub-contractors, their employees or agents or any related party. Appropriate agreements between TII, Luas operator and the developer shall be undertaken and completed prior to the commencement of development. REASON: To ensure consistency with Section 2.14 of the Cherrywood Planning Scheme and in the interests of orderly development, proper planning and sustainable development. WATERSUPPLY AND WASTEWATER 12. a) All water & waste infrastructure required to service this development shall align with Irish Water masterplans for the area. b) At connection application stage, the applicant shall demonstrate that the design is in compliance with Cherrywood Planning Scheme and that all relevant core water and wastewater infrastructures within the Zone have adequate capacity, integrity and connectivity with Irish Water networks (water and wastewater). c) The appropriate set back distance shall be applied to existing infrastructure in accordance with the requirements of Irish Water. d) The applicant / developer shall sign a connection agreement with Irish Water prior to any works commencing and connecting to their network (water and wastewater). e) All development is to be carried out in compliance with Irish Water Standards codes and practices. f) All infrastructure (water and wastewater) shall be designed and installed in accordance with the Irish Water Codes of Practice and Standard Details. g) The applicant / developer shall submit a Statement of Design Acceptance to the planning Authority confirming the development proposal designs and layouts for water and wastewater are in compliance with Irish Water’s standards & Codes of Practice prior to commencement of works. h) The applicant / developer shall facilitate the Brides Glen Watermain upgrades works in agreement with Irish Water. REASON: In the interests of sustainable development and in the interests of consistency with PI 4, PI 5 and PI 12 of the Planning Scheme. To ensure agreement with Irish Water for the applicant’s design proposals and to ensure the adequate provision of water and wastewater. SURFACE WATER 13. (a) Prior to the commencement of the Development the applicant/developer shall provide revised surface water layout drawings clearly outlining and detailing SuDS measures for all sections of the development access road. Surface water runoff shall be intercepted by at least one SuDS measure in accordance with the requirements of the Planning Scheme. The applicant/developer shall also provide details of SuDS measures, interception and volume provided and design details for the north eastern portion of the site, the universal access route to Tully park. (b) Prior to the commencement of development, the Applicant/Developer shall submit the following for the written agreement of the Planning Authority: (i) Hydraulic calculations and engineering drawings for the proposed surface water network, representative of the final detailed design and inclusive of the following: • Surface water network calculations and storm simulations for the 1 in 30 and 1 in 100 year events incorporating climate change inclusive of the full contributing catchment area, which are fully commensurate with the surface water design drawings. • full input data to show the design criteria adopted • Calculations for the attenuation storage requirements for the 1 in 100 year storm event including climate change and locations for the full site area. • Detailed design drawings for all SuDS measures including green roofs. Drawings shall includes plans, cross sections and details. The applicant/developer shall demonstrate how for the green roofs the flow control opening is protected from blockage and a means of managing overflow and exceedance shall be identified. (ii) A detailed operations and maintenance plan for all the proposed SuDS components, inclusive of the petrol and oil interceptors and green roofs. (c) The Applicant/Developer shall ensure that interception and treatment of at least 5mm of runoff is provided on the subject site during all phases of the proposed construction and occupation of the development. Surface water runoff from the site shall pass through at least one level of treatment using a SuDS measure prior to discharge into the public realm. (d) The provision and design of green roofs for the subject development shall adhere to the requirements of the latest DLRCC green roof policy document 2022 incorporated into the DRLCC County Development Plan 2022-2028. REASON: In the interests of sustainable development, to ensure long term optimum operation of the surface water management system; and to comply with the requirements of PI 6 of the Cherrywood Planning Scheme and Dun Laoghaire Rathdown County Council’s County Development Plan. 14. a) A Stormwater Audit shall be carried out at Stage 2 for the detailed design stage in accordance with PI 7 of the Cherrywood Planning scheme. The audit shall be carried out at the Developer’s expense. An independent audit team shall bused and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the commencement of development, unless otherwise agreed.The Stage 2 Stormwater Audit reports shall address any and all phased construction and occupation proposals for the development. b) For any proposed partial commissioning of surface water infrastructure associated with any phased construction /occupation of the development, interim Stage 3 Stormwater Audits shall be carried out for the post construction / prior to commissioning phases, in accordance with PI 7 of the Cherrywood Planning Scheme and at phases pre-agreed with the Planning Authority as part of the Stage 2 Audit process. These audits shall be carried out at the Developer’s expense. An independent audit team shall be used and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. c) A Stormwater Audit shall be carried out at Stage 3 for the post construction / prior to commissioning stage in accordance with PI 7 of the Cherrywood Planning scheme. The audit shall be carried out at the Developer’s expense. An independent audit team shall be used and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 3 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the final commissioning of the full surface water network for the development. REASON: In the interests of sustainable development and to comply with the requirements of PI 7 of the Cherrywood Planning Scheme. WASTEWATER 15. (a) The applicant/developer shall provide a revised wastewater network design layout which ensures that sufficient separation distances are provided between the development wastewater and stormwater infrastructure for the subject development prior to the commencement of development. (b) Any utility connection and or upgrade work and subsequent reinstatement works to existing Cherrywood Common Infrastructure as proposed by the subject application will be at the Applicant/Developer’s expense. All reinstatement works to existing Cherrywood common infrastructure shall accord with permitted infrastructure designs under DZ15A/0758. An independent monitoring engineer shall oversee any upgrade and utility connection works to Cherrywood Common Infrastructure. REASON: In the interests of sustainable development and to comply with the requirements of PI 12 of the Cherrywood Planning Scheme. TRANSPORTATION 16. a) To ensure that the future sustainable targets as set out in Table 4.1 of the Cherrywood Planning Scheme are achieved, the Travel Plan for this development is to be reviewed on an Annual Basis. This review should include updated annual travel surveys of resident’s mode share, a review of available sustainable infrastructure to inform the mode share targets and to develop SMART measures for the development on site. This updated report should be submitted to the Area Wide Travel Plan Coordinator for review and comments and any actions arising from the review are to be then implemented by the nominated Travel Plan Coordinator. This shall be undertaken until such time that Roads Phase 1 is complete, taken in charge and operational. REASON: In order to ensure that the proposed development is consistent with the Planning Scheme and in the interest of the proper planning and sustainable development of the area 17. a) Prior to the commencement of development, a Stage 2 Quality Audit (which shall include a Road Safety Audit, Access Audit, Cycle Audit and Walking Audit) shall be carried out for the detailed design stage and shall be submitted for the written agreement of the Planning Authority. The audit shall be carried out at the Applicant/Developer’s expense in accordance with the Design Manual for Urban Roads & Streets (DMURS) guidance and TII (Transport Infrastructure Ireland) standards. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Quality Audit reports shall address any and all phased construction and occupation proposals for the development. The Applicant/Developer shall ensure that the construction / occupation phased stages proposed do not result in adverse safety conditions for future residents. b) For any proposed phased construction /occupation stages of the development, interim Stage 3 Quality Audits shall be carried out for the post construction / prior to occupation stages, at phased stages pre-agreed with the Planning Authority as part of the Stage 2 Quality Audit process. These audits shall be carried out at the eveloper’s expense. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Applicant/Developer shall ensure that permeable and connecting walking and cycling routes are completed and operational at each construction / occupation phase to allow future residents of this development to safely access public transport, recreational facilities, schools, retail facilities and other key destinations in Cherrywood. Any identified deficiencies identified by the interim Stage 3 Quality Audits in this regard shall be completed at the developer’s expense to safely link the development site to the existing public transport infrastructure, recreational facilities, schools, retail facilities and other key destinations in Cherrywood. c) Prior to the final occupation stage of the development in its entirety, a Stage 3 Quality Audit (which shall include a Road Safety Audit, Access Audit, Cycle Audit and Walking Audit) shall be carried out for the post construction / prior to occupation stage and shall be submitted for the written agreement of the Planning Authority. The audit shall be carried out at the Developer’s expense in accordance with the Design Manual for Urban Roads & Streets (DMURS) guidance and TII (Transport Infrastructure Ireland) standards. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Developer shall ensure that permeable and connecting walking and cycling routes are completed and operational to allow future residents of this development to access public transport, recreational facilities, schools, retail facilities and other key destinations in Cherrywood. Any identified deficiencies identified by the Stage 3 Quality Audit in this regard shall be completed at the developer’s expense to link the development site to the existing public transport infrastructure, recreational facilities, schools, retail facilities and other key destinations in Cherrywood. REASON:In the interests of orderly and sustainable development;To allow for pedestrian and cycle permeability; and in the interests of consistency with PI 14 and PI 20 of the Cherrywood Planning Scheme. 18. a) Prior to the commencement of the subject development or as otherwise agreed with the Planning Authority the applicant/developer shall submit the detailed design of the boundary wall along the western edge of the development access road which includes design levels and wall dimensions, material details and including retaining elements for the agreement of the Planning Authority. The detailed design should be co-ordinated with the adjacent developments detailed design. REASON: In the interests of sustainable development and to comply with the requirements of section 4.2.7 of the Cherrywood Planning Scheme. 19. a) The applicant/developer shall provide a total of 224 no. car parking spaces for the subject development, including 2 car-sharing spaces. Prior to the commencement of the Development the applicant/developer shall provide revised layout drawings which clearly details the layout of car parking provision in the subject development. The revised drawings shall clearly detail the adequate provision of car parking spaces at the podium level and surface level, accessible car parking spaces, electric vehicle car parking spaces, and car sharing spaces in accordance with the requirements of the Cherrywood Planning Scheme and the requirements of the DLRCC County Development Plan 2022-2028. The applicant’s parking layout drawing shall also detail proposals for assignment of car parking spaces in the subject development to individual units. b) A minimum of one car parking space per five car parking spaces should be equipped with one fully functional EV Charging Point. Ducting for every car parking space shall also be provided. REASON: In the interests of sustainable development and to comply with the requirements of PI 21 of the Cherrywood Planning Scheme. 20. a) The applicant/developer shall provide drawings detailing the final layout and quantity of the short term and long stay cycle parking spaces prior to the commencement of development or as otherwise agreed with the Planning Authority. b) Prior to commencement of development or as otherwise agreed, the Applicant/Developer shall prepare a cycle parking management strategy for the development for the written agreement of the Planning Authority.This cycle parking management strategy shall include a comprehensive cycle parking operation and monitoring regime which clearly shows how the operation and maintenance for the development’s cycle parking will be implemented and managed, including routine and annual maintenance of the stacked cycle parking, and how demand for cycle parking will be monitored.This cycle parking management strategy shall also outline how provisions for future demand will be implemented if required. The applicant/developer should have regard to the cycle parking requirements of the NTA national cycle manual and the design standard for new apartments in relation to the proposed bicycle parking provision. Reason: To ensure adequate cycle parking provision for future residents and in the interests of consistency with PI 22 of the Cherrywood Planning Scheme. UTILITIES 21. a) The Applicant/Developer shall ensure that adequate separation distances are provided within the development between utility service ducts and surface water, water and foul and public lighting infrastructure to ensure access for future operation and maintenance activities as may be required. b) The detailed design of the electricity supply infrastructure for the development shall be agreed (in writing) with ESB Networks/ESBI. (c) Any upgrade works/utility connection works and subsequent reinstatement works to existing Cherrywood common infrastructure as proposed by the subject application will be at the Applicant/Developer’s expense. All reinstatement works to existing Cherrywood common infrastructureshall accord with permitted infrastructure designs under DZ15A/0758.An independent monitoring engineer shall oversee any upgrade and utility connection works to Cherrywood Common Infrastructure. REASON: In the interests of orderly development the inclusion of infrastructure and connections would avoid subsequent excavation of newly constructed roadway, and to ensure that designs shall meet with the current and future requirements ESB Networks/ESBI and to ensure consistency with Section 4.3.1 of the Planning Scheme. 22. a) The detailed design of the telecoms network for the development shall be agreed (in writing) with the telecoms providers. REASON: In the interests of orderly development the inclusion of infrastructure and connections would avoid subsequent excavation of newly constructed roadway; To ensure that designs shall meet with the current and future requirements of the telecoms providers, and to ensure consistency with PI 26 of the Planning Scheme. GREEN INFRASTRUCTURE 23. The Applicant/Developer shall provide the following for the written agreement of the Planning Authority: - a) The Applicant/Developer shall retain the services of a qualified Landscape Architect, as his/her Landscape Consultant, throughout the course of the development works, and shall notify the Planning Authority of that appointment in writing prior to the commencement of development. b) The Applicant/Developer shall engage the Landscape Consultant to procure, oversee and supervise the landscape contract for the implementation of the permitted landscape proposals. When all landscape works are inspected and completed to the satisfaction of the Landscape Consultant, he/she shall prepare, sign and submit a Practical Completion Certificate (PCC) to the Planning Authority, as verification that approved landscape plans and specifications have been fully implemented. REASON: To ensure a high-quality public realm and consistency with the Cherrywood Planning Scheme and in the interest of proper planning and sustainable development of the area. 24. Prior to commencement of development of the landscape/public realm areas, the Applicant/Developer shall provide the following for the written agreement of the Planning Authority: - a) Hard landscape plans and construction details for all hard-standing pedestrian, cycling, and vehicular areas (including adjoining footpath and road interfaces), detailing the specifications of all surface/finish materials. In this regard, samples, data sheets and on-site mock-ups of all materials shall be provided for the written agreement of the Planning Authority. Approved control samples must be held, on-site. at all times. b) All surfaces and finishes shall include materials that are consistent with PD 14. In particular, the finishes shall comprise of durable, easily sourced and high-quality materials, comprising of natural stone (or other materials as agreed with the Planning Authority) that harmonise and complement those on the adjoining boundaries of Tully Park, Bishops Street, Cherrywood Town Centre and the adjoining Post Primary School plot. REASON: To ensure consistency with the Cherrywood Planning Scheme and Objectives PD 14 and GI 7. 25. Prior to the commencement of landscape development, the Applicant/Developer shall submit the following for the written agreement of the Planning Authority: a) A completed Site Summary Sheet for Site Code 2.9, in accordance with Section B of the Cherrywood Amenity Space Guidance Document. REASON: To ensure consistency with Section 5.4.4 of the Cherrywood Planning Scheme and the Cherrywood Amenity space Guidance Document. 26. b) Prior to the commencement of development, the Applicant/Developer shall engage the services of a qualified Arborist as an Arboricultural Consultant, for the entire period of construction activity. The Applicant/Developer shall inform the Planning Authority in writing, of the appointment and name of the Consultant. c) At Practical Completion of the development, the Consultant shall carry out a Post-construction Arboricultural Assessment of all retained trees and submit to the Planning Authority - a signed Arboricultural Completion Certificate stating that all Tree Works have been satisfactorily completed in accordance with his/her recommendations, highlighting any residual concerns arising from the Post-construction Assessment. REASON: To ensure consistency with Section 5.4.7 of the Cherrywood Planning Scheme and give practical effect to the retention, protection and sustainability of trees during and after construction of the permitted development. 27. The Applicant/Developer shall undertake the following: - Prior to the occupation of Apartment Block B, or as otherwise agreed with the Planning Authority, the Applicant/Developer shall ensure the required universal access route for Tully Park is made available for use by all residents and Park users. REASON: To ensure a high-quality public realm and consistency with the Cherrywood Planning Scheme and in the interest of proper planning and sustainable development of the area. PLAY 28. Prior to the commencement of landscape development, the following shall be submitted for the written agreement of the Planning Authority: a) Final design details of all play opportunities and facilities (formal and/or informal as appropriate), in respect of design detailing, planting, boundaries, equipment and safety surface, in accordance with Section 4.7.1, 4.7.2, and 4.7.3 of the Amenity Space Guidance Document. All proposed equipment and ancillaries shall include specifications for the same and proof that all equipment conforms to European Standards EN 1176-1-11 and EN 1177 Playground equipment and surfacing, and to BS/EN standards 2017/18 for Playground Installations for HIC (Head Injury Criterion) and CFH (Critical Fall Height). REASON: to ensure quality play provision in compliance with best practice and reputable guidance; and GI 72 and GI 73 of the Cherrywood Planning Scheme and Sections 4.6.3, 4.7.1 and 4.7.2 of the Cherrywood Amenity Space Guidance Document. 29. The following shall be complied with: Prior to occupation of Phase 1 the following shall be submitted for the written agreement of the Planning Authority: i. A play map in GIS format which details all play provision provided for, in accordance with Section 4.6.3 and Section 4.7.2 of the Cherrywood Amenity Space Guidance Document. ii. A post-installation Practical Completion Certificate, in accordance with the requirements and guidelines of the Royal Society for the Prevention of Accidents (RoSPA). The Certificate shall be prepared and signed by a suitably qualified (RoSPA-approved), technical professional with expertise and experience in playground design and playground health and safety. Prior to occupation of Phase 2 the following shall be submitted for the written agreement of the Planning Authority: i. A play map in GIS format which details all play provision provided for, in accordance with Section 4.6.3 and Section 4.7.2 of the Cherrywood Amenity Space Guidance Document. ii. A post-installation Practical Completion Certificate, in accordance with the requirements and guidelines of the Royal Society for the Prevention of Accidents (RoSPA). The Certificate shall be prepared and signed by a suitably qualified (RoSPA-approved), technical professional with expertise and experience in playground design and playground health and safety. Prior to occupation of Phase 3 the following shall be submitted for the written agreement of the Planning Authority: i. A play map in GIS format which details all play provision provided for, in accordance with Section 4.6.3 and Section 4.7.2 of the Cherrywood Amenity Space Guidance Document. ii. A post-installation Practical Completion Certificate, in accordance with the requirements and guidelines of the Royal Society for the Prevention of Accidents (RoSPA). The Certificate shall be prepared and signed by a suitably qualified (RoSPA-approved), technical professional with expertise and experience in playground design and playground health and safety. REASON: to ensure the construction of safe, quality play provision in compliance with best practice and reputable guidance; and GI 73 and GI 72 of the Cherrywood Planning Scheme and Sections 4.6.3, 4.7.1 and 4.7.2 of the Cherrywood Amenity Space Guidance Document. BOUNDARIES 30. Prior to the commencement of landscape development, the Applicant/Developer shall submit the following for the written agreement of the Planning Authority: a) Details, specifications and samples for all boundaries, interfaces and transitions between private space, communal space and public space having regard to the need to ensure a coherent and complementary palette of materials and finishes across the application site, and with Tully Park, as permitted under Planning Reg. Ref. DZ15A/0813. REASON: to ensure consistency with Specific Objectives GI 8, GI 77 and PD 14 of the Cherrywood Planning Scheme BIODIVERSITY AND HABITATS 31. The Applicant is requested to undertake the following: a) Prior to the commencement of development, the Applicant/Developer shall engage the services of a qualified Ecologist as an Ecological Consultant, for the duration of the works. The Applicant/Developer shall inform the Planning Authority in writing, of this appointment and the name of the Consultant. b) The Consultant shall ensure the implementation of Section 5.2 (Mitigation Measures) and Section 5.3 (Evaluation of Mitigation Measures) of the submitted Ecological Impact Assessment, as well as all recommendations within Habitat Management Plan (prepared by Minogue & Associates, Consulting Ecologists, dated September 2022). REASON: To ensure consistency with Specific Objective GI 46 of the Cherrywood Planning Scheme. 32. Prior to the commencement of landscape works the following shall be submitted for the written agreement of the Planning Authority: a) Details of Soft Landscape Design to include detailed Planting Plan and Planting Schedule - stating species/varieties, approximate quantities, sizes, rootball presentation and spacings. Planting mixes should specify a diverse range of species/varieties/cultivars and a diversity of forms and plant sizes (multi-stems, feathered, semi-matures, etc.) using both native and exotic species and pollinator-friendly native species (in accordance with the All-Ireland Pollinator Plan 2015-2020), all designed to provide vegetation that is visually appealing, bio-diverse, and easily managed. This should include management programmes for all proposed trees, shrubs and other vegetation demonstrating long-term continuity and consistency. REASON: To ensure consistency with Objective GI 65 and Section 5.5 of the Cherrywood Planning Scheme. WASTE MANAGEMENT AND CIRCULAR ECONOMY 33. The development shall be in accordance with the requirements of the Planning Authority (Waste Management / Environmental Enforcement Section)as follows: (a) Prior to the commencement of the proposed site works noise, vibration and dust monitoring stations to be installed and maintained to provide continuous monitoring to measure and record the impact of site activities on local receptors. Noise monitoring to demonstrate compliance with the recommendations contained in BS 5228 shall be installed, monitored and reported on at weekly intervals by a suitable qualified specialist company for the duration of the contract. All monitoring data to be compiled into a weekly technical monitoring report which shall identify remedial measures where levels exceed relevant limit values. (b) Development shall be carried out in compliance with the submitted recommendations in the submitted Environmental Noise Survey and implementation of any necessary measures to avoid creation of nuisance affecting adjoining land uses due to the operation of proposed ventilation and heating services. (c) Regarding Construction Waste - Records shall be maintained and made available for inspection on site demonstrating tracking of all waste generated to final destination. (d) The submitted Resource & Waste Management Plan shall be updated and implemented, throughout the construction phase of the work, identifying type of materials/proportion of re-use/recycled materials and future maintenance to support the implementation of Government and EU circular economy policy.) (e) Regarding Liaison with Public - A Public Liaison Plan shall be developed and implemented for the duration of the works, covering the following; i. Appointment of a Liaison Officer as a single point of contact to engage with the local community and respond to concerns ii. Keeping local residents informed of progress and timing of particular construction activities that may impact on them iii. Provision of a notice at the site entrance identifying the proposed means for making a complaint iv. Maintenance of a complaints log recording all complaints received and follow up actions (f) Pest Control - An appropriate rodent/pest control plan shall be developed and implemented for the duration of the works on site. (g) Development shall be carried out in compliance with the submitted Operational Waste Management Plan Reason: In the interest of orderly development. CONSTRUCTION ENVIRONMENTAL MANAGEMENT 34. The development shall be carried out in accordance with the requirements of the Planning Authority (Environmental Health Officer) as follows: (a) Construction Environmental Management Plan - The final Construction Environmental Management Plan must reduce any adverse impacts from construction on the environment, health and neighbouring facilities and control any temporary emissions during the construction phase to prevent nuisance or adverse health effects to include: i. A programme of continuous noise monitoring and noise vibration shall be carried out for the duration of the development, along the site boundary/ noise sensitive location(s) and by an appropriately qualified acoustic technician. Should any noise assessment identify the noise limits being exceeded, further investigation will be carried out and mitigation measures implemented to ensure compliance. Copies of the monitoring shall be made available to the Environmental Health Officers Air & Noise Unit on request. (b) All mechanical plant and ventilation inlets and outlets should be sound insulated and/or fitted with sound attenuators as necessary. They shall operate in such a manner so as not to cause a nuisance to the any neighbouring facilities, residents or businesses (c) Nearby noise sensitive location shall not exceed the background level by 10dB(A) or more or exceed NG4 limits whichever is lesser. i. Daytime (07:00 to 19:00 hrs) – 55dB Laeq, 15 mins ii. Evening (19:00 to 23:00 hrs) – 50dB Laeq, 15 mins iii. Night-time (23:00 to 07:00 hrs) – 45dB Laeq, 15mins As measured from the façade of the nearest noise sensitive location/s. Clearly audible and impulsive tones at noise sensitive locations during evening and night shall be avoided irrespective of the noise level. (d) No heavy construction equipment/machinery shall be operated on or adjacent to the construction site before 8.00am or after 7.00p.m., Monday to Friday, and before 8.00 a.m. and after 2.00pm on Saturdays. (e) During the construction phase, all necessary steps shall be taken to contain dust and airborne pollutants arising from the site and to prevent nuisance to persons in the locality. This shall include i) covering skips, ii) covering slack heaps, iii) netting of scaffolding, iv) regular road and pavement damping and sweeping, v) use of water spray to suppress dust, vi) proper paved or hard stand access for trucks and vehicles to and from the site to prevent dirt and dust from the site being carried from the site on to public roads etc. (f) A programme of dust monitoring shall be carried out by the developer at locations adjacent to the site boundaries and shall be made available to the local authority on an agreed basis and/or on request. (g) Set up monitory points at the proposed locations to measure total dust deposition rates. The amount of dust deposited anywhere outside the proposed development, when averaged over a 30-day period, should not exceed: i. 130mg/m2 per day when measured according to the BS method which takes account of insoluble components only, or ii. 350mg/m2 per day when measured according to TA Luft, which includes both soluble and insoluble matter. (EPA compliance monitoring is based on the TA Luft method) (h) The construction compound facilities must be included in the Construction Environmental Management Plan. The construction compound will include adequate welfare facilities such as wash rooms, drying rooms, canteen and first aid room as well as foul drainage and potable water supply. Temporary discharges utilising the existing sewerage network to be agreed with DLRCC and Irish Water. (i) Construction Domestic Waste Management Plan - The Construction Environment Management Plan is required to contain details for the management of domestic waste and in particular recyclable materials and food waste arising within the development. Facilities are required for separation, storage and collection of waste, ensuring that there is adequate signage and lighting to facilitate the operation of these facilities.’ REASON: In the interests of orderly development TAKING-IN-CHARGE 35. The applicant shall complete, within a period to be specified in writing to the Applicant by the Planning Authority, all infrastructural works (including Roads, Footpaths, Car Parks, Open Spaces, Sewers, Watermains, Drains & Public Lighting) to the standards in the Council's Guidance Document on Development Works in Residential and Industrial Areas. REASON: To ensure the development is carried out in accordance with the County Council's Standards and in the interests of the proper planning and sustainable development of the area in which the development is located. MANAGEMENT COMPANY 36. Prior to commencement of development the applicant shall submit full details of a properly constituted Owners' Management Company for the written agreement of the Planning Authority. This shall include a layout map of the permitted development showing the areas to be taken in charge and those areas to be maintained by the Owners' Management Company. Membership of this Company shall be compulsory for all purchasers of property in the development. Confirmation that this Company has been set up shall be submitted to the Planning Authority prior to the occupation of the first residential unit. Reason: To provide for the satisfactory completion and maintenance of the development in the interest of residential amenity. ROAD MAINTENANCE 37. To ensure adequate financial provision is on hand to rectify any damaged caused to the road network associated with DZ15A/0758 and DZ17A/0862, as part of the condition survey that shall be submitted to the Planning Authority prior to commencement (inclusive of enabling works) under condition number 11(h) shall include a detailed map that shows all routes that will be utilised for construction traffic associated with this development from commencement (inclusive of enabling works) to occupation of all units within this development. This detailed map shall include the area of roadway in meters square to be utilised for construction traffic, this measurement will be used to calculate the value of a cash security or insurance bond for the value of €30/m2 of roadway utilised, to be lodged with the Planning Authority. No works shall take place (inclusive of enabling works) until this bond or cash security has been agreed and accepted by the Planning Authority. This bond will be refunded on satisfactory completion and certification by the Developer of any works identified in the condition survey, to be completed after occupation of all units within the development, and with written agreement from the Planning Authority that those works are carried out to Taking in Charge Standard. Failure to comply with the above condition may lead to the insurance bond/cash security being sequestered by the Planning Authority to complete any outstanding works . REASON: To ensure that a ready sanction may be available to the County Council to induce the provision of services and prevent disamenity in the development. REGULATION OF COMMERCIAL INSTITUTIONAL INVESTMENT IN HOUSING 38. With regard to the Regulation of Commercial Institutional Investment in Housing, Guidelines for Planning Authorities, May 2021, a. Prior to the commencement of the development as permitted, the Applicant or any person with an interest in the land shall enter into an agreement with the Planning Authority (such agreement must specify the number and location of each duplex unit), pursuant to Section 47 of the Planning and Development Act 2000, as amended, that restricts all applicable residential units permitted to first occupation by individual purchasers i.e. those not being a corporate entity, and/or by those eligible for the occupation of social and/or affordable housing, including cost rental housing. b. An agreement pursuant to Section 47 shall be applicable (i) for the period of duration of the planning permission or (ii) from the date of commencement of the duration of the planning permission until the date on which the last housing unit the subject of the section 47 agreement has been transferred to an individual purchaser, whichever is the later, except where after not less than two years from the date of completion of each housing unit, it is demonstrated to the satisfaction of the planning authority that it has it has not been possible to transact each of the housing units for use by individual purchasers and/or to those eligible for the occupation of social and/or affordable housing, including cost rental housing. c. The determination of the Planning Authority as required in (b) shall be subject to receipt by the Planning and Housing Authority of satisfactory documentary evidence from the Applicant or any person with an interest in the land regarding the sales and marketing of the specified housing units, in which case the Planning Authority shall confirm in writing to the Developer or any person with an interest in the land, that the Section 47 agreement has been terminated and that the requirement of this planning condition has been discharged in respect of each specified duplex unit. d. For the avoidance of doubt, the definition of ‘houses and duplex units’ in this condition is as per the definition set out in the Ministerial Planning Guidelines under Section 28 of the Planning and Development Act 2000 (as amended), Regulation of Commercial Institutional Investment in Housing, namely, i. A house, defined as not including a building designed for use or used as two or more dwellings or a flat, an apartment or other dwelling within such a building, and, ii. A duplex unit, defined as a dwelling within a building designed for use as two individual dwellings and/or on one shared plot, with separate entrances. REASON: To restrict new housing development to use by persons of a particular class or description in order to ensure an adequate choice and supply of housing, including affordable housing, in the common good.’ FINANCIAL CONTRIBUTIONS 39. A financial contribution shall be paid by the proposer to the Council towards the cost of the extension of Luas Line B from the Sandyford Depot to Cherrywood, namely Luas Line B1. This contribution shall be paid prior to the commencement of the development or in such other manner as may otherwise be agreed with the Planning Authority. The rate of contribution payable shall be that pertaining to the particular year in which implementation of the Planning Permission is commenced. The Supplementary Development Contribution Scheme provides for an annual increase in the levels of contribution payable, as outlined in the scheme, by a factor of 5% compound interest per annum. The levels of contribution will be reviewed annually on the 13th of January of each year during which the scheme is in force to take account of the aforementioned increase. The rate of contribution payable in respect of this development, at current contribution rates, is €949,789.80, and is subject to increase as outlined above. It should be noted that contributions assessed in accordance with the Supplementary Development Contribution Scheme cannot be appealed to An Bord Pleanala unless the applicant considers the levy referred to in this condition has not been properly applied in accordance with the terms of the Scheme. REASON: To part finance the extension of the Luas Line B1 from Sandyford Depot to Cherrywood, as provided for in the Supplementary Development Contribution Scheme adopted by the Council of Dún laoghaire-Rathdown on the 13th of January, 2003. 40. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €47,969.82 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of Surface Water Public Infrastructure and Facilities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015 and as included in Table 2 of the Cherrywood Planning Scheme Development Contribution Scheme 2017-2020. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme ) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Public Infrastructure and Facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. Note on above Condition: Please note that with effect from 1st January, 2014 Irish Water are now the statutory body responsible for both water and waste water services. Accordingly, the contribution payable has been reduced by the amount of the contribution associated with these services. Further details/clarification can be obtained from Irish Water at Tel. 1 850 278 278. 41. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €1,098,517.14 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015 and as included in Table 2 of the Cherrywood Planning Scheme Development Contribution Scheme 2017-2020. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 42. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €713,075.40 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Community & Parks Public Infrastructure, Facilities and Amenities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015 and as included in Table 2 of the Cherrywood Planning Scheme Development Contribution Scheme 2017-2020. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks Public Infrastructure, Facilities and Amenities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 43. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €95,550.84 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of Surface Water Public Infrastructure and Facilities benefiting development in the Cherrywood Planning Scheme area only of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Public Infrastructure and Facilities benefiting development in the in the Cherrywood Planning Scheme area and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 44. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €608,062.14 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Roads Public Infrastructure and Facilities in the Cherrywood Planning Scheme Area. This Cherrywood Planning Scheme element of the Development Contribution shall be used solely to fund infrastructure identified in the Plan, as listed in Appendix III – Cherrywood Planning Scheme Projects List, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the Cherrywood Planning Scheme Area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 45. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €165,045.60 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Community & Parks Public Infrastructure Facilities & Amenities in the Cherrywood Planning Scheme Area. This Cherrywood Planning Scheme element of the Development Contribution shall be used solely to fund infrastructure identified in the Plan, as listed in Appendix III - Cherrywood Planning Scheme Area Only, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks Public Infrastructure Facilities & Amenities benefiting development in the Cherrywood Planning Scheme Area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 46. No development on foot of this permission shall commence until security for the provision and satisfactory completion of services (including roads, footpaths, open spaces, public lighting, sewers, watermains and drains) in accordance with the Plans and particulars lodged with the application, has been given by:- a) Lodgement with the Council of an approved Insurance Company Bond in the sum of €593,100.00 which shall be kept in force by the Developer until such time as Roads, Open Spaces, Car Parks, Sewers, Watermains and Drains are completed to the satisfaction of the Council OR/... b) Lodgement with the Council of a Cash Sum of €367,400.00 to be applied by the Council at its absolute discretion if such services are not duly provided to its satisfaction on the provision and completion of such services to standard specifications. REASON: To ensure that a ready sanction may be available to the Council to induce the provision of services and prevent disamenity in the development. 47. This development shall not be carried out without prior agreement, in writing, between the Applicant & the Planning Authority relating to the payment of development contributions. REASON: Investment by Dún Laoghaire-Rathdown County Council in Local Authority works has facilitated and will facilitate the proposed development. It is considered appropriate and reasonable that the developer should contribute to the cost of same. Note 1: That water supply and foul drainage shall be in accordance with the requirements of the Irish Water. Note 2: The applicant is advised that in the event of encroachment or oversailing of the adjoining property, the consent of the adjoining property owner is required. If this written agreement is not obtained, the proposed development shall be modified only insofar as is required to do this. Note 3: The attention of the applicant is drawn to Section 34(13) of the Planning and Development Act 2000, as amended, which relates as follows- 'A person shall not be entitled solely by reason of a permission under this section to carry out any development'. ## Nearby applications - [DZ26A/0151/WEB](https://cherrywoodplans.com/application/DZ26A-0151-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18.. Granted (24 Jun 2026). 188 new homes, a mix of apartments, two-level units and houses, beside Tully Park off Bishop Street. - [DZ20A/0946](https://cherrywoodplans.com/application/DZ20A-0946.md): Lands known as Tully Park (c12.9HA), Laughanstown, Dublin 18. Granted (18 Feb 2021). Revises part of the permitted Tully Park, moving the café kiosk, redesigning the playground and adding a raised boardwalk. - [DZ15A/0813](https://cherrywoodplans.com/application/DZ15A-0813.md): Laughanstown, Dublin 18, (Tully Park). Granted (13 Jul 2016). Creates Tully Park, a 12.9-hectare public park with a playground, café kiosk and nature trails. - [DZ15A/0758](https://cherrywoodplans.com/application/DZ15A-0758.md): in the townlands of Cherrywood, Laughanstown, Brennanstown, Loughlinstown and Glebe, Dublin 18. Granted (16 Aug 2016). Phase 1 roads for Cherrywood: about 5.4km of new and upgraded roads including Grand Parade, Castle Street and Bishop Street. - [ABP30342919](https://cherrywoodplans.com/application/ABP30342919.md): Site (c.3.06ha) in the townlands of Laughanstown, Dublin 18 (lands generally bounded by Bishop Street to the south, the Luas green line to the east and Tully park to the north. Granted (18 Apr 2019). Builds 184 homes, a mix of apartments, two-level units and houses, between Bishop Street, the Luas line and Tully Park. - [DZ25A/0489/WEB](https://cherrywoodplans.com/application/DZ25A-0489-WEB.md): 20, Domville Court, Tullyvale, Cherrywood, Dublin 18, D18VN3A. Granted (11 Aug 2025). Permission to keep a glass conservatory permanently at the back of a house on Domville Court. - [DZ25A/0480/WEB](https://cherrywoodplans.com/application/DZ25A-0480-WEB.md): 20, Domville Court, Tullyvale, Cherrywood, Dublin 18, D18VN3A. Refused or withdrawn (19 Jun 2025). Permission to keep a glass conservatory at the back of a house on Domville Court. - [DZ24A/0236/WEB](https://cherrywoodplans.com/application/DZ24A-0236-WEB.md): Lands in the townland of Laughanstown, between Grand Parade and Tully Park, in Domville Development Area 4, Cherrywood, Dublin 18. Refused or withdrawn (15 Apr 2024). Amends the Domville permission to raise four blocks on Grand Parade from 4 to 6 storeys, adding 58 apartments. - [DZ17A/0714](https://cherrywoodplans.com/application/DZ17A-0714.md): Lands in the townlands of Lehaunstown and Cherrywood, Dublin 18. The application relates to development in the Cherrywood Strategic Development Zone.(Domville site). Granted (7 Aug 2018). Builds 322 new homes, 242 apartments and 80 houses, plus a crèche on the Domville site in Cherrywood. - [DZ26B/0241/WEB](https://cherrywoodplans.com/application/DZ26B-0241-WEB.md): 17 Domville Court, Cherrywood, Dublin 18, D18WEK6. Granted (10 Jun 2026). Permission to keep a glass conservatory permanently in the back garden of a house on Domville Court. - [DZ26B/0073/WEB](https://cherrywoodplans.com/application/DZ26B-0073-WEB.md): 17 Domville Court, Cherrywood, Dublin 18, D18WEK6. Refused or withdrawn (13 Mar 2026). Permission to keep a glass conservatory built in the back garden of a house on Domville Court. - [DZ26B/0030/WEB](https://cherrywoodplans.com/application/DZ26B-0030-WEB.md): 17 Domville Court, Tullyvale, Cherrywood, Dublin 18, D18 WEK6. Refused or withdrawn (28 Jan 2026). Permission to keep a glass conservatory built in the back garden of a house on Domville Court. - [DZ21A/0806](https://cherrywoodplans.com/application/DZ21A-0806.md): Lands in the townland of, Laughanstown, Dublin 18, located between Grand Parade and Tully Park. Granted (12 Aug 2022). Amends a permitted scheme between Grand Parade and Tully Park to add 60 apartments in three new 4-storey blocks. - [DZ18A/0458](https://cherrywoodplans.com/application/DZ18A-0458.md): on lands (c.0.74 HA) in the townland of Laughanstown, Dublin 18 (Development Area 8 - Tully). Granted (11 Jul 2018). Builds a new primary school with 24 classrooms plus a special needs unit, south-west of Tully Park. - [DZ24A/0291/WEB](https://cherrywoodplans.com/application/DZ24A-0291-WEB.md): Lands in the townland of Laughanstown, Dublin 18, located between Grand Parade and Tully Park., The application relates to development in Domville Development Area 4 of the Cherrywood Strategic Development Zone.. Granted (25 Mar 2025). Amends the Domville permission to raise four blocks on Grand Parade from 4 to 6 storeys, adding 58 apartments. - [DZ21A/1038](https://cherrywoodplans.com/application/DZ21A-1038.md): site 1.85 ha at Castle Street and Bishop Street, Cherrywood, Dublin 18. Granted (8 Nov 2022). Builds a new 1,000-pupil secondary school at Castle Street and Bishop Street, Cherrywood. - [DZ26B/0366/WEB](https://cherrywoodplans.com/application/DZ26B-0366-WEB.md): 10 Domville Square, Cherrywood, Dun Laoghaire, Dublin 18, D18H7WA. Granted (14 Aug 2026). Adds a small glass conservatory to the rear of a house at Domville Square. - [DZ26B/0360/WEB](https://cherrywoodplans.com/application/DZ26B-0360-WEB.md): 10, Domville Square, Cherrywood, Dun Laoghaire, Dublin 18, D18H7WA. Refused or withdrawn (24 Jun 2026). A small glass conservatory added to the back of a house on Domville Square. - [D04A/1013](https://cherrywoodplans.com/application/D04A-1013.md): Laughanstown/Cherrywood, With Access From N11, Wyattville Road, Co. Dublin.. Refused or withdrawn (9 May 2005). Seeks to keep modified land shaping and drainage works on a 36-hectare site at Laughanstown/Cherrywood and further alter them. - [DZ25A/0325/WEB](https://cherrywoodplans.com/application/DZ25A-0325-WEB.md): In the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18. Granted (15 Jan 2026). 121 apartments in two blocks of 3 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ25A/0102/WEB](https://cherrywoodplans.com/application/DZ25A-0102-WEB.md): In the Townlands of Laughanstown, in Cherrywood, Dublin 18. Granted (26 May 2025). Amends a permitted 200-apartment scheme in Macnebury to drop its basement and cut car parking from 241 to 160 spaces. - [DZ24A/1024/WEB](https://cherrywoodplans.com/application/DZ24A-1024-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood,, Dublin 18. Granted (1 May 2025). Amends a permitted Macnebury apartment scheme to cut car parking from 312 to 213 spaces and add bike, bin and storage buildings, with no change to the homes. - [DZ25A/0008/WEB](https://cherrywoodplans.com/application/DZ25A-0008-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18. Refused or withdrawn (6 Feb 2025). Amends a permitted 200-apartment scheme in Macnebury to drop its basement and cut car parking from 241 to 160 spaces. - [DZ24A/1016/WEB](https://cherrywoodplans.com/application/DZ24A-1016-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18. Refused or withdrawn (3 Jan 2025). Amends a permitted Macnebury development by removing its basement and cutting car parking from 241 to 160 spaces. - [DZ24A/0017](https://cherrywoodplans.com/application/DZ24A-0017.md): Townlands of Laughanstown and Cherrywood, Macnebury - Development Area 7 - Cherrywood, Dublin 18. Granted (11 Jun 2024). 200 apartments in three blocks of 4 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ23A/0811](https://cherrywoodplans.com/application/DZ23A-0811.md): In the Townlands of Laughanstown and Cherrywood. Macnebury, Development Area 7 , Cherrywood, Dublin 18. Refused or withdrawn (4 Jan 2024). 200 apartments in three blocks of 4 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ22A/1021](https://cherrywoodplans.com/application/DZ22A-1021.md): Lands within Development Area 7 - Macnebury, including part of the Res 3 plot known as M1 located south of Bishop Street, west of Cherrywood Avenue, east and north of the proposed Beckett Road, Laughanstown, Dublin 18. Granted (27 Jun 2023). 283 new homes, mostly apartments in four blocks of 4–5 storeys, plus a crèche, south of Bishop Street in Macnebury. - [DZ25A/0161/WEB](https://cherrywoodplans.com/application/DZ25A-0161-WEB.md): Lands in the townlands of Laughanstown, Dublin 18. The application relates to development in Cherrywood Strategic Development Zone. Granted (23 Apr 2025). Completion of a 145-metre stretch of Grand Parade from Tully Vale Road towards Bishop Street. - [DZ21A/1042](https://cherrywoodplans.com/application/DZ21A-1042.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (30 May 2022). 122 new homes, a mix of houses, two-level units and apartments, beside Tully Park and Lehaunstown Lane. - [DZ17A/0161](https://cherrywoodplans.com/application/DZ17A-0161.md): Lands (site area c.0.95ha) in the townland of Laughanstown, Dublin 18. Granted (12 Dec 2017). Sets up a temporary concrete plant for 7 years to supply the building of Cherrywood. - [DZ22A/0820](https://cherrywoodplans.com/application/DZ22A-0820.md): Townlands of Laughanstown, Brennanstown and Cherrywood,, Dublin 18. Granted (12 Dec 2022). Makes minor changes to the already-permitted 168-home scheme in Tully, swapping the designs of 12 houses and altering some roofs. - [DZ22A/0403](https://cherrywoodplans.com/application/DZ22A-0403.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Refused or withdrawn (22 Jul 2022). Makes minor changes to the already-permitted 168-home scheme in Tully, swapping the designs of 12 houses and altering some roofs. - [DZ21A/0699](https://cherrywoodplans.com/application/DZ21A-0699.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (23 Sep 2021). Smaller first-floor bathroom windows on 33 permitted houses in Tully. - [DZ20A/0552](https://cherrywoodplans.com/application/DZ20A-0552.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18,. Granted (11 Mar 2021). 163 new homes, mostly houses, between Castle Street and Tully Park. - [DZ25A/0044/WEB](https://cherrywoodplans.com/application/DZ25A-0044-WEB.md): In the Townlands of Laughanstown, and Brennanstown, Dublin 18. Granted (10 Jul 2025). Amends a permitted Lehaunstown scheme to add a storey to two buildings, taking it from 492 to 517 homes, with fewer car spaces. - [DZ21A/0334](https://cherrywoodplans.com/application/DZ21A-0334.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (7 Apr 2022). 482 new homes, mostly apartments in five blocks up to 5 storeys, beside Barrington's Road and the Luas in Lehaunstown. - [DZ20A/0877](https://cherrywoodplans.com/application/DZ20A-0877.md): Bishop Street, Cherrywood, Dublin 18, Co Dublin. Granted (29 Jan 2021). Installs a small gas regulator building on Bishop Street near the Luas line. - [D03A/0735](https://cherrywoodplans.com/application/D03A-0735.md): Tullyvale, Druid Valley, Cherrywood, Loughlinstown, Co. Dublin.. Granted (22 Sep 2003). Changes the approved Tullyvale housing development by realigning its access road and adding a signalised pedestrian crossing. - [DZ26A/0052/WEB](https://cherrywoodplans.com/application/DZ26A-0052-WEB.md): Townland of Laughanstown, Cherrywood, Dublin 18. Granted (24 Mar 2026). Makes minor layout and landscaping changes to a permitted Tully housing scheme, moving bin stores to the front of the two-level homes. - [DZ26A/0032/WEB](https://cherrywoodplans.com/application/DZ26A-0032-WEB.md): Block A1, The Tully Building, Civic Street, Cherrywood Town Centre, Dublin 18, D18WDK0. Granted (13 Mar 2026). Revised plan for 24 mobile phone antennas and 9 dishes on Block A1, The Tully Building, after an earlier compliance submission was rejected. - [DZ25A/0485/WEB](https://cherrywoodplans.com/application/DZ25A-0485-WEB.md): Block A1, Tully Buildings, Cherrywood, Dublin 18. Granted (1 Aug 2025). 24 mobile phone antennas and 9 dishes on the facade and roof of Block A1, Tully Buildings. - [DZ23A/0443](https://cherrywoodplans.com/application/DZ23A-0443.md): Lands in the townlands of Laughanstown, Dublin 18, (Lands within 'Development Area 7- Macnebury', including part of the Res 2 plot known as 'M4, located West & South of Castle Street, south of Lehaunstown Lane and North of Bishop Street. Granted (7 Nov 2023). Changes a condition so 66 permitted homes in Macnebury can be occupied before the Cherrywood Avenue/Beckett Road underpass is built. - [DZ21A/1085](https://cherrywoodplans.com/application/DZ21A-1085.md): Lands of Laughanstown, Dublin 18, (Lands within 'Development Area 7- Macnebury', M4, located West & South of Castle Street, south of Lehaunstown Lane and North of Bishop Street. Granted (2 Dec 2022). Builds 65 three-bed homes in five three-storey blocks in Macnebury, west of Castle Street. - [DZ18A/0499](https://cherrywoodplans.com/application/DZ18A-0499.md): Lands (c.1.22ha) in the townlands of Cherrywood & Laughanstown, Dublin 18. Granted (11 Jan 2019). 146 apartments in four 4-storey blocks off Grand Parade on plot TC5. - [DZ26A/0580/WEB](https://cherrywoodplans.com/application/DZ26A-0580-WEB.md): Bishop Street (M3a), Laughanstown, Dublin 18 (Development Area 7 Macnebury - Res3 Plot). More information requested (22 Sep 2026). 32 new homes, mostly 3-bed two-level apartments, off Bishop Street in Macnebury. - [REF20225](https://cherrywoodplans.com/application/REF20225.md): Lehaunstown Park House, Laughanstown, Co Dublin, (A Protected Structure). Granted (23 Jan 2026). Minor internal changes to the stable building at Lehaunstown Park House, a protected structure. - [DZ23A/0359](https://cherrywoodplans.com/application/DZ23A-0359.md): Lehaunstown Park House, Lehaunstown Co Dublin. Granted (17 May 2024). Restores Lehaunstown Park House and its tower house, converts the stables to shops, and builds a large garden centre. - [D05A/1658](https://cherrywoodplans.com/application/D05A-1658.md): Tullyvale, Druids Valley, Cherrywood, Loughlinstown, Co. Dublin. Refused or withdrawn (22 Feb 2006). 396 homes in 9 buildings of 3 to 8 storeys, with a childcare facility, at Tullyvale, Druids Valley. - [DZ24A/1030/WEB](https://cherrywoodplans.com/application/DZ24A-1030-WEB.md): In the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18. Granted (11 Jun 2025). Amends a permitted scheme off Tully Vale Road to add 59 apartments by raising four blocks by one or two storeys. - [DZ26A/0148/WEB](https://cherrywoodplans.com/application/DZ26A-0148-WEB.md): Townland of Laughanstown, Dublin 18, The site is bounded by Grand Parade and Western Courtyard roads. Granted (20 Jul 2026). 311 new homes and a crèche in buildings of 3 to 6 storeys between Grand Parade and Western Courtyard. - [DZ23A/0423](https://cherrywoodplans.com/application/DZ23A-0423.md): On lands (c.17.03 a) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (Also Co. Dublin). Granted (10 Aug 2023). Amends the Cherrywood Town Centre permission to add two 2-bed apartments to Block A1. - [DZ22A/0690](https://cherrywoodplans.com/application/DZ22A-0690.md): Townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (12 May 2023). Facade and balcony design changes to Cherrywood Town Centre apartment Blocks A1, A2 and A3. - [DZ22A/0747](https://cherrywoodplans.com/application/DZ22A-0747.md): Townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (30 Mar 2023). Changes of use and merging of units in Town Centre Blocks C1 and C2 to create a larger 723 sq.m shop with off-licence. - [DZ22A/0846](https://cherrywoodplans.com/application/DZ22A-0846.md): Lands (c. 17.03 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (22 Dec 2022). Removes a planned viewing platform at Block F1 in Cherrywood Town Centre, replacing it with a glass balustrade. - [DZ22A/0138](https://cherrywoodplans.com/application/DZ22A-0138.md): (c. 17.03ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (30 Aug 2022). Minor changes of use between shop and restaurant-type units in Town Centre Blocks C1 and C2, and a slightly larger crèche. - [DZ21A/0807](https://cherrywoodplans.com/application/DZ21A-0807.md): Lands (c. 17.03 ha), in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (8 Jul 2022). Amends the Cherrywood Town Centre permission to cut residential parking from 1,363 to 1,169 spaces and add 41 car-sharing spaces. - [DZ21A/0713](https://cherrywoodplans.com/application/DZ21A-0713.md): Lands (c. 17.01 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (3 Oct 2021). Design changes to the three apartment blocks A1–A3 in Cherrywood Town Centre, including taller windows and smaller roof terrace. - [DZ20A/0585](https://cherrywoodplans.com/application/DZ20A-0585.md): on a site in the Townlands of Laughanstown and Cherrywood, Dublin 18. Refused or withdrawn (2 Jun 2021). A temporary sales and marketing suite with 8 parking spaces for just under 5 years off Gun and Drum Hill Road. - [DZ19A/1024](https://cherrywoodplans.com/application/DZ19A-1024.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (9 Sep 2020). Amends the Cherrywood Town Centre plan to shrink the basement under Blocks A1–A3 and reassign parking. - [DZ20A/0002](https://cherrywoodplans.com/application/DZ20A-0002.md): Lands (c.17.01ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (9 Sep 2020). Makes minor changes to electrical rooms and landscaping in Town Centre Blocks F1 and F3. - [DZ19A/0458](https://cherrywoodplans.com/application/DZ19A-0458.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (19 Jun 2020). Major redesign of Cherrywood Town Centre plot TC1, adding two supermarkets, an 11-screen cinema and much more retail space. - [DZ26A/0579/WEB](https://cherrywoodplans.com/application/DZ26A-0579-WEB.md): Castle Street (M5), Laughanstown, Dublin 18 (Development Area 7 Macnebury - Res2 Plot). More information requested (22 Sep 2026). 40 new homes, mostly 3-bed two-level apartments, off Castle Street in Macnebury. - [DZ22A/0093](https://cherrywoodplans.com/application/DZ22A-0093.md): Townland of Laughanstown, Dublin 18. Granted (1 Apr 2022). Seeks to keep two advertising signs for Cherrywood housing for 3 more years. - [DZ25A/0014/WEB](https://cherrywoodplans.com/application/DZ25A-0014-WEB.md): Townlands of Laughanstown & Brennanstown, Dublin 18. Granted (3 Mar 2025). Amends the permitted Tully village centre (plot T1) to shrink the basement, cutting car parking from 210 to 157 spaces. - [DZ23A/0106](https://cherrywoodplans.com/application/DZ23A-0106.md): Lands in the Townlands of Laughanstown and Brennanstown, Dublin 18. Granted (22 Sep 2023). A village centre at Tully with a supermarket, shops, cafés and 139 build-to-rent apartments in two blocks of 3–5 storeys. - [D05A/0162](https://cherrywoodplans.com/application/D05A-0162.md): Druid Valley, Cherrywood, Loughlinstown, Co, Dublin.. Refused or withdrawn (7 Apr 2005). Builds 805 apartments and homes plus a crèche across 50 buildings at Druid Valley, Cherrywood. - [D06A/1016](https://cherrywoodplans.com/application/D06A-1016.md): Townland of Laughanstown, Cherrywood, Loughlinstown, Co. Dublin.. Granted (28 Nov 2006). Builds a 110 kV ESB electrical transformer station in Laughanstown. - [DZ22A/0952](https://cherrywoodplans.com/application/DZ22A-0952.md): The Hunt Building, Grand Parade, Cherrywood Town Centre, Dublin 18. Refused or withdrawn (1 Feb 2023). 6 mobile phone antennas and 2 dishes on the roof of The Hunt Building, Grand Parade. - [DZ22A/0796](https://cherrywoodplans.com/application/DZ22A-0796.md): The Hunt Building, Grand Parade, Cherrywood Town Centre, Dublin 18. Refused or withdrawn (23 Nov 2022). 6 mobile phone antennas and 2 dishes, finished to look like brick, on the roof of The Hunt Building, Grand Parade. - [DZ21A/1017](https://cherrywoodplans.com/application/DZ21A-1017.md): Townlands of Laughanstown, Glebe, and Cherrywood, Dublin 18, (also Co Dublin). Granted (11 Nov 2022). About 1.6km of new roads including Beckett Road with an underpass below the Wyattville Link Road, plus a park around an ancient wedge tomb. - [DZ19A/0597](https://cherrywoodplans.com/application/DZ19A-0597.md): Development Area 8 -Tully, Cherrywood SDZ, Includes the Res 2 plots ''T9'' and ''T10''. Granted (11 Mar 2020). 184 new homes, mainly houses plus two small apartment blocks, on plots T9 and T10 in Tully. - [DZ20A/0824](https://cherrywoodplans.com/application/DZ20A-0824.md): Lands (c. 17.01 ha), in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (11 Jan 2021). Changes the windows, balconies and frontage of Town Centre Block F2 on Cherrywood Avenue and Central Avenue. - [DZ19A/0148](https://cherrywoodplans.com/application/DZ19A-0148.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (24 Apr 2019). Amends Town Centre plot TC2 to add 47 apartments, taking Blocks C1 and C2 from 384 to 431 homes. - [DZ23A/0573](https://cherrywoodplans.com/application/DZ23A-0573.md): Lands (c. 17.03 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (19 Oct 2023). Amends the Cherrywood Town Centre permission to add 4 apartments in Blocks F2 and F3, bringing plot TC4 to 524 homes. - [DZ22A/0550](https://cherrywoodplans.com/application/DZ22A-0550.md): Lehaunstown Park Open Space, Laughanstown, Dublin 18. Granted (13 Apr 2023). Turns a temporary car park into Lehaunstown Park Open Space with community gardens and a play plaza. - [DZ26B/0186/WEB](https://cherrywoodplans.com/application/DZ26B-0186-WEB.md): 4 Mercer Row,Laughanstown, Dublin 18, D18XH7P. Granted (25 May 2026). Three new roof windows added to the front of a house on Mercer Row. - [DZ26B/0153/WEB](https://cherrywoodplans.com/application/DZ26B-0153-WEB.md): 4 Mercer Row, Laughanstown, Dublin, D18XH7P. Refused or withdrawn (19 Mar 2026). Three new roof windows added to the front of a house on Mercer Row. - [DZ26A/0750/WEB](https://cherrywoodplans.com/application/DZ26A-0750-WEB.md): Unit B, Mercer Way, Tully Village Centre West, Dublin 18, D18C58F. Refused or withdrawn (7 Oct 2026). Combines two permitted shop units at Tully Village Centre into one convenience store with an off-licence. - [DZ22A/0770](https://cherrywoodplans.com/application/DZ22A-0770.md): On Lands Development Area 8 (Tully), Cherrywood SDZ, Laughanstown, Dublin 18. Granted (22 Mar 2023). 71 homes, a crèche, shops and a community room on plot T11 west of Castle Street in Tully village centre. - [DZ25A/0152/WEB](https://cherrywoodplans.com/application/DZ25A-0152-WEB.md): Land in the townland of Laughanstown, Dublin 18, located north-west of the Tullyvale residential development.The application relates to development in. Granted (11 Jul 2025). Amends an earlier housing permission to shrink the planned basement car park to 13 spaces. - [DZ21A/0414](https://cherrywoodplans.com/application/DZ21A-0414.md): Townland of Laughanstown, Dublin 18. Granted (5 May 2022). 107 new homes, a mix of apartments and houses, north-west of Tullyvale. ## Links - [This page on CherrywoodPlans](https://cherrywoodplans.com/application/DZ22A-0133) - [Council record, documents and conditions (DLR planning portal)](https://planning.agileapplications.ie/dunlaoghaire/application-details/92240) - [All Cherrywood applications](https://cherrywoodplans.com/applications.md) _Source: Dún Laoghaire–Rathdown County Council planning data, refreshed daily. CherrywoodPlans is an independent site, not run by the council._