# Planning application DZ22A/0681 > Cherrywood Avenue, (Adjoining Cherrywood Business Park), Cherrywood, Dublin 18, Cherrywood, Dún Laoghaire–Rathdown. Granted (28 Jun 2023). - **Reference:** DZ22A/0681 - **Address:** Cherrywood Avenue, (Adjoining Cherrywood Business Park), Cherrywood, Dublin 18 - **Status:** Granted (28 Jun 2023) - **Decision:** GRANT PERMISSION - **Application type:** Permission (SDZ) - **Applicant:** Sorohan Builders Ltd - **Lodged:** 2 Jun 2023 - **Decided:** 28 Jun 2023 - **Location (lat, lng):** 53.240906, -6.143394 ## Proposal Works within a total application area of 1.048Ha to include the construction of a five storey over ground residential apartment development on a site of 1.02Ha and inclusion of an additional area of 0.028Ha to facilitate site access via Cherrywood Avenue. The Development will comprise: i. 70 no. apartments (34 no. 1-bed apartments, 27 no. 2-bedroom apartments, and 9 no. 3-bedroom apartments). ii. Shared resident support facilities and tenant amenity (total approx. 190m2) comprising a communal lounge, communal workshop, concierge and post room at ground level, and communal amenity space (total approx. 124 m2) in the form of 8 no. winter gardens at the upper levels, and communal open space ( total approx. 2749m2). iii 71 no. car parking spaces (including 4 no. disabled spaces) and 72 no. long stay cycle parking spaces at under-croft level and 6 no. visitor car parking spaces at street level (accessed via Cherrywood Avenue) and 16 no. visitor cycle parking spaces at street level. iv. Creation of 2 no. pedestrian accesses, modifications/improvements to the existing footpath, and works to Cherrywood Avenue to facilitate vehicular access to the site. v. Hard and soft landscaping, boundary treatments, green roof, on-site lighting, ESB substation, plant room, SuDs drainage, piped and other services, and all ancillary site development works necessary to facilitate the development (including the alteration of site levels and the development of the previously permitted pond 5A-1 granted under planning register reference DZ18A/0854). The application relates to development within the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme, 2014 (as amended). ## In plain English A 5-storey block of 70 apartments on Cherrywood Avenue, beside Cherrywood Business Park. - **70** apartments - **77** car parking spaces - **88** bicycle spaces - **5** storeys ### What's planned A five-storey apartment building on a site of about **1.02** hectares, with access from Cherrywood Avenue. ### Residential **70** apartments (**34** one-bed, **27** two-bed, **9** three-bed), with a residents' lounge, workshop, concierge and post room (about **190** sq.m) and **8** winter gardens. ### Transport **71** undercroft car spaces (including **4** disabled) and **6** visitor spaces, plus **72** long-stay and **16** visitor bicycle spaces. Two pedestrian entrances and footpath improvements. ### Environment About **2,749** sq.m of shared open space, a green roof, sustainable drainage and works to a permitted pond. _This summary was written by AI from the proposal text. Check the council record before relying on it._ ## Conditions ### Condition 2 First Schedule Reasons and Considerations Having regard to the 'residential' land use of the site as set out in the Cherrywood Planning Scheme, as amended, and 2022-2028 Dún Laoghaire - Rathdown County Development Plan, it is considered that subject to compliance with the conditions below, the proposed development would not seriously injure the amenities of the area and would not contravene materially the zoning of the application site or that of adjoining sites, subject to conditions. Appropriate Assessment (AA) Screening Having regard to the nature and scale of the proposed development, as clarified by way of Significant Further Information received on 02.06.2023 it has been determined that the proposed development would not significantly impact upon a Natura 2000 Site. Environmental Impact Assessment (EIA) Screening Having regard to the nature and scale of the proposed development, as clarified by way of Significant Further Information received on 02.06.2023, there is no real likelihood of significant effects on the environment arising from the proposed development. Second Schedule Conditions MISCELLANEOUS / GENERAL 1. The development shall be carried out in its entirety in accordance with the plans, particulars and specifications lodged with the application, as amended by Significant Further Information received on 02.06.2023, save as may be required by the other conditions attached hereto. REASON: To ensure that the development shall be in accordance with the permission and that effective control be maintained. 2. Prior to the commencement of development, the Applicant, or any other person with an interest in the land to which the application relates, shall comply with requirements of Part V, Section 96 of the Planning and Development Act 2000, as amended, and in accordance with agreement to be reached with the County Council's Housing Department, unless the Applicant shall have applied for and been granted an exemption certificate under Section 97 of the Planning & Development Act, 2000, as amended. In this regard, the Applicant shall submit a detailed submission to include, inter alia, existing and development use land values, construction, development and any attributable costs associated with the development. REASON: To comply with Part V of the Planning and Development Act, 2000, as amended. PHASING & SEQUENCING 3. The Applicant / Developer shall comply with the following: The Cherrywood Avenue and Beckett Road Underpass H-G-F-F1 road network as previously granted under DZ21A/1017, shall have commenced construction prior to the final occupation of the subject development (the final 10% of the dwelling units). Prior to the final occupation of the subject development (the final 10% of the dwelling units), the Applicant / Developer shall submit evidence that the full extent of the Cherrywood Avenue and Beckett Road Underpass H-G-F-F1 road network has progressed / is progressing on site, for the written agreement of the Planning Authority. Reason: Having regard to the Phasing and Sequencing requirements of the Cherrywood Planning Scheme as set out in Section 7.2, Table 7.3 and Section 7.2.2 in the interests of orderly development, proper planning and the sustainable development of the area, and order that the Cherrywood road network for Development Area 6B (having regard in particular to the proposed development) is provided in tandem with the residential development thus providing connectivity and accessibility for future residents. 4. In the event that the Cherrywood Road Network of WLR-J-F-G-H-A3 is complete, prior to or during the construction phase of the proposed development, the alternative construction access route as permitted under this application shall revert to the construction route as outlined in Table 6.6.2 of the Planning Scheme upon completion of the Cherrywood Road Network of WLR-J-F-G-H-A3 as permitted under DZ15A/0758, DZ17A/0862 and DZ21A/1017 to taking in charge standard.With regard to the alternative and/or any future construction access serving the site, the development's construction management plan shall address and continually monitor road and traffic safety impacts, environmental impacts, and impacts on residential amenity. Reason: In order to ensure that the proposed development is consistent with the Planning Scheme and in the interest of the proper planning and sustainable development of the area. GIS 5. Prior to the completion of development, the developer shall submit, all drawings in digital format (CAD/GIS) projected to ITM (Irish Transverse Mercator). These shall include those for DZ18A/0854 and as further amended by this permission. This information should include the following: • Overall site plans in DWG format (ITM projection in metres) • Ground floor plans of buildings in DWG format (ITM projection in metres) • Site sections and elevations in PDF format. REASON: To ensure consistency with Section 7.4 of the Cherrywood Planning Scheme. DENSITY 6. The proposed density for the application site is in excess of the permitted density range for Res2 zoned lands at 45-70 units per hectare as identified in Table 2.9 and 6.6.1 of the Planning Scheme. As such the applicant/developer shall submit, prior to the commencement of development or as otherwise agreed with the Planning Authority, revised plans and particulars for the written agreement of the Planning Authority, for the apartment block, which reduce the overall density to a maximum 70units per hectare, by either the omission or amalgamation of residential units. Any revisions to the apartment block shall ensure consistency with all other Planning Scheme Objectives is retained. In doing so, drawings shall also be submitted in the case of any subsequent revisions to the car parking or cycle parking provision, to ensure consistency with Objective PI 21. REASON: To ensure consistency with Table 2.9 and 6.6.1 and PI 21 of the Cherrywood Planning Scheme. MATERIALS AND FINISHES 7. Prior to the commencement of development, the applicant/developer shall submit for the written agreement of the planning Authority the following: (a) Details of the proposed external design/finishes of all buildings including; façade materials, windows and doors, balcony/terrace and boundary treatments, any under croft screening, lighting, ESB substations, entrance to basement car parks, Bike and Bin Stores and staging areas, roof services/plant and associated screening, and microclimate screening mechanisms, in the form of on-site mock-ups for inspection and viewing, followed subsequently by submission of the samples in the format of sample boards, or the like. (b)The external finishes of buildings shall include materials that are: • of high quality, durable, sustainable and attractive, with the avoidance of render where feasible. Any render shall be silicone based, or similar, to ensure durability and avoid staining. • at ground floor, comprise of durable and high-quality materials including natural stone or brick, • ensure harmony and visual coherence in the built environment yet articulating interest to avoid monolithic and bulky facades along the perimeter elevations, with particular attention to the upper floors, • be practical to source, erect, replace, and maintain, and meet the user specification and standards, including those relating to environmental sustainability and wellness. REASON: To ensure consistency with Objectives PD 9, PD12, PD 14 and PD 19 of the Cherrywood Planning Scheme. 8. Prior to the commencement of development above basement level, the Applicant/Developer shall submit, for the written agreement of the Planning Authority, revised drawings clearly indicating the location of service boxes, including meter boxes, vents and other similar ancillary provision, within the curtilage of development ensuring they act as a positive design feature that enhances the local streetscape and do not register as visual clutter. REASON: To reduce visual clutter within the public realm consistent with Section 2.8 Urban Form and Objective PD 15 of the Cherrywood Planning Scheme. 9. The height of the lift/stair overrun shall be reduced, to a height not exceeding 1.2metres or as otherwise agreed with the Planning Authority. REASON: To ensure the protection of residential amenity in views from private amenity and roof gardens and to ensure consistency with Section 2.8.2, PD 19 of the Planning Scheme and Section 3.3 and 3.4 of the UFDF. SIGNAGE 10 .Prior to the installation of any signage associated with the proposed development, the developer shall submit for the written agreement of the Planning Authority a Signage Strategy including: (a) Details of all signage, including all external signage, way-finding and directional signage in accordance with the Cherrywood SDZ Wayfinding and Directional Signage Guidance 2021 and shall be agreed in writing with the Planning Authority. (b) Street name and numbering in accordance with H6 and GI 10. (c) Full details of the location and content including background colour, lettering typeface, logos and colour. (d) Materials that are high quality, modern and durable, and that respect the proportions and design of the building and its surroundings. REASON: In the interests of visual amenity and in order to comply with Specific Objectives PD 30 and PD 32 of the Cherrywood Planning Scheme and the Cherrywood SDZ Wayfinding and Directional Signage Guidance 2021. CONSTRUCTION MANAGEMENT 11. The Applicant/Developer shall comply with the following requirements: (a) The construction of the development shall be managed in accordance with a final Construction Management Plan, which shall be submitted for the development in its entirely to the Planning Authority for agreement in writing, prior to commencement of any development. In this regard the final Construction Management Plan shall include an environmental management plan including a waste management plan, a sediment and water pollution control plan in relation to the construction phase, a Community Liaison Plan and a Construction Traffic Management Plan.The construction management plan shall include measures to frequently monitor and review the alternative construction access route permitted until such time that the construction route as outlined in Table 6.6.2 of the Planning Scheme becomes available. (b) Prior to the commencement of development, the Applicant/Developer shall prepare a Construction and Demolition Resource Waste Management Plan (RWMP) as set out in the Best Practice Guidelines for the Preparation of Resource and Waste Management Plans for C&D Projects (2021) including demonstration of proposals to adhere to best practice and protocols. The RWMP shall include specific proposals as to how the RWMP will be measured and monitored for effectiveness; these details shall be placed on the file and retained as part of the public record. (i) Prior to the commencement of development, the Applicant/Developer shall nominate an individual as Designated Community Liaison Officer (DCLO) for the subject development and shall advise the Planning Authority of this nomination in writing. (ii) Site development and building works shall be carried out only between the hours of 7.00am to 7.00pm Monday to Friday inclusive, 8.00am to 2.00pm Saturdays and no works permitted on site on Sundays and public holidays. Deviation from these times will only be allowed in exceptional circumstances where prior written approval has been received from the Planning Authority. This shall be addressed in the Community Liaison Plan. (iii) Construction staff shall be prohibited from parking on public roads. Parking for construction staff shall be provided by the Developer/Contractor within the site boundary. (iv) to the commencement of development, the Developer shall submit details, including an engineering layout, of the proposed makeup and location of the site compound for the written approval of the Planning Authority. (v) Construction vehicles shall not be permitted to park or wait on roads outside the site boundary. All parking and waiting areas shall be provided Developer/Contractor within the site boundary. (vi) Prior to commencement of development a mechanism and structure for on-site monitoring, reporting on progress and quality control to the Planning Authority in relation to construction standards, materials, as-built drawings and records shall be agreed in writing with the Planning Authority. (vii) Prior to commencement of development, or as otherwise agreed with the Planning Authority, a vibration and settlement monitoring regime for existing roads and utility infrastructure to the north of the subject development shall be submitted for the written agreement of the Planning Authority. This monitoring regime shall include proposed regime operation and mitigation responses. The monitoring regime is required to ensure existing infrastructure is not adversely affected during adjacent earthworks and shall be wholly carried out at the Developer's expense. (viii) Prior to the commencement of the proposed site works noise, vibration and dust monitoring stations to be installed and maintained to provide continuous monitoring to measure and record the impact of site activities on local receptors. Noise monitoring to demonstrate compliance with the recommendations contained in BS 5228 shall be installed, monitored and reported on at weekly intervals by a suitable qualified specialist company for the duration of the contract. All monitoring data to be compiled into a weekly technical monitoring report which shall identify remedial measures where levels exceed relevant limit values. (ix) A Noise Management Plan shall be developed and implemented demonstrating selection of construction methodology and implementation of mitigation measures to minimise nuisance affecting adjoining properties and design of building services, such as ventilation equipment and ducting, to avoid creation of nuisance affecting adjoining residential areas. (x) For the duration of this development, from commencement of construction works (inclusive of enabling works) to completion of construction works, the Developer shall undertake continuous monitoring of the road network to be utilised for construction access to this development. In this regard and at a minimum, an independent condition survey of the roads constructed under DZ15A/0758 and DZ17A/0862 that are to be utilised for construction access to this development shall be undertaken by suitably qualified engineers/ surveyors appointed by the Developer, at the Developer's expense, both prior to commencement of development and prior to occupation of the final phase of the development. The appointment of the engineers/surveyors shall be agreed in advance and in writing with the Planning Authority and they shall be independent of the Developer and the Developer's design and construction teams. The condition survey(s) produced are to be submitted for the written agreement of the Planning Authority. Damage, including structural defects, damage to the wearing course, footpaths, kerbs, road markings etc, to the road network that is identified in the condition survey(s) shall be rectified/replaced by the Developer, at the Developer's expense and to a taking in charge standard which is to the satisfaction of the Planning Authority. (xi) The Applicant/Developer shall ensure there is no adverse impact on Luas operation and safety and the development shall comply with TII's 'Code of engineering practice for works on, near, or adjacent the Luas light rail system'. REASON: To ensure consistency with Section 2.14 of the Cherrywood Planning Scheme, to comply with the requirements of TII and in the interests of orderly development, proper planning and sustainable development. ARCHAEOLOGY 12. Prior to the commencement of any construction works, (a) The Applicant shall engage the services of a suitably qualified archaeologist to carry out archaeological monitoring at the development site. No sub-surface work shall be undertaken in the absence of the archaeologist without his/her express consent. (b) Should significant archaeological features be found, any works which would affect them shall cease pending agreement with the National Monument Service as to how they are to be dealt with. (c) Having completed the work, the archaeologist shall submit a written report to the Planning Authority and to the National Monuments Service of the Department of Culture, Heritage and the Gaeltacht. Where archaeological material/features are shown to be present, preservation in situ, preservation by record (excavation) or monitoring may be required, and this shall be agreed with the National Monuments Service. (d) All remaining topsoil stripping associated with the proposed development shall be monitored by a suitably qualified archaeologist and works should include a programme of metal detection which will require a licence from the National Monuments Service of the DoHLGH. (e) The archaeologist is required to notify the Department of Housing, Local Government and Heritage in writing at least four weeks prior to the commencement of any site preparations. This will allow the archaeologist sufficient time to obtain a licence to carry out the work. (f) The archaeologist shall excavate additional test trenches, if necessary, at locations chosen by the archaeologist (licensed under the National Monuments Act, 1930, as amended) having consulted the site drawings and geophysical survey results. REASON: To ensure the continued preservation (either in situ or by record) of places, caves, sites, features or other objects of archaeological interest and to ensure that the proposed development is consistent with Section 3.2.4 of the Planning Scheme. WATER SUPPLY AND WASTEWATER 13. The Applicant/Developer shall comply with the following requirements: (a) The subject development is designed to be reliant upon a proposed new PE100 watermain that is to be installed in Cherrywood Avenue by Uisce Éireann. This new PE100 watermain shall be constructed, commissioned and operational prior to occupation of the first phase of the subject development. (b) All water & waste infrastructure required to service this development shall align with Uisce Éireann masterplans for the area. (c) The Applicant shall sign a connection agreement with Uisce Éireann prior to any works commencing and connecting to their network (water and wastewater). (d) Should the Applicant wish to provide temporary connections to existing Irish Water infrastructure, either directly or indirectly, they are required to enter into a separate pre-connection agreement with Uisce Éireann, prior to the commencement of any works on site. (e) All development is to be carried out in compliance with Uisce Éireann Standards codes and practices. (f) All infrastructure (water and wastewater) should be designed and installed in accordance with the Uisce Éireann Codes of Practice and Standard Details. Reason: To ensure a connection from the subject development to Uisce Éireann's water supply network can be facilitated; To ensure agreement with Uisce Éireann for the applicant's design proposals; to ensure the adequate provision of water and wastewater infrastructure; and to ensure the development is consistent with with PI 4, PI 5 and PI 12 of the Planning Scheme. SURFACE WATER 14. The Applicant/Developer shall comply with the following requirements: (a) The subject development is reliant upon Pond 5A for surface water management. Prior to the commencement of the subject development, Pond 5A, as granted permission under DZ18A/0854, shall be constructed, commissioned and operational, inclusive of the associated public surface water sewers and infrastructure, and the decommissioning of the existing temporary pond located on the subject development site. (b) The Applicant/Developer shall facilitate the installation of an upgraded surface water sewer within Cherrywood Avenue that forms part of the delivery of Pond 5A, as permitted under DZ18A/0854. In this regard, the Applicant/Developer shall consult with the Planning Authority (Development Agency Project Team) prior to the commencement of development, regarding the works programme for the surface water sewer upgrade. (c) Surface water discharge from the subject development shall be limited to 1 l/s/ha as per the requirements of the Planning Scheme. (d) Prior to the commencement of development, the detailed design of pond 5A-1 shall be submitted to the Planning Authority to include plan and cross-sectional details which clearly outline the proposed earthworks with cut and fill levels and detailing the proposed design levels, integrated with the adjacent greenway and Pond 5A-0 as constructed, along with details of the permanent water level and top water level of the pond considering the treatment and attenuation requirements of the subject development. The invert level of the outlet pipework from pond 5A-1 shall be aligned with the detailed design of Pond 5A as permitted under DZ18A/0854. (e) Prior to the commencement of development, the applicant/developer shall engage with the designers of Pond 5A project being delivered by DLRCC and shall subsequently provide detailed design details for the written agreement of the Planning Authority that align with the detailed design drawings of Pond 5A for the proposed pedestrian connection to the viewing platform in proximity to Pond 5A-0. (f) Prior to the commencement of development, the applicant/developer shall provide an operations and maintenance plan for the proposed SuDS components, inclusive of all SuDS features including the pond, petrol interceptor and green roofs. REASON:To ensure that the proposed development can discharge surface water via a connection to the public surface water network, in the interests of sustainable development and to comply with the requirements of PI 6 of the Cherrywood Planning Scheme. 15. The Applicant/Developer shall comply with the following requirements: (a) A Stormwater Audit shall be carried out at Stage 2 for the detailed design stage in accordance with PI 7 of the Cherrywood Planning scheme. The audit shall be carried out at the Developer's expense. An independent audit team shall be used and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the commencement of development, unless otherwise agreed.The Stage 2 Stormwater Audit reports shall address any and all phased construction and occupation proposals for the development. (b) A Stormwater Audit shall be carried out at Stage 3 for the post construction / prior to commissioning stage in accordance with PI 7 of the Cherrywood Planning scheme. The audit shall be carried out at the Developer's expense. An independent audit team shall be used and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 3 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the final commissioning of the full surface water network for the development. REASON:In the interests of sustainable development and to comply with the requirements of PI 7 of the Cherrywood Planning Scheme. TRANSPORTATION 16. To ensure that the future sustainable targets as set out in Table 4.1 of the Cherrywood Planning Scheme are achieved, the Travel Plan for this development is to be reviewed on an Annual Basis. This review should include updated annual travel surveys of residential and commercial mode share, a review of available sustainable infrastructure to inform the mode share targets and to develop SMART measures for the development on site. This updated report should be submitted to the Area Wide Travel Plan Coordinator for review and comments and any actions arising from the review are to be then implemented by the nominated Travel Plan Coordinator. This shall be undertaken until such time as the Road Requirements listed in Table 6.6.2 of the Planning Scheme have been completed and are operation, or as otherwise agreed with the Planning Authority. REASON: In order to ensure that the proposed development is consistent with the Planning Scheme and in the interest of the proper planning and sustainable development of the area. 17. The Applicant/Developer shall comply with the following requirements: (a) As part of the subject development works, The Applicant/Developer shall modify Cherrywood Avenue to provide turning lanes and an access junction to facilitate vehicular access into the subject development. Prior to the occupation of the subject development, the upgrade of Cherrywood Avenue, inclusive of pedestrian and cycle facilities as per Figure 4.4 of the Planning Scheme, for the extent as included within the red line boundary of the subject application shall be completed to a Taking In Charge Standard. (b) A raised table arrangement shall be provided at the access junction to the subject development to maintain priority for pedestrians and cyclists travelling on Cherrywood Avenue. Prior to the commencement of development, the Applicant/Developer shall submit revised design details for the developments access junction for the written agreement of the Planning Authority. (c) Any amendment works to existing built Cherrywood roads infrastructure under DZ17A/0862 as part of the subject development proposals shall be undertaken by the Applicant/Developer at the Applicant/Developers own expense. Reason: To ensure suitable vehicular, pedestrian and cycle access to the subject development, to ensure pedestrian and cyclist priority on Cherrywood Avenue, and in the interests of consistency with Planning Scheme objective PI 14. 18. Prior to the commencement of development, The Applicant/Developer shall submit the detailed design for the development's internal footpaths and shared surface access road for the written agreement of the Planning Authority. This detailed design shall include fully dimensioned engineering, architectural and landscaping drawings, inclusive of standard cross sections and cross sections at building pinch points in the development. All footpaths in the development shall have a minimum unobstructed width of 2m and all detailed design drawings from the differing design disciplines must align. Reason: In the interests of orderly and sustainable development;to allow for pedestrian permeability and comfort; and in the interests of consistency with DMURS and Cherrywood Planning Scheme Section 4.2.7 and PI 20. 19. The Applicant/Developer shall comply with the following requirements: (a) Prior to the commencement of development, a Stage 2 Quality Audit (which shall include a Road Safety Audit, Access Audit, Cycle Audit and Walking Audit) shall be carried out for the detailed design stage and shall be submitted for the written agreement of the Planning Authority. The audit shall be carried out at the Applicant/Developer's expense in accordance with the Design Manual for Urban Roads & Streets (DMURS) guidance and TII (Transport Infrastructure Ireland) standards. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Quality Audit reports shall address any and all phased construction and occupation proposals for the development. The Applicant/Developer shall ensure that the construction / occupation phased stages proposed do not result in adverse safety conditions for future residents. (b) Prior to the final occupation stage of the development in its entirety, aStage 3Quality Audit (which shall include a Road Safety Audit, Access Audit, Cycle Audit and Walking Audit) shall be carried out for the post construction / prior to occupation stage and shall be submitted for the written agreement of the Planning Authority. The audit shall be carried out at theDeveloper's expense in accordance with the Design Manual for Urban Roads & Streets (DMURS) guidance and TII (Transport Infrastructure Ireland) standards. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Developer shall ensure that permeable and connecting walking and cycling routes are completed and operational to allow future residents of this development to access public transport, recreational facilities, schools, retail facilities and other key destinations in Cherrywood. Any identified deficiencies identified by the Stage 3 Quality Audit in this regard shall be completed at the developer's expense to link the development site to the existing public transport infrastructure, recreational facilities, schools, retail facilities and other key destinations in Cherrywood. Reason:In the interests of orderly and sustainable development;To allow for pedestrian and cycle permeability; and in the interests of consistency with PI 14 And PI 20 of the Cherrywood Planning Scheme. 20. The Applicant/Developer shall comply with the following requirements: (a) A minimum of 1 (one) residential car parking space shall be provided for the residential units permitted under this application and shall be clearly marked as attaching to a particular unit. Remaining car parking spaces unallocated to specific units shall be utilised by residents of/visitors to the subject development permitted under this application only, shall not be sold separately or let to any other persons or businesses unattached to the development as permitted under this application, and shall be managed accordingly by the development's management company. (b) A car parking management strategy, inclusive of drawings, shall be prepared by the Applicant/Developer and submitted for agreement, in writing, to the Planning Authority prior to the occupation of any development proposed by this application.This car parking management strategy shall include a comprehensive car parking operation and monitoring regime which clearly shows the provision and operation of the residential car parking for the proposed development and how the residential car parking will be managed to restrict car parking within the subject development to residents and/or visitors to the development only.In addition, this car parking management strategy shall set out the proposed location of and an operation and monitoring regime for the development's car sharing space. (c) A minimum of one car parking space per five car parking spaces shall be equipped with one fully functional EV Charging Point, in accordance with the Cherrywood Planning Scheme and the Dun Laoghaire Rathdown County Council County Development Plan 2022-2028. Ducting for every car parking space shall also be provided to ensure that all car parking spaces are future-proofed for Electric Vehicles. Reason: In the interests of orderly development and proper planning and the sustainable development of the area and for consistency with the Cherrywood Planning Scheme PI 21. 21. Prior to commencement of development, the Applicant/Developer shall prepare a cycle parking management strategy for the development for the written agreement of the Planning Authority.This cycle parking management strategy shall include full detailed proposals to segregate cyclists from vehicular traffic when accessing the long-term cycle parking locations, noting that any stepped access proposals shall incorporate wheeling channels if intended to be used by cyclists, and a comprehensive cycle parking operation and monitoring regime which clearly shows how the operation and maintenance for the development's cycle parking will be implemented and managed, including how demand for cycle parking will be monitored.This cycle parking management strategy shall also outline how provisions for future demand will be implemented by the Applicant/Developer/Operator if required. Reason: To ensure adequate cycle parking provision for future residents and in the interests of consistency with PI 22 of the Cherrywood Planning Scheme. UTILITIES & TELECOMS 22. The Applicant/Developer shall comply with the following requirements: (a) The detailed design of the electricity supply network shall be agreed (in writing) with ESB Networks/ESBI. The Applicant/Developer shall ensure that adequate separation distances are provided within the development between utility service ducts and surface water, water supply and foul water infrastructure to ensure access for future operation and maintenance activities as may be required. (b) The detailed design of the telecoms network shall be agreed (in writing) with the telecoms providers. The Applicant/Developer shall ensure that adequate separation distances are provided within the development between utility service ducts and surface water, water supply and foul water infrastructure to ensure access for future operation and maintenance activities as may be required. Reason: In the interests of orderly development the inclusion of infrastructure and connections would avoid subsequent excavation of newly constructed roadway; To ensure that designs shall meet with the current and future requirements of ESB Networks/ESBI and the telecoms providers, and to ensure consistency with Section 4.3.1 and PI 26 of the Planning Scheme. LANDSCAPING 23.. The Applicant/Developer shall provide the following for the written agreement of the Planning Authority: (a) The Applicant/Developer shall retain the services of a qualified Landscape Architect, as his/her Landscape Consultant, throughout the course of the development works, and shall notify the Planning Authority of that appointment in writing prior to the commencement of development. (b) The Applicant/Developer shall engage the Landscape Consultant to procure, oversee and supervise the landscape contract for the implementation of the permitted landscape proposals. When all landscape works are inspected and completed to the satisfaction of the Landscape Consultant, he/she shall prepare, sign and submit a Practical Completion Certificate (PCC) to the Planning Authority, as verification that approved landscape plans and specifications have been fully implemented REASON: To ensure a high-quality public realm and consistency with theCherrywoodPlanning Scheme and in the interest of proper planning and sustainable development of the area. 24. Prior to commencement of development of the landscape/public realm areas, the Applicant/Developer shall provide the following for the written agreement of the Planning Authority: (a) Hard landscape plans and construction details for all hard-standing pedestrian, cycling, and vehicular areas (including adjoining footpath and road interfaces), detailing the specifications of all surface/finish materials. In this regard, samples, data sheets and on-site mock-ups of all materials shall be provided for the written agreement of the Planning Authority. Approved control samples must be held, on-site. at all times. (b) All surfaces and finishes shall include materials that are consistent with PD 14. In particular, the finishes shall comprise of durable, easily sourced and high-quality materials, comprising of natural stone (or other materials as agreed with the Planning Authority) that harmonise and complement those on the adjoining boundaries of Beckett Park, Castle Street, and Mercer Road (Plot T9). REASON: To ensure consistency with the Cherrywood Planning Scheme and Objectives PD 14 and GI 7. 25. Prior to the commencement of landscape work, the applicant/developer shall submit for the written agreement of the Planning Authority, details of Soft Landscape Design to include detailed Planting Plan and Planting Schedule - stating species/varieties, approximate quantities, sizes, rootball presentation and spacings. Planting mixes should specify a diverse range of species/varieties/cultivars and a diversity of forms and plant sizes (multi-stems, feathered, semi-matures, etc.) using both native and exotic species and pollinator-friendly native species (in accordance with the All-Ireland Pollinator Plan 2021-2025), all designed to provide vegetation that is visually appealing, bio-diverse, and easily managed. This should include management programmes for all proposed trees, shrubs and other vegetation demonstrating long-term continuity and consistency. REASON: To ensure consistency with Specific Objective GI 65 and Section 5.5 of the Cherrywood Planning Scheme. TREES 26. The Applicant/Developer shall comply with the following requirements: (a) Prior to the commencement of development, the Applicant/Developer shall engage the services of a qualified Arborist as an Arboricultural Consultant, for the entire period of construction activity. The Applicant/Developer shall inform the Planning Authority in writing, of the appointment and name of the Consultant. (b) At Practical Completion of the development, the Consultant shall carry out a Post-construction Arboricultural Assessment of all retained trees and submit to the Planning Authority - a signed Arboricultural Completion Certificate stating that all Tree Works have been satisfactorily completed in accordance with his/her recommendations, highlighting any residual concerns arising from the Post-construction Assessment. (c) All existing trees to be maintained, shall be suitably protected during construction phases of the development. REASON: To ensure consistency with Section 5.4.7 of the Cherrywood Planning Scheme and give practical effect to the retention, protection and sustainability of trees during and after construction of the permitted development. PLAY 27. Prior to the commencement of landscape development, the applicant/developer shall submit for the written agreement of the Planning Authority, final design details of all play opportunities and facilities (formal and/or informal as appropriate), in respect of design detailing, planting, boundaries, equipment and safety surface, in accordance with Section 4.7.1, 4.7.2, and 4.7.3 of the Amenity Space Guidance Document. All proposed equipment and ancillaries shall include specifications for the same and proof that all equipment conforms to European Standards EN 1176-1-11 and EN 1177 Playground equipment and surfacing, and to BS/EN standards 2017/18 for Playground Installations for HIC (Head Injury Criterion) and CFH (Critical Fall Height). REASON: to ensure quality play provision in compliance with best practice and reputable guidance; and GI 72 and GI 73 of the Cherrywood Planning Scheme and Sections 4.6.3, 4.7.1 and 4.7.2 of the Cherrywood Amenity Space Guidance Document. 28. Upon completion of all proposed play spaces within Phase 1 and prior to the occupation of residential units, the following shall be submitted for the written agreement of the Planning Authority: (a) A play map in GIS format which details all play provision provided for, in accordance with Section 4.6.3 and Section 4.7.2 of the Cherrywood Amenity Space Guidance Document. (b) A post-installation Practical Completion Certificate, in accordance with the requirements and guidelines of the Royal Society for the Prevention of Accidents (RoSPA). The Certificate shall be prepared and signed by a suitably qualified (RoSPA-approved), technical professional with expertise and experience in playground design and playground health and safety. REASON: to ensure the provision and construction of safe, quality play provision in compliance with best practice and reputable guidance; and GI 72 of the Cherrywood Planning Scheme and Sections 4.6.3, 4.7.1 & 4.7.2 of the Cherrywood Amenity Space Guidance Document. BOUNDARIES 29. Prior to the commencement of landscape development, the Applicant/Developer shall submit, for the written agreement of the Planning Authority, Details, specifications and samples for all boundaries, interfaces and transitions between private space, communal space and public space having regard to the need to ensure a coherent and complementary palette of materials and finishes across the application site, and with adjoining permitted developments including Cherrywood Town Centre / Cherrywood Avenue as permitted under Planning Reg. Ref. DZ17A/0862 and the adjacent TC3 residential plot permitted under DZ20A/0552 (permitted) and DZ21A/ 0783 (permitted). REASON: to ensure consistency with Specific Objectives GI 8, GI 77 and PD 14 of the Cherrywood Planning Scheme. BIODIVERSITY 30. The Applicant/Developer shall comply with the following requirements: (a) Prior to the commencement of development, the Applicant/Developer shall engage the services of a qualified ecologist as an ecological consultant, for the duration of the works. The Applicant/Developer shall inform the Planning Authority in writing, of this appointment and the name of the Consultant. (b) The Consultant shall ensure the implementation of the mitigation measures, as outlined in Table 5 of the submitted Ecological Impact Assessment, dated 24/08/22, prepared by Altemar Marine and Environmental Consultancy. REASON: To ensure consistency with Specific Objective GI 46 of the Cherrywood Planning Scheme. 31. Prior to the commencement of development, the Applicant/Developer shall commission and implement an Invasive Species Eradication Plan, prepared by a qualified Invasive Species Specialist, to prevent the spread of established Invasive Species identified onsite (a legal requirement) in accordance with best practice. REASON: To ensure consistency with GI 68 of the Planning Scheme. MANAGEMENT COMPANY 32. Prior to commencement of development the applicant shall submit full details of a properly constituted Owners' Management Company for the written agreement of the Planning Authority.This shall include a layout map of the permitted development showing the areas to be taken in charge and those areas to be maintained by the Owners' Management Company. Membership of this Company shall be compulsory for all purchasers of property in the development. Confirmation that this Company has been set up shall be submitted to the Planning Authority prior to the occupation of the first residential unit. REASON: To provide for the satisfactory completion and maintenance of the development in the interest of residential amenity. FINANCIAL CONTRIBUTIONS 33. A financial contribution shall be paid by the proposer to the Council towards the cost of the extension of Luas Line B from the Sandyford Depot to Cherrywood, namely Luas Line B1. This contribution shall be paid prior to the commencement of the development or in such other manner as may otherwise be agreed with the Planning Authority. The rate of contribution payable shall be that pertaining to the particular year in which implementation of the Planning Permission is commenced. The Supplementary Development Contribution Scheme provides for an annual increase in the levels of contribution payable, as outlined in the scheme, by a factor of 5% compound interest per annum. The levels of contribution will be reviewed annually on the 13th of January of each year during which the scheme is in force to take account of the aforementioned increase. The rate of contribution payable in respect of this development, at current contribution rates, is €351,774.00 , and is subject to increase as outlined above. It should be noted that contributions assessed in accordance with the Supplementary Development Contribution Scheme cannot be appealed to An Bord Pleanala unless the applicant considers the levy referred to in this condition has not been properly applied in accordance with the terms of the Scheme. REASON: To part finance the extension of the Luas Line B1 from Sandyford Depot to Cherrywood, as provided for in the Supplementary Development Contribution Scheme adopted by the Council of Dún laoghaire-Rathdown on the 13th of January, 2003. 34. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €23,677.56 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of Surface Water Public Infrastructure and Facilities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015 and as included in Table 2 of the Cherrywood Planning Scheme Development Contribution Scheme 2017-2020. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme ) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Public Infrastructure and Facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. Note on above Condition: Please note that with effect from 1st January 2014 Irish Water are now the statutory body responsible for both water and waste water services. Accordingly, the contribution payable has been reduced by the amount of the contribution associated with these services. Further details/clarification can be obtained from Irish Water at Tel. 1 850 278 278. 35. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €542,227.48 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015 and as included in Table 2 of the Cherrywood Planning Scheme Development Contribution Scheme 2017-2020. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 36. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €351,973.78 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Community & Parks Public Infrastructure, Facilities and Amenities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015 and as included in Table 2 of the Cherrywood Planning Scheme Development Contribution Scheme 2017-2020. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks Public Infrastructure, Facilities and Amenities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 37. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €47,058.90 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of Surface Water Public Infrastructure and Facilities benefiting development in the Cherrywood Planning Scheme area only of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Public Infrastructure and Facilities benefiting development in the in the Cherrywood Planning Scheme area and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 38. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €299,475.40 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Roads Public Infrastructure and Facilities in the Cherrywood Planning Scheme Area. This Cherrywood Planning Scheme element of the Development Contribution shall be used solely to fund infrastructure identified in the Plan, as listed in Appendix III - Cherrywood Planning Scheme Projects List, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the Cherrywood Planning Scheme Area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 39. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €81,286.10 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Community & Parks Public Infrastructure Facilities & Amenities in the Cherrywood Planning Scheme Area. This Cherrywood Planning Scheme element of the Development Contribution shall be used solely to fund infrastructure identified in the Plan, as listed in Appendix III - Cherrywood Planning Scheme Area Only, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks Public Infrastructure Facilities & Amenities benefiting development in the Cherrywood Planning Scheme Area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 40. No development on foot of this permission shall commence until security for the provision and satisfactory completion of services (including roads, footpaths, open spaces, public lighting, sewers, watermains and drains) in accordance with the Plans and particulars lodged with the application, has been given by: a) Lodgement with the Council of an approved Insurance Company Bond in the sum of €323,400.00 which shall be kept in force by the Developer until such time as Roads, Open Spaces, Car Parks, Sewers, Watermains and Drains are completed to the satisfaction of the Council OR/... b) Lodgement with the Council of a Cash Sum of €200,000.00 to be applied by the Council at its absolute discretion if such services are not duly provided to its satisfaction on the provision and completion of such services to standard specifications. REASON: To ensure that a ready sanction may be available to the Council to induce the provision of services and prevent disamenity in the development. 41. To ensure adequate financial provision is on hand to rectify any damaged caused to the road network associated with DZ15A/0758 and DZ17A/0862, as part of the condition survey that shall be submitted to the Planning Authority prior to commencement (inclusive of enabling works) under above condition shall include a detailed map that shows all routes that will be utilised for construction traffic associated with this development from commencement (inclusive of enabling works) to occupation of this development. This detailed map shall include the area of roadway in meters square to be utilised for construction traffic, this measurement will be used to calculate the value of a cash security or insurance bond for the value of €30/m2 of roadway utilised, to be lodged with the Planning Authority. No works shall take place (inclusive of enabling works) until this bond or cash security has been agreed and accepted by the Planning Authority. This bond will be refunded on satisfactory completion and certification by the Developer of any works identified in the condition survey, to be completed after occupation of all units within the development, and with written agreement from the Planning Authority that those works are carried out to Taking in Charge Standard. Failure to comply with the above condition may lead to the insurance bond/cash security being sequestered by the Planning Authority to complete any outstanding works REASON: To ensure that a ready sanction may be available to the County Council to induce the provision of services and prevent disamenity in the development. 42. This development shall not be carried out without prior agreement, in writing, between the Applicant & the Planning Authority relating to the payment of development contributions. REASON:Investment by Dún Laoghaire-Rathdown County Council in Local Authority works has facilitated and will facilitate the proposed development. It is considered appropriate and reasonable that the developer should contribute to the cost of same. NOTES: NOTE 1: That water supply and foul drainage shall be in accordance with the requirements of the Irish Water. NOTE 2: The attention of the applicant is drawn to Section 34(13) of the Planning and Development Act 2000, as amended, which relates as follows- 'A person shall not be entitled solely by reason of a permission under this section to carry out any development'. NOTE 3:The Applicant is advised that all/any requirements of the Environmental Health Office shall be ascertained and strictly adhered to. NOTE 4:The Applicant is advised that all/any requirements of Inland Fisheries Ireland shall be ascertained and strictly adhered to. ## Nearby applications - [DZ18A/0854](https://cherrywoodplans.com/application/DZ18A-0854.md): site (c.2.62 HA) at Cherrywood Business Park, Cherrywood Avenue, Cherrywood, Co. Dublin (also Dublin 18) (lands to the south and west of Blocks G and G2, south of Cherrywood Avenue). Granted (31 Oct 2018). Builds a three-pond drainage system with a walking and cycling route south of Cherrywood Avenue. - [DZ26A/0001/WEB](https://cherrywoodplans.com/application/DZ26A-0001-WEB.md): Cherrywood Avenue, (Adjoining Cherrywood Business Park), Cherrywood, Dublin 18. Granted (29 Jun 2026). Amends a permitted apartment scheme on Cherrywood Avenue to go from 67 to 70 apartments, with more parking. - [DZ25A/0983/WEB](https://cherrywoodplans.com/application/DZ25A-0983-WEB.md): Cherrywood Avenue ( adjoining Cherrywood Business Park), Cherrywood, Dublin 18. Refused or withdrawn (22 Dec 2025). Amends a permitted apartment scheme on Cherrywood Avenue to go from 67 to 70 apartments, with more parking. - [D06A/0116](https://cherrywoodplans.com/application/D06A-0116.md): Glencarraig, Rathmichael, Co. Dublin. Granted (18 Aug 2006). 19 homes and a new access road linking Brides Glen Road to Cherrywood Science & Technology Park at Glencarraig. - [D05A/1083](https://cherrywoodplans.com/application/D05A-1083.md): Glencarrig (site At), Rathmichael, Co. Dublin. Refused or withdrawn (12 Oct 2005). Builds 73 apartments in two blocks at Glencarrig, with a new road and cycle route from Brides Glen Road to Cherrywood Business Park. - [DZ22A/1025](https://cherrywoodplans.com/application/DZ22A-1025.md): Cherrywood Avenue, Lands within the townlands of Glebe and Cherrywood, Dublin 18. Granted (2 Nov 2023). Builds 44 homes, houses and two-level units, off Cherrywood Avenue. - [D13A/0292](https://cherrywoodplans.com/application/D13A-0292.md): Site at Glencarrig, Brides Glen Road, Rathmichael, Co. Dublin. Granted (1 Aug 2013). Amends the earlier Glencarrig permission with a revised design for 10 five-bedroom detached houses. - [DZ23A/0242](https://cherrywoodplans.com/application/DZ23A-0242.md): Townland of Cherrywood Dublin 18 The site is located in the Cherrywood Planning Scheme and forms part of the south eastern porti. Granted (7 Jun 2023). Changes to the permitted basement at Town Centre 3 so it can later connect to the wider TC3 basement. - [DZ21A/0785](https://cherrywoodplans.com/application/DZ21A-0785.md): c.0.95 ha townland, Cherrywood, Dublin 18 (also Co. Dublin). Granted (30 Mar 2022). An office building of up to 8 storeys with ground-floor cafés at the corner of Town Centre 3, beside the Bride's Glen Luas stop. - [D07A/1770](https://cherrywoodplans.com/application/D07A-1770.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin.. Refused or withdrawn (28 Jan 2008). Builds a multi-storey car park with 1,081 spaces and 10 ground-floor shops at Cherrywood Business Park. - [DZ20A/0052](https://cherrywoodplans.com/application/DZ20A-0052.md): 1.86 ha in the townlands of Cherrywood, Dublin 18 (also Co. Dublin)--TC3. Granted (13 Apr 2021). A mixed-use block at Town Centre 3 with an 8-storey office building and 198 build-to-rent apartments. - [DZ24A/0485/WEB](https://cherrywoodplans.com/application/DZ24A-0485-WEB.md): Site Known as Block G3, Cherrywood Business Park, Cherrywood, Loughlinstown, Co. Dublin. Granted (19 Dec 2024). A 4-storey science and technology office building with labs on Block G3, Cherrywood Business Park. - [DZ17A/0731](https://cherrywoodplans.com/application/DZ17A-0731.md): G3 (west of Block G2), Cherrywood Business Park, Cherrywood, Loughlinstown, Co Dublin (within the Cherrywood Strategic Development Zone (SDZ) and subject to the Cherrywood Planning Scheme 2014). Granted (26 Jan 2018). Builds a new four-storey office building, G3, on Cherrywood Avenue in Cherrywood Business Park. - [D03A/0479](https://cherrywoodplans.com/application/D03A-0479.md): ESB, Plot M, Cherrywood Science And Technology Park, Wyatville Link Road. Granted (14 Jul 2003). Seeks to keep an ESB 38 kV line mast already installed at Cherrywood Business Park. - [D07A/1243](https://cherrywoodplans.com/application/D07A-1243.md): Glencarrig, Rathmichael, Co. Dublin. Granted (25 Oct 2007). Amends an earlier permission at Glencarrig to redesign one house and add a tenth five-bedroom house. - [DZ22A/0591](https://cherrywoodplans.com/application/DZ22A-0591.md): C. 3.71 in the Townland of Cherrywood, Block Town Centre 3 (TC3), Dublin 18. Granted (20 Jun 2023). 418 build-to-rent apartments in four blocks of up to 5 storeys at Town Centre 3, with shops, cafés and community space. - [DZ24A/1007/WEB](https://cherrywoodplans.com/application/DZ24A-1007-WEB.md): ‘Red Zone’ temporary surface car park, and Blocks F1-F3, ‘The Campus’, Cherrywood Avenue,, Cherrywood (Glebe Townland), Co. Dublin, Dublin 18. Granted (18 Feb 2025). Shrinking the temporary Red Zone car park on Cherrywood Avenue to about 398 spaces for another 5 years, and opening 226 basement spaces at The Campus. - [DZ22A/0728](https://cherrywoodplans.com/application/DZ22A-0728.md): Red Zone car park, Cherrywood Avenue, Cherrywood (Glebe Townland), Co Dublin/Dublin 18. Granted (14 Mar 2023). Keeping the temporary Red Zone surface car park for about 740 cars on Cherrywood Avenue for another 5 years. - [DZ20A/0477](https://cherrywoodplans.com/application/DZ20A-0477.md): Blocks F1,F2 & F3 (3no. office blocks under construction), Cherrywood Business Park, Cherrywood, Co. Dublin (also Dublin 18) & at the temporary surface car park at Cherrywood (Glebe Townland) Co. Dublin (also Dublin 18). Granted (28 Aug 2020). Allows up to 229 spaces in the basement car park of office Blocks F1–F3 to be used for temporary parking for 7 years. - [DZ17A/0417](https://cherrywoodplans.com/application/DZ17A-0417.md): Cherrywood Glebe Townland, Co Dublin ( Dublin 18) (Lands within Dev Area 6-Bride's Glen-bounded by M50 west, Cherrywood Ave & undeveloped lands to north undeveloped lands & Glencarrig res. estate east & res prop. & undev. lands off Brides Glen to south. Granted (7 Nov 2017). Uses land off Cherrywood Avenue as a temporary car park for about 740 cars for 5 years. - [DZ17A/0326](https://cherrywoodplans.com/application/DZ17A-0326.md): Cherrywood, Glebe Townland, Co Dublin (Also Dublin 18) (Lands within Dev Area 7-Macnebury-bounded by M50 to west, Cherrywood Ave & undeveloped lands to north, undeveloped lands & Glencarrig res. estate to east & undeveloped lands off Brides Glen to south. Refused or withdrawn (26 Apr 2017). Uses land off Cherrywood Avenue as a temporary car park for about 740 cars for 5 years. - [D10A/0701](https://cherrywoodplans.com/application/D10A-0701.md): Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (24 May 2011). A 197-space surface park and ride car park beside the Brides Glen Luas stop. - [D22A/0964](https://cherrywoodplans.com/application/D22A-0964.md): The Old Glebe, Brides Glen Road, Dublin 18, D18Y7H7. Granted (4 Apr 2023). Alters Old Glebe House, a protected structure, and extends its coach house from one to three bedrooms. - [D06A/1497](https://cherrywoodplans.com/application/D06A-1497.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (14 Dec 2006). Builds a new four-storey office building, Block G2, over a two-level car park at Cherrywood Business Park. - [DZ20A/0611](https://cherrywoodplans.com/application/DZ20A-0611.md): Site of approximately 4,730 sq m at Building 11, (formerly known as Block G2), Cherrywood Business Park, Cherrywood, Co. Dublin, D18 DH50. Granted (19 Oct 2020). Expands the day hospital in Building 11, Cherrywood Business Park, to 1,220 sq.m. - [DZ18A/1131](https://cherrywoodplans.com/application/DZ18A-1131.md): Site of approx. 4,730 sqm at Building 11 (formerly known as Block G2), Cherrywood Business Park, Cherrywood, Dublin D18 DH50. Granted (5 Feb 2019). Turns part of the ground floor of Building 11 at Cherrywood Business Park into a 922 sq.m day hospital. - [DZ16A/0935](https://cherrywoodplans.com/application/DZ16A-0935.md): Block G2, Cherrywood Business Park, Cherrywood, Co. Dublin. Granted (17 Feb 2017). Adds landscaping, a drop-off area and a sign at Block G2, Cherrywood Business Park, and keeps three glass canopies. - [DZ17A/0649](https://cherrywoodplans.com/application/DZ17A-0649.md): Block G2, Cherrywood Business Park, Cherrywood, Co Dublin. Granted (8 Sep 2017). Adds louvred screening around rooftop plant on Block G2, Cherrywood Business Park. - [D13A/0534](https://cherrywoodplans.com/application/D13A-0534.md): Old Glebe House, Brides Glen Road, Townland Glebe (Rathmichael),Dublin 18. Granted (11 Feb 2014). Replaces a single-storey annex on Old Glebe House, a protected structure, with a new single-storey extension. - [D19A/0277](https://cherrywoodplans.com/application/D19A-0277.md): Old Glebe House, Brides Glen Road, Rathmichael, Dublin 18. Refused or withdrawn (19 Jun 2019). Builds three detached three-storey houses within the grounds of Old Glebe House, a protected structure, on Brides Glen Road. - [D22A/1019](https://cherrywoodplans.com/application/D22A-1019.md): Old Glebe House, Brides Glen Road, Shankill, Dublin 18, D18Y7H7. Refused or withdrawn (22 Feb 2023). Builds two four-bedroom houses in the lower grounds of the Old Glebe on Brides Glen Road. - [D24A/0037](https://cherrywoodplans.com/application/D24A-0037.md): The Old Glebe House, Brides Glen Road, Shankill, Dublin 18, D18Y7H7. Granted (11 Mar 2024). Changes to an approved extension at The Old Glebe House, Brides Glen Road, enlarging the ground floor from 83 to 103 sq.m. - [D23A/0820](https://cherrywoodplans.com/application/D23A-0820.md): The Old Glebe House, Brides Glen Road, Shankill, Dublin 18, D18Y7H7. Refused or withdrawn (15 Jan 2024). Changes to an approved extension at The Old Glebe House, Brides Glen Road, enlarging the ground floor from 83 to 103 sq.m. - [D23A/0392](https://cherrywoodplans.com/application/D23A-0392.md): The Old Glebe House, Brides Glen Road, Shankill, Dublin 18, D18Y7H7--a protected structure.. Granted (1 Nov 2023). Two new 4-bedroom, two-storey houses in the lower grounds of The Old Glebe House, Brides Glen Road. - [DZ19A/0577](https://cherrywoodplans.com/application/DZ19A-0577.md): Cherrywood Avenue South adjacent to Building 11, formally known as Building G2, Cherrywood Business Park, Loughlinstown, Dublin, D18 DH50. Granted (23 Jan 2020). A new loading bay on Cherrywood Avenue South beside Building 11 in Cherrywood Business Park. - [D04A/1012](https://cherrywoodplans.com/application/D04A-1012.md): Cherrywood/Glebe, (ED Rathmichael), Wyvattville Link Road, Co. Dublin.. Refused or withdrawn (9 May 2005). Reshapes and drains an 8.6-hectare site at Cherrywood/Glebe and stores topsoil on a further 5.1 hectares at Laughanstown. - [DZ16A/0124](https://cherrywoodplans.com/application/DZ16A-0124.md): Cherrywood Business Park (to west of Block G2 and south of Block G and G2), Cherrywood, Loughlinstown, Co Dublin. Granted (21 Apr 2016). Seeks to keep a temporary access road to the Blocks G and G2 car park at Cherrywood Business Park for 7 years. - [D09A/0804](https://cherrywoodplans.com/application/D09A-0804.md): Cherrywood Science & Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (14 Jan 2010). Permission to keep changes at Blocks G and G2, Cherrywood Science & Technology Park, including a larger basement car park. - [D07A/0229](https://cherrywoodplans.com/application/D07A-0229.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.. Granted (28 May 2007). Adds a temporary vehicle ramp to the basement car park serving Blocks G and G2 at Cherrywood Business Park. - [D04A/0232](https://cherrywoodplans.com/application/D04A-0232.md): Block H, Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (23 Apr 2004). Puts up a lit corporate logo sign at Block H, Cherrywood Business Park. - [D02A/0508](https://cherrywoodplans.com/application/D02A-0508.md): Building H, Cherrywood Science & Technology Park,, Cherrywood, Loughlinstown, Co. Dublin.. Granted (22 Jul 2002). Adds 15 parking spaces to the car park serving Building H at Cherrywood Business Park. - [DZ21A/0818](https://cherrywoodplans.com/application/DZ21A-0818.md): Site of approximately 0.43 ha at Building 10 (formerly known as Block G), Cherrywood Business Park, Cherrywood, Co. Dublin, D18 T3Y1. Granted (24 Feb 2022). New plant enclosures, flue stacks and doors at Building 10 in Cherrywood Business Park. - [D22A/0079](https://cherrywoodplans.com/application/D22A-0079.md): Cherrywood Lodge, Brides Glen Road, Shankill, Dublin 18. Granted (30 Mar 2022). Converting and extending an outbuilding at Cherrywood Lodge, Brides Glen Road, into a new single-storey home. - [D08B/0452](https://cherrywoodplans.com/application/D08B-0452.md): Heather Hill, Cherrywood Road, Loughlinstown, Co. Dublin. Granted (7 Aug 2008). Extends a house at Heather Hill, Cherrywood Road, with single and two-storey additions. - [D06A/1475](https://cherrywoodplans.com/application/D06A-1475.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (20 Dec 2006). Enlarges the approved Block G office building by filling in a front recess and extending the penthouse, adding 502 sq.m. - [D06A/0015](https://cherrywoodplans.com/application/D06A-0015.md): Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (1 Mar 2006). Adds an extra floor to the approved Block G office building at Cherrywood Business Park, taking it from three to four storeys. - [D05A/0219](https://cherrywoodplans.com/application/D05A-0219.md): Cherrywood Science & Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (9 Nov 2005). Changes the approved Block G office building with a two-level underground car park and a larger floor area. - [D06A/1660](https://cherrywoodplans.com/application/D06A-1660.md): Park One, Cherrywood Science And Technology Park, Loughlinstown, Co. Dublin.. Granted (6 Mar 2007). Completes the distributor road through Park One at Cherrywood Business Park, letting overhead power lines go underground. - [D02A/0430](https://cherrywoodplans.com/application/D02A-0430.md): Cherrywood Science & Technology Park,, Cherrywood, Loughlinstown, Co. Dublin.. Granted (10 Jul 2002). Allows five permitted science and technology buildings at Cherrywood Business Park to be used instead for office-based industry. - [D22A/0353](https://cherrywoodplans.com/application/D22A-0353.md): Cherrywood House, Cherrywood Road, Shankill, Dublin 18 (A Protected Structure). Granted (15 Sep 2022). Restores and upgrades Cherrywood House, a protected structure, replacing its 20th-century flat-roofed extensions. - [D07A/0597](https://cherrywoodplans.com/application/D07A-0597.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.(Blocks F and G),. Refused or withdrawn (12 Jun 2007). Three office buildings of 4 to 7 storeys at Cherrywood Science & Technology Park, with a 612-space basement car park. - [D08A/0035](https://cherrywoodplans.com/application/D08A-0035.md): Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (26 Jun 2008). A 4–5 storey office building (Building F) and new road at Cherrywood Science & Technology Park, with 289 basement car spaces. - [D16A/0361](https://cherrywoodplans.com/application/D16A-0361.md): The Orchard, Cherrywood Road, Loughlinstown, Co. Dublin. Granted (12 Sep 2016). Builds two new two-storey houses beside an existing home at The Orchard, Cherrywood Road. - [DZ19A/1021](https://cherrywoodplans.com/application/DZ19A-1021.md): Blocks F1, F2 and F3 (3no. office blocks under construction) at Cherrywood Business Park, Cherrywood, Co Dublin (also Dublin 18). Refused or withdrawn (5 Feb 2020). Allows up to 229 spaces in the basement car park of office Blocks F1–F3 to be used for temporary parking for 7 years. - [DZ18A/1104](https://cherrywoodplans.com/application/DZ18A-1104.md): Lands (c.2.57ha) Cherrywood Business Park (lands including & adjoining former Block F, part of existing Block G (basement level -1 only) & lands to rear Blocks G & G2, Cherrywood, Co Dublin (also Dublin 18). Site is within Development Area 6A Brides Glen. Granted (29 Jan 2019). Builds office Block F3 and expands the shared basement car park to 658 spaces, with a new linear park, at Cherrywood Business Park. - [DZ19A/0186](https://cherrywoodplans.com/application/DZ19A-0186.md): c. 1.676 ha at Cherrywood Business Park (lands including former Block F), Cherrywood, Co. Dublin (also Dublin 18). Granted (9 May 2019). Adds landscaped roof terraces to permitted office Blocks F1 and F2 at Cherrywood Business Park. - [DZ17A/0122](https://cherrywoodplans.com/application/DZ17A-0122.md): Lands (c.1.6284 ha) at Cherrywood Business Park (lands including former Block F), Cherrywood, Co Dublin (also Dublin 18). Granted (7 Feb 2018). Builds two five-storey office blocks, F1 and F2, over an existing basement car park at Cherrywood Business Park. - [DZ17A/0171](https://cherrywoodplans.com/application/DZ17A-0171.md): Cherrywood Business Park, Cherrywood, Dublin 18. Granted (21 Apr 2017). Seeks to keep the existing entrance and wayfinding signs at Cherrywood Business Park. - [D02A/0660](https://cherrywoodplans.com/application/D02A-0660.md): Clanart, Cherrywoood Road, Loughlinstown, Dublin 18.. Granted (20 Aug 2002). Seeks permission to keep part of an existing single-storey bungalow on Cherrywood Road. - [DZ21A/0029](https://cherrywoodplans.com/application/DZ21A-0029.md): Site of approximately 1,094 sq m at Building 8 (formerly known as Block E), Cherrywood Business Park, Cherrywood, Co. Dublin, c. Granted (29 Apr 2021). Rebuilds the front entrance of Building 8 at Cherrywood Business Park with a slightly larger lobby. - [DZ19A/0808](https://cherrywoodplans.com/application/DZ19A-0808.md): Cherrywood Business Park, Cherrywood & Loughlinstown, Co. Dublin, (Also Dublin 18). Granted (17 Dec 2019). Installs a small gas pressure regulator building in Cherrywood Business Park. - [DZ19A/0647](https://cherrywoodplans.com/application/DZ19A-0647.md): Cherrywood Business Park, Cherrywood & Loughlinstown, Co. Dublin, (Also Dublin 18). Refused or withdrawn (18 Sep 2019). Installs a small gas pressure regulator building in Cherrywood Business Park. - [DZ19A/0523](https://cherrywoodplans.com/application/DZ19A-0523.md): Cherrywood Business Park, Cherrywood & Loughlinstown, Co. Dublin, (Also Dublin 18). Refused or withdrawn (23 Aug 2019). Installs a small gas pressure regulator building in Cherrywood Business Park. - [DZ24A/0366/WEB](https://cherrywoodplans.com/application/DZ24A-0366-WEB.md): Building 8, Cherrywood Business Park, Dublin 18, D18W319. Granted (17 Jul 2024). Adds tenant signage and a wayfinding totem at Building 8, Cherrywood Business Park. - [DZ23A/0573](https://cherrywoodplans.com/application/DZ23A-0573.md): Lands (c. 17.03 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (19 Oct 2023). Amends the Cherrywood Town Centre permission to add 4 apartments in Blocks F2 and F3, bringing plot TC4 to 524 homes. - [D15B/0171](https://cherrywoodplans.com/application/D15B-0171.md): Clanart, Cherrywood Road, Loughlinstown, Dublin 18. Granted (10 Jul 2015). Rebuilds and extends a single-storey house at Clanart, Cherrywood Road, with a new raised roof. - [DZ23A/0283](https://cherrywoodplans.com/application/DZ23A-0283.md): Building 8, Cherrywood Business Park, Cherrywood, Loughlinstown, Co. Dublin, D18 W319. Granted (11 Aug 2023). Turns Building 8 at Cherrywood Business Park from offices into a private medical clinic. - [DZ20A/0824](https://cherrywoodplans.com/application/DZ20A-0824.md): Lands (c. 17.01 ha), in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (11 Jan 2021). Changes the windows, balconies and frontage of Town Centre Block F2 on Cherrywood Avenue and Central Avenue. - [DZ19A/0148](https://cherrywoodplans.com/application/DZ19A-0148.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (24 Apr 2019). Amends Town Centre plot TC2 to add 47 apartments, taking Blocks C1 and C2 from 384 to 431 homes. - [D09A/0501](https://cherrywoodplans.com/application/D09A-0501.md): Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Refused or withdrawn (3 Sep 2009). 112 apartments, offices and shops in three buildings of 5–6 storeys at Cherrywood Science & Technology Park. - [DZ17A/0862](https://cherrywoodplans.com/application/DZ17A-0862.md): Lands (17.01ha) in the townlands of Cherrywood, Dublin 18. Granted (29 May 2018). The original Cherrywood Town Centre permission: 15 blocks with 1,269 homes, shops, offices, two hotels and a library, plus Grand Parade. - [D06A/0911](https://cherrywoodplans.com/application/D06A-0911.md): Block D, Cherrywood Science & Technology Park, Cherrywood, Loughlinstown, Co. Dublin. Granted (23 Aug 2006). Makes internal changes to the Block D office building, enclosing its entrance and adding a fire escape stairs. - [D08A/0687](https://cherrywoodplans.com/application/D08A-0687.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Refused or withdrawn (7 Aug 2008). Replacing Block D with a 5-storey office building with a large ground-floor shop at Cherrywood Science & Technology Park. - [D06A/0630](https://cherrywoodplans.com/application/D06A-0630.md): Spar Retail Unit, Block D, Cherrywood Science & Technology Park, Loughlinstown, Dublin 18. Granted (12 Jul 2006). An off-licence counter added to the Spar shop in Block D of Cherrywood Science & Technology Park. - [DZ19A/1024](https://cherrywoodplans.com/application/DZ19A-1024.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (9 Sep 2020). Amends the Cherrywood Town Centre plan to shrink the basement under Blocks A1–A3 and reassign parking. - [DZ20A/0002](https://cherrywoodplans.com/application/DZ20A-0002.md): Lands (c.17.01ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (9 Sep 2020). Makes minor changes to electrical rooms and landscaping in Town Centre Blocks F1 and F3. - [DZ19A/0458](https://cherrywoodplans.com/application/DZ19A-0458.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (19 Jun 2020). Major redesign of Cherrywood Town Centre plot TC1, adding two supermarkets, an 11-screen cinema and much more retail space. - [DZ16A/0530](https://cherrywoodplans.com/application/DZ16A-0530.md): Units 2 & 4 Building 7 (previously 'Block D'), Cherrywood Business Park, Cherrywood, Loughlinstown, Co Dublin. Granted (9 Sep 2016). Changes two vacant units in Building 7, Cherrywood Business Park, into medical and dental use. - [DZ23A/0423](https://cherrywoodplans.com/application/DZ23A-0423.md): On lands (c.17.03 a) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (Also Co. Dublin). Granted (10 Aug 2023). Amends the Cherrywood Town Centre permission to add two 2-bed apartments to Block A1. - [DZ22A/0690](https://cherrywoodplans.com/application/DZ22A-0690.md): Townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (12 May 2023). Facade and balcony design changes to Cherrywood Town Centre apartment Blocks A1, A2 and A3. - [DZ22A/0747](https://cherrywoodplans.com/application/DZ22A-0747.md): Townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (30 Mar 2023). Changes of use and merging of units in Town Centre Blocks C1 and C2 to create a larger 723 sq.m shop with off-licence. - [DZ22A/0846](https://cherrywoodplans.com/application/DZ22A-0846.md): Lands (c. 17.03 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (22 Dec 2022). Removes a planned viewing platform at Block F1 in Cherrywood Town Centre, replacing it with a glass balustrade. - [DZ22A/0138](https://cherrywoodplans.com/application/DZ22A-0138.md): (c. 17.03ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (30 Aug 2022). Minor changes of use between shop and restaurant-type units in Town Centre Blocks C1 and C2, and a slightly larger crèche. - [DZ21A/0807](https://cherrywoodplans.com/application/DZ21A-0807.md): Lands (c. 17.03 ha), in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (8 Jul 2022). Amends the Cherrywood Town Centre permission to cut residential parking from 1,363 to 1,169 spaces and add 41 car-sharing spaces. - [DZ21A/0713](https://cherrywoodplans.com/application/DZ21A-0713.md): Lands (c. 17.01 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (3 Oct 2021). Design changes to the three apartment blocks A1–A3 in Cherrywood Town Centre, including taller windows and smaller roof terrace. - [D05A/1672](https://cherrywoodplans.com/application/D05A-1672.md): Block D, Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (13 Feb 2006). Makes small changes to Block D, enlarging a ground-floor shop and trimming the offices. - [DZ25A/0066/WEB](https://cherrywoodplans.com/application/DZ25A-0066-WEB.md): Building 7 The Campus, Cherrywood Avenue, Cherrywood (Glebe Townland), Co Dublin, Dublin 18, D18T8Y6. Granted (20 Mar 2025). Part of Building 7 at The Campus changes from offices to medical and dental use. - [D05A/0419](https://cherrywoodplans.com/application/D05A-0419.md): Block D, Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (26 Oct 2005). Extends the existing Block D building at Cherrywood Business Park, adding 790 sq.m of shop and office space. - [D07A/0604](https://cherrywoodplans.com/application/D07A-0604.md): Cherrywood Science Technology Park,(Block D1), Loughlinstown, Co. Dublin.. Granted (2 Apr 2008). Replacing a crèche with a 4-storey office building and restaurant (Block D1) at Cherrywood Science & Technology Park. - [D08A/0952](https://cherrywoodplans.com/application/D08A-0952.md): Cherrywood Science & Technology Park,(Block D1), Cherrywood, Loughlinstown, Co. Dublin. Refused or withdrawn (15 Oct 2008). Design changes to the approved Block D1 office building at Cherrywood Science & Technology Park. - [D08A/1062](https://cherrywoodplans.com/application/D08A-1062.md): Unit 6, Block C, The Facilities Building, Cherrywood, Co. Dublin. Granted (13 Nov 2008). Adds lit signage to the front of Unit 6, Block C, at Cherrywood Business Park. - [D08A/0762](https://cherrywoodplans.com/application/D08A-0762.md): Unit 6, Block C, The Facilities Building, Cherrywood, Co. Dublin. Refused or withdrawn (25 Aug 2008). Adds lit signage to the front of Unit 6, Block C, at Cherrywood Business Park. - [DZ16A/0535](https://cherrywoodplans.com/application/DZ16A-0535.md): Hibernia House, Cherrywood Business Park, Loughlinstown, Dublin 18. Granted (9 Sep 2016). Puts up two high-level lit 'evros' signs on Hibernia House, Cherrywood Business Park. - [D09A/0146](https://cherrywoodplans.com/application/D09A-0146.md): Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (23 Apr 2009). Fills in atrium spaces in Building AA at Cherrywood Business Park, adding 269 sq.m and 5 parking spaces. - [D02A/0424](https://cherrywoodplans.com/application/D02A-0424.md): Cherrywood Science & Technology Park,, Cherrywood, Loughlinstown, Co. Dublin.. Granted (10 Jul 2002). Allows two permitted three-storey science and technology buildings, AA and AB, to be used instead for office-based industry. - [DZ25A/0543/WEB](https://cherrywoodplans.com/application/DZ25A-0543-WEB.md): Dlr Properties Limited, Hibernia House, Cherrywood Business Park, Dublin 18, D18E440. Granted (28 Aug 2025). Hibernia House in Cherrywood Business Park changes from offices to a medical centre with a pharmacy. - [D07A/0233](https://cherrywoodplans.com/application/D07A-0233.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.. Granted (27 Aug 2007). Extends and reworks the approved Block C leisure building, adding a double-height swimming pool hall. - [D06A/0268](https://cherrywoodplans.com/application/D06A-0268.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (16 Jun 2006). Builds a four-storey leisure and retail building (Block C) with a fitness centre and 25-metre pool at Cherrywood Business Park. - [D05A/1715](https://cherrywoodplans.com/application/D05A-1715.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Refused or withdrawn (12 Jan 2006). Builds a four-storey leisure and retail building (Block C) with a fitness centre and 20-metre pool at Cherrywood Business Park. - [DZ16A/0816](https://cherrywoodplans.com/application/DZ16A-0816.md): Unit 4 Building 5 (previously Block C), Cherrywood Business Park, Cherrywood, Dublin 18. Granted (10 Jan 2017). Changes a vacant shop unit in Cherrywood Business Park into a bank with an ATM. - [D08A/0121](https://cherrywoodplans.com/application/D08A-0121.md): Block C, Cherrywood Science And Technology Park, Cherrywood, Loughlinstown, Co. Dublin. Granted (24 Jun 2008). Seeks to keep an extension to the Block C facilities building and sets out options for a front loading bay. - [D07A/1607](https://cherrywoodplans.com/application/D07A-1607.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.. Refused or withdrawn (24 Jan 2008). The top floor of Block C at Cherrywood Science & Technology Park changes from recreation use to offices. - [D07A/1503](https://cherrywoodplans.com/application/D07A-1503.md): Block C, Cherrywood Science And Technology Park, Cherrywood, Loughlinstown, Co. Dublin. Refused or withdrawn (18 Dec 2007). Keeping a 52 sq.m ground-floor extension and shopfronts at Block C, Cherrywood Science & Technology Park. - [D21B/0118](https://cherrywoodplans.com/application/D21B-0118.md): Saint Michael's Lodge, Cherrywod Road, Shankill, Dublin 18, D18F7AR. Granted (16 Jul 2021). Seeks to keep a rear dormer window at Saint Michael's Lodge, Cherrywood Road. - [DZ23A/0508](https://cherrywoodplans.com/application/DZ23A-0508.md): Unit 3 and Unit 1, Building 5, Cherrywood Business Park, Cherrywood, Loughlinstown, Co Dublin. Granted (22 Sep 2023). Two units in Building 5, Cherrywood Business Park, become a dental clinic and a café. - [DZ16A/0123](https://cherrywoodplans.com/application/DZ16A-0123.md): Units 1 & 2 Block C, Cherrywood Business Park, Cherrywood, Loughlinstown, Co Dublin. Granted (21 Apr 2016). Reconfigures two ground-floor shop units in Block C and turns one into a café/restaurant. - [DZ14A/0596](https://cherrywoodplans.com/application/DZ14A-0596.md): Unit 1 , Block C, Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co Dublin. Granted (11 Dec 2014). Changes Shop Unit 1 in Block C, Cherrywood Business Park, into a dental clinic. - [DZ21A/1017](https://cherrywoodplans.com/application/DZ21A-1017.md): Townlands of Laughanstown, Glebe, and Cherrywood, Dublin 18, (also Co Dublin). Granted (11 Nov 2022). About 1.6km of new roads including Beckett Road with an underpass below the Wyattville Link Road, plus a park around an ancient wedge tomb. - [DZ18A/1178](https://cherrywoodplans.com/application/DZ18A-1178.md): 2.2 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (17 Apr 2019). Amends Town Centre plot TC2 to add one apartment, expand retail and resident amenity space, and move the crèche. - [D11B/0364](https://cherrywoodplans.com/application/D11B-0364.md): 105, Cherrywood Road, Loughlinstown, Co. Dublin. Granted (12 Jan 2012). Adds a single-storey extension to the rear and side of a house at 105 Cherrywood Road. - [DZ19A/0255](https://cherrywoodplans.com/application/DZ19A-0255.md): Cherrywood Business Park (lands including & adjoining Bldgs 2-5 & 7 & basement level under Buildings 3, 4 & 5, Pond 4 & part of the linear park), Cherrywood, Co Dublin .. Granted (3 Dec 2019). Upgrades the public spaces of Cherrywood Business Park with raised meeting pods, a large canopy, a sunken garden and linear park improvements. ## Links - [This page on CherrywoodPlans](https://cherrywoodplans.com/application/DZ22A-0681) - [Council record, documents and conditions (DLR planning portal)](https://planning.agileapplications.ie/dunlaoghaire/application-details/94054) - [All Cherrywood applications](https://cherrywoodplans.com/applications.md) _Source: Dún Laoghaire–Rathdown County Council planning data, refreshed daily. CherrywoodPlans is an independent site, not run by the council._