# Planning application DZ22A/1025 > Cherrywood Avenue, Lands within the townlands of Glebe and Cherrywood, Dublin 18, Cherrywood, Dún Laoghaire–Rathdown. Granted (2 Nov 2023). - **Reference:** DZ22A/1025 - **Address:** Cherrywood Avenue, Lands within the townlands of Glebe and Cherrywood, Dublin 18 - **Status:** Granted (2 Nov 2023) - **Decision:** GRANT PERMISSION - **Application type:** Permission (SDZ) - **Applicant:** LSREF V EDEN BG4 Limited - **Lodged:** 6 Oct 2023 - **Decided:** 2 Nov 2023 - **Permission expires:** 1 Nov 2026 - **Location (lat, lng):** 53.240382, -6.144174 ## Proposal The following: All site clearance and enabling works required to implement the development, including removal of existing car parking and hardstanding within application site boundary. Construction of a residential development of 44 no. units, comprising 8 no. four bedroom houses and 18 no. duplex buildings, containing 24 no. three bedroom units and 12 no. two bedroom units. The overall gross floor area of the residential development is 4,875 sqm. The proposed development will also include the provision of communal and private open space including gardens, terraces and balconies. Provision of landscaped open space (365 sqm) footpaths (including maintaining and upgrading an existing pedestrian link between Glencarraig and Cherrywood Avenue) landscaping works and boundary treatments. Provision of vehicular access arrangements from Cherrywood Avenue and internal access arrangements within the site. Provision of car parking (64 no. spaces) bicycle parking (53 no. spaces), and motorcycle parking (2 no. spaces). The proposed development includes drainage and services, works to Cherrywood Avenue including services connections, lighting, bin storage, a substation and all associated and ancillary site development works and services. This application relates to development in the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014 (as amended). ## In plain English Builds 44 homes, houses and two-level units, off Cherrywood Avenue. - **44** homes - **64** car spaces - **53** bicycle spaces - **4,875** sq.m floor area ### What's planned A residential scheme of **44** homes replacing existing car parking off Cherrywood Avenue. ### Residential **8** four-bed houses and **18** buildings of two-level homes containing **24** three-beds and **12** two-beds. Total floor area **4,875** sq.m. ### Community **365** sq.m of landscaped open space, plus an upgraded walking link between Glencarraig and Cherrywood Avenue. ### Transport **64** car, **53** bike and **2** motorcycle spaces, with access from Cherrywood Avenue. _This summary was written by AI from the proposal text. Check the council record before relying on it._ ## Conditions ### Condition 3 First Schedule Reasons and Considerations Having regard to the residential ' land use of the site as set out in the Cherrywood Planning Scheme, as amended, and the 2022-2028 Dún Laoghaire - Rathdown County Development Plan, it is considered that subject to compliance with the conditions below, the proposed development would not seriously injure the amenities of the area and would not contravene materially the zoning of the application site or that of adjoining sites, subject to conditions. Appropriate Assessment (AA) Screening Having regard to the location, nature and scale of the development proposed, as clarified by way of Significant Clarification of Further Information received on06.10.2023, it has been determined that the proposed development would not significantly impact upon a Natura 2000 Site. Environmental Impact Assessment (EIA) Screenig It is the responsibility of the competent authority (Dún Laoghaire-Rathdown County Council) to undertake a screening for Environmental Impact Assessment (EIA). The nature and scale of the proposed development is considered below the thresholds for mandatory EIA. Having regard to the nature and scale of the proposed development, as clarified by way of Significant Clarification of Further Information received on06.10.2023, it is considered that there is no real likelihood of significant effects on the environment arising from the proposed development. The need for environmental impact assessment can, therefore, be excluded at preliminary examination and as such a screening determination is not required. Second Schedule Conditions MISCELLANEOUS / GENERAL 1. The development shall be carried out in its entirety in accordance with the plans, particulars and specifications lodged with the application, as amended by Significant Clarification of Further Information received on 06.10.2023, save as may be required by the other conditions attached hereto. REASON: To ensure that the development shall be in accordance with the permission and that effective control be maintained. 2. Prior to the commencement of development, the Applicant, or any other person with an interest in the land to which the application relates, shall comply with requirements of Part V, Section 96 of the Planning and Development Act 2000, as amended, and in accordance with agreement to be reached with the County Council's Housing Department, unless the Applicant shall have applied for and been granted an exemption certificate under Section 97 of the Planning & Development Act, 2000, as amended. REASON: To comply with Part V of the Planning and Development Act, 2000, as amended. 3. With regard to the Regulation of Commercial Institutional Investment in Housing, Guidelines for Planning Authorities, May 2021: a) Prior to the commencement of the development as permitted, the Applicant or any person with an interest in the land shall enter into an agreement with the Planning Authority (such agreement must specify the number and location of each housing unit), pursuant to Section 47 of the Planning and Development Act 2000, as amended, that restricts all residential units permitted to first occupation by individual purchasers i.e. those not being a corporate entity, and/or by those eligible for the occupation of social and/or affordable housing, including cost rental housing. b) An agreement pursuant to Section 47 shall be applicable (i) for the period of duration of the planning permission or (ii) from the date of commencement of the duration of the planning permission until the date on which the last residential unit the subject of the section 47 agreement has been transferred to an individual purchaser, whichever is the later, except where after not less than two years from the date of completion of each housing unit, it is demonstrated to the satisfaction of the planning authority that it has it has not been possible to transact each of the residential units for use by individual purchasers and/or to those eligible for the occupation of social and/or affordable housing, including cost rental housing. c) The determination of the Planning Authority as required in (b) shall be subject to receipt by the Planning and Housing Authority of satisfactory documentary evidence from the Applicant or any person with an interest in the land regarding the sales and marketing of the specified residential units, in which case the Planning Authority shall confirm in writing to the Developer or any person with an interest in the land, that the Section 47 agreement has been terminated and that the requirement of this planning condition has been discharged in respect of each specified housing unit. d) For the avoidance of doubt, the definition of 'houses and duplex units' in this condition is as per the definition set out in the Ministerial Planning Guidelines under Section 28 of the Planning and Development Act 2000 (as amended), Regulation of Commercial Institutional Investment in Housing, namely, i) A house, defined as not including a building designed for use or used as two or more dwellings or a flat, an apartment or other dwelling within such a building, and, ii) A duplex unit, defined as a dwelling within a building designed for use as two individual dwellings and/or on one shared plot, with separate entrances. REASON: To restrict new housing development to use by persons of a particular class or description in order to ensure an adequate choice and supply of housing, including affordable housing, in the common good. 4. The entirety of the pedestrian route, from the public road to the north to the Glencarrig estate to the southeast, shall be constructed and maintained free of all physical impediments at all times. REASON: To ensure appropriate pedestrian access to and through the scheme. DIGITAL DRAWINGS 5. Prior to the completion of development, the Applicant/Developer shall submit for the written agreement of the Planning Authority, all drawings in digital format (CAD/GIS) projected to ITM (Irish Transverse Mercator). These shall include those for DZ22A/1025 and as further amended by this permission. This information should include the following : • Overall site plans in DWG format (ITM projection in metres) • Ground floor plans of buildings in DWG format (ITM projection in metres) • Site sections and elevations in PDF format. REASON: To ensure consistency with Section 7.4 of the Cherrywood Planning Scheme. PHASING & SEQUENCING 6. The Cherrywood Avenue and Beckett Road Underpass H-G-F-F1 road network as previously granted under DZ21A/1017, shall have commenced construction prior to the final occupation of the subject development (the final 10% of the dwelling units). Prior to the final occupation of the subject development (the final 10% of the dwelling units), the Applicant / Developer shall submit evidence that the full extent of the Cherrywood Avenue and Beckett Road Underpass H-G-F-F1 road network has progressed / is progressing on site, for the written agreement of the Planning Authority. REASON: Having regard to the Phasing and Sequencing requirements of the Cherrywood Planning Scheme as set out in Section 7.2, Table 7.3 and Section 7.2.2 in the interests of orderly development, proper planning and the sustainable development of the area, and order that the Cherrywood road network for Development Area 6B (having regard in particular to the proposed development) is provided in tandem with the residential development thus providing connectivity and accessibility for future residents. 7. In the event that the Cherrywood Road Network of WLR-J-F-G-H-A3 is complete, prior to or during the construction phase of the proposed development, the alternative construction access route as permitted under this application shall revert to the construction route as outlined in Table 6.6.2 of the Planning Scheme upon completion of the Cherrywood Road Network of WLR-J-F-G-H-A3 as permitted under DZ15A/0758, DZ17A/0862 and DZ21A/1017 to taking in charge standard. With regard to the alternative and/or any future construction access serving the site, the development's construction management plan shall address and continually monitor road and traffic safety impacts, environmental impacts, and impacts on residential amenity. REASON: In order to ensure that the proposed development is consistent with the Planning Scheme and in the interest of the proper planning and sustainable development of the area. URBAN FORM 8. Prior to the commencement of development, the applicant/developer shall submit a technical assessment of internal daylighting and sun lighting of all dwellings with reference to the performance criteria set out under IS EN 17037:2018. This shall be additional to the technical assessment submitted with the subject application and carried out under BS EN 17037. REASON: To help ensure consistency with PD 12 of the Cherrywood Planning Scheme, 2014 (as amended). 9. Prior to the commencement of development, the developer shall provide, for the written agreement of the Planning Authority : a) Details of the proposed external design/finishes of all buildings including; façade materials, windows and doors, balcony/terrace and boundary treatments, lighting, ESB substations, Bike and Bin Stores and staging areas, roof services/plant and associated screening, and microclimate screening mechanisms, in the form of on-site mock-ups for inspection and viewing, followed subsequently by submission of the samples in the format of sample boards, or the like. b) The external finishes of buildings shall include materials that are: • of high quality, durable, sustainable and attractive, with the avoidance of render where feasible. Any render shall be silicone based, or similar, to ensure durability and avoid staining. • at ground floor, comprise of durable and high-quality materials including natural stone or brick, • ensure harmony and visual coherence in the built environment yet articulating interest to avoid monolithic and bulky facades along the perimeter elevations, with particular attention to the upper floors, • be practical to source, erect, replace, and maintain, and meet the user specification and standards, including those relating to environmental sustainability and wellness. REASON: To ensure consistency with Objectives PD 9, PD12, PD 14 and PD 19 of the Cherrywood Planning Scheme. 10. Prior to the installation of any signage associated with the proposed development, the developer shall submit for the written agreement of the Planning Authority a Signage Strategy including: (a) Details of all signage, including all external signage, way-finding and directional signage in accordance with the Cherrywood SDZ Wayfinding and Directional Signage Guidance 2021 and shall be agreed in writing with the Planning Authority. (b) Street name and numbering in accordance with H6 and GI 10. (c) Full details of the location and content including background colour, lettering typeface, logos and colour. (d) Materials that are high quality, modern and durable, and that respect the proportions and design of the building and its surroundings. REASON: In the interests of visual amenity and in order to comply with Specific Objectives PD 30 and PD 32 of the Cherrywood Planning Scheme and the Cherrywood SDZ Wayfinding and Directional Signage Guidance 2021. ARCHAEOLOGY 11. Prior to the commencement of any construction works, (a) The Applicant/Developer shall engage the services of a suitably qualified archaeologist to carry out archaeological monitoring at the development site. No sub-surface work shall be undertaken in the absence of the archaeologist without his/her express consent. (b) Should significant archaeological features be found, any works which would affect them shall cease pending agreement with the National Monument Service as to how they are to be dealt with. (c) Having completed the work, the archaeologist shall submit a written report to the Planning Authority and to the National Monuments Service of the Department of Culture, Heritage and the Gaeltacht. Where archaeological material/features are shown to be present, preservation in situ, preservation by record (excavation) or monitoring may be required, and this shall be agreed with the National Monuments Service. (d) All remaining topsoil stripping associated with the proposed development shall be monitored by a suitably qualified archaeologist and works should include a programme of metal detection which will require a licence from the National Monuments Service of the DoHLG (e) The archaeologist is required to notify the Department of Housing, Local Government and Heritage in writing at least four weeks prior to the commencement of any site preparations. This will allow the archaeologist sufficient time to obtain a licence to carry out the work (f) The archaeologist shall excavate additional test trenches, if necessary, at locations chosen by the archaeologist (licensed under the National Monuments Act, 1930, as amended) having consulted the site drawings and geophysical survey results. REASON: To ensure the continued preservation (either in situ or by record) of places, caves, sites, features or other objects of archaeological interest and to ensure that the proposed development is consistent with Section 3.2.4 of the Planning Scheme. GREEN INFRASTRUCTURE 12. Prior to the commencement of landscape development, the Applicant/Developer shall submit for the written agreement of the Planning Authority: (a) Final Landscape Masterplan and design details for all public and communal open spaces including sections, planting and boundaries, in accordance with Section 4.7.4, 4.7.5, 4.8 to 4.14 of the Amenity Space Guidance Document. The Central North play area shall be universally accessible. (b) Hard landscape plans and construction details for all hard standing pedestrian, cycling, vehicular / maintenance areas and proposed street furniture detailing the specifications of all furniture and surface/finish materials. In this regard, samples, data sheets and or / onsite mock ups of all materials shall be provided for the agreement of the written Planning Authority and approved control samples must be held on site at all times. All surfaces and finishes shall include materials that are consistent PD 14. In particular the finishes shall comprise of durable, easily sourced and high quality materials (materials as agreed with the Planning Authority) that harmonise and complement those within the adjoining Cherrywood Avenue and the Town Centre TC3. (c) Details of Soft Landscape Design to include detailed Planting Plan(s) and Planting Schedule, as appropriate, stating species/varieties, approximate quantities, sizes, rootball presentation and spacings. Planting mixes should specify a diverse range of species/varieties/cultivars and a diversity of forms and plant sizes (multi-stems, feathered, semi-matures, etc.); using both native and exotic species and pollinator-friendly native species (in accordance with the All-Ireland Pollinator Plan 2015-2020), all designed to provide vegetation that is visually-appealing, bio-diverse, and easily managed shall be submitted for the written agreement of the Planning Authority prior to the commencement of development or as otherwise agreed. REASON: In the interests of proper planning and sustainable development and to ensure consistency with PD 9, PD 14, GI 5, GI 6, G I7 and G I8 and Section 5.4.4 of the Cherrywood Planning Scheme. 2014 (as amended) and Sections 4.7.4, 4.7.5, 4.8 to 4.14 of the Cherrywood Amenity Space Guidance Document. 13. (a) Prior to the commencement of the landscaping elements of the development, revised drawings, sections and information demonstrating the size, planting and maintenance of the re-instated hedgerow and associated buffer shall be submitted for the written agreement of the Planning Authority and shall include the following: A sufficient buffer on the maintenance side of the reinstated hedgerow No wildflower seed or commercial seed will be used to create the buffer to the hedgerow and it will be allowed to recolonise and develop from soils originating from the site - no imported topsoil will be used. Maintenance Proposals for the reinstated hedgerow to ensure its long-term viability. Maintenance access to be restricted to landscape maintenance only. b) Prior to the commencement of the landscaping elements of the development, the developer shall engage and retain the professional services of a qualified Landscape Architect, as his/her Landscape Consultant, throughout the course of the development works; and shall notify the Planning Authority of that appointment in writing prior to commencement. (c) Once the Landscape Plans are agreed by the Planning Authority, in accordance with part a)of this condition, the Landscape Consultant shall procure, oversee and supervise the landscape contract for the implementation of the permitted landscape proposals. When all landscape works are inspected and completed to the satisfaction of the Landscape Consultant, he/she shall prepare, sign and submit a Practical Completion Certificate (PCC), as verification that approved landscape plans and specification have actually been fully implemented. REASON: In the interest of protecting heritage and biodiversity, give practical effect to the sustainability of the reinstated hedgerow and to ensure consistency with Section 5.4.7 of the Cherrywood Planning Scheme, Objective GI43 and Map 5.2 of the Cherrywood planning Scheme, as amended; Section 3.15.1 and Figure 12 of the Biodiversity Plan and GI7 and GI10 of the Planning Scheme. 14 (a) The developer shall retain the services of a qualified arborist immediately prior to and during the period of construction activity to ensure the protection of the hedges to be retained. The arborist shall carry out a post-construction assessment on the condition of the hedges and submit a report of that assessment to the Planning Authority for written agreement upon completion of the permitted development. (b) The hedges to be retained shall be protected during the course of construction by a temporary fence, in accordance with the default specification of barrier fencing shown in BS 5837: 2012 Trees in relation to design, demolition and construction - recommendations (in Figs 2, 3), or a 1.5 metre high robust timber post and rail fence or similar approved and agreed with the Planning Authority. The fence shall be installed along the inside of the hedges, so that vulnerable Root Protection Zones, as determined by the qualified arborist, are protected. Notices are to be placed on all protective fences stating that the trees within the fence are protected. REASON: In the interests of protecting the visual character and quality of the site and of local wildlife and the proper planning and sustainable development of the area. 15. Prior to the commencement of landscape development, the Applicant/Developer shall submit the following for the written agreement of the Planning Authority: (a)Final design details of all play opportunities and facilities (formal and/or informal as appropriate), in respect of design detailing, planting, boundaries, equipment and safety surface, in accordance with Section 4.7.1, 4.7.2, and 4.7.3 of the Amenity Space Guidance Document. All proposed equipment and ancillaries shall include specifications for the same and proof that all equipment conforms to European Standards EN 1176-1-11 and EN 1177 Playground equipment and surfacing, and to BS/EN standards 2017/18 for Playground Installations for HIC (Head Injury Criterion) and CFH (Critical Fall Height). The Central North play area shall be accessible to all by way of a ramp. A completed Site Summary Sheet for Site Code 2.17 shall be provided. REASON: To ensure quality play provision in compliance with best practice and reputable guidance; and GI 72 and GI 73 of the Cherrywood Planning Scheme and Sections 4.6.3, 4.7.1 and 4.7.2 of the Cherrywood Amenity Space Guidance Document. 16. Upon completion of each play space and prior to its occupation, the Applicant/Developer shall submit the following for the written agreement of the Planning Authority: (a) A play map in GIS format which details all play provision provided for, in accordance with Section 4.6.3 and Section 4.7.2 of the Cherrywood Amenity Space Guidance Document. (b) A post-installation Practical Completion Certificate, in accordance with the requirements and guidelines of the Royal Society for the Prevention of Accidents (RoSPA). The Certificate shall be prepared and signed by a suitably qualified (RoSPA-approved), technical professional with expertise and experience in playground design and playground health and safety. REASON: To ensure the provision and construction of safe, quality play provision in compliance with best practice and reputable guidance; and GI 72 of the Cherrywood Planning Scheme and Sections 4.6.3, 4.7.1 & 4.7.2 of the Cherrywood Amenity Space Guidance Document. 17. Prior to the commencement of landscape development, the Applicant/Developer shall submit, for the written agreement of the Planning Authority, details, specifications and samples for all boundaries, interfaces and transitions between private space, communal space and public space having regard to the need to ensure a coherent and complementary palette of materials and finishes across the application site, and with adjoining permitted developments including Cherrywood Town Centre / Cherrywood Avenue as permitted under Planning Reg. Ref. DZ17A/0862 and the adjacent TC3 residential plot permitted under DZ20A/0552 (permitted) DZ21A/ 0783 (permitted) and DZ22A/0681 (permitted). REASON: to ensure consistency with Specific Objectives GI 76 of the Cherrywood Planning Scheme. CONSTRUCTION MANAGEMENT 18. The Applicant/Developer shall comply with the following requirements: - (a) The construction of the development shall be managed in accordance with a final Construction Management Plan, which shall be submitted for the development in its entirely to the Planning Authority for agreement in writing, prior to commencement of any development. In this regard the final Construction Management Plan shall include a Community Liaison Plan, inclusive of a nominated Project Liaison Officer (PLO) to manage all public relations issues relating to the construction works, and a Construction Traffic Management Plan. (b) Site development and building works shall be carried out only between the hours of 7.00am to 7.00pm Monday to Friday inclusive, 8.00am to 2.00pm Saturdays and no works permitted on site on Sundays and public holidays. Deviation from these times will only be allowed in exceptional circumstances where prior written approval has been received from the Planning Authority. This should be addressed in the Community Liaison Plan. (c) Construction staff shall be prohibited from parking on public roads. Construction staff shall be prohibited from parking in the adjacent Glencarraig Estate. (d) Construction vehicles shall not be permitted to park or wait on roads outside the site boundary. All parking and waiting areas shall be provided Developer/Contractor within the site boundary. (e) Prior to commencement of development a mechanism and structure for on-site monitoring, reporting on progress and quality control to the Planning Authority in relation to construction standards, materials, as-built drawings and records shall be agreed in writing with the Planning Authority. (f) Prior to commencement of development, proposals will be submitted for the written approval of the Planning Authority that demonstrate how it is proposed to maintain the existing road network permitted under DZ15A/0758 (and Extension of Duration Permission DZ15A/0758/E) and DZ17A/0862 to an acceptable standard during the construction phase of the proposed development. In this regard, for the duration of this development, from commencement of construction works (inclusive of enabling works) to completion of construction works, the Developer shall undertake continuous monitoring of the road network to be utilised for construction access to this development. In this regard and at a minimum, an independent condition survey of the roads constructed under DZ15A/0758 (and Extension of Duration Permission DZ15A/0758/E) and DZ17A/0862 that are to be utilised for construction access to this development shall be undertaken by suitably qualified engineers/ surveyors appointed by the Developer, at the Developer's expense, both prior to commencement of development and prior to occupation of the final phase of the development. The appointment of the engineers/surveyors shall be agreed in advance and in writing with the Planning Authority and they shall be independent of the Developer and the Developer's design and construction teams. The condition survey(s) produced are to be submitted for the written agreement of the Planning Authority. Damage, including structural defects, damage to the wearing course, footpaths, kerbs, road markings etc, to the road network that is identified in the condition survey(s) shall be rectified/replaced by the Developer, at the Developer's expense and to a taking in charge standard of development which is to the satisfaction of the Planning Authority. (g) Prior to the commencement of development, the developer or any agent acting on its behalf shall prepare a Construction and Demolition Resource Waste Management Plan (RWMP) as set out in the Best Practice Guidelines for the Preparation of Resource and Waste Management Plans for C&D Projects (2021) including demonstration of proposals to adhere to best practice and protocols. The RWMP shall include specific proposals as to how the RWMP will be measured and monitored for effectiveness; these details shall be placed on the file and retained as part of the public record. The RWMP must be submitted to the planning authority for written agreement prior to the commencement of development. All records (including for waste and all resources) pursuant to the agreed RWMP shall be made available for inspection at the site office at all times. (h) Prior to the commencement of development or at an alternative time as agreed in writing with the Planning Authority in advance of the commencement of development, the applicant / developer shall submit a detailed Stormwater Management Plan for the construction phase(s). REASON: To ensure consistency with Section 2.14 of the Cherrywood Planning Scheme, to ensure compliance with the requirements of Transport Infrastructure Ireland (TII), and in the interests of orderly development, proper planning and sustainable development. WATER SUPPLY & WASTEWATER 19. The Applicant/Developer shall comply with the following: a) The subject development is designed to be reliant upon a proposed new 355mm PE100 watermain that is to be installed in Cherrywood Avenue by Uisce Éireann or as part of development works permitted under DZ21A/1017 or DZ22A/0591. This new PE100 watermain shall be constructed, commissioned and operational prior to occupation of the subject development. In the event that the Applicant/Developer extends the 355mm diameter watermain up to the development site entrance as part of the subject development works, all necessary agreements with Uisce Éireann shall be in place prior to the commencement of these works and the watermain shall be constructed in accordance with Uisce Éireann's standards. b) Prior to the commencement of development, the Applicant/Developer shall agree the detailed design of the section of 225mm diameter foul pipeline proposed to be installed within Cherrywood Avenue to serve the subject development with Uisce Éireann. All necessary agreements with Uisce Éireann shall be in place prior to the commencement of the installation of the 225mm diameter foul pipeline and the foul pipeline shall be constructed in accordance with Uisce Éireann's standards. c) All water & waste infrastructure required to service this development shall align with Uisce Éireann masterplans for the area. d) The Applicant shall sign a connection agreement with Uisce Éireann prior to any works commencing and connecting to their network (water and wastewater). e) Should the Applicant wish to provide temporary connections to existing Irish Water infrastructure, either directly or indirectly, they are required to enter into a separate pre-connection agreement with Uisce Éireann, prior to the commencement of any works on site. f) All development is to be carried out in compliance with Uisce Éireann Standards codes and practices. g) All infrastructure (water and wastewater) shall be designed and installed in accordance with the Uisce Éireann Codes of Practice and Standard Details. REASON: To ensure a connection from the subject development to Uisce Éireann's water supply network and wastewater network can be facilitated; To ensure agreement with Uisce Éireann for the applicant's design proposals; to ensure the adequate provision of water and wastewater infrastructure; and to ensure the development is consistent with PI 4, PI 5 and PI 12 of the Planning Scheme. SURFACE WATER 20. The Applicant/Developer shall comply with the following requirements: a) The subject development shall direct its surface water discharge to Pond 5A, granted permission under DZ18A/0854, as per the surface water design submitted as part of this application. b) The surface water design submitted as part of this application details a connection to the existing temporary pond to the east is to be utilised on an interim basis in the event that Pond 5A is not operational at occupation stage for the subject development. Within 3 months of the grant of permission date or prior to the commencement of development, whichever is the sooner, the Applicant/Developer shall submit evidence to the Planning Authority for written agreement that demonstrates consent for a connection from the subject development to the existing temporary pond to the east on an interim basis has been obtained from the landowner on whose lands the existing temporary pond is located. Otherwise, the subject development shall rely solely upon Pond 5A, granted permission under DZ18A/0854. In such a case Pond 5A, together with its associated public surface water sewers and infrastructure, shall be constructed, commissioned and operational prior to occupation of the subject development. c) In a scenario in which the Applicant/Developer has received consent for a connection from the subject development to the existing temporary pond to the east on an interim basis from the landowner on whose lands the existing temporary pond is located and such a connection has been made in advance of Pond 5A's operation, the Applicant/Developer shall promptly re-route surface water discharge from the subject development to Pond 5A upon formal communication from the Planning Authority that Pond 5A has been commissioned and is operational. The works associated with re-routing surface water discharge from the subject development to Pond 5A shall be carried out by the Applicant/Developer at their own expense. d) The Applicant/Developer shall facilitate the installation of an upgraded surface water sewer within Cherrywood Avenue that forms part of the delivery of Pond 5A, as permitted under DZ18A/0854. In this regard, the Applicant/Developer shall consult with the Planning Authority (Development Agency Project Team) prior to the commencement of development, regarding the works programme for the surface water sewer upgrade. e) Full detailed design of the surface water drainage infrastructure shall be submitted and agreed in writing with the Planning Authority. The detailed design shall include full detailed design for all SuDS components for the development, including hydraulic calculations (microdrainage or similar), including area allocations and design input details and results, and full detail of interception volumes provided, with calculations in tabular format. f) A detailed Stormwater Management Plan shall be formulated for the construction phase of the subject development and shall be submitted by the Applicant/Developer and agreed in writing with the Planning Authority prior to the commencement of development. g) Surface water discharge from the subject development shall be limited to 1 l/s/ha as per the requirements of the Planning Scheme. h) Prior to the commencement of development, the applicant/developer shall provide an operations and maintenance plan for the proposed SuDS components, inclusive of all SuDS features including the petrol interceptor, for the written agreement of the Planning Authority. i) Operation and maintenance of the pumps for the subject development shall be carried by the Applicant/Developer/Operator. Prior to the commencement of development, the applicant/developer shall provide an operations and maintenance plan for the pumps for the written agreement of the Planning Authority. REASON:To ensure that the proposed development can discharge surface water via a connection to the public surface water network, in the interests of sustainable developmentandto comply with the requirements ofPI 6 of the Cherrywood Planning Scheme. 21.The Applicant/Developer shall comply with the following: (a) A Stormwater Audit shall be carried out at Stage 2 for the detailed design stage in accordance with PI 7 of the Cherrywood Planning scheme. The audit shall be carried out at the Developer's expense. An independent audit team shall beusedand all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the commencement of development, unless otherwise agreed.The Stage 2 Stormwater Audit reports shall address any and all phased construction and occupation proposals for the development. (b) For any proposed partial commissioning of surface water infrastructure associated with any phased construction /occupation of the development, interim Stage 3 Stormwater Audits shall be carried out for the post construction / prior to commissioning phases, in accordance with PI 7 of the Cherrywood Planning Scheme and at phases pre-agreed with the Planning Authority as part of the Stage 2 Audit process. These audits shall be carried out at the Developer's expense. An independent audit team shall be used and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. (c) A Stormwater Audit shall be carried out at Stage 3 for the post construction / prior to commissioning stage in accordance with PI 7 of the Cherrywood Planning scheme. The audit shall be carried out at the Developer's expense. An independent audit team shall beusedand all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 3 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the final commissioning of the full surface water network for the development. REASON: In the interests of sustainable development and to comply with the requirements of PI 7 of the Cherrywood Planning Scheme. TRANSPORTATION 22. To ensure that the future sustainable targets as set out in Table 4.1 of the Cherrywood Planning Scheme are achieved, the Travel Plan for this development is to be reviewed on an Annual Basis. This review should include updated annual travel surveys of residential mode share, a review of available sustainable infrastructure to inform the mode share targets and to develop SMART measures for the development on site. This updated report should be submitted to the Area Wide Travel Plan Coordinator for review and comments and any actions arising from the review are to be then implemented by the nominated Travel Plan Coordinator. This shall be undertaken until such time as the Road Requirements listed in Table 6.6.2 of the Planning Scheme have been completed and are operation, or as otherwise agreed with the Planning Authority. REASON: In order to ensure that the proposed development is consistent with the Planning Scheme and in the interest of the proper planning and sustainable development of the area. 23. The Applicant/Developer shall comply with the following: a) As part of the subject development works, the Applicant/Developer shall modify Cherrywood Avenue as appropriate to provide turning lanes and an access junction to facilitate vehicular access into the subject development. The detailed design for the access arrangement from Cherrywood Avenue to the subject development, inclusive of drawings, shall be agreed in writing with the Planning Authority prior to the commencement of development. This detailed design shall be supported by traffic flow analysis of the performance of the designed access arrangement to the subject development and the permitted Plot TC3 access arrangement (under DZ22A/0591), using traffic flows extracted from the Cherrywood Local Area Model, trip generations for the subject development and for the TC3 development at the location of the junctions. Should the detailed design process conclude that right turning movements from Cherrywood Avenue into the subject development cannot be accommodated safely, then vehicular access to the subject development from Cherrywood Avenue shall be via a left turning manoeuvre only, in accordance with the suggested solution in the submitted Barrett Mahony Development Access report (Rev. PL2 dated 27th September 2023). In this scenario, and prior to the commencement of development, the Applicant/Developer shall submit for the written agreement of the Planning Authority full details that demonstrate how future residents and visitors to the development are to be made aware of the left turn only access requirement for the subject development. b) Prior to the occupation of the subject development, the upgrade of Cherrywood Avenue, inclusive of pedestrian and cycle facilities as per Figure 4.4 of the Planning Scheme, for the extent as included within the red line boundary of the subject application shall be completed to a Taking In Charge Standard. c) A raised table arrangement shall be provided at the access junction to the subject development as per the proposals within the application to maintain priority for pedestrians and cyclists travelling on Cherrywood Avenue. d) Any amendment works to built Cherrywood roads infrastructure as part of the subject development proposals shall be undertaken by the Applicant/Developer at the Applicant/Developers own expense. REASON: To ensure suitable vehicular, pedestrian and cycle access to the subject development, to ensure pedestrian and cyclist priority on Cherrywood Avenue, and in the interests of consistency with Planning Scheme objective PI 24.The Applicant/Developer shall comply with the following: (a) Prior to the commencement of development, aStage 2Quality Audit (which shall include a Road Safety Audit, Access Audit, Cycle Audit and Walking Audit) shall be carried out for the detailed design stage and shall be submitted for the written agreement of the Planning Authority. The audit shall be carried out at the Applicant/Developer's expense in accordance with the Design Manual for Urban Roads & Streets (DMURS) guidance and TII (Transport Infrastructure Ireland) standards. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Quality Audit reports shall address any and all phased construction and occupation proposals for the development. The Applicant/Developer shall ensure that the construction / occupation phased stages proposed do not result in adverse safety conditions for future residents. (b) For any proposed phased construction /occupation stages of the development, interim Stage 3 Quality Audits shall be carried out for the post construction / prior to occupation stages, at phased stages pre-agreed with the Planning Authority as part of the Stage 2 Quality Audit process. These audits shall be carried out at theDeveloper's expense. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Applicant/Developer shall ensure that permeable and connecting walking and cycling routes are completed and operational at each construction / occupation phase to allow future residents of this development tosafelyaccess public transport, recreational facilities, schools, retail facilities and other key destinations in Cherrywood. Any identified deficiencies identified by the interim Stage 3 Quality Audits in this regard shall be completed at the developer's expense tosafelylink the development site to the existing public transport infrastructure, recreational facilities, schools, retail facilities and other key destinations in Cherrywood. (c) Prior to the final occupation stage of the developmentin its entirety, aStage 3Quality Audit (which shall include a Road Safety Audit, Access Audit, Cycle Audit and Walking Audit) shall be carried out for the post construction / prior to occupation stage and shall be submitted for the written agreement of the Planning Authority. The audit shall be carried out at theDeveloper's expense in accordance with the Design Manual for Urban Roads & Streets (DMURS) guidance and TII (Transport Infrastructure Ireland) standards. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. TheDeveloper shall ensure that permeable and connecting walking and cycling routes are completed and operational to allow future residents of this development to access public transport, recreational facilities, schools, retail facilities and other keydestinations in Cherrywood. Any identified deficiencies identified by the Stage 3 Quality Audit in this regard shall be completed at the developer's expense to link the development site to the existing public transport infrastructure, recreational facilities, schools, retail facilities and other key destinations in Cherrywood. REASON: In the interests of orderly and sustainable development;To allow for pedestrian and cycle permeability; and in the interestsof consistency with PI 14and PI 20of the Cherrywood Planning Scheme. 25. The applicant shall provide appropriate hazard (corduroy) tactile paving at the top and bottom of the steps in the subject development. REASON: In the interests of orderly development and proper planning and the sustainable development of the area and for consistency with the Cherrywood Planning Scheme PI 20. 26. The Applicant/Developer shall comply with the following: (a) Of the 70 no. residential car parking spaces permitted under this application, a minimum of 58 no. car parking spaces shall be provided for the residential units permitted under this application (equating to a minimum of 1 (one) residential car parking space per unit) and shall be clearly marked as attaching to a particular unit. Any remaining car parking spaces unallocated to specific units, inclusive of the car share space, shall be utilised by residents of/visitors to the subject development permitted under this application only and shall be clearly marked for this purpose, shall not be sold separately or let to any other persons or businesses unattached to the development as permitted under this application, and managed accordingly by the development's management company. (b) A car parking management strategy, inclusive of drawings, shall be prepared by the Applicant/Developer and submitted for agreement, in writing, to the Planning Authority prior to the occupation of any development proposed by this application. This car parking management strategy shall identify the location of the car sharing space for the development and shall include a comprehensive car parking operation and monitoring regime for the development which clearly shows how the residential car parking, inclusive of the car sharing space, will be managed by the Applicant/ Developer/Management Company to restrict car parking within the subject development to residents and/or visitors to the development only. (c) A minimum of one car parking space per five car parking spaces shall be equipped with one fully functional EV Charging Point, in accordance with the Cherrywood Planning Scheme and the Dun Laoghaire Rathdown County Council County Development Plan 2022-2028. Ducting for every car parking space shall also be provided to ensure that all car parking spaces are future-proofed for Electric Vehicles. REASON: In the interests of orderly development and proper planning and the sustainable development of the area and for consistency with the Cherrywood Planning Scheme PI 21. 27. Prior to occupation of development, the Applicant/Developer shall prepare a cycle parking management strategy for the development for the written agreement of the Planning Authority.This cycle parking management strategy shall include a comprehensive cycle parking operation and monitoring regime which clearly shows how the operation and maintenance for the development's cycle parking will be implemented and managed, including how demand for cycle parking will be monitored.This cycle parking management strategy shall also outline how additional provisions for future demand will be implemented by the Applicant/Developer/Operator if required. REASON: To ensure adequate cycle parking provision for future residents and in the interests of consistency with PI 22 of the Cherrywood Planning Scheme. UTILITIES & TELECOMS 28.The applicant/ Developer shall comply with the following: (a) The detailed design of the electricity supply network shall be agreed (in writing) with ESB Networks/ESBI. (b) The detailed design of the telecoms network shall be agreed (in writing) with the telecoms providers. (c) The Applicant/Developer shall ensure that adequate separation distances are provided within the development between utility service ducts and surface water, water and foul infrastructure to ensure access for future operation and maintenance activities as may be required. REASON: In the interests of orderly development; to ensure the inclusion of infrastructure and connections would avoid subsequent excavation of newly constructed roadway; to ensure that designs shall meet with the current and future requirements of ESB Networks/ESBI/telecoms providers; and to ensure consistency with Section 4.3.1 and PI 26 of the Planning Scheme. CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN 29. Prior to commencement of development, the Applicant shall submit a) A final construction environmental management plan for the written agreement of the Planning Authority. This must reduce any adverse impacts from construction on the environment and health and control any temporary emissions during the construction phase to prevent nuisance or adverse health effects to include: Waste management and recovery, all necessary steps shall be taken to contain noise, dust and airborne pollutants arising from the site and to prevent nuisance to persons in the locality. b) During the construction phase all reasonable measures shall be taken to reduce potential impacts relating to noise nuisance and disturbance and vibrational impacts to an acceptable level. Noise levels shall be controlled and monitored to ensure that site construction activities do not have an adverse or unacceptable impact on local receptors, adjacent property, adjacent users and human health and on the wider receiving environment. c) A programme of continuous noise, dust and vibration monitoring shall be carried out if required, along the site boundary/ noise sensitive location(s) and by an appropriately qualified and experienced acoustic technician. Copies of any environmental monitoring should it be required shall be made available to the Environmental Health Service's Air & Noise Unit upon request.' REASON: To ensure the development is carried out in accordance with the County Council's Standards and in the interests of the proper planning and sustainable development of the area. TAKING IN CHARGE 30. The applicant shall complete, within a period to be specified in writing to the Applicant by the Planning Authority, all infrastructural works (including Roads, Footpaths, Car Parks, Open Spaces, Sewers, Watermains, Drains & Public Lighting) to the standards outlined in the Council's Guidance Document 'Taking in Charge Policy for Residential Developments' and in accordance with the Department of the Environment, Community and Local Government's requirements. REASON: To ensure the development is carried out in accordance with the County Council's Standards and in the interests of the proper planning and sustainable development of the area in which the development is located. MANAGEMENT COMPANY 31. Prior to commencement of development the applicant shall submit full details of a properly constituted Management Company for the written agreement of the Planning Authority. This shall include a layout map of the permitted development showing the areas to be taken in charge and those areas to be maintained by the Owners' Management Company. Membership of this Company shall be compulsory for all purchasers of property in the development. Confirmation that this Company has been set up shall be submitted to the Planning Authority prior to the occupation of the first residential unit. REASON: To provide for the satisfactory completion and maintenance of the development in the interest of residential amenity. FINANCIAL CONTRIBUTIONS 32.A financial contribution shall be paid by the proposer to the Council towards the cost of the extension of Luas Line B from the Sandyford Depot to Cherrywood, namely Luas Line B1. This contribution shall be paid prior to the commencement of the development or in such other manner as may otherwise be agreed with the Planning Authority. The rate of contribution payable shall be that pertaining to the particular year in which implementation of the Planning Permission is commenced. The Supplementary Development Contribution Scheme provides for an annual increase in the levels of contribution payable, as outlined in the scheme, by a factor of 5% compound interest per annum. The levels of contribution will be reviewed annually on the 13th of January of each year during which the scheme is in force to take account of the aforementioned increase. The rate of contribution payable in respect of this development, at current contribution rates, is €918,130.14 and is subject to increase as outlined above. It should be noted that contributions assessed in accordance with the Supplementary Development Contribution Scheme cannot be appealed to An Bord Pleanala unless the applicant considers the levy referred to in this condition has not been properly applied in accordance with the terms of the Scheme. REASON: To part finance the extension of the Luas Line B1 from Sandyford Depot to Cherrywood, as provided for in the Supplementary Development Contribution Scheme adopted by the Council of Dún laoghaire-Rathdown on the 13th of January 2003. 33. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €7,588.14 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Local Authority in respect of the provision of Surface Water Infrastructure benefiting development in the area of the Planning Authority, as provided for in the Development Contribution Scheme 2023-2028 made by Dún Laoghaire-Rathdown County Council on the 9th of October 2023. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index commencing from 1st January 2025. Contributions shall be payable at the index-adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Article 4.7 of the Scheme. Outstanding balances as of the 1st of January each year shall be subject to indexation and adjusted accordingly until the contribution has been paid in full. (See Article 8.3 of the Scheme). REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Infrastructure benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. Note on above Condition: Please note that with effect from 1st January 2014 Uisce Éireann are now the statutory body responsible for both water and wastewater services. Accordingly, the contribution payable has been reduced by the amount of the contribution associated with these services. Further details/clarification can be obtained from Uisce Éireann at Tel. 1800 278 278. 34.The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €113,826.74 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Local Authority in respect of the provision of the Transport Infrastructure benefiting development in the area of the Planning Authority, as provided for in the Development Contribution Scheme 2023-2028 made by Dún Laoghaire-Rathdown County Council on the on the 9th of October 2023. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index commencing from 1st January 2025. Contributions shall be payable at the index-adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Article 4.7 of the Scheme. Outstanding balances as of the 1st of January each year shall be subject to indexation and adjusted accordingly until the contribution has been paid in full. (See Article 8.3 of the Scheme) REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Transport Infrastructure benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 35.The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €637,428.12 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Local Authority in respect of the provision of the Community & Parks facilities & Recreational amenities benefiting development in the area of the Planning Authority, as provided for in the Development Contribution Scheme 2023-2028 made by Dún Laoghaire-Rathdown County Council on the 9th of October 2023. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index commencing from 1st January 2025. Contributions shall be payable at the index-adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Article 4.7 of the Scheme. Outstanding balances as of the 1st of January each year shall be subject to indexation and adjusted accordingly until the contribution has been paid in full. (See Article 8.3 of the Scheme) REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks facilities & Recreational amenities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 36.The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €998,702.00 to the Planning Authority a contribution towards expenditure that was/or is proposed to be incurred by the Local Authority in respect of public infrastructure and facilities benefitting development in the Cherrywood Planning Scheme Area identified in Appendix III to the Development Contribution Scheme in respect of development in the Cherrywood Planning Scheme Area 2023 - 2028 made by Dún Laoghaire-Rathdown County Council on the 9th October 2023, as provided for in the said Scheme. This contribution shall be used solely to fund the public infrastructure and facilities identified in Appendix III to the Scheme: Public Infrastructure and Facilities benefitting development in the Cherrywood Planning Scheme Area. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index from 1st January, 2025. Contributions shall be payable at the index-adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Article 4.7 of the Scheme. Outstanding balances as of the 1st of January each year shall be subject to indexation and adjusted accordingly until the contribution has been paid in full. (See Article 7.3 of the Scheme) REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the public infrastructure and facilities benefitting development in the Cherrywood Planning Scheme Area and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 37. No development on foot of this permission shall commence until security for the provision and satisfactory completion of services (including roads, footpaths, open spaces, public lighting, sewers, watermains and drains) in accordance with the Plans and particulars lodged with the application, has been given by:- a) Lodgement with the Council of an approved Insurance Company Bond in the sum of €288,600.00 which shall be kept in force by the Developer until such time as Roads, Open Spaces, Car Parks, Sewers, Watermains and Drains are completed to the satisfaction of the Council OR/... b) Lodgement with the Council of a Cash Sum of €178,400.00 to be applied by the Council at its absolute discretion if such services are not duly provided to its satisfaction on the provision and completion of such services to standard specifications. REASON: To ensure that a ready sanction may be available to the Council to induce the provision of services and prevent disamenity in the development. 38.To ensure adequate financial provision is on hand to rectify any damaged caused to the road network associated with DZ15A/0758 and as extended by permission DZ15A/0758/E, as part of the condition survey that shall be submitted to the Planning Authority prior to commencement (inclusive of enabling works) under above condition shall include a detailed map that shows all routes that will be utilised for construction traffic associated with this development from commencement (inclusive of enabling works) to occupation of this development. This detailed map shall include the area of roadway in meters square to be utilised for construction traffic, this measurement will be used to calculate the value of a cash security or insurance bond for the value of €30/m2 of roadway utilised, to be lodged with the Planning Authority. No works shall take place (inclusive of enabling works) until this bond or cash security has been agreed and accepted by the Planning Authority. This bond will be refunded on satisfactory completion and certification by the Developer of any works identified in the condition survey, to be completed after occupation of all units within the development, and with written agreement from the Planning Authority that those works are carried out to Taking in Charge Standard. Failure to comply with the above condition may lead to the insurance bond/cash security being sequestered by the Planning Authority to complete any outstanding works REASON: To ensure that a ready sanction may be available to the County Council to induce the provision of services and prevent disamenity in the development. 39. This development shall not be carried out without prior agreement, in writing, between the Applicant & the Planning Authority relating to the payment of development contributions. REASON: Investment by Dún Laoghaire-Rathdown County Council in Local Authority works has facilitated and will facilitate the proposed development. It is considered appropriate and reasonable that the developer should contribute to the cost of same. NOTE 1: The proposed development shall accord with the requirements of Irish Water. Note 2: The attention of the applicant is drawn to Section 34(13) of the Planning and Development Act 2000, as amended, which relates as follows- 'A person shall not be entitled solely by reason of a permission under this section to carry out any development'. NOTE 3:The Applicant is advised that all/any requirements of the Environmental Enforcement Section shall be ascertained and strictly adhered to. ## Nearby applications - [DZ26A/0001/WEB](https://cherrywoodplans.com/application/DZ26A-0001-WEB.md): Cherrywood Avenue, (Adjoining Cherrywood Business Park), Cherrywood, Dublin 18. Granted (29 Jun 2026). Amends a permitted apartment scheme on Cherrywood Avenue to go from 67 to 70 apartments, with more parking. - [DZ25A/0983/WEB](https://cherrywoodplans.com/application/DZ25A-0983-WEB.md): Cherrywood Avenue ( adjoining Cherrywood Business Park), Cherrywood, Dublin 18. Refused or withdrawn (22 Dec 2025). Amends a permitted apartment scheme on Cherrywood Avenue to go from 67 to 70 apartments, with more parking. - [DZ22A/0681](https://cherrywoodplans.com/application/DZ22A-0681.md): Cherrywood Avenue, (Adjoining Cherrywood Business Park), Cherrywood, Dublin 18. Granted (28 Jun 2023). A 5-storey block of 70 apartments on Cherrywood Avenue, beside Cherrywood Business Park. - [DZ24A/1007/WEB](https://cherrywoodplans.com/application/DZ24A-1007-WEB.md): ‘Red Zone’ temporary surface car park, and Blocks F1-F3, ‘The Campus’, Cherrywood Avenue,, Cherrywood (Glebe Townland), Co. Dublin, Dublin 18. Granted (18 Feb 2025). Shrinking the temporary Red Zone car park on Cherrywood Avenue to about 398 spaces for another 5 years, and opening 226 basement spaces at The Campus. - [DZ22A/0728](https://cherrywoodplans.com/application/DZ22A-0728.md): Red Zone car park, Cherrywood Avenue, Cherrywood (Glebe Townland), Co Dublin/Dublin 18. Granted (14 Mar 2023). Keeping the temporary Red Zone surface car park for about 740 cars on Cherrywood Avenue for another 5 years. - [DZ20A/0477](https://cherrywoodplans.com/application/DZ20A-0477.md): Blocks F1,F2 & F3 (3no. office blocks under construction), Cherrywood Business Park, Cherrywood, Co. Dublin (also Dublin 18) & at the temporary surface car park at Cherrywood (Glebe Townland) Co. Dublin (also Dublin 18). Granted (28 Aug 2020). Allows up to 229 spaces in the basement car park of office Blocks F1–F3 to be used for temporary parking for 7 years. - [DZ17A/0417](https://cherrywoodplans.com/application/DZ17A-0417.md): Cherrywood Glebe Townland, Co Dublin ( Dublin 18) (Lands within Dev Area 6-Bride's Glen-bounded by M50 west, Cherrywood Ave & undeveloped lands to north undeveloped lands & Glencarrig res. estate east & res prop. & undev. lands off Brides Glen to south. Granted (7 Nov 2017). Uses land off Cherrywood Avenue as a temporary car park for about 740 cars for 5 years. - [DZ17A/0326](https://cherrywoodplans.com/application/DZ17A-0326.md): Cherrywood, Glebe Townland, Co Dublin (Also Dublin 18) (Lands within Dev Area 7-Macnebury-bounded by M50 to west, Cherrywood Ave & undeveloped lands to north, undeveloped lands & Glencarrig res. estate to east & undeveloped lands off Brides Glen to south. Refused or withdrawn (26 Apr 2017). Uses land off Cherrywood Avenue as a temporary car park for about 740 cars for 5 years. - [D06A/0116](https://cherrywoodplans.com/application/D06A-0116.md): Glencarraig, Rathmichael, Co. Dublin. Granted (18 Aug 2006). 19 homes and a new access road linking Brides Glen Road to Cherrywood Science & Technology Park at Glencarraig. - [D05A/1083](https://cherrywoodplans.com/application/D05A-1083.md): Glencarrig (site At), Rathmichael, Co. Dublin. Refused or withdrawn (12 Oct 2005). Builds 73 apartments in two blocks at Glencarrig, with a new road and cycle route from Brides Glen Road to Cherrywood Business Park. - [D13A/0292](https://cherrywoodplans.com/application/D13A-0292.md): Site at Glencarrig, Brides Glen Road, Rathmichael, Co. Dublin. Granted (1 Aug 2013). Amends the earlier Glencarrig permission with a revised design for 10 five-bedroom detached houses. - [DZ18A/0854](https://cherrywoodplans.com/application/DZ18A-0854.md): site (c.2.62 HA) at Cherrywood Business Park, Cherrywood Avenue, Cherrywood, Co. Dublin (also Dublin 18) (lands to the south and west of Blocks G and G2, south of Cherrywood Avenue). Granted (31 Oct 2018). Builds a three-pond drainage system with a walking and cycling route south of Cherrywood Avenue. - [D07A/1770](https://cherrywoodplans.com/application/D07A-1770.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin.. Refused or withdrawn (28 Jan 2008). Builds a multi-storey car park with 1,081 spaces and 10 ground-floor shops at Cherrywood Business Park. - [DZ23A/0242](https://cherrywoodplans.com/application/DZ23A-0242.md): Townland of Cherrywood Dublin 18 The site is located in the Cherrywood Planning Scheme and forms part of the south eastern porti. Granted (7 Jun 2023). Changes to the permitted basement at Town Centre 3 so it can later connect to the wider TC3 basement. - [DZ21A/0785](https://cherrywoodplans.com/application/DZ21A-0785.md): c.0.95 ha townland, Cherrywood, Dublin 18 (also Co. Dublin). Granted (30 Mar 2022). An office building of up to 8 storeys with ground-floor cafés at the corner of Town Centre 3, beside the Bride's Glen Luas stop. - [DZ20A/0052](https://cherrywoodplans.com/application/DZ20A-0052.md): 1.86 ha in the townlands of Cherrywood, Dublin 18 (also Co. Dublin)--TC3. Granted (13 Apr 2021). A mixed-use block at Town Centre 3 with an 8-storey office building and 198 build-to-rent apartments. - [DZ22A/0591](https://cherrywoodplans.com/application/DZ22A-0591.md): C. 3.71 in the Townland of Cherrywood, Block Town Centre 3 (TC3), Dublin 18. Granted (20 Jun 2023). 418 build-to-rent apartments in four blocks of up to 5 storeys at Town Centre 3, with shops, cafés and community space. - [D07A/1243](https://cherrywoodplans.com/application/D07A-1243.md): Glencarrig, Rathmichael, Co. Dublin. Granted (25 Oct 2007). Amends an earlier permission at Glencarrig to redesign one house and add a tenth five-bedroom house. - [DZ24A/0485/WEB](https://cherrywoodplans.com/application/DZ24A-0485-WEB.md): Site Known as Block G3, Cherrywood Business Park, Cherrywood, Loughlinstown, Co. Dublin. Granted (19 Dec 2024). A 4-storey science and technology office building with labs on Block G3, Cherrywood Business Park. - [DZ17A/0731](https://cherrywoodplans.com/application/DZ17A-0731.md): G3 (west of Block G2), Cherrywood Business Park, Cherrywood, Loughlinstown, Co Dublin (within the Cherrywood Strategic Development Zone (SDZ) and subject to the Cherrywood Planning Scheme 2014). Granted (26 Jan 2018). Builds a new four-storey office building, G3, on Cherrywood Avenue in Cherrywood Business Park. - [D04A/1012](https://cherrywoodplans.com/application/D04A-1012.md): Cherrywood/Glebe, (ED Rathmichael), Wyvattville Link Road, Co. Dublin.. Refused or withdrawn (9 May 2005). Reshapes and drains an 8.6-hectare site at Cherrywood/Glebe and stores topsoil on a further 5.1 hectares at Laughanstown. - [D03A/0479](https://cherrywoodplans.com/application/D03A-0479.md): ESB, Plot M, Cherrywood Science And Technology Park, Wyatville Link Road. Granted (14 Jul 2003). Seeks to keep an ESB 38 kV line mast already installed at Cherrywood Business Park. - [D22A/0964](https://cherrywoodplans.com/application/D22A-0964.md): The Old Glebe, Brides Glen Road, Dublin 18, D18Y7H7. Granted (4 Apr 2023). Alters Old Glebe House, a protected structure, and extends its coach house from one to three bedrooms. - [D13A/0534](https://cherrywoodplans.com/application/D13A-0534.md): Old Glebe House, Brides Glen Road, Townland Glebe (Rathmichael),Dublin 18. Granted (11 Feb 2014). Replaces a single-storey annex on Old Glebe House, a protected structure, with a new single-storey extension. - [D19A/0277](https://cherrywoodplans.com/application/D19A-0277.md): Old Glebe House, Brides Glen Road, Rathmichael, Dublin 18. Refused or withdrawn (19 Jun 2019). Builds three detached three-storey houses within the grounds of Old Glebe House, a protected structure, on Brides Glen Road. - [D10A/0701](https://cherrywoodplans.com/application/D10A-0701.md): Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (24 May 2011). A 197-space surface park and ride car park beside the Brides Glen Luas stop. - [D22A/1019](https://cherrywoodplans.com/application/D22A-1019.md): Old Glebe House, Brides Glen Road, Shankill, Dublin 18, D18Y7H7. Refused or withdrawn (22 Feb 2023). Builds two four-bedroom houses in the lower grounds of the Old Glebe on Brides Glen Road. - [D24A/0037](https://cherrywoodplans.com/application/D24A-0037.md): The Old Glebe House, Brides Glen Road, Shankill, Dublin 18, D18Y7H7. Granted (11 Mar 2024). Changes to an approved extension at The Old Glebe House, Brides Glen Road, enlarging the ground floor from 83 to 103 sq.m. - [D23A/0820](https://cherrywoodplans.com/application/D23A-0820.md): The Old Glebe House, Brides Glen Road, Shankill, Dublin 18, D18Y7H7. Refused or withdrawn (15 Jan 2024). Changes to an approved extension at The Old Glebe House, Brides Glen Road, enlarging the ground floor from 83 to 103 sq.m. - [D23A/0392](https://cherrywoodplans.com/application/D23A-0392.md): The Old Glebe House, Brides Glen Road, Shankill, Dublin 18, D18Y7H7--a protected structure.. Granted (1 Nov 2023). Two new 4-bedroom, two-storey houses in the lower grounds of The Old Glebe House, Brides Glen Road. - [D06A/1497](https://cherrywoodplans.com/application/D06A-1497.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (14 Dec 2006). Builds a new four-storey office building, Block G2, over a two-level car park at Cherrywood Business Park. - [DZ20A/0611](https://cherrywoodplans.com/application/DZ20A-0611.md): Site of approximately 4,730 sq m at Building 11, (formerly known as Block G2), Cherrywood Business Park, Cherrywood, Co. Dublin, D18 DH50. Granted (19 Oct 2020). Expands the day hospital in Building 11, Cherrywood Business Park, to 1,220 sq.m. - [DZ18A/1131](https://cherrywoodplans.com/application/DZ18A-1131.md): Site of approx. 4,730 sqm at Building 11 (formerly known as Block G2), Cherrywood Business Park, Cherrywood, Dublin D18 DH50. Granted (5 Feb 2019). Turns part of the ground floor of Building 11 at Cherrywood Business Park into a 922 sq.m day hospital. - [DZ16A/0935](https://cherrywoodplans.com/application/DZ16A-0935.md): Block G2, Cherrywood Business Park, Cherrywood, Co. Dublin. Granted (17 Feb 2017). Adds landscaping, a drop-off area and a sign at Block G2, Cherrywood Business Park, and keeps three glass canopies. - [DZ17A/0649](https://cherrywoodplans.com/application/DZ17A-0649.md): Block G2, Cherrywood Business Park, Cherrywood, Co Dublin. Granted (8 Sep 2017). Adds louvred screening around rooftop plant on Block G2, Cherrywood Business Park. - [D22A/0079](https://cherrywoodplans.com/application/D22A-0079.md): Cherrywood Lodge, Brides Glen Road, Shankill, Dublin 18. Granted (30 Mar 2022). Converting and extending an outbuilding at Cherrywood Lodge, Brides Glen Road, into a new single-storey home. - [D06A/1660](https://cherrywoodplans.com/application/D06A-1660.md): Park One, Cherrywood Science And Technology Park, Loughlinstown, Co. Dublin.. Granted (6 Mar 2007). Completes the distributor road through Park One at Cherrywood Business Park, letting overhead power lines go underground. - [DZ19A/0577](https://cherrywoodplans.com/application/DZ19A-0577.md): Cherrywood Avenue South adjacent to Building 11, formally known as Building G2, Cherrywood Business Park, Loughlinstown, Dublin, D18 DH50. Granted (23 Jan 2020). A new loading bay on Cherrywood Avenue South beside Building 11 in Cherrywood Business Park. - [DZ16A/0124](https://cherrywoodplans.com/application/DZ16A-0124.md): Cherrywood Business Park (to west of Block G2 and south of Block G and G2), Cherrywood, Loughlinstown, Co Dublin. Granted (21 Apr 2016). Seeks to keep a temporary access road to the Blocks G and G2 car park at Cherrywood Business Park for 7 years. - [D09A/0804](https://cherrywoodplans.com/application/D09A-0804.md): Cherrywood Science & Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (14 Jan 2010). Permission to keep changes at Blocks G and G2, Cherrywood Science & Technology Park, including a larger basement car park. - [D07A/0229](https://cherrywoodplans.com/application/D07A-0229.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.. Granted (28 May 2007). Adds a temporary vehicle ramp to the basement car park serving Blocks G and G2 at Cherrywood Business Park. - [D08B/0452](https://cherrywoodplans.com/application/D08B-0452.md): Heather Hill, Cherrywood Road, Loughlinstown, Co. Dublin. Granted (7 Aug 2008). Extends a house at Heather Hill, Cherrywood Road, with single and two-storey additions. - [D02A/0508](https://cherrywoodplans.com/application/D02A-0508.md): Building H, Cherrywood Science & Technology Park,, Cherrywood, Loughlinstown, Co. Dublin.. Granted (22 Jul 2002). Adds 15 parking spaces to the car park serving Building H at Cherrywood Business Park. - [D04A/0232](https://cherrywoodplans.com/application/D04A-0232.md): Block H, Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (23 Apr 2004). Puts up a lit corporate logo sign at Block H, Cherrywood Business Park. - [DZ21A/0818](https://cherrywoodplans.com/application/DZ21A-0818.md): Site of approximately 0.43 ha at Building 10 (formerly known as Block G), Cherrywood Business Park, Cherrywood, Co. Dublin, D18 T3Y1. Granted (24 Feb 2022). New plant enclosures, flue stacks and doors at Building 10 in Cherrywood Business Park. - [D22A/0353](https://cherrywoodplans.com/application/D22A-0353.md): Cherrywood House, Cherrywood Road, Shankill, Dublin 18 (A Protected Structure). Granted (15 Sep 2022). Restores and upgrades Cherrywood House, a protected structure, replacing its 20th-century flat-roofed extensions. - [D06A/1475](https://cherrywoodplans.com/application/D06A-1475.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (20 Dec 2006). Enlarges the approved Block G office building by filling in a front recess and extending the penthouse, adding 502 sq.m. - [D06A/0015](https://cherrywoodplans.com/application/D06A-0015.md): Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (1 Mar 2006). Adds an extra floor to the approved Block G office building at Cherrywood Business Park, taking it from three to four storeys. - [D05A/0219](https://cherrywoodplans.com/application/D05A-0219.md): Cherrywood Science & Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (9 Nov 2005). Changes the approved Block G office building with a two-level underground car park and a larger floor area. - [D02A/0430](https://cherrywoodplans.com/application/D02A-0430.md): Cherrywood Science & Technology Park,, Cherrywood, Loughlinstown, Co. Dublin.. Granted (10 Jul 2002). Allows five permitted science and technology buildings at Cherrywood Business Park to be used instead for office-based industry. - [DZ23A/0573](https://cherrywoodplans.com/application/DZ23A-0573.md): Lands (c. 17.03 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (19 Oct 2023). Amends the Cherrywood Town Centre permission to add 4 apartments in Blocks F2 and F3, bringing plot TC4 to 524 homes. - [DZ20A/0824](https://cherrywoodplans.com/application/DZ20A-0824.md): Lands (c. 17.01 ha), in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (11 Jan 2021). Changes the windows, balconies and frontage of Town Centre Block F2 on Cherrywood Avenue and Central Avenue. - [DZ19A/0148](https://cherrywoodplans.com/application/DZ19A-0148.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (24 Apr 2019). Amends Town Centre plot TC2 to add 47 apartments, taking Blocks C1 and C2 from 384 to 431 homes. - [D16A/0361](https://cherrywoodplans.com/application/D16A-0361.md): The Orchard, Cherrywood Road, Loughlinstown, Co. Dublin. Granted (12 Sep 2016). Builds two new two-storey houses beside an existing home at The Orchard, Cherrywood Road. - [D07A/0597](https://cherrywoodplans.com/application/D07A-0597.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.(Blocks F and G),. Refused or withdrawn (12 Jun 2007). Three office buildings of 4 to 7 storeys at Cherrywood Science & Technology Park, with a 612-space basement car park. - [DZ17A/0862](https://cherrywoodplans.com/application/DZ17A-0862.md): Lands (17.01ha) in the townlands of Cherrywood, Dublin 18. Granted (29 May 2018). The original Cherrywood Town Centre permission: 15 blocks with 1,269 homes, shops, offices, two hotels and a library, plus Grand Parade. - [D02A/0660](https://cherrywoodplans.com/application/D02A-0660.md): Clanart, Cherrywoood Road, Loughlinstown, Dublin 18.. Granted (20 Aug 2002). Seeks permission to keep part of an existing single-storey bungalow on Cherrywood Road. - [D08A/0035](https://cherrywoodplans.com/application/D08A-0035.md): Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (26 Jun 2008). A 4–5 storey office building (Building F) and new road at Cherrywood Science & Technology Park, with 289 basement car spaces. - [DZ19A/1024](https://cherrywoodplans.com/application/DZ19A-1024.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (9 Sep 2020). Amends the Cherrywood Town Centre plan to shrink the basement under Blocks A1–A3 and reassign parking. - [DZ20A/0002](https://cherrywoodplans.com/application/DZ20A-0002.md): Lands (c.17.01ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (9 Sep 2020). Makes minor changes to electrical rooms and landscaping in Town Centre Blocks F1 and F3. - [DZ19A/0458](https://cherrywoodplans.com/application/DZ19A-0458.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (19 Jun 2020). Major redesign of Cherrywood Town Centre plot TC1, adding two supermarkets, an 11-screen cinema and much more retail space. - [DZ23A/0423](https://cherrywoodplans.com/application/DZ23A-0423.md): On lands (c.17.03 a) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (Also Co. Dublin). Granted (10 Aug 2023). Amends the Cherrywood Town Centre permission to add two 2-bed apartments to Block A1. - [DZ22A/0690](https://cherrywoodplans.com/application/DZ22A-0690.md): Townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (12 May 2023). Facade and balcony design changes to Cherrywood Town Centre apartment Blocks A1, A2 and A3. - [DZ22A/0747](https://cherrywoodplans.com/application/DZ22A-0747.md): Townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (30 Mar 2023). Changes of use and merging of units in Town Centre Blocks C1 and C2 to create a larger 723 sq.m shop with off-licence. - [DZ22A/0846](https://cherrywoodplans.com/application/DZ22A-0846.md): Lands (c. 17.03 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (22 Dec 2022). Removes a planned viewing platform at Block F1 in Cherrywood Town Centre, replacing it with a glass balustrade. - [DZ22A/0138](https://cherrywoodplans.com/application/DZ22A-0138.md): (c. 17.03ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (30 Aug 2022). Minor changes of use between shop and restaurant-type units in Town Centre Blocks C1 and C2, and a slightly larger crèche. - [DZ21A/0807](https://cherrywoodplans.com/application/DZ21A-0807.md): Lands (c. 17.03 ha), in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (8 Jul 2022). Amends the Cherrywood Town Centre permission to cut residential parking from 1,363 to 1,169 spaces and add 41 car-sharing spaces. - [DZ21A/0713](https://cherrywoodplans.com/application/DZ21A-0713.md): Lands (c. 17.01 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (3 Oct 2021). Design changes to the three apartment blocks A1–A3 in Cherrywood Town Centre, including taller windows and smaller roof terrace. - [D15B/0171](https://cherrywoodplans.com/application/D15B-0171.md): Clanart, Cherrywood Road, Loughlinstown, Dublin 18. Granted (10 Jul 2015). Rebuilds and extends a single-storey house at Clanart, Cherrywood Road, with a new raised roof. - [DZ19A/1021](https://cherrywoodplans.com/application/DZ19A-1021.md): Blocks F1, F2 and F3 (3no. office blocks under construction) at Cherrywood Business Park, Cherrywood, Co Dublin (also Dublin 18). Refused or withdrawn (5 Feb 2020). Allows up to 229 spaces in the basement car park of office Blocks F1–F3 to be used for temporary parking for 7 years. - [DZ18A/1104](https://cherrywoodplans.com/application/DZ18A-1104.md): Lands (c.2.57ha) Cherrywood Business Park (lands including & adjoining former Block F, part of existing Block G (basement level -1 only) & lands to rear Blocks G & G2, Cherrywood, Co Dublin (also Dublin 18). Site is within Development Area 6A Brides Glen. Granted (29 Jan 2019). Builds office Block F3 and expands the shared basement car park to 658 spaces, with a new linear park, at Cherrywood Business Park. - [DZ19A/0186](https://cherrywoodplans.com/application/DZ19A-0186.md): c. 1.676 ha at Cherrywood Business Park (lands including former Block F), Cherrywood, Co. Dublin (also Dublin 18). Granted (9 May 2019). Adds landscaped roof terraces to permitted office Blocks F1 and F2 at Cherrywood Business Park. - [DZ17A/0122](https://cherrywoodplans.com/application/DZ17A-0122.md): Lands (c.1.6284 ha) at Cherrywood Business Park (lands including former Block F), Cherrywood, Co Dublin (also Dublin 18). Granted (7 Feb 2018). Builds two five-storey office blocks, F1 and F2, over an existing basement car park at Cherrywood Business Park. - [DZ17A/0171](https://cherrywoodplans.com/application/DZ17A-0171.md): Cherrywood Business Park, Cherrywood, Dublin 18. Granted (21 Apr 2017). Seeks to keep the existing entrance and wayfinding signs at Cherrywood Business Park. - [DZ21A/0029](https://cherrywoodplans.com/application/DZ21A-0029.md): Site of approximately 1,094 sq m at Building 8 (formerly known as Block E), Cherrywood Business Park, Cherrywood, Co. Dublin, c. Granted (29 Apr 2021). Rebuilds the front entrance of Building 8 at Cherrywood Business Park with a slightly larger lobby. - [DZ19A/0808](https://cherrywoodplans.com/application/DZ19A-0808.md): Cherrywood Business Park, Cherrywood & Loughlinstown, Co. Dublin, (Also Dublin 18). Granted (17 Dec 2019). Installs a small gas pressure regulator building in Cherrywood Business Park. - [DZ19A/0647](https://cherrywoodplans.com/application/DZ19A-0647.md): Cherrywood Business Park, Cherrywood & Loughlinstown, Co. Dublin, (Also Dublin 18). Refused or withdrawn (18 Sep 2019). Installs a small gas pressure regulator building in Cherrywood Business Park. - [DZ19A/0523](https://cherrywoodplans.com/application/DZ19A-0523.md): Cherrywood Business Park, Cherrywood & Loughlinstown, Co. Dublin, (Also Dublin 18). Refused or withdrawn (23 Aug 2019). Installs a small gas pressure regulator building in Cherrywood Business Park. - [DZ24A/0366/WEB](https://cherrywoodplans.com/application/DZ24A-0366-WEB.md): Building 8, Cherrywood Business Park, Dublin 18, D18W319. Granted (17 Jul 2024). Adds tenant signage and a wayfinding totem at Building 8, Cherrywood Business Park. - [DZ23A/0283](https://cherrywoodplans.com/application/DZ23A-0283.md): Building 8, Cherrywood Business Park, Cherrywood, Loughlinstown, Co. Dublin, D18 W319. Granted (11 Aug 2023). Turns Building 8 at Cherrywood Business Park from offices into a private medical clinic. - [D09A/0501](https://cherrywoodplans.com/application/D09A-0501.md): Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Refused or withdrawn (3 Sep 2009). 112 apartments, offices and shops in three buildings of 5–6 storeys at Cherrywood Science & Technology Park. - [DZ21A/1017](https://cherrywoodplans.com/application/DZ21A-1017.md): Townlands of Laughanstown, Glebe, and Cherrywood, Dublin 18, (also Co Dublin). Granted (11 Nov 2022). About 1.6km of new roads including Beckett Road with an underpass below the Wyattville Link Road, plus a park around an ancient wedge tomb. - [D06A/0911](https://cherrywoodplans.com/application/D06A-0911.md): Block D, Cherrywood Science & Technology Park, Cherrywood, Loughlinstown, Co. Dublin. Granted (23 Aug 2006). Makes internal changes to the Block D office building, enclosing its entrance and adding a fire escape stairs. - [D08A/0687](https://cherrywoodplans.com/application/D08A-0687.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Refused or withdrawn (7 Aug 2008). Replacing Block D with a 5-storey office building with a large ground-floor shop at Cherrywood Science & Technology Park. - [D06A/0630](https://cherrywoodplans.com/application/D06A-0630.md): Spar Retail Unit, Block D, Cherrywood Science & Technology Park, Loughlinstown, Dublin 18. Granted (12 Jul 2006). An off-licence counter added to the Spar shop in Block D of Cherrywood Science & Technology Park. - [DZ16A/0530](https://cherrywoodplans.com/application/DZ16A-0530.md): Units 2 & 4 Building 7 (previously 'Block D'), Cherrywood Business Park, Cherrywood, Loughlinstown, Co Dublin. Granted (9 Sep 2016). Changes two vacant units in Building 7, Cherrywood Business Park, into medical and dental use. - [D05A/1672](https://cherrywoodplans.com/application/D05A-1672.md): Block D, Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (13 Feb 2006). Makes small changes to Block D, enlarging a ground-floor shop and trimming the offices. - [DZ25A/0066/WEB](https://cherrywoodplans.com/application/DZ25A-0066-WEB.md): Building 7 The Campus, Cherrywood Avenue, Cherrywood (Glebe Townland), Co Dublin, Dublin 18, D18T8Y6. Granted (20 Mar 2025). Part of Building 7 at The Campus changes from offices to medical and dental use. ## Links - [This page on CherrywoodPlans](https://cherrywoodplans.com/application/DZ22A-1025) - [Council record, documents and conditions (DLR planning portal)](https://planning.agileapplications.ie/dunlaoghaire/application-details/95030) - [All Cherrywood applications](https://cherrywoodplans.com/applications.md) _Source: Dún Laoghaire–Rathdown County Council planning data, refreshed daily. CherrywoodPlans is an independent site, not run by the council._