# Planning application DZ23A/0106 > Lands in the Townlands of Laughanstown and Brennanstown, Dublin 18, Cherrywood, Dún Laoghaire–Rathdown. Granted (22 Sep 2023). - **Reference:** DZ23A/0106 - **Address:** Lands in the Townlands of Laughanstown and Brennanstown, Dublin 18 - **Status:** Granted (22 Sep 2023) - **Decision:** GRANT PERMISSION - **Application type:** Permission (SDZ) - **Applicant:** LSREF V Eden T1 Limited - **Lodged:** 30 Aug 2023 - **Decided:** 22 Sep 2023 - **Location (lat, lng):** 53.247852, -6.15793 ## Proposal A mixed use commercial and Build to Rent apartment development (total overall gross floor area of c. 16,508sqm) consisting of 2no Blocks of 3-5 storeys over basement on a developing tile (T1) of approximately 1.09 Ha comprising of the following- Block A comprises 1no. supermarket (gross floor area of c. 2748.6sqm) 8no. retail units (gross floor areaof c. 992.9sqm) 3no. food and beverage/non retail units (gross floor area of c.276sqm) 1no. high intensity employment unit (gross floor area of c.68.1sqm) 1no loading/delivery area (c.138sqm at ground floor level facilitating deliveries to proposed retail units. 139no. Build to rent residential units, in a mix of 25no. studios, 50 no. 1-bedroom apartments and 64 no. 2 bedroom apartments. Each proposed residential unit has private open space in the form of a balcony/terrace, a range of tenant amenity/tenant facility floorspace at ground floor and podium level (overall c.205sqm) including a single storey tenant amenity building (c. 150sqm) Block B comprises 1no community facility (gross floor area of c.215sqm) 2no. high intensity employment units (gross floor area of 488sqm) 2no food and beverage/non retail units (gross floor area of c. 279.1sqm) The development also includes public open space in the form of the Village Green c.1132.1sqm of communal open space serving the proposed Build to Rent residential units, 202no. car parking spaces 167no. at basement and 33no. at surface level). It is also proposed to make use of 4no. existing car parking spaces located adjacent to the proposed development on Castle Street as additional non residential visitor parking spaces (2no. and Gun and Drum Hill Road (2no) An additional 2no. car parking spaces for use as non-residential visitor parking spaces are proposed on Gun and Drum Hill Road, together with the provisionof a new vehicular access off Gun and Drum Hill Road serving the development (being amendments to the Phase 1 Roads permission, permitted under DZ15A/0758 and as extended by DZ15A/0758/E). 2no. existing car parking spaces on Castle Street to be used as a pull-in loading bay for use Monday-Saturday between 7am and 7pm, 258 No. bicycle parking spaces (156 No. at basement and 102 No. at surface level) 9no. motorcycle parking spaces (7 no. at basement level and 2 no. at surface level. Bring bank consisting of 6 no. bottle banks, 3 no. ESB substations/Switchrooms, Basement Ventilation, all ancillary site development and infrastructional works, hard and soft landscaping and boundary treatment works. The application also provides for the use of roads and services at Gun and Drum Hill Road, Grand Parade, Castle Street and Barringtons Road (permitted and under construction under DZ15A/0758 as extended by DZ15A/0758/E and as amended by DZ20A/0399, Dz21A/0334 and DZ21A/0664). ## In plain English A village centre at Tully with a supermarket, shops, cafés and 139 build-to-rent apartments in two blocks of 3–5 storeys. - **139** apartments - **2,749** sq.m supermarket - **202** car parking spaces - **258** bicycle spaces - **5** storeys max ### What's planned A mixed-use development of about **16,508** sq.m on tile T1 (**1.09** hectares), in two blocks over a basement. ### Residential **139** build-to-rent apartments (**25** studios, **50** one-bed, **64** two-bed), each with a balcony or terrace, plus about **205** sq.m of resident facilities. ### Commercial A supermarket of about **2,749** sq.m, **8** shop units (about **993** sq.m), **5** food and drink units and small office units. ### Community A community facility of about **215** sq.m, a public Village Green, and a bottle bank. ### Transport **202** car spaces mostly in the basement, **258** bicycle spaces and **9** motorcycle spaces. A new vehicle entrance off Gun and Drum Hill Road, plus extra visitor parking and a loading bay on nearby streets. _This summary was written by AI from the proposal text. Check the council record before relying on it._ ## Conditions ### Condition 2 First Schedule Reasons & Considerations Having regard to the Tully Village Centre land use as set out in the Cherrywood Planning Scheme, as amended, and the policies and objectives as set out in the 2022-2028 Dún Laoghaire-Rathdown County Development Plan, it is considered that the development would not detract from the amenities of the area and is therefore considered to be in accordance with the proper planning and sustainable development of the area Subject to Conditions. Appropriate Assessment Screening The proposed development has been screened for AA (report on file) and an Appropriate Assessment Updated for Request for Further Information Proposed Cherrywood-Development Area 8 - Tully-Village Centre, Dublin 18, prepared by Minogue and Associates has been submitted with the application. Having regard to the location, nature and scale of the development proposed, as clarified by way of Further Information received on 30/08/2023, it has been determined that the proposed development would not significantly impact upon a Natura 2000 Site. Environmental Impact Assessment Screening It is the responsibility of the competent authority (Dún Laoghaire-Rathdown County Council) to undertake a screening for Environmental Impact Assessment (EIA). The nature and scale of the proposed development is considered below the thresholds for mandatory EIA. Having regard to the nature and scale of the proposed development, which comprises an 148 no. build-to-rent (BTR) residential units 1; no. supermarket; 8 no. retail units; 5 no. food and beverage/ non-retail units; 1 no. community facility; 3 no. high intensity employment units, in development area 8 - Tully within the Cherrywood Planning Scheme, as clarified by way of Further Information received on 30/08/2023, it is considered that there is no real likelihood of significant effects on the environment arising from the proposed development and the need for environmental impact assessment is not required. Second Schedule Conditions 1. The development shall be carried out in its entirety in accordance with the plans, particulars and specifications lodged with the application, as amended by Further Information received on 30/08/2023 save as may be required by the other conditions attached hereto. REASON: To ensure that the development shall be in accordance with the permission and that effective control be maintained. PHASING AND SEQUENCING 2. a) Regarding Roads Phase 1, Residential units shall not be occupied prior to the completion of Roads Phase 1: Junction at A, roads I1-A-A1-B-L-P2-C-D-D1-K1-K-F1-J-A2-A1 and road B-A2 (provided by permission DZ15A/0758 and as amended by DZ17A/0862) to Taking in Charge Standard. b) The road network elements as permitted under DZ15A/0758 that have not been Taken-In-Charge and which serve the proposed development for construction and occupation access, shall not be a public road and shall remain as a private road until such time as Taken in Charge by the Planning Authority in accordance with DZ15A/0758 and DZ17A/0862. REASON: To ensure consistency with the Phasing and Sequencing requirements of Cherrywood Planning Scheme Table 7.3 Transportation Infrastructure, to ensure that the road materials and specifications meet with the requirements of the Planning Authority and in the interests of the proper planning and sustainable development of the area. 3. The proposed temporary pond shall remain in use until the date of the commissioning and commencement of operation of the permanent Regional Attenuation Pond (Pond 2A). The temporary pond shall then cease use within 6 months of the date of the commissioning and commencement of operation pf the permanent Regional Attenuation Pond (Pond 2A). It is envisaged that the period of time for the use of the temporary pond will be in the region of 2 years. REASON: in the interest of clarity and the proper planning and sustainable development of the area. 4. Prior to the commencement of development, the Applicant / Developer shall submit for the written agreement of the Planning Authority all drawings in digital format (CAD/GIS) projected to ITM (Irish Transverse Mercator). This information should include the following: • Overall site plans in DWG format (ITM projection in metres) • Ground floor plans of building in DWG format (ITM projection in metres) • Site sections and elevations in PDF format. REASON: To ensure consistency with Section 7.4 of the Cherrywood Planning Scheme. BUILD TO RENT 5. Prior to the commencement of development, the owner shall submit, for the written consent of the Planning Authority, details of a proposed covenant or legal agreement which confirms that the development hereby permitted shall remain owned and operated by an institutional entity for a minimum period of not less than 15 years and where no Individual residential units shall be sold separately for that period. The period of 15 years shall be from the date of occupation of the first residential unit within the scheme. REASON: In the interest of the proper planning and sustainable development of the area. PART V 6. Prior to the commencement of development, the Applicant, or any other person with an interest in the land to which the application relates, shall comply with requirements of Part V, Section 96 of the Planning and Development Act 2000, as amended, and in accordance with agreement to be reached with the County Council's Housing Department, unless the Applicant shall have applied for and been granted an exemption certificate under Section 97 of the Planning & Development Act, 2000, as amended. In this regard, the Applicant shall submit a detailed submission to include, inter alia, existing and development use land values, construction, development and any attributable costs associated with the development. REASON: To comply with Part V of the Planning and Development Act, 2000, as amended. LAND USE 7. Within six months of the occupation of any of the residential units that are the subject of this planning permission, a creche facility (permanent or temporary) shall be constructed on lands within the applicant's ownership and made available within Development Area (DA) 8 Tully and/or Development Area (DA)1 Lehaunstown of the Cherrywood Planning Scheme 2014 (as amended). REASON: To ensure consistency with Section 2.3.3. (Childcare) of the Cherrywood Planning Scheme (2014, as amended), Ministerial Guidelines, and in the interests of proper planning and sustainable development. 8. The permitted community use unit shall be for community use and publicly accessible and not the sole use of private residents. In the interest of clarity, the community use unit shall be privately managed, maintained and operated, or as otherwise agreed with the Planning Authority. REASON: To ensure the permitted community units is available for the use of the community, and to ensure consistency with Specific Objective DA55 and Section 2.3.4 of the Cherrywood Planning Scheme. URBAN FORM 9. Regarding land use, development type and quantum: a) The development of Tully Village Centre shall be in accordance with Table 6.8.1 and Section 6.8 of the Cherrywood Planning Scheme. b) The use of each ground floor non-residential unit shall be agreed in writing with the Planning Authority prior to the commencement of the use, or as otherwise agreed in writing with the Planning Authority. In this regard, a schedule of the units which identifies each use (e.g. convenience, comparison, retail services), number for each unit and accompanying drawings inclusive of net and gross areas shall also be submitted. c) Any change to the use identified in the schedule of units referred to in (a) above shall be the subject of a separate planning application. d) Notwithstanding the provisions of the Planning and Development Regulations 2001 (as amended), no amalgamation of units or subdivision of any unit shall take place without a prior grant of planning permission. REASON: To ensure an appropriate level of active frontages, activation, animation and mix of uses in accordance with Section 2.8 Urban Form and Table 6.8.1 of the Cherrywood Planning Scheme. 10. Within six months of the occupation of any of the residential units that are the subject of this planning permission, a creche facility (permanent or temporary) shall be constructed on lands within the applicant's ownership and made available within Development Area (DA) 8 Tully and/or Development Area (DA)1 Lehaunstown of the Cherrywood Planning Scheme 2014 (as amended). REASON: To ensure consistency with Section 2.3.3 (Childcare) of the Cherrywood Planning Scheme (2014, as amended), Ministerial Guidelines, and in the interests of proper planning and sustainable development. 11. Prior to the commencement of development, the applicant/developer shall provide, for the written agreement of the Planning Authority: a) Details of the proposed external design/finishes of all buildings, in the form of samples and on-site mock ups. b) The external finishes of buildings, including ESB substations and basement access areas, shall include materials that are consistent with Section 3.4 of the UFDF. In particular the external finishes of buildings shall: - be of high quality, durable and attractive. - At ground floor, comprise of durable and high-quality materials including natural stone or brick. - ensure harmony and visual coherence in the built environment, yet articulating interest to avoid monolithic and bulky facades along the perimeter elevations, with particular attention to the upper floors. - be practical to source, erect, replace, and maintain. - demonstrate environmental performance compliant with all building regulation standards and requirements which may change during implementation of the Planning Scheme. - meet the user specification and standards, including those relating to environmental sustainability and wellness. c) The applicant/developer shall submit a Public Realm Strategy including location and details, including materials, of vents, bin stores, service and meter boxes and similar ancillary provisions and surface level services, for the written agreement of the Planning Authority. d) The developer shall submit a Management Plan for the Public Realm network, including details of maintenance and safety, which shall be reviewed on an annual basis unless otherwise agreed with the Planning Authority. REASON: To ensure consistency with PD 7, PD 14 and PD 15 of the Cherrywood Planning Scheme. 12. In relation to the roof plant/over run/services the applicant/developer shall accord with the following a) The external finishes shall be light in colour and blend with the external finishes of the building façade and shall be included in any required mock-ups/samples of materials to be provided by way of compliance with related conditions. b) No additional development shall take place above roof level, including lift motors, air handling equipment, storage tanks, ducts or other external plant other than those shown on the drawings hereby approved, unless authorised by a prior grant of planning permission. REASON: To ensure consistency with Section 2.8.2 and PD 19 of the Cherrywood Planning Scheme and in the interests of visual and residential amenity. SIGNAGE AND ADVERTISING 13. The Applicant/Developer shall comply with the following: a) Prior to the installation of any shopfronts, the Developer shall submit for the written agreement of the Planning Authority full details of all shop fronts including shopfront designs and shop fascias, including their colour, materials, design, scale and finishes. Shopfronts/unit fronts shall be contemporary in design. b) Prior to the installation of any shopfront/ signage, awnings, canopies, banners, flags, other projecting elements, wayfinding & directional signage, promotional signage, window displays, and outdoor seating, the Developer shall submit for the written agreement of the Planning Authority full details of their location, design and content including colour /background colour, materials, scale, lettering typeface, logos and finishes. Signage shall be complimentary to the design of any shopfront/unit front, comprising individually mounted quality lettering, shall be simple in design with discreet illumination. Box signs and internally illuminated signage is not appropriate. c) All wayfinding and directional signage shall also be consistent with the Cherrywood Wayfinding & Directional Signage Strategy 2021. All signage shall be at street level. d) All shopfronts and signage shall be of high quality, modern and durable and respect the proportions and design of the building and its surroundings. e) Notwithstanding the provisions of the Planning & Development Regulations 2011 (as amended), advertisement signs (including any signs installed to be visible through windows), advertisement structures, banners, canopies, flags or other projecting element shall not be displayed or erected on the building or within the curtilage, or attached to the glazing, without the prior grant of planning permission. f) As part of this application, window displays shall be maintained at all times and the glazing in shop fronts shall be kept free of all stickers, decals, posters and advertisements. g) Roller shutters and its casing, shall be recessed behind glazing and shall be factory finished in a single colour to match the colour scheme of the building prior to their erection. The said shutters shall be open lattice type and shall not be painted on site, be left unpainted or used for advertising. REASON: In the interests of visual amenity and in order to comply with Section 2.12 Signage and Advertising and Specific Objectives PD 30, PD 31 and PD32 of the Cherrywood Planning Scheme. 14. An acceptable street naming and unit numbering scheme (in both Irish and English) for both the residential and commercial units, shall be submitted for written agreement of the Planning Authority prior to the first marketing of development or the first erection of any advertising hoardings on site, whichever comes first. In this regard, the use of street names reflecting local place names or local history would be acceptable. REASON: To ensure consistency with Specific Objectives H6 and PD32 of the Planning Scheme, and in the interests of orderly development, proper planning and sustainable development. CONSTRUCTION MANAGEMENT 15. The Developer shall comply with the following requirements: a) The construction of the development shall be managed in accordance with a final Construction Management Plan, which shall be submitted for the development in its entirely to the Planning Authority for agreement in writing, prior to commencement of any development. In this regard the final Construction Management Plan shall include an environmental management plan including a construction waste and resource management plan, a sediment and water pollution control plan in relation to the construction phase, a Community Liaison Plan and a Construction Traffic Management Plan. The applicant's finalised construction management plan shall consider IFI requirements for the protection of fisheries habitat during construction and development works. The final Construction Management Plan shall also provide detailed information regarding the proposed sequence of construction and location(s) of the site compound during the construction stage(s). b) The Village green area is required to be available for use by residents of the Village Centre and as such, this area shall cease as a construction compound location and shall be fully completed as per the Village Green landscaping design submitted under this application prior to the occupation of the first residential unit of the subject development. c) Gun and Drum Hill as permitted under DZ15A/0758 shall be fully completed to a taking in charge standard prior to the commencement of development to facilitate a construction access route to the site. d) A Resource & Waste Management Plan shall be updated and implemented, throughout the construction phase of the work, identifying type of materials/proportion of re-use/recycled materials and future maintenance to support the implementation of Government and EU circular economy policy. Records shall be maintained and made available for inspection on site demonstrating tracking of all waste generated to final destination. e) Site development and building works shall be carried out only between the hours of 7.00am to 7.00pm Monday to Friday inclusive, 8.00am to 2.00pm Saturdays and no works permitted on site on Sundays and public holidays. Deviation from these times will only be allowed in exceptional circumstances where prior written approval has been received from the planning authority. This should be addressed in the Community Liaison Plan. f) Construction staff shall be prohibited from parking on public roads. Parking for construction staff shall be provided by the Developer/Contractor within the site boundary. g) Prior to the commencement of development, the Developer shall submit details, including an engineering layout, of the proposed makeup and location of the site compound for the written approval of the Planning Authority. h) Construction vehicles shall not be permitted to park or wait on roads outside the site boundary. All parking and waiting areas shall be provided Developer/Contractor within the site boundary. i) Prior to commencement of development a mechanism and structure for on-site monitoring, reporting on progress and quality control to the Planning Authority in relation to construction standards, materials, as-built drawings and records shall be agreed in writing with the Planning Authority. j) A Noise Management Plan shall be developed and implemented demonstrating selection of construction methodology and implementation of mitigation measures to minimise nuisance affecting adjoining properties and design of building services, such as ventilation equipment and ducting, to avoid creation of nuisance affecting adjoining residential areas. k) Prior to the commencement of the proposed site works noise, vibration and dust monitoring stations are to be installed and maintained to provide continuous monitoring to measure and record the impact of site activities on local receptors. Noise monitoring to demonstrate compliance with the recommendations contained in BS 5228 shall be installed, monitored and reported on at weekly intervals by a suitable qualified specialist company for the duration of the contract. All monitoring data to be compiled into a weekly technical monitoring report which shall identify remedial measures where levels exceed relevant limit values. l) An appropriate rodent/pest control plan shall be developed and implemented for the duration of the works on site. m) For the duration of this development, from commencement of construction works (inclusive of enabling works) to completion of construction works, the Developer shall undertake continuous monitoring of the road network to be utilised for construction access to this development. In this regard and at a minimum, an independent condition survey of the roads constructed under DZ15A/0758 and as extended by DZ15A/0758E, DZ15A/0814 and DZ17A/0862 that are to be utilised for construction access to this development shall be undertaken by suitably qualified engineers/ surveyors appointed by the Developer, at the Developer's expense, both prior to commencement of development and prior to occupation of the final phase of the development. The appointment of the engineers/surveyors shall be agreed in advance and in writing with the Planning Authority and they shall be independent of the Developer and the Developer's design and construction teams. The condition survey(s) produced are to be submitted for the written agreement of the Planning Authority. Damage, including structural defects, damage to the wearing course, footpaths, kerbs, road markings etc, to the road network that is identified in the condition survey(s) shall be rectified/replaced by the Developer, at the Developer's expense and to a taking in charge standard of development which is to the satisfaction of the Planning Authority. n) The proposed development is located in close proximity to a Luas Line; the applicant should ensure there is no adverse impact on Luas operation and safety. The development shall comply with TII's ‘Code of engineering practice for works on, near, or adjacent the Luas light rail system’. REASON: In the interests of sustainable development, to facilitate construction access to the subject development, and to comply with the requirements of section 2.14 of the Cherrywood Planning Scheme. HERITAGE 16. The Applicant/Developer shall undertake the archaeological mitigation set out in Section 5.2 'Mitigation' of the Archaeological Assessment report prepared by IAC Archaeology submitted with the application. a) The Applicant shall engage the services of a suitably qualified archaeologist to carry out pre-development mitigation at the site. No sub-surface work shall be undertaken in the absence of the archaeologist without his/her express consent. b) The archaeologist is required to notify the Department of Housing, Local Government and Heritage in writing at least four weeks prior to the commencement of site preparations. This will allow the archaeologist sufficient time to obtain a licence to carry out the work. c) Having completed the work, the archaeologist shall submit a written report to the Planning Authority and to the National Monuments Service of the Department of Housing, Local Government and Heritage. Where archaeological material/features are shown to be present, preservation in situ, preservation by record (excavation) or monitoring may be required. REASON: To ensure the continued preservation (either in situ or by record) of places, caves, sites, features or other objects of archaeological interest. WATER AND DRAINAGE 17. The Applicant/Developer shall comply with the following: a) All water & wastewater infrastructure required to service this development shall align with the relevant Irish Water masterplan for the Cherrywood SDZ area. b) At connection application stage, the Applicant shall demonstrate that the design is in compliance with Cherrywood Planning Scheme and that all relevant core water and wastewater infrastructures within the Zone have adequate capacity, integrity and connectivity with Irish Water networks (water and wastewater). c) The Applicant shall sign a connection agreement with Irish Water prior to any works commencing and connecting to their network (water and wastewater). d) All development is to be carried out in compliance with Irish Water Standards codes and practices. e) All infrastructure (water and wastewater) should be designed and installed in accordance with the Irish Water Codes of Practice and Standard Details. f) Any upgrade and utility connection worksand subsequent reinstatement works to existing Cherrywood Common Infrastructure as proposed by the subject application will be at the Applicant/Developer's expense. All reinstatement works to existing Cherrywood common infrastructure shall accord with permitted infrastructure designs under DZ15A/0758 and as extended by DZ15A/0758/An independent monitoring engineer shall oversee any upgrade works and utility connections to Cherrywood Common Infrastructure. REASON: In the interests of sustainable development and in the interests of consistency with PI 4, PI 5 and PI 12 of the Planning Scheme, to ensure agreement with Irish Water on design proposals and to ensure the adequate provision of water and wastewater. 18. The Applicant/Developer shall comply with the following: a) The controlled runoff rate from the subject development is to be limited to 1/l/s/ha in accordance with the requirements of PI 8 of the Planning Scheme. Any and all phased construction and occupation of the subject development shall also adhere to this requirement for the rate of runoff to be limited to 1l/s/ha. b) Prior to the commencement of development, the Applicant/Developer shall submit the following for the written agreement of the Planning Authority: i. Hydraulic calculations and engineering drawings for the proposed surface water network, representative of the final detailed design and inclusive of the following: • The full surface water network calculations and storm simulations for the 1 in 30 and 1 in 100 year event incorporating climate change inclusive of the full contributing catchment area, which are fully commensurate with the detailed surface water design drawings. The applicant/developer shall include design drawings showing the volume and I.L. of all attenuation structures referenced for full clarity. • Full input data to show the design criteria adopted. • Calculations for the attenuation storage requirements for the 1 in 100 year event including climate change and locations for the full site area. • Detailed design drawings for all SuDS measures proposed. Drawings shall include plans, cross sections and details. The applicant shall provide detailed design calculations that clearly demonstrate how the various proposed interception measures on site provide the proposed volume of interception. • Proposed hydrobrake flow restriction control rates for any phased construction and commissioning of the surface water network. ii. A final construction surface water management plan. Comprehensive surface water management measures must be implemented at the construction stage to prevent any pollution of local surface waters. Any topsoil or demolition material which is stored on site must have mitigations in place to prevent any deleterious entering the surface water network. Any dewatering of ground water during excavation works must be treated by infiltration over land or into an attenuation area being discharged from site. iii. A detailed operations and maintenance plan for all the proposed SuDS components, inclusive of the petrol and oil interceptors. c) The provision and design of green roofs for the subject development shall adhere to the requirements of the latest DLRCC green roof policy document 2022. d) Any upgrade and utility connection works and subsequent reinstatement works to existing Cherrywood Common Infrastructure as proposed by the subject application will be at the Applicant/Developer's expense. All reinstatement works to existing Cherrywood common infrastructure shall accord with permitted infrastructure designs under DZ15A/0758 and as extended by DZ15A/0758/E. An independent monitoring engineer shall oversee any upgrade works and utility connections to Cherrywood Common Infrastructure. REASON: In the interests of sustainable development, to ensure long term optimum operation of the surface water management system; and to comply with the requirements of PI 6 and PI 8 of the Cherrywood Planning Scheme and Dun Laoghaire Rathdown County Council County Development Plan, 2022-2028. 19. The Applicant/Developer shall comply with the following: a) Prior to the commencement of development, the Applicant/ Developer shall submit design details regarding the interception of rainwater falling onto the pitched roof beside the basement tank, that clearly demonstrate that all surface water is intercepted prior to reaching the attenuation tank. b) A Stormwater Audit shall be carried out at Stage 2 for the detailed design stage in accordance with PI 7 of the Cherrywood Planning scheme. The audit shall be carried out at the Developer's expense. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the commencement of development, unless otherwise agreed. The Stage 2 Stormwater Audit reports shall address any and all phased construction and occupation proposals for the development. c) For any proposed partial commissioning of surface water infrastructure associated with any phased construction /occupation of the development, interim Stage 3 Stormwater Audits shall be carried out for the post construction / prior to commissioning phases, in accordance with PI 7 of the Cherrywood Planning Scheme and at phases pre-agreed with the Planning Authority as part of the Stage 2 Audit process. These audits shall be carried out at the Developer's expense. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. d) A Stormwater Audit shall be carried out at Stage 3 for the post construction / prior to commissioning stage in accordance with PI 7 of the Cherrywood Planning scheme. The audit shall be carried out at the Developer's expense. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 3 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the final commissioning of the full surface water network for the development. REASON: In the interests of sustainable development and to ensure long term optimum operation of the surface water management system and to comply with the requirements of PI 7 of the Cherrywood Planning Scheme. 20. Prior to the commencement of development, the Applicant/Developer shall submit an overland flow route drawing that includes designed exceedance flow routes for the subject T1 development, the proposed greenway, the T2 development permitted under DZ21A/0664 and the T3 development (DZ22A/0729) for the written agreement of the Planning Authority. REASON: To clearly identify overland flow routes and levels for the greenway and adjoining sites T1/T2/T3 to ensure the risk of property flooding during extreme storm events has been suitably mitigated in the development designs. 21. Prior to the commencement of development, the applicant/ developer shall submit detailed design drawings showing the locations of all proposed tree pits/ trees for the written agreement of the Planning Authority. These drawings shall be consistent across all disciplines (engineering, landscape and architecture, etc.). REASON: In the interests of sustainable development and to ensure compliance with Planning Scheme objective PI 10. TRANSPORTATION 22. (a) Following detailed design changes on foot of conditions attached to this permission and prior to the commencement of development, the Applicant/Developer shall submit a revised Travel Plan for the written agreement of the Planning Authority that clearly demonstrates how the subject development will develop and support a culture of sustainable travel into and within the Planning Scheme and achieve the proposed modal shift towards Active Travel modes by making cycling/ walking/ public transport more attractive for residential and non-residential occupants. The revised Travel Plan shall include detailed information on bicycle parking and demonstrate how access to same will be suitable for users of all ages and abilities and bicycles of all types including cargo bike and e-bikes. (b) To ensure that the future sustainable targets as set out in Table 4.1 of the Cherrywood Planning Scheme are achieved, the Travel Plan for this development is to be reviewed on an Annual Basis. This review should include updated annual travel surveys of resident's mode share, a review of available sustainable infrastructure to inform the mode share targets and to develop SMART measures for the development on site. This updated report should be submitted to the Area Wide Travel Plan Coordinator for review and comments and any actions arising from the review are to be then implemented by the nominated Travel Plan Coordinator. REASON: In order to ensure that the proposed development will develop and support a culture of sustainable travel into and within the Planning Scheme; to ensure the subject development will achieve modal shift targets; and to ensure compliance with Planning Scheme objectives PI 13 and PI 24. 23. Any and all amendment works to existing Cherrywood common infrastructure to be constructed as part of the subject development proposals will be at the Applicant/Developer's expense. REASON: In order to ensure that the proposed development is consistent with the Planning Scheme and in the interest of the proper planning and sustainable development of the area. 24. The submitted design solution for access via a staircase with wheel channel, to the Village Centre long term bicycle parking at basement level, is considered by the Planning Authority to be sub-standard and provides an inadequate quality of service to access the development for cycle users of all ages/abilities and for bicycles of all types. In the interest of clarity, the submitted design solution is not acceptable. Prior to the commencement of development, the Applicant/Developer shall submit for the written agreement of the Planning Authority, revised design proposals for access to the Village Centre long term bicycle parking locations demonstrating cycle access to bicycle parking at basement level can easily and safely cater for cyclists of all abilities and bicycles of all types, including cargo bikes and e-bikes, in accordance with the requirements of the Planning Scheme, Dun Laoghaire Rathdown County Council's County Development Plan 2022- 2028, Dun Laoghaire Rathdown County Council's Standards for Cycle Parking and associated Cycling Facilities for New Developments (2018), Measures CYC2 and CYC5 of the Greater Dublin Area Transport Strategy 2022-2042 and the NTA's Cycle Design Manual. As part of these revised cycle access design proposals, the Applicant/Developer shall consider a revised design proposal for the vehicular basement access ramp that includes cyclist segregation, as well as an appropriate gradient and transition design for cyclists. The applicant shall submit revised design proposals and relevant drawings accordingly. REASON: To ensure suitable cycle access to basement level bicycle parking for the development which can easily and safely cater for cyclists of all abilities and bicycles of all types; To accord with the provisions of Dun Laoghaire Rathdown County Council's County Development Plan 2022- 2028, Dun Laoghaire Rathdown County Council's Standards for Cycle Parking and associated Cycling Facilities for New Developments (2018), the Greater Dublin Area Transport Strategy 2022-2042 and the Cycle Design Manual; In the interests of consistency with Section 4.2.7, PI 13 and PI 20 of the Cherrywood Planning Scheme; and in the interests of orderly and sustainable development. 25. Having regard to Planning Scheme Section 4.2.7, the Applicant/Developer shall comply with the following: a) Prior to the operation of the ground floor retail units, The Applicant/Developer shall submit for the written agreement of the Planning Authority, a comprehensive servicing strategy for the retail units of the Village Centre the subject of this permission. The Applicant/Developer shall consult with the Planning Authority in this regard and the servicing strategy shall include, but not be limited to, proposals for the management and operation of the loading area on Castle Street, including measures proposed to both deter and manage car parking in the loading bay within the timeframe required; confirmation of the loading bay timeframe required and whether public car parking can also be facilitated in the Castle Street loading bay spaces during retail unit opening hours on weekdays and weekends; full proposals, inclusive of drawings, for the loading bay signage design and locations. b) Servicing vehicles for the retail units of the Village centre shall utilise designated loading bay areas only and shall be prohibited from utilising public car parking spaces. Servicing vehicles for the retail units of the Village centre shall not obstruct vehicular, cyclist or pedestrian traffic along Gun & Drum Hill and Castle Street by stopping on the road network, cycle tracks or footpaths. c) Prior to the commencement of development, the detailed design for the subject development's internal cul de sac road, inclusive of engineering long sections and cross sections detailing all service ducts, pipes, manholes and service chambers, shall be submitted by the Applicant/Developer for the written approval of the Planning Authority. This internal road permitted under this planning application shall be constructed in full, inclusive of footpaths on either side with an unobstructed two metre width for pedestrian movement in accordance with the requirements of the Cherrywood Planning Scheme and in accordance with DMURS guidance. d) Prior to the commencement of development, a Stage 2 Quality Audit (which shall include a Road Safety Audit, Access Audit, Cycle Audit and Walking Audit) shall be carried out for the detailed design stage and shall be submitted for the written agreement of the Planning Authority. The audit shall be carried out at the Applicant/Developer's expense in accordance with the Design Manual for Urban Roads & Streets (DMURS) guidance and TII (Transport Infrastructure Ireland) standards. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Quality Audit reports shall address any and all phased construction and occupation proposals for the development. The Applicant/Developer shall ensure that the construction / occupation phased stages proposed do not result in adverse safety conditions for future residents. e) For any proposed phased construction /occupation stages of the development, interim Stage 3 Quality Audits shall be carried out for the post construction / prior to occupation stages, at phased stages pre-agreed with the Planning Authority as part of the Stage 2 Quality Audit process. These audits shall be carried out at the Developer's expense. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Applicant/Developer shall ensure that permeable and connecting walking and cycling routes are completed and operational at each construction / occupation phase to allow future residents of this development to safely access public transport, recreational facilities, schools, retail facilities and other key destinations in Cherrywood. Any identified deficiencies identified by the interim Stage 3 Quality Audits in this regard shall be completed at the developer's expense to safely link the development site to the existing public transport infrastructure, recreational facilities, schools, retail facilities and other key destinations in Cherrywood. f) Prior to the final occupation stage of the development in its entirety, a Stage 3 Quality Audit (which shall include a Road Safety Audit, Access Audit, Cycle Audit and Walking Audit) shall be carried out for the post construction / prior to occupation stage and shall be submitted for the written agreement of the Planning Authority. The audit shall be carried out at the Developer's expense in accordance with the Design Manual for Urban Roads & Streets (DMURS) guidance and TII (Transport Infrastructure Ireland) standards. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Developer shall ensure that permeable and connecting walking and cycling routes are completed and operational to allow future residents of this development to access public transport, recreational facilities, schools, retail facilities and other key destinations in Cherrywood. Any identified deficiencies identified by the Stage 3 Quality Audit in this regard shall be completed at the developer's expense to link the development site to the existing public transport infrastructure, recreational facilities, schools, retail facilities and other key destinations in Cherrywood. REASON: In the interests of orderly and sustainable development; To allow for pedestrian and cycle permeability; and in the interests of consistency with Section 4.2.7 and PI 20 of the Cherrywood Planning Scheme. 26. The Applicant/Developer shall comply with the following: a) 117 no. residential car parking spaces, including 2 no. car-sharing spaces, are permitted under this application in accordance with the residential car parking standards of the Cherrywood Planning Scheme, as amended. A minimum of 1 (one) residential car parking space shall be allocated to the residential units permitted under this application and shall be clearly marked as attaching to a particular unit. Prior to the commencement of development, the applicant/developer shall submit for the written agreement of the Planning Authority engineering/architectural drawings that clearly identify the proposed uses of all car parking spaces (EV-charging, disabled, residential/ non-residential, etc.). b) Prior to the commencement of Development, the Applicant/Developer shall clarify the location of the car parking spaces reserved for the HIE units in the basement for agreement in writing with the Planning Authority. c) The Applicant/Developer shall consult with the Planning Authority (and the relevant DLRCC service departments) and subsequently submit a car parking strategy for the management and operation of the on street car parking and loading areas on Castle Street and Gun and Drum Hill for the written agreement of the Planning Authority prior to the commencement of development. This strategy shall comprehensively address measures to protect the surrounding public realm from car parking overspill and measures to deter excessive vehicular journeys, prevent unauthorised car parking and to encourage travelling to the Village Centre by active travel modes, including the potential introduction of pay and display parking at these locations if considered appropriate by DLRCC. d) A car parking management strategy for the basement car parking shall be prepared by the Applicant/Developer and submitted for agreement, in writing, to the Planning Authority prior to the commencement of development. This car parking management strategy shall include a comprehensive car parking operation and monitoring regime which clearly shows the operation of car parking for the proposed development, including the segregation of car parking spaces assigned to differing uses at the basement levels and how this car parking will be implemented and managed, noting that residential parking spaces to the western side of the basement carpark appear to be accessible to all users of the car park in the submitted proposal. e) A minimum of one car parking space per five car parking spaces shall be equipped with one fully functional EV Charging Point, in accordance with the Cherrywood Planning Scheme and the Dun Laoghaire Rathdown County Council County Development Plan 2022-2028. Ducting for every car parking space shall also be provided to ensure that all car parking spaces are future-proofed for Electric Vehicles. REASON: In the interests of orderly development and proper planning and the sustainable development of the area; to deter excessive vehicular journeys, prevent unauthorised car parking and to encourage travelling to the Village Centre by active travel modes; and for consistency with the Cherrywood Planning Scheme PI21. 27. Prior to the commencement of development, a revised cycle parking management strategy for the development shall be prepared by the Applicant/Developer and submitted to the Planning Authority for agreement in writing. This cycle parking management strategy shall include a comprehensive cycle parking operation and monitoring regime which clearly shows how the operation and maintenance for the development's cycle parking will be implemented and managed, how larger bicycles such as cargo bikes and e-bikes are to be accommodated at basement level within the development, and how demand for cycle parking will be monitored. This cycle parking management strategy shall also outline in detail how additional provisions for future demand will be implemented if required. REASON: To ensure adequate cycle parking provision for future residents and in the interests of consistency with PI 22 of the Cherrywood Planning Scheme. 28. The provision and location of service ducts, pipes, manholes and service chambers shall be agreed with the relevant service providers prior to commencement of the road construction works. The services to be considered include electricity, water, wastewater, gas, telecoms, traffic communication and public lighting. The Applicant/Developer shall ensure that adequate separation distances are provided within the development between utility service ducts and surface water, water and foul infrastructure to ensure access for future operation and maintenance activities as may be required. Manholes and service chambers shall be designed and located to minimise adverse visual impact on public realm finishes within the Village Centre. REASON: In the interests of orderly development, to ensure the inclusion of below ground service infrastructure and to avoid subsequent excavation of newly constructed roadways; to ensure that designs shall meet with the current and future requirements of the Planning Authority (DLR Traffic Section) and the utility and service providers; and to ensure consistency with PI 4, PI 12, PI 14, Section 4.3.1 and PI 26 of the Cherrywood Planning Scheme. GREEN INFRASTRUCTURE 29. The Applicant/Developer shall provide the following for the written agreement of the Planning Authority: a) The Applicant/Developer shall retain the services of a qualified Landscape Architect, as his/her Landscape Consultant, throughout the course of the development works, and shall notify the Planning Authority of that appointment in writing prior to the commencement of development. b) The Applicant/Developer shall engage the Landscape Consultant to procure, oversee and supervise the landscape contract for the implementation of the permitted landscape proposals. When all landscape works are inspected and completed to the satisfaction of the Landscape Consultant, he/she shall prepare, sign and submit a Practical Completion Certificate (PCC) to the Planning Authority, as verification that approved landscape plans and specifications have been fully implemented. REASON: To ensure a high-quality public realm and consistency with the Cherrywood Planning Scheme and in the interest of proper planning and sustainable development of the area. PUBLIC REALM 30. Prior to the completion of development, the Applicant / Developer shall agree in writing with the Planning Authority proposals for public art or civic landmarks within the subject development. The Applicant / Developer shall engage the services of a public art specialist to advise regarding the commission. The final artwork must comply with the standard requirements of DLRCC with regard to health and safety and ongoing maintenance. The Applicant / Developer's public art specialist shall liaise with DLRCC through the Arts Office (and Parks & Landscape Services section) and the final design and location shall be agreed in writing with the Planning Authority prior to installation. REASON: To ensure consistency with Specific Objective PD 8 of the Cherrywood Planning Scheme in relation to public art and civic landmarks. 31. Prior to commencement of development of the landscape/public realm areas, the Applicant/Developer shall provide the following for the written agreement of the Planning Authority: - a) Hard landscape plans and construction details for all hard-standing pedestrian, cycling, and vehicular areas (including adjoining footpath and road interfaces), detailing the specifications of all surface/finish materials. In this regard, samples, data sheets and on-site mock-ups of all materials shall be provided for the written agreement of the Planning Authority. Approved control samples must be held, on-site. at all times. b) All surfaces and finishes shall include materials that are consistent with PD 14. In particular, the finishes shall comprise of durable, easily sourced and high-quality materials, comprising of natural stone (or other materials as agreed with the Planning Authority) that harmonise and complement those on the adjoining boundaries of Beckett Park, Castle Street, and Mercer Road (Plot T9). REASON: To ensure consistency with the Cherrywood Planning Scheme and Objectives PD 14 and GI 7. 32. Prior to the commencement of construction of the superstructure (above basement), the applicant/ developer shall submit for the written agreement of the Planning Authority, revised landscape drawings and a landscape Masterplan which omits the proposed planters and landscaping as shown on the submitted landscape Masterplan submitted by way of further information and facilitates the optimum use of the public realm area at the corner of Castle Street and Gun and Drum Hill, for spill out and outdoor seating associated with the food and beverage unit at this location. REASON: To ensure the optimum use of and animate the public realm and to ensure consistency with Objective GI 32 of the Cherrywood Planning Scheme. 33. The north-south orientated concrete surface footpath permitted under this planning permission along the eastern boundary of the application site (as per Cunnane Stratton Reynold Drawing 21576-2-101 received on 30 August 2023), shall be completed and open for pedestrian movement along its entirety, prior to the occupation of any development permitted under this permission or prior to the occupation of any dwelling permitted within the adjacent residential development (T3) development under DZ22A/0729, whichever is the sooner. REASON: In the interest of clarity, orderly development and consistency with Specific Objectives PI 20 and G 34 and GI 32 of the Cherrywood Planning Scheme (2014, as amended). 34. The east-west orientated shared route greenway permitted under this planning permission between Castle Street and Lehaunstown Lane (as per Cunnane Stratton Reynold Drawing 21576-2-101 received on 30 August 2023) shall be completed and open for pedestrian and cyclist movement along its entirety, prior to the occupation of any development permitted under this planning permission or prior to the occupation of any dwelling permitted within the adjacent residential site (T3) development, whichever is the sooner. REASON: In the interest of clarity, orderly development and consistency with Specific Objectives PI 20, GI 32 and GI 34 of the Cherrywood Planning Scheme. 35. Prior to the commencement of development, the applicant/ developer shall submit, for the written agreement of the Planning Authority, revised landscape drawings and architectural drawings clearly identifying the following: a) Own door access, including stepped access where necessary, via the private amenity space (terrace/balcony) of the residential units at first floor of Block A to the internal communal courtyard, where possible. b) The omission of the external corridors along the north and south inner elevations of Block A at first floor to allow for direct access from the associated units to the internal communal courtyard. The drawings shall include privacy strips for the units and appropriate hard and soft landscaping to interface with the courtyard amenity space. REASON: To ensure consistency with GI 32 and GI 76 of the Planning Scheme and with the Amenity Space Guidance document. 36. The applicant/developer/Management of the Tully Village Centre commercial units shall facilitate and encourage the use of outdoor seating within the public realm to serve the food and beverage uses associated with the ground floor units in both Block A and B as shown on the Landscape Masterplan Drawing 21576-2-101, submitted by way of further information and as revised by way of compliance with conditions attached to this permission. REASON: To ensure consistency with GI 32, Section 2.8 Urban Form and PD 14 of the Cherrywood Planning Scheme. 37. Prior to the commencement of development, the applicant/developer shall submit for the written agreement of the Planning Authority a strategy including detailed landscape plans for all areas of public realm which identifies all locations for vents which are visible within any public or communal spaces. Vents shall be integrated sensitively and appropriately into the surrounding landscape having regard for maintenance, public safety and visual appearance. REASON: To ensure that the proposed development is consistent with GI 32, PD 7 and PD 14 of the Cherrywood Planning Scheme. TREES AND HEDGEROWS 38. The Applicant/Developer shall comply with the following: a) Prior to the commencement of development, the Applicant/Developer shall engage the services of a qualified Arborist as an Arboricultural Consultant, for the entire period of construction activity. The Applicant/Developer shall inform the Planning Authority in writing, of the appointment and name of the Consultant. b) At Practical Completion of the development, the Consultant shall carry out a Post-construction Arboricultural Assessment of all retained trees and submit to the Planning Authority - a signed Arboricultural Completion Certificate stating that all Tree Works have been satisfactorily completed in accordance with his/her recommendations, highlighting any residual concerns arising from the Post-construction Assessment. REASON: To ensure consistency with Section 5.4.7 of the Cherrywood Planning Scheme and give practical effect to the retention, protection and sustainability of trees during and after construction of the permitted development. HABITATS, ECOLOGY & BIODIVERSITY 39. The Applicant/Developer shall comply with the following: a) Prior to the commencement of development, the Applicant/Developer shall engage the services of a qualified ecologist as an ecological consultant, for the duration of the works. The Applicant/Developer shall inform the Planning Authority in writing, of this appointment and the name of the Consultant. b) The Consultant shall ensure the implementation of Section 5.3 (Mitigation Measures) and Section 5.4 (Evaluation of Mitigation Measures) of the submitted Ecological Impact Assessment, as well as all recommendations within Habitat Management Plan (prepared by Minogue & Associates, Consulting Ecologists). REASON: To ensure consistency with Specific Objective GI 46 of the Cherrywood Planning Scheme. 40. The applicant/developer shall accord with the following: a) In advance of site clearance, a preclearance survey shall be undertaken by the project ecologist to confirm continued absence of non-native species from the development site. b) All mitigation measures detailed within the EcIA must be implemented. c) Removal of vegetation (e.g. scrub and grassland) should be avoided, between the 1st of March and the 31st of August, to avoid direct impacts on nesting birds. Where the construction programme does not allow this seasonal restriction to be observed, then these areas will be inspected by a suitably qualified ecologist for the presence of breeding birds prior to clearance. Areas found not to contain nests shall be cleared within three days of the nest survey. Where the vegetation is not cleared within three days of checks, a repeat check shall be required. Should nesting birds be encountered during surveys, the removal of vegetation shall be required to be delayed until after the nesting has finished. REASON: To ensure consistency with Section 5.5.5 the Cherrywood Planning Scheme and the Cherrywood Biodiversity Plan. 41. Prior to the commencement of landscape works the Applicant/Developer shall be submitted the following for the written agreement of the Planning Authority: Details of Soft Landscape Design to include detailed Planting Plan and Planting Schedule stating species/varieties, approximate quantities, sizes, rootball presentation and spacings. Planting mixes should specify a diverse range of species/varieties/cultivars and a diversity of forms and plant sizes (multi-stems, feathered, semi-matures, etc.) using both native and exotic species and pollinator-friendly native species (in accordance with the All-Ireland Pollinator Plan 2015-2020), all designed to provide vegetation that is visually appealing, bio-diverse, and easily managed. This should include management programmes for all proposed trees, shrubs and other vegetation demonstrating long-term continuity and consistency. REASON: To ensure consistency with Objective GI 65 and Section 5.5 of the Cherrywood Planning Scheme. 42. The Applicant / Developer shall ensure that all surface water mitigation for the protection of ecological resources during construction as set out in Sections 3.5 Mitigation and Section 5.4 Mitigation Measures of the submitted Construction Environment Management Plan are applied in the course of construction. REASON: To ensure consistency with Specific Objective GI57 of the Planning Scheme in relation to watercourse protection and best practice. PLAY 43. Prior to the commencement of development, the Applicant/Developer shall submit the following for the written agreement of the Planning Authority: Final design details of all play opportunities and facilities (formal and/or informal as appropriate), in respect of design detailing, planting, boundaries, equipment and safety surface, in accordance with Section 4.7.1, 4.7.2, and 4.7.3 of the Amenity Space Guidance Document. All proposed equipment and ancillaries shall include specifications for the same and proof that all equipment conforms to European Standards EN 1176-1-11 and EN 1177 Playground equipment and surfacing, and to BS/EN standards 2017/18 for Playground Installations for HIC (Head Injury Criterion) and CFH (Critical Fall Height). REASON: To ensure quality play provision in compliance with best practice and reputable guidance; and GI 72 and GI 73 of the Cherrywood Planning Scheme and Sections 4.6.3, 4.7.1 and 4.7.2 of the Cherrywood Amenity Space Guidance Document. 44. Upon completion of each play space and prior to its occupation, the Applicant/Developer shall submit the following for the written agreement of the Planning Authority: a) A play map in GIS format which details all play provision provided for, in accordance with Section 4.6.3 and Section 4.7.2 of the Cherrywood Amenity Space Guidance Document. b) A post-installation Practical Completion Certificate, in accordance with the requirements and guidelines of the Royal Society for the Prevention of Accidents (RoSPA). The Certificate shall be prepared and signed by a suitably qualified (RoSPA-approved), technical professional with expertise and experience in playground design and playground health and safety. REASON: To ensure the provision and construction of safe, quality play provision in compliance with best practice and reputable guidance; and GI 72 of the Cherrywood Planning Scheme and Sections 4.6.3, 4.7.1 & 4.7.2 of the Cherrywood Amenity Space Guidance Document. 45. Prior to the completion of development, the developer shall submit to the Planning Authority for completeness, all drawings in digital format (CAD/GIS) projected to ITM (Irish Transverse Mercator). These shall include those for DZ23A/0005 and as further amended by this permission. This information should include the following: • Overall site plans in DWG format (ITM projection in metres) • Ground floor plans of buildings in DWG format (ITM projection in metres) • Site sections and elevations in PDF format. REASON: To ensure consistency with Section 7.4 of the Cherrywood Planning Scheme. TAKING IN CHARGE 46. The Applicant shall complete, within a period to be specified in writing to the Applicant by the Planning Authority, all infrastructural works (including Roads, Footpaths, Car Parks, Open Spaces, Sewers, Watermains, Drains & Public Lighting) to the standards outlined in the Council's Guidance document on Development Works in Residential and Industrial Areas. REASON: To ensure the development is carried out in accordance with the County Council's Standards and in the interests of the proper planning and sustainable development of the area in which the development is located. MANAGEMENT COMPANY 47. Prior to commencement of development the Applicant shall submit full details of a properly constituted Management Company for the written agreement of the Planning Authority. This shall include a layout map of the permitted development showing the areas to be taken in charge and those areas to be maintained by the Management Company. Membership of this Company shall be compulsory for all purchasers of property in the development. Confirmation that this Company has been set up shall be submitted to the Planning Authority prior to the occupation of the first residential unit. REASON: To provide for the satisfactory completion and maintenance of the development in the interest of residential amenity. FINANCIAL CONTRIBUTIONS 48. A financial contribution shall be paid by the proposer to the Council towards the cost of the extension of Luas Line B from the Sandyford Depot to Cherrywood, namely Luas Line B1. This contribution shall be paid prior to the commencement of the development or in such other manner as may otherwise be agreed with the Planning Authority. The rate of contribution payable shall be that pertaining to the particular year in which implementation of the Planning Permission is commenced. The Supplementary Development Contribution Scheme provides for an annual increase in the levels of contribution payable, as outlined in the scheme, by a factor of 5% compound interest per annum. The levels of contribution will be reviewed annually on the 13th of January of each year during which the scheme is in force to take account of the aforementioned increase. The rate of contribution payable in respect of this development, at current contribution rates, is €486,855.90 , and is subject to increase as outlined above. It should be noted that contributions assessed in accordance with the Supplementary Development Contribution Scheme cannot be appealed to An Bord Pleanala unless the Applicant considers the levy referred to in this condition has not been properly applied in accordance with the terms of the Scheme. REASON: To part finance the extension of the Luas Line B1 from Sandyford Depot to Cherrywood, as provided for in the Supplementary Development Contribution Scheme adopted by the Council of Dún Laoghaire-Rathdown on the 13th of January, 2003. 49. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €64,137.40 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of Surface Water Public Infrastructure and Facilities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015 and as included in Table 2 of the Cherrywood Planning Scheme Development Contribution Scheme 2017-2020. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme ) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered Reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Public Infrastructure and Facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. Note on above Condition: Please note that with effect from 1st January, 2014 Irish Water are now the statutory body responsible for both water and waste water services. Accordingly, the contribution payable has been reduced by the amount of the contribution associated with these services. Further details/clarification can be obtained from Irish Water at Tel. 1 850 278 278. 50. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €1,468,249.93 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015 and as included in Table 2 of the Cherrywood Planning Scheme Development Contribution Scheme 2017-2020. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered Reasonable that the payment of a contribution be required in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 51. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €952,955.18 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Community & Parks Public Infrastructure, Facilities and Amenities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015 and as included in Table 2 of the Cherrywood Planning Scheme Development Contribution Scheme 2017-2020. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered Reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks Public Infrastructure, Facilities and Amenities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 52. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €134,392.55 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of Surface Water Public Infrastructure and Facilities benefiting development in the Cherrywood Planning Scheme area only of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered Reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Public Infrastructure and Facilities benefiting development in the in the Cherrywood Planning Scheme area and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 53. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €854,802.65 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Roads Public Infrastructure and Facilities in the Cherrywood Planning Scheme Area. This Cherrywood Planning Scheme element of the Development Contribution shall be used solely to fund infrastructure identified in the Plan, as listed in Appendix III - Cherrywood Planning Scheme Projects List, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered Reasonable that the payment of a contribution be required in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the Cherrywood Planning Scheme Area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 54. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €231,957.38 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Community & Parks Public Infrastructure Facilities & Amenities in the Cherrywood Planning Scheme Area. This Cherrywood Planning Scheme element of the Development Contribution shall be used solely to fund infrastructure identified in the Plan, as listed in Appendix III - Cherrywood Planning Scheme Area Only, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered Reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks Public Infrastructure Facilities & Amenities benefiting development in the Cherrywood Planning Scheme Area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 55. No development on foot of this permission shall commence until security for the provision and satisfactory completion of services (including roads, footpaths, open spaces, public lighting, sewers, watermains and drains) in accordance with the Plans and particulars lodged with the application, has been given by:- a) Lodgement with the Council of an approved Insurance Company Bond in the sum of €549,600.00 which shall be kept in force by the Developer until such time as Roads, Open Spaces, Car Parks, Sewers, Watermains and Drains are completed to the satisfaction of the Council OR/... b) Lodgement with the Council of a Cash Sum of €340,400.00 to be applied by the Council at its absolute discretion if such services are not duly provided to its satisfaction on the provision and completion of such services to standard specifications. REASON: To ensure that a ready sanction may be available to the Council to induce the provision of services and prevent disamenity in the development. 56. To ensure adequate financial provision is on hand to rectify any damaged caused to the road network associated with DZ15A/0758 and as extended by permission DZ15A/0758/E, DZ15A/0814 and DZ17A/0862 as part of the condition survey that shall be submitted to the Planning Authority prior to commencement (inclusive of enabling works) under above condition shall include a detailed map that shows all routes that will be utilised for construction traffic associated with this development from commencement (inclusive of enabling works) to occupation of this development. This detailed map shall include the area of roadway in meters square to be utilised for construction traffic, this measurement will be used to calculate the value of a cash security or insurance bond for the value of €30/m2 of roadway utilised, to be lodged with the Planning Authority. No works shall take place (inclusive of enabling works) until this bond or cash security has been agreed and accepted by the Planning Authority. This bond will be refunded on satisfactory completion and certification by the Developer of any works identified in the condition survey, to be completed after occupation of all units within the development, and with written agreement from the Planning Authority that those works are carried out to Taking in Charge Standard. Failure to comply with the above condition may lead to the insurance bond/cash security being sequestered by the Planning Authority to complete any outstanding works REASON: To ensure that a ready sanction may be available to the Council to induce the provision of services and prevent disamenity in the development. 57. This development shall not be carried out without prior agreement, in writing, between the Applicant & the Planning Authority relating to the payment of development contributions. REASON: Investment by Dún Laoghaire-Rathdown County Council in Local Authority works has facilitated and will facilitate the proposed development. It is considered appropriate and reasonable that the developer should contribute to the cost of same. NOTES: NOTE 1: The attention of the Applicant is drawn to Section 34(13) of the Planning and Development Act 2000, as amended, which relates as follows- 'A person shall not be entitled solely by REASON of a permission under this section to carry out any development'. NOTE 2: That water supply and foul drainage shall be in accordance with the requirements of Uisce Éireann/Irish Water. The following requirements of Uisce Éireann /Irish Water shall be complied with in the proposed development: The applicant shall sign a connection agreement with Uisce Éireann prior to any works commencing and connecting to the Uisce Éireann network. The applicant shall obtain a Statement of Design Acceptance from Uisce Éireann prior to any works commencing on site. Uisce Éireann does not permit any build over of its assets and separation distances as per Uisce Éireann's Standards Codes and Practices shall be achieved. Any proposals by the applicant to build over/near or divert existing water or wastewater services subsequently occurs, the applicant shall submit details to Uisce Éireann for assessment of feasibility and have written confirmation of feasibility of diversion(s) from Uisce Éireann prior to connection agreement. All development shall be carried out in compliance with Uisce Éireann Standards codes and practices.' NOTE 3: Any alterations to the drainage systems within the site are a matter for compliance with the Building Regulation. NOTE 4: The Applicant is advised that all/any requirements of the Environmental Health Office and Environmental Health Office - Air Pollution and Noise Control Unit shall be ascertained and strictly adhered to. NOTE 5: The Applicant is advised that all / any requirements of Inland Fisheries Ireland shall be ascertained and strictly adhered to. NOTE 6: This permission does not imply any consent or approval for the structural stability and/or habitability of the works carried out and does not imply that the structure complies with the Building Regulations. NOTE 7: The Applicant is advised that in the event of encroachment or oversailing of the adjoining property, the consent of the adjoining property owner is required. If this written agreement is not obtained the proposed development shall be modified only insofar as is required to do this. ## Nearby applications - [DZ25A/0014/WEB](https://cherrywoodplans.com/application/DZ25A-0014-WEB.md): Townlands of Laughanstown & Brennanstown, Dublin 18. Granted (3 Mar 2025). Amends the permitted Tully village centre (plot T1) to shrink the basement, cutting car parking from 210 to 157 spaces. - [DZ20A/0585](https://cherrywoodplans.com/application/DZ20A-0585.md): on a site in the Townlands of Laughanstown and Cherrywood, Dublin 18. Refused or withdrawn (2 Jun 2021). A temporary sales and marketing suite with 8 parking spaces for just under 5 years off Gun and Drum Hill Road. - [DZ26A/0750/WEB](https://cherrywoodplans.com/application/DZ26A-0750-WEB.md): Unit B, Mercer Way, Tully Village Centre West, Dublin 18, D18C58F. Refused or withdrawn (7 Oct 2026). Combines two permitted shop units at Tully Village Centre into one convenience store with an off-licence. - [DZ22A/0770](https://cherrywoodplans.com/application/DZ22A-0770.md): On Lands Development Area 8 (Tully), Cherrywood SDZ, Laughanstown, Dublin 18. Granted (22 Mar 2023). 71 homes, a crèche, shops and a community room on plot T11 west of Castle Street in Tully village centre. - [DZ21A/0664](https://cherrywoodplans.com/application/DZ21A-0664.md): Site in the Townlands of, Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (5 May 2022). 47 apartments in a 4-storey block off Castle Street in Tully. - [DZ26A/0052/WEB](https://cherrywoodplans.com/application/DZ26A-0052-WEB.md): Townland of Laughanstown, Cherrywood, Dublin 18. Granted (24 Mar 2026). Makes minor layout and landscaping changes to a permitted Tully housing scheme, moving bin stores to the front of the two-level homes. - [DZ22A/0623](https://cherrywoodplans.com/application/DZ22A-0623.md): On Lands Development ,Plot T 11, Area 8 (Tully), Cherrywood SDZ, Laughanstown, Dublin 18. Granted (18 Jan 2023). 49 new houses on plot T11 west of Castle Street in Tully. - [DZ24A/0696/WEB](https://cherrywoodplans.com/application/DZ24A-0696-WEB.md): Townlands of Laughanstown, and Brennanstown, Dublin 18. Granted (29 Oct 2024). Amends a permitted Tully scheme to add 4 apartments by raising part of Apartment Building 1 to 4 storeys. - [DZ25A/0044/WEB](https://cherrywoodplans.com/application/DZ25A-0044-WEB.md): In the Townlands of Laughanstown, and Brennanstown, Dublin 18. Granted (10 Jul 2025). Amends a permitted Lehaunstown scheme to add a storey to two buildings, taking it from 492 to 517 homes, with fewer car spaces. - [DZ21A/0334](https://cherrywoodplans.com/application/DZ21A-0334.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (7 Apr 2022). 482 new homes, mostly apartments in five blocks up to 5 storeys, beside Barrington's Road and the Luas in Lehaunstown. - [DZ21A/1042](https://cherrywoodplans.com/application/DZ21A-1042.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (30 May 2022). 122 new homes, a mix of houses, two-level units and apartments, beside Tully Park and Lehaunstown Lane. - [DZ22A/0729](https://cherrywoodplans.com/application/DZ22A-0729.md): Townlands of, Laughanstown, Brennanstown and, Cherrywood, Dublin 18. Granted (22 Sep 2023). 57 new homes, houses and 3-bed two-level apartments, off Gun and Drum Hill Road in Tully. - [DZ21A/1069](https://cherrywoodplans.com/application/DZ21A-1069.md): The overall site area of this application is approximately 8.7Ha. Townlands of Laughanstown and Brennanstown Dublin 18. Granted (2 Feb 2022). Minor changes to a permitted 136-home scheme in Tully so it can be built and occupied in phases. - [DZ22A/0820](https://cherrywoodplans.com/application/DZ22A-0820.md): Townlands of Laughanstown, Brennanstown and Cherrywood,, Dublin 18. Granted (12 Dec 2022). Makes minor changes to the already-permitted 168-home scheme in Tully, swapping the designs of 12 houses and altering some roofs. - [DZ22A/0403](https://cherrywoodplans.com/application/DZ22A-0403.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Refused or withdrawn (22 Jul 2022). Makes minor changes to the already-permitted 168-home scheme in Tully, swapping the designs of 12 houses and altering some roofs. - [DZ21A/0699](https://cherrywoodplans.com/application/DZ21A-0699.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (23 Sep 2021). Smaller first-floor bathroom windows on 33 permitted houses in Tully. - [DZ20A/0552](https://cherrywoodplans.com/application/DZ20A-0552.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18,. Granted (11 Mar 2021). 163 new homes, mostly houses, between Castle Street and Tully Park. - [DZ26B/0186/WEB](https://cherrywoodplans.com/application/DZ26B-0186-WEB.md): 4 Mercer Row,Laughanstown, Dublin 18, D18XH7P. Granted (25 May 2026). Three new roof windows added to the front of a house on Mercer Row. - [DZ26B/0153/WEB](https://cherrywoodplans.com/application/DZ26B-0153-WEB.md): 4 Mercer Row, Laughanstown, Dublin, D18XH7P. Refused or withdrawn (19 Mar 2026). Three new roof windows added to the front of a house on Mercer Row. - [DZ19A/0597](https://cherrywoodplans.com/application/DZ19A-0597.md): Development Area 8 -Tully, Cherrywood SDZ, Includes the Res 2 plots ''T9'' and ''T10''. Granted (11 Mar 2020). 184 new homes, mainly houses plus two small apartment blocks, on plots T9 and T10 in Tully. - [DZ20A/0399](https://cherrywoodplans.com/application/DZ20A-0399.md): Townlands of Laughanstown and Brennanstown, Tully Development Area 8, Cherrywood, Dublin 18. Granted (22 Jan 2021). 136 new homes, mostly houses and two-level apartments, in Tully between Castle Street and the Luas, plus the Castle Street extension. - [DZ23A/0455](https://cherrywoodplans.com/application/DZ23A-0455.md): Area 8 (Tully) Cherrywood SDZ Lands, Laughanstown, Dublin 18. Granted (27 Oct 2023). Amends a permitted Tully housing scheme to provide 5 three-bed houses on Mercer's Road in place of 5 homes dropped by condition. - [DZ24A/0686/WEB](https://cherrywoodplans.com/application/DZ24A-0686-WEB.md): Townlands of Laughanstown, and Brennanstown, Dublin 18. Refused or withdrawn (4 Sep 2024). Amends a permitted Tully scheme to add 4 apartments by raising part of Apartment Building 1 to 4 storeys. - [DZ23A/0028](https://cherrywoodplans.com/application/DZ23A-0028.md): Townlands of Laughanstown and Brennanstown, Dublin 18. Granted (8 Dec 2023). 56 new homes and a 3-storey childcare centre on tile T13 beside Beckett Park and Castle Street in Tully. - [DZ15A/0814](https://cherrywoodplans.com/application/DZ15A-0814.md): Laughanstown, Dublin 18, (Beckett Park). Granted (13 Jul 2016). Beckett Park: a new 5.1-hectare public park in Tully with a sports pitch, tennis courts, playground and pavilion café. - [DZ23A/0468](https://cherrywoodplans.com/application/DZ23A-0468.md): Townlands of Laughanstown and Brennanstown, Dublin 18. Granted (9 May 2024). Amends a permitted Lehaunstown scheme to rearrange units, add 4 homes (488 to 492) and move a temporary crèche. - [DZ23A/0354](https://cherrywoodplans.com/application/DZ23A-0354.md): Townlands of Laughanstown and Brennanstown, Dublin 18. Refused or withdrawn (23 Jun 2023). Amends a permitted Lehaunstown scheme to rearrange units and add 4 homes, taking it from 488 to 492. - [DZ23A/0812](https://cherrywoodplans.com/application/DZ23A-0812.md): Townlands of Laughanstown & Brennanstown, Dublin 18. Granted (14 Feb 2024). Amends a permitted housing scheme at L1 West to change the internal layouts of its 4-bed houses and move the site compound. - [DZ16A/0531](https://cherrywoodplans.com/application/DZ16A-0531.md): Glenellen, Lehaunstown Lane, Cabinteely, Dublin 18. Granted (1 Sep 2016). Demolishes the house Glenellen and its outbuildings on Lehaunstown Lane. - [DZ18A/0458](https://cherrywoodplans.com/application/DZ18A-0458.md): on lands (c.0.74 HA) in the townland of Laughanstown, Dublin 18 (Development Area 8 - Tully). Granted (11 Jul 2018). Builds a new primary school with 24 classrooms plus a special needs unit, south-west of Tully Park. - [REF20225](https://cherrywoodplans.com/application/REF20225.md): Lehaunstown Park House, Laughanstown, Co Dublin, (A Protected Structure). Granted (23 Jan 2026). Minor internal changes to the stable building at Lehaunstown Park House, a protected structure. - [DZ23A/0359](https://cherrywoodplans.com/application/DZ23A-0359.md): Lehaunstown Park House, Lehaunstown Co Dublin. Granted (17 May 2024). Restores Lehaunstown Park House and its tower house, converts the stables to shops, and builds a large garden centre. - [DZ15A/0813](https://cherrywoodplans.com/application/DZ15A-0813.md): Laughanstown, Dublin 18, (Tully Park). Granted (13 Jul 2016). Creates Tully Park, a 12.9-hectare public park with a playground, café kiosk and nature trails. - [DZ20A/0946](https://cherrywoodplans.com/application/DZ20A-0946.md): Lands known as Tully Park (c12.9HA), Laughanstown, Dublin 18. Granted (18 Feb 2021). Revises part of the permitted Tully Park, moving the café kiosk, redesigning the playground and adding a raised boardwalk. - [DZ22A/0550](https://cherrywoodplans.com/application/DZ22A-0550.md): Lehaunstown Park Open Space, Laughanstown, Dublin 18. Granted (13 Apr 2023). Turns a temporary car park into Lehaunstown Park Open Space with community gardens and a play plaza. - [DZ15A/0758](https://cherrywoodplans.com/application/DZ15A-0758.md): in the townlands of Cherrywood, Laughanstown, Brennanstown, Loughlinstown and Glebe, Dublin 18. Granted (16 Aug 2016). Phase 1 roads for Cherrywood: about 5.4km of new and upgraded roads including Grand Parade, Castle Street and Bishop Street. - [DZ23A/0005](https://cherrywoodplans.com/application/DZ23A-0005.md): Site in the the townlands of Laughanstown and Brennanstown, Castle Street, Barrington's Road, Dublin 18. Granted (7 Jul 2023). 89 new homes (houses and two-level apartments) and a crèche off Castle Street and Barrington's Road. - [DZ26B/0366/WEB](https://cherrywoodplans.com/application/DZ26B-0366-WEB.md): 10 Domville Square, Cherrywood, Dun Laoghaire, Dublin 18, D18H7WA. Granted (14 Aug 2026). Adds a small glass conservatory to the rear of a house at Domville Square. - [DZ26B/0360/WEB](https://cherrywoodplans.com/application/DZ26B-0360-WEB.md): 10, Domville Square, Cherrywood, Dun Laoghaire, Dublin 18, D18H7WA. Refused or withdrawn (24 Jun 2026). A small glass conservatory added to the back of a house on Domville Square. - [DZ18A/1129](https://cherrywoodplans.com/application/DZ18A-1129.md): Site (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8). Granted (4 Feb 2019). Builds a drainage basin and regrades a future school site in Laughanstown. - [DZ26A/0151/WEB](https://cherrywoodplans.com/application/DZ26A-0151-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18.. Granted (24 Jun 2026). 188 new homes, a mix of apartments, two-level units and houses, beside Tully Park off Bishop Street. - [DZ22A/0133](https://cherrywoodplans.com/application/DZ22A-0133.md): Townlands of Laughanstown and Cherrywood, Dublin 18. Granted (22 Nov 2022). Builds 163 homes, a mix of apartments, triplexes, maisonettes and houses, beside Tully Park. - [DZ20A/0690](https://cherrywoodplans.com/application/DZ20A-0690.md): Site area of 9.77, in townlands of Laughanstown Brennanstown and Cherrywood, Dublin 18. Refused or withdrawn (3 Nov 2020). 152 new homes, mostly apartments plus houses, off Barrington's Road and Castle Street in Lehaunstown. - [DZ21A/1038](https://cherrywoodplans.com/application/DZ21A-1038.md): site 1.85 ha at Castle Street and Bishop Street, Cherrywood, Dublin 18. Granted (8 Nov 2022). Builds a new 1,000-pupil secondary school at Castle Street and Bishop Street, Cherrywood. ## Links - [This page on CherrywoodPlans](https://cherrywoodplans.com/application/DZ23A-0106) - [Council record, documents and conditions (DLR planning portal)](https://planning.agileapplications.ie/dunlaoghaire/application-details/95397) - [All Cherrywood applications](https://cherrywoodplans.com/applications.md) _Source: Dún Laoghaire–Rathdown County Council planning data, refreshed daily. CherrywoodPlans is an independent site, not run by the council._