# Planning application DZ23A/0455 > Area 8 (Tully) Cherrywood SDZ Lands, Laughanstown, Dublin 18, Cherrywood, Dún Laoghaire–Rathdown. Granted (27 Oct 2023). - **Reference:** DZ23A/0455 - **Address:** Area 8 (Tully) Cherrywood SDZ Lands, Laughanstown, Dublin 18 - **Status:** Granted (27 Oct 2023) - **Decision:** GRANT PERMISSION - **Application type:** Permission (SDZ) - **Applicant:** Cairn Homes Properties Ltd. - **Lodged:** 3 Oct 2023 - **Decided:** 27 Oct 2023 - **Location (lat, lng):** 53.246454, -6.160845 ## Proposal Revisions/modifications to the previously permitted development under DZ22A/0623 including revised proposals for the section of Mercer's Road within the applicants ownership involving the provision of 5 no. houses (3 bed) and associated parking (10 spaces) in lieu of Units 15-19 inclusive ommitted by Condition 15 of Ref DZ22A/0623. The total number of units remains unchanged at 49 no. houses. The proposals include revised details for Mercer's Road consistant with Cherrywood Planning Scheme. Permission is also sought for all associated site and development works. ## In plain English Amends a permitted Tully housing scheme to provide 5 three-bed houses on Mercer's Road in place of 5 homes dropped by condition. - **5** houses - **10** car spaces - **49** houses total ### What's planned Changes to an earlier permission (DZ22A/0623) along Mercer's Road. The scheme stays at **49** houses. ### Residential **5** three-bed houses replace Units 15–19, which a condition of the original permission had removed. ### Transport **10** parking spaces for the new houses, and Mercer's Road is redesigned to match the Cherrywood Planning Scheme. _This summary was written by AI from the proposal text. Check the council record before relying on it._ ## Conditions ### Condition 2 First Schedule Reasons and Considerations Having regard to the residential land use of the ste as set out in the Cherrywood Planning Scheme, as amended, and the 2022-2028 Dún Laoghaire - Rathdown County Development Plan, it is considered that subject to compliance with the conditions below, the proposed development would not seriously injure the amenities of the area and would not contravene materially the zoning of the application site or that of adjoining sites, subject to conditions. Appropriate Assessment (AA) Screening Having regard to the location, nature and scale of the development proposed, as clarified by way of Further Information received on03.10.2023, it has been determined that the proposed development would not significantly impact upon a Natura 2000 Site. Environmental Impact Assessment (EIA) Screening It is the responsibility of the competent authority (Dún Laoghaire-Rathdown County Council) to undertake a screening for Environmental Impact Assessment (EIA). Having regard to the nature and scale of the proposed development, as clarified by way of Further Information received on03.10.2023, it is considered that there is no real likelihood of significant effects on the environment arising from the proposed development. Second Schedule Conditions MISCELLANEOUS / GENERAL 1. (a)The development shall be carried out in its entirety in accordance with the plans, particulars and specifications lodged with the application, as amended by Further Information received on 27.09.2023. (b)Save for amendments granted on foot of this permission, the development shall otherwise be carried out in strict accordance with the terms and conditions of Planning Permission Reg. Ref. DZ22A/0623, save as may be required by the other conditions attached hereto. (c)No other development or amendments are permitted on foot of this planning permission. REASON: To ensure that the development shall be in accordance with the permission and that effective control be maintained. 2. Prior to the commencement of development, the Applicant, or any other person with an interest in the land to which the application relates, shall comply with requirements of Part V, Section 96 of the Planning and Development Act 2000, as amended, and in accordance with agreement to be reached with the County Council's Housing Department, unless the Applicant shall have applied for and been granted an exemption certificate under Section 97 of the Planning & Development Act, 2000, as amended. In this regard, the Applicant shall submit a detailed submission to include, inter alia, existing and development use land values, construction, development and any attributable costs associated with the development. REASON: To comply with Part V of the Planning and Development Act, 2000, as amended. 3. With regard to the Regulation of Commercial Institutional Investment in Housing, Guidelines for Planning Authorities, May 2021: a)Prior to the commencement of the development as permitted, the Applicant or any person with an interest in the land shall enter into an agreement with the Planning Authority (such agreement must specify the number and location of each housing unit), pursuant to Section 47 of the Planning and Development Act 2000, as amended, that restricts all residential units permitted to first occupation by individual purchasers i.e. those not being a corporate entity, and/or by those eligible for the occupation of social and/or affordable housing, including cost rental housing. b) An agreement pursuant to Section 47 shall be applicable (i) for the period of duration of the planning permission or (ii) from the date of commencement of the duration of the planning permission until the date on which the last residential unit the subject of the section 47 agreement has been transferred to an individual purchaser, whichever is the later, except where after not less than two years from the date of completion of each housing unit, it is demonstrated to the satisfaction of the planning authority that it has it has not been possible to transact each of the residential units for use by individual purchasers and/or to those eligible for the occupation of social and/or affordable housing, including cost rental housing. c) The determination of the Planning Authority as required in 3(b) shall be subject to receipt by the Planning and Housing Authority of satisfactory documentary evidence from the Applicant or any person with an interest in the land regarding the sales and marketing of the specified residential units, in which case the Planning Authority shall confirm in writing to the Developer or any person with an interest in the land, that the Section 47 agreement has been terminated and that the requirement of this planning condition has been discharged in respect of each specified housing unit. d) For the avoidance of doubt, the definition of 'houses and duplex units' in this condition is as per the definition set out in the Ministerial Planning Guidelines under Section 28 of the Planning and Development Act 2000 (as amended), Regulation of Commercial Institutional Investment in Housing, namely, i. A house, defined as not including a building designed for use or used as two or more dwellings or a flat, an apartment or other dwelling within such a building, and, ii. A duplex unit, defined as a dwelling within a building designed for use as two individual dwellings and/or on one shared plot, with separate entrances. REASON : To restrict new housing development to use by persons of a particular class or description in order to ensure an adequate choice and supply of housing, including affordable housing, in the common good. 4. Prior to the completion of development, the Applicant/Developer shall submit for the written agreement of the Planning Authority, all drawings in digital format (CAD/GIS) projected to ITM (Irish Transverse Mercator). These shall include for drawings in relation to DZ22A/0623 as further amended by this permission. This information should include the following: • Overall site plans in DWG format (ITM projection in metres) • Ground floor plans of buildings in DWG format (ITM projection in metres) • Site sections and elevations in PDF format. REASON : To ensure consistency with Section 7.4 of the Cherrywood Planning Scheme. ACCESS AND MOVEMENT 5. Prior to the commencement of the construction of the element of Mercer's Road which is the subject of this application, the detailed design for the element of Mercer's Road, inclusive of engineering long sections, tie-in details and cross sections detailing all service ducts, pipes, manholes and service chambers, shall be submitted by the Applicant/Developer for the written approval of the Planning Authority. The element of Mercer's Road permitted under this planning application shall be constructed in full, inclusive of a 6m wide carriageway and footpaths on either side with an unobstructed 2m width for pedestrian movement in accordance with the requirements of the Cherrywood Planning Scheme. REASON: In the interests of sustainable development and to comply with the requirements of PI 14 of the Cherrywood Planning Scheme. DRAINAGE AND WATER 6. Prior to the commencement of the construction of the element of Mercers Road which is subject of this application, the applicant shall submit for the written agreement of the Planning Authority the detailed design of the proposed swale, inclusive of engineering layouts/ sections and landscaping details that also include any proposed tree pits. This detailed design information shall clearly demonstrate how surface water runoff enters the swale and how the swale connects to the surface water network of the subject development and the development permitted under the parent permission DZ22A/0623. The applicant shall also add a legend and any missing text to the revised engineering drawing, detailing the proposed swale and any other SuDS measures, i.e. tree pits. The applicant shall ensure and demonstrate that the proposed swale is designed in accordance with current design standards, including 'The SuDS Manual' (CIRIA, document C753). REASON: To ensure adequate surface water drainage, in the interests of sustainable development and to comply with the requirements of PI 6 and GI 44 of the Cherrywood Planning Scheme. 7. At detailed design stage, a Stage 2 Stormwater Audit shall be carried out for the subject development in accordance with PI 7 of the Cherrywood Planning scheme. The audit shall be carried out at theDeveloper's expense. An independent audit team shall beused,and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the commencement of the construction of the element of Mercer's Road the subject of this application (DZ23A/0455). The Stage 2 Stormwater Audit reports shall fully address the design for the swale on the western side of the element of Mercer's Road the subject of this application (DZ23A/0455) and its incorporation into the designed surface water network for the TI1 development as a whole (i.e. DZ22A/0623 and DZ23A/0455). Any other proposed SuDS measures, i.e. tree pits for the proposed trees (as per landscaping drawings and Waterman Moylan drawing No. C3000 - to be revised, as per Condition 4 above) shall also be assessed in this Stage 2 Stormwater Audit Report. REASON: In the interests of sustainable development and to comply with the requirements of PI 7 of the Cherrywood Planning Scheme. GREEN INFRASTRUCTURE 8. All trees planted in/adjacent to hard paved areas on the eastern side of Mercer Road shall incorporate tree root structural cell systems unless otherwise agreed in writing with the Planning Authority. REASON: In the interests of sustainable development and to ensure consistency with PI 6 and PI 10 of the Cherrywood Planning Scheme, 2014 (as amended). 9. The proposed development including the swale permitted along the western edge of Mercers Road shall be planted with a diverse and appropriate mix of tree (3 no. trees minimum on western side of Mercer Road and 4 no minimum of eastern side) and plant species in line with Condition 24 of DZ22A/0623 and GI 54 of the Cherrywood Planning Scheme, 2014 (as amended). REASON: In the interest of promoting appropriate planting and biodiversity and to ensure consistency with Sections 5.4 and 5.5 including GI 44 and GI 54 of the Cherrywood Planning Scheme, 2014 (as amended). FINANCIAL CONTRIBUTIONS 10. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €1,687.50 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of Surface Water Public Infrastructure and Facilities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015 and as included in Table 2 of the Cherrywood Planning Scheme Development Contribution Scheme 2017-2020. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme ) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Public Infrastructure and Facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. Note on above Condition: Please note that with effect from 1st January, 2014 Irish Water are now the statutory body responsible for both water and waste water services. Accordingly, the contribution payable has been reduced by the amount of the contribution associated with these services. Further details/clarification can be obtained from Irish Water at Tel. 1 850 278 278. 11. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €38,644.70 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015 and as included in Table 2 of the Cherrywood Planning Scheme Development Contribution Scheme 2017-2020. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 12. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €25,085.30 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Community & Parks Public Infrastructure, Facilities and Amenities benefiting development in the area of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 14th December, 2015 and as included in Table 2 of the Cherrywood Planning Scheme Development Contribution Scheme 2017-2020. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks Public Infrastructure, Facilities and Amenities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 13. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €3,361.35 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of Surface Water Public Infrastructure and Facilities benefiting development in the Cherrywood Planning Scheme area only of the Authority, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Public Infrastructure and Facilities benefiting development in the in the Cherrywood Planning Scheme area and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 14. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €21,391.10 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Roads Public Infrastructure and Facilities in the Cherrywood Planning Scheme Area. This Cherrywood Planning Scheme element of the Development Contribution shall be used solely to fund infrastructure identified in the Plan, as listed in Appendix III - Cherrywood Planning Scheme Projects List, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON:It is considered reasonable that the payment of a contribution be required in respect of the provision of the Roads Public Infrastructure and Facilities benefiting development in the Cherrywood Planning Scheme Area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 15. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €5,806.15 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Planning Authority in respect of the provision of the Community & Parks Public Infrastructure Facilities & Amenities in the Cherrywood Planning Scheme Area. This Cherrywood Planning Scheme element of the Development Contribution shall be used solely to fund infrastructure identified in the Plan, as listed in Appendix III - Cherrywood Planning Scheme Area Only, as provided for in the Development Contribution Scheme made by Dún Laoghaire-Rathdown County Council on the 12/06/2017. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index (See Article 12 of the Scheme) commencing from 1st January, 2018. Contributions shall be payable at the index adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Note 1 to the Table at Article 9 of the Scheme. Outstanding balances may be subject to interest charges. REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks Public Infrastructure Facilities & Amenities benefiting development in the Cherrywood Planning Scheme Area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 16. No development on foot of this permission shall commence until security for the provision and satisfactory completion of services (including roads, footpaths, open spaces, public lighting, sewers, watermains and drains) in accordance with the Plans and particulars lodged with the application, has been given by: a) Lodgement with the Council of an approved Insurance Company Bond in the sum of €37,400.00 which shall be kept in force by the Developer until such time as Roads, Open Spaces, Car Parks, Sewers, Watermains and Drains are completed to the satisfaction of the Council OR/... b) Lodgement with the Council of a Cash Sum of €23,000.00 to be applied by the Council at its absolute discretion if such services are not duly provided to its satisfaction on the provision and completion of such services to standard specifications. REASON: To ensure that a ready sanction may be available to the Council to induce the provision of services and prevent disamenity in the development. 17. The Developer shall pay all Financial Contributions on foot of Reg. Ref DZ22A/0623. This development shall not be carried out without prior agreement, in writing, between the Applicant and the Planning Authority relating to the payment of development contributions. REASON: Investment by Dún Laoghaire-Rathdown County Council in Local Authority works has facilitated and will facilitate the proposed development. It is considered appropriate and reasonable that the developer should contribute to the cost of same. 18. This development shall not be carried out without prior agreement, in writing, between the Applicant & the Planning Authority relating to the payment of development contributions. REASON: Investment by Dún Laoghaire-Rathdown County Council in Local Authority works has facilitated and will facilitate the proposed development. It is considered appropriate and reasonable that the developer should contribute to the cost of same. NOTE 1: The proposed development shall accord with the requirements of Irish Water. NOTE 2: The attention of the applicant is drawn to Section 34(13) of the Planning and Development Act 2000, as amended, which relates as follows- 'A person shall not be entitled solely by reason of a permission under this section to carry out any development'. ## Nearby applications - [DZ22A/0623](https://cherrywoodplans.com/application/DZ22A-0623.md): On Lands Development ,Plot T 11, Area 8 (Tully), Cherrywood SDZ, Laughanstown, Dublin 18. Granted (18 Jan 2023). 49 new houses on plot T11 west of Castle Street in Tully. - [DZ26B/0186/WEB](https://cherrywoodplans.com/application/DZ26B-0186-WEB.md): 4 Mercer Row,Laughanstown, Dublin 18, D18XH7P. Granted (25 May 2026). Three new roof windows added to the front of a house on Mercer Row. - [DZ26B/0153/WEB](https://cherrywoodplans.com/application/DZ26B-0153-WEB.md): 4 Mercer Row, Laughanstown, Dublin, D18XH7P. Refused or withdrawn (19 Mar 2026). Three new roof windows added to the front of a house on Mercer Row. - [DZ19A/0597](https://cherrywoodplans.com/application/DZ19A-0597.md): Development Area 8 -Tully, Cherrywood SDZ, Includes the Res 2 plots ''T9'' and ''T10''. Granted (11 Mar 2020). 184 new homes, mainly houses plus two small apartment blocks, on plots T9 and T10 in Tully. - [DZ22A/0770](https://cherrywoodplans.com/application/DZ22A-0770.md): On Lands Development Area 8 (Tully), Cherrywood SDZ, Laughanstown, Dublin 18. Granted (22 Mar 2023). 71 homes, a crèche, shops and a community room on plot T11 west of Castle Street in Tully village centre. - [DZ26A/0750/WEB](https://cherrywoodplans.com/application/DZ26A-0750-WEB.md): Unit B, Mercer Way, Tully Village Centre West, Dublin 18, D18C58F. Refused or withdrawn (7 Oct 2026). Combines two permitted shop units at Tully Village Centre into one convenience store with an off-licence. - [DZ20A/0585](https://cherrywoodplans.com/application/DZ20A-0585.md): on a site in the Townlands of Laughanstown and Cherrywood, Dublin 18. Refused or withdrawn (2 Jun 2021). A temporary sales and marketing suite with 8 parking spaces for just under 5 years off Gun and Drum Hill Road. - [DZ24A/0696/WEB](https://cherrywoodplans.com/application/DZ24A-0696-WEB.md): Townlands of Laughanstown, and Brennanstown, Dublin 18. Granted (29 Oct 2024). Amends a permitted Tully scheme to add 4 apartments by raising part of Apartment Building 1 to 4 storeys. - [DZ25A/0014/WEB](https://cherrywoodplans.com/application/DZ25A-0014-WEB.md): Townlands of Laughanstown & Brennanstown, Dublin 18. Granted (3 Mar 2025). Amends the permitted Tully village centre (plot T1) to shrink the basement, cutting car parking from 210 to 157 spaces. - [DZ23A/0106](https://cherrywoodplans.com/application/DZ23A-0106.md): Lands in the Townlands of Laughanstown and Brennanstown, Dublin 18. Granted (22 Sep 2023). A village centre at Tully with a supermarket, shops, cafés and 139 build-to-rent apartments in two blocks of 3–5 storeys. - [DZ24A/0686/WEB](https://cherrywoodplans.com/application/DZ24A-0686-WEB.md): Townlands of Laughanstown, and Brennanstown, Dublin 18. Refused or withdrawn (4 Sep 2024). Amends a permitted Tully scheme to add 4 apartments by raising part of Apartment Building 1 to 4 storeys. - [DZ23A/0028](https://cherrywoodplans.com/application/DZ23A-0028.md): Townlands of Laughanstown and Brennanstown, Dublin 18. Granted (8 Dec 2023). 56 new homes and a 3-storey childcare centre on tile T13 beside Beckett Park and Castle Street in Tully. - [DZ15A/0814](https://cherrywoodplans.com/application/DZ15A-0814.md): Laughanstown, Dublin 18, (Beckett Park). Granted (13 Jul 2016). Beckett Park: a new 5.1-hectare public park in Tully with a sports pitch, tennis courts, playground and pavilion café. - [DZ21A/0664](https://cherrywoodplans.com/application/DZ21A-0664.md): Site in the Townlands of, Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (5 May 2022). 47 apartments in a 4-storey block off Castle Street in Tully. - [DZ22A/0820](https://cherrywoodplans.com/application/DZ22A-0820.md): Townlands of Laughanstown, Brennanstown and Cherrywood,, Dublin 18. Granted (12 Dec 2022). Makes minor changes to the already-permitted 168-home scheme in Tully, swapping the designs of 12 houses and altering some roofs. - [DZ22A/0403](https://cherrywoodplans.com/application/DZ22A-0403.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Refused or withdrawn (22 Jul 2022). Makes minor changes to the already-permitted 168-home scheme in Tully, swapping the designs of 12 houses and altering some roofs. - [DZ21A/0699](https://cherrywoodplans.com/application/DZ21A-0699.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (23 Sep 2021). Smaller first-floor bathroom windows on 33 permitted houses in Tully. - [DZ20A/0552](https://cherrywoodplans.com/application/DZ20A-0552.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18,. Granted (11 Mar 2021). 163 new homes, mostly houses, between Castle Street and Tully Park. - [DZ22A/0550](https://cherrywoodplans.com/application/DZ22A-0550.md): Lehaunstown Park Open Space, Laughanstown, Dublin 18. Granted (13 Apr 2023). Turns a temporary car park into Lehaunstown Park Open Space with community gardens and a play plaza. - [DZ25A/0044/WEB](https://cherrywoodplans.com/application/DZ25A-0044-WEB.md): In the Townlands of Laughanstown, and Brennanstown, Dublin 18. Granted (10 Jul 2025). Amends a permitted Lehaunstown scheme to add a storey to two buildings, taking it from 492 to 517 homes, with fewer car spaces. - [DZ21A/0334](https://cherrywoodplans.com/application/DZ21A-0334.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (7 Apr 2022). 482 new homes, mostly apartments in five blocks up to 5 storeys, beside Barrington's Road and the Luas in Lehaunstown. - [DZ26A/0052/WEB](https://cherrywoodplans.com/application/DZ26A-0052-WEB.md): Townland of Laughanstown, Cherrywood, Dublin 18. Granted (24 Mar 2026). Makes minor layout and landscaping changes to a permitted Tully housing scheme, moving bin stores to the front of the two-level homes. - [REF20225](https://cherrywoodplans.com/application/REF20225.md): Lehaunstown Park House, Laughanstown, Co Dublin, (A Protected Structure). Granted (23 Jan 2026). Minor internal changes to the stable building at Lehaunstown Park House, a protected structure. - [DZ23A/0359](https://cherrywoodplans.com/application/DZ23A-0359.md): Lehaunstown Park House, Lehaunstown Co Dublin. Granted (17 May 2024). Restores Lehaunstown Park House and its tower house, converts the stables to shops, and builds a large garden centre. - [DZ22A/0729](https://cherrywoodplans.com/application/DZ22A-0729.md): Townlands of, Laughanstown, Brennanstown and, Cherrywood, Dublin 18. Granted (22 Sep 2023). 57 new homes, houses and 3-bed two-level apartments, off Gun and Drum Hill Road in Tully. - [DZ21A/1042](https://cherrywoodplans.com/application/DZ21A-1042.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (30 May 2022). 122 new homes, a mix of houses, two-level units and apartments, beside Tully Park and Lehaunstown Lane. - [DZ17A/0172](https://cherrywoodplans.com/application/DZ17A-0172.md): Site in the townlands of Laughanstown and Tiknick, Shankill, Co. Dublin. Granted (13 Apr 2017). Lets two existing 110 kV overhead power lines in Laughanstown and Tiknick stay for five more years. - [DZ16A/0995](https://cherrywoodplans.com/application/DZ16A-0995.md): Laughanstown and Tiknick, Shankill, Co. Dublin. Refused or withdrawn (22 Feb 2017). ESB seeks to keep two existing 110kV overhead power lines near Cherrywood substation for another five years. - [DZ21A/1069](https://cherrywoodplans.com/application/DZ21A-1069.md): The overall site area of this application is approximately 8.7Ha. Townlands of Laughanstown and Brennanstown Dublin 18. Granted (2 Feb 2022). Minor changes to a permitted 136-home scheme in Tully so it can be built and occupied in phases. - [DZ20A/0399](https://cherrywoodplans.com/application/DZ20A-0399.md): Townlands of Laughanstown and Brennanstown, Tully Development Area 8, Cherrywood, Dublin 18. Granted (22 Jan 2021). 136 new homes, mostly houses and two-level apartments, in Tully between Castle Street and the Luas, plus the Castle Street extension. - [DZ18A/1129](https://cherrywoodplans.com/application/DZ18A-1129.md): Site (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8). Granted (4 Feb 2019). Builds a drainage basin and regrades a future school site in Laughanstown. - [DZ18A/0458](https://cherrywoodplans.com/application/DZ18A-0458.md): on lands (c.0.74 HA) in the townland of Laughanstown, Dublin 18 (Development Area 8 - Tully). Granted (11 Jul 2018). Builds a new primary school with 24 classrooms plus a special needs unit, south-west of Tully Park. - [D06A/1016](https://cherrywoodplans.com/application/D06A-1016.md): Townland of Laughanstown, Cherrywood, Loughlinstown, Co. Dublin.. Granted (28 Nov 2006). Builds a 110 kV ESB electrical transformer station in Laughanstown. - [DZ23A/0468](https://cherrywoodplans.com/application/DZ23A-0468.md): Townlands of Laughanstown and Brennanstown, Dublin 18. Granted (9 May 2024). Amends a permitted Lehaunstown scheme to rearrange units, add 4 homes (488 to 492) and move a temporary crèche. - [DZ23A/0354](https://cherrywoodplans.com/application/DZ23A-0354.md): Townlands of Laughanstown and Brennanstown, Dublin 18. Refused or withdrawn (23 Jun 2023). Amends a permitted Lehaunstown scheme to rearrange units and add 4 homes, taking it from 488 to 492. - [DZ23A/0812](https://cherrywoodplans.com/application/DZ23A-0812.md): Townlands of Laughanstown & Brennanstown, Dublin 18. Granted (14 Feb 2024). Amends a permitted housing scheme at L1 West to change the internal layouts of its 4-bed houses and move the site compound. - [DZ23A/0443](https://cherrywoodplans.com/application/DZ23A-0443.md): Lands in the townlands of Laughanstown, Dublin 18, (Lands within 'Development Area 7- Macnebury', including part of the Res 2 plot known as 'M4, located West & South of Castle Street, south of Lehaunstown Lane and North of Bishop Street. Granted (7 Nov 2023). Changes a condition so 66 permitted homes in Macnebury can be occupied before the Cherrywood Avenue/Beckett Road underpass is built. ## Links - [This page on CherrywoodPlans](https://cherrywoodplans.com/application/DZ23A-0455) - [Council record, documents and conditions (DLR planning portal)](https://planning.agileapplications.ie/dunlaoghaire/application-details/96600) - [All Cherrywood applications](https://cherrywoodplans.com/applications.md) _Source: Dún Laoghaire–Rathdown County Council planning data, refreshed daily. CherrywoodPlans is an independent site, not run by the council._