# Planning application DZ23A/0468 > Townlands of Laughanstown and Brennanstown, Dublin 18, Cherrywood, Dún Laoghaire–Rathdown. Granted (9 May 2024). - **Reference:** DZ23A/0468 - **Address:** Townlands of Laughanstown and Brennanstown, Dublin 18 - **Status:** Granted (9 May 2024) - **Decision:** GRANT PERMISSION - **Application type:** Permission (SDZ) - **Applicant:** LSREF V Eden L1 Limited - **Lodged:** 12 Apr 2024 - **Decided:** 9 May 2024 - **Location (lat, lng):** 53.250678, -6.1591 ## Proposal Amendments to development permitted under Reg. Ref. DZ21A/0334 and is also an amendment to site development and landscape works permitted under Reg. Refs. DZ20A/0399, DZ21A/1069 and DZ21A/1042. The amendments to the site development and landscape works through the L1 tile are consistent with that under Planning Reg. Ref. DZ23A/0005. • Permission is also sought for the relocation of permitted temporary creche and its associated external play space from the ground floor of Building 3 to the ground floor of Building 2, including the temporary change of use at that location to accommodate the creche. The ground floor space in Building 3 accommodating the temporary creche will revert to its permanent use permitted under Reg. Ref: DZ21A/0334 as residential amenity use. The ground floor space in Building 2 now proposed to accommodate the temporary creche is permitted under Reg. Ref: DZ21A/0334 as residential amenity use as well as storage and cycle storage. The operation of the temporary creche will only be necessary if a permanent creche facility of commensurate or appropriate scale has not been applied for and approved on a site within the Tully and Lehaunstown Development Areas of the Planning Scheme in the ownership of the Applicant. Where a permanent creche facility of commensurate or appropriate scale has been applied for and approved on a site within the Tully and Lehaunstown Development Areas of the Planning Scheme and in the ownership of the Applicant, and the temporary creche is operational, the temporary creche facility, including the external play space, shall cease and the area that comprised the facility shall be converted and revert to the permanent uses permitted consistent with Condition 8 of Reg. Ref. DZ21A/0334. ## In plain English Amends a permitted Lehaunstown scheme to rearrange units, add 4 homes (488 to 492) and move a temporary crèche. - **492** homes - **555** car parking spaces - **655** bicycle spaces ### What's planned Changes to the residential scheme permitted under DZ21A/0334, beside Barrington's Road and the Luas. ### Residential Across **58** homes, **43** are removed, **47** new ones added and **11** modified. **40** permitted two-level units become **28** in 3-storey buildings. Overall homes rise from **488** to **492**, and the raised courtyards move to ground level. ### Transport Car parking stays at **555** spaces (**114** with EV charging), some moved on-street. Bicycle spaces total **655** and motorcycle spaces drop by 4 to **22**. ### Community The temporary crèche moves from Building 3 to Building 2 and will close once a permanent crèche is approved nearby. ### Environment Changes to the storm water drainage network and a new connection to the public storm sewer. _This summary was written by AI from the proposal text. Check the council record before relying on it._ ## Conditions ### Condition 2 First Schedule Reasons and Considerations Having regard to the 'Residential' zoning of the site as set out in the Cherrywood Planning Scheme, as amended, and Dún Laoghaire - Rathdown County Development Plan 2022 - 2028, it is considered that subject to compliance with the conditions below, the proposed development would not seriously injure the amenities of the area and would not contravene materially the zoning of the application site or that of adjoining sites, subject to conditions and accords with the Planning Scheme. Appropriate Assessment Screeening Having regard to the nature and scale of the proposed development, as clarified by way of Significant Further Information received on 12.04.2024, it has been determined that the proposed development would not significantly impact upon a Natura 2000 Site. Environmental Impact Assessment (EIA) Screening Having regard to the nature and scale of the proposed development, as clarified by way of Significant Further Information received on 12.04.2024, which comprises an amendment to previously permitted development in a fully serviced urban location, it is considered that there is no real likelihood of significant effects on the environment arising from the proposed development. The need for environmental impact assessment can, therefore, be excluded at the preliminary examination and as such a screening determination is not required. Second Schedule Conditions GENERAL/MISCELLANEOUS 1. (a) The development shall be carried out in its entirety in accordance with the plans, particulars and specifications lodged with the application, as amended by Significant Further Information received on 12.04.2024. (b) Save for amendments granted on foot of this permission, the development shall otherwise be carried out in strict accordance with the terms and conditions of Planning Permission Reg. Ref. DZ21A/0334, save as may be required by the other conditions attached hereto. (c) Permitted amendments shall only relate to the lower ground/basement, ground and first floor of Apartment Buildings 1, 2 and 3 and the replacement of duplex blocks with associated changes at ground floor/surface level. REASON: To ensure that the development shall be in accordance with the permission and that effective control be maintained. 2. Prior to the commencement of development, the Applicant, or any other person with an interest in the land to which the application relates, shall comply with requirements of Part V, Section 96 of the Planning and Development Act 2000, as amended, and in accordance with agreement to be reached with the County Council's Housing Department, unless the Applicant shall have applied for and been granted an exemption certificate under Section 97 of the Planning & Development Act, 2000, as amended. In this regard, the Applicant shall submit a detailed submission to include, inter alia, existing and development use land values, construction, development and any attributable costs associated with the development. REASON: To comply with Part V of the Planning and Development Act, 2000, as amended. 3.Prior to the completion of development, the Applicant/Developer shall submit for the written agreement of the Planning Authority, all drawings in digital format (CAD/GIS) projected to ITM (Irish Transverse Mercator). This information should include the following: • Overall site plans in DWG format (ITM projection in metres) • Ground floor plans of buildings in DWG format (ITM projection in metres) • Site sections and elevations in PDF format. REASON: To ensure consistency with Section 7.4 of the Cherrywood Planning Scheme. URBAN FORM AND DEVELOPMENT OBJECTIVES 4. The temporary creche facility including the temporary courtyard layout with creche play area shall be constructed and made available in accordance with the layout for said facility as shown on Dwg L1L2-HJL-B2-00-DR-A-P82001 and Dwg. No. 1852-23_PL_P_04.5 received on 14 July 2023, prior to the occupation of the final 10% of the combined number of dwellings permitted under DZ21A/0334 and hereby permitted under this amendment permission. Such a facility shall be made available for operation until such time as, a permanent creche facility of commensurate or appropriate scale has been approved, constructed and made available on a site within the Tully and Lehaunstown Development Areas of the Cherrywood Planning Scheme (2014, as amended). At this time, the subject temporary creche facility, including the creche play area, shall be converted and revert to the uses and permanent/long term layout permitted in accordance with Dwg L1L2-HJL-B2-00-DR-A-P82001 and Dwg. No. 1852-23_PL_P_04.5, received on 14 July 2023, located at the south-eastern ground floor area of Building 2. REASON: To ensure consistency with Section 2.3.3 of the Cherrywood Planning Scheme (2014, as amended), Ministerial Guidelines and in the interests of proper planning and sustainable development. CONSTRUCTION MANAGEMENT 5. For the duration of this development, from commencement of construction works (inclusive of enabling works) to completion of construction works, the Developer shall undertake continuous monitoring of the road network to be utilised for construction access to this development. In this regard and at a minimum, an independent condition survey of the roads constructed under DZ15A/0758 and as extended by DZ15A/0758E, and DZ17A/0862 that are to be utilised for construction access to this development shall be undertaken by suitably qualified engineers/ surveyors appointed by the Developer, at the Developer's expense, both: i. prior to commencement of development and ii. prior to occupation of the final phase of the development. The appointment of the engineers/surveyors shall be agreed in advance and in writing with the Planning Authority and they shall be independent of the Developer and the Developer's design and construction teams. The condition survey(s) produced are to be submitted for the written agreement of the Planning Authority. Damage, including structural defects, damage to the wearing course, footpaths, kerbs, road markings etc, to the road network that is identified in the condition survey(s) shall be rectified/replaced by the Developer, at the Developer's expense and to a taking in charge standard of development which is to the satisfaction of the Planning Authority. REASON: To ensure consistency with Section 2.14 of the Cherrywood Planning Scheme and in the interests of orderly development, proper planning and sustainable development. 6. Prior to commencement of development, the applicant/developer shall submit a final detailed Construction Management Plan (CMP) for the written agreement of the Planning Authority that shall address/ include, but not be limited to, the following: The Construction Programme - Details of the programme, methodology regarding the proposed development, including start and end dates of each phase and forecast completion date for each proposed building. The Construction Management Plan and programme of works shall amongst other items provided for interception, containment and treatment of construction runoff. No construction runoff shall be diverted to proposed SuDS measures. Any surface water sewer pipes used to convey construction runoff shall be thoroughly cleaned before subsequent connection to SuDS elements. Construction Traffic Routes - A drawing showing construction traffic routes, the type of vehicles and number of vehicles forecast to use the proposed route(s). Site Compound(s): Details and location of the site compound for all proposed construction phases (propose: Phase 1 and Phase 2). Traffic Management - Details of temporary traffic management and signage along construction routes, at site accesses and as required in the vicinity of the site, Traffic Marshals and/or Banksmen - Confirmation that any traffic management measures on the road shall be provided by Qualified Traffic Marshals and/ or banksmen. A Construction Waste and Resource Management Plan shall be updated and implemented, throughout the construction phase of the work, identifying type of materials/proportion of re-use/recycled materials and future maintenance to support the implementation of Government and EU circular economy policy. Records shall be maintained and made available for inspection on site demonstrating tracking of all waste generated to final destination. REASON: To protect neighbouring amenity, maintain road safety and manage waste throughout construction works, to adhere to Temporary Traffic Management Design Guidance and Temporary Traffic Management Operations Guidance, and for consistency with Planning Scheme objectives under 2.1.4. 7. Prior to commencement of development the applicant shall provide detailed temporary access arrangement drawings, which must undergo a Stage 1 and Stage 2 Road Safety Audit for the written agreement of the Planning Authority. The applicant/ developer shall submit detailed layout drawing(s) of the temporary Access Junction with Barrington Road, which shall take account of/ include all existing trees, proposed hoarding, site access gates, all necessary signage, road markings, etc. Regarding the design (in particular of the cycle path/ footpath) the applicant shall adhere to DMURS and the Cycle Design Manual (2023). The detailed layout drawings of the temporary access junction on Barrington Road (and all secondary access junctions) shall include visibility splays/ sightlines to demonstrate forward visibility requirements are being met for all road users, including pedestrians and cyclists. Swept path analysis drawings demonstrating access and egress movements for the largest anticipated construction vehicle (which might be mobile cranes) and vehicle specification details, including dimensions, of the construction vehicles required. Reason: In the interest of road safety for vulnerable road users/ pedestrians and cyclists, and for consistency with Planning Scheme objectives under 2.1.4. PHYSICAL INFRASTRUCTURE: 8. Prior to commencement on site the applicant shall ensure that all requirements in relation to surface water drainage are resolved/ incorporated into the final design of the surface water infrastructure, including but not limited to the following: a) As the subject development is reliant upon the surface water infrastructure permitted under DZ23A/005, the developer shall ensure that the DZ23A/0005 surface water infrastructure is completed prior to connection of the subject development to it. b) Extensive Green Roofs: Prior to the commencement of the development, the applicant / developer shall submit to the planning authority for its written agreement, a detailed drawing demonstrating that the apartment blocks have 'Extensive Green Roof' covering a minimum of 70% of their roof area, as per current DLRCC Development Plan 2022-2028 Appendix 7 Green Roof Policy. Calculations confirming sufficient coverage shall also be included. The drawing shall include a breakdown (roof areas per apartment block and overall areas) of total roof area (into extensive green roof area, area covered by solar or other services. c) Prior to commencement of the development, the applicant shall submit to the planning authority for its written approval, fully dimensioned site-specific construction stage details and maintenance arrangements for the proposed SuDS measures/ attenuation systems, green roofs/ podiums, etc. d) Prior to commencement of development, the applicant shall provide detailed calculations and detailed design drawings, confirming that discharge from the subject development site is limited to 1.0 l/s/ha, for the written approval of the Planning Authority. e.) Prior to the commencement of the development, the applicant shall submit, for the written agreement of the Planning Authority, full details of the flow control devices, including model and make number, orifice size and flow control hydraulic characteristics curve. f.) The applicant shall ensure that all drainage works are carried out in accordance with the agreed details and that a post-construction maintenance specification and schedule is implemented on-site. Maintenance contractors with specialist training in SuDS care shall be used. Thereafter, all elements of the surface water management system shall be maintained at all times in accordance with the post- construction maintenance specification and schedule. g.) The applicant shall ensure that all underground attenuation systems within 5 metres of foundations or site boundaries have an impermeable liner and are offset sufficiently from the site boundary to provide sufficient space for future maintenance. h.) The applicant shall revise their layout plans (regarding the clash between the proposed bicycle/bin store located between Blocks 1 and 2 and the proposed Stormtech attenuation in the same location) and provide revised layout drawings to resolve any clashes between structures and underground attenuation/ surface water drainage. Also refer to PI22, bicycle parking. i.) The applicant shall ensure that all landscape proposals are compatible with the drainage proposals. REASON: In the interest of proper planning and development and to comply with Objective PI 6 of the Cherrywood Planning Scheme. 9. Regarding Stage 1 Stormwater Audit the applicant shall ensure that: a.) Prior to commencement on site the applicant shall ensure that all requirements of the Stage 1 Stormwater Audit are implemented and incorporated into the final design of the surface water infrastructure, including but not limited to the following: b.) Prior to commencement of construction, as per the applicant's Feedback Response in the submitted Stage 1 Stormwater Audit, groundwater monitoring of a duration to be agreed with the planning authority, shall be undertaken to ensure that at least 1m separation from the groundwater table can be achieved, below the lowest infiltration SuDS feature. The applicant shall provide the results of the groundwater monitoring and the associated infiltration proposals, to the local authority for their written approval. REASON: In the interest of sustainable development and to comply with the requirements of objective PI 7 of the Cherrywood Planning Scheme. 10. Prior to commencement of the development, the applicant/ developer shall provide details of all proposed on-site shared and segregated cycleways for written approval by the Planning Authority. Details of such provision shall include: final construction details, finishes, demarcation, and include all on-site cycleways junctions and/ or transitions/ connections with the existing cycle network on Barrington's Road, Grand Parade and Lehaunstown Lane. All on-site cycleways shall be provided in accordance with the agreed details prior to occupation of the development. REASON: In the interest of active and sustainable transport and safety and to ensure delivery of coherent on-site cycleways connected with cycle networks i.e., a series of interconnected routes joining all main origins and destinations without gaps or interruptions in provision in accordance with the Cycle Design Manual (2023) and DLRCOCO's Standards for Cycle Parking and associated Cycle Facilities for New Developments (2018) and for consistency with Planning Scheme objectives in chapter 4.2.7. 11. Prior to the commencement of development, the applicant/development shall provide the following for the written agreement with the planning authority: a. )An updated kerb layout drawing (drawing C-329 'Kerb Layout' by CS Consulting), ensuring that all tactile paving at pedestrian crossing points line up with dropped kerbs provided. b.) Detailed designs for the proposed external stepped areas. (details should include: Corduroy paving; Dimensions of riser and treads; Permanent visual contrast details for the first and last steps and;Handrails, including dimensions. REASON: To ensure compliance with Technical Guidance Document M and K of the Building Regulations and the Cherrywood Planning Scheme, and for consistency with Planning Scheme objective PI 20. 12. Prior to the commencement of development, a Car Park Layout and Management Plan for the development shall be prepared by the Applicant/Developer and submitted to the Planning Authority for agreement in writing. This Plan shall include the required modification of drawing CHW5-CSC-ZZ-XX-DR-C-0337-P3 and must demonstrate safe and unobstructed access/egress of parking bays, a car park layout plan including any modifications to parking bay provisions (i.e., removal of end bays where safe access/egress is not possible, or alternative measures), and shall include, but not be limited to: The proposed management of parking bays, demonstration of flexible arrangements including the temporary conversion of standard management parking bays to provide additional disabled parking provision upon request for residents while the creche is temporarily operational; and details of parking bay allocation, monitoring and enforcement measures required. The applicant shall revise swept paths and resubmit their swept paths analysis showing a 150mm offset/tolerance between the vehicle and any adjacent structure including bicycle parking, bulky waste stores and parked vehicles. REASON: To ensure that satisfactory parking layout is available to prospective development residents and users, in the interests of traffic safety, and for consistency with Planning Scheme objective PI 21. 13. The submitted design solution for access to the long-term bicycle parking at basement level under the apartments in this development via a non-segregated ramp (shared by cyclists and vehicles), is considered by the Planning Authority to be sub-standard and provides an inadequate quality of service to access the development for cycle users of all ages/abilities and for bicycles of all types. In the interest of clarity, the submitted design solution is not acceptable. a.) Prior to the commencement of development, the Applicant/Developer shall submit for the written agreement of the Planning Authority, revised design proposals for access to the long term bicycle parking locations demonstrating cycle access to bicycle parking at basement level can easily and safely cater for cyclists of all abilities and bicycles of all types, including cargo bikes and e-bikes, in accordance with the requirements of the Planning Scheme, Dun Laoghaire Rathdown County Council's County Development Plan 2022- 2028, Dun Laoghaire Rathdown County Council's Standards for Cycle Parking and associated Cycling Facilities for New Developments (2018), Measures CYC2 and CYC5 of the Greater Dublin Area Transport Strategy 2022-2042 and the NTA's Cycle Design Manual. As part of these revised cycle access design proposals, the Applicant/Developer shall consider a revised design proposal for the vehicular basement access ramp that includes cyclist segregation, as well as an appropriate gradient and transition design for cyclists. The applicant shall submit revised design proposals and relevant drawings accordingly. b.) Prior to commencement of the development, the applicant/developer shall provide, for the written agreement of the Planning Authority, a Cycle Parking Management Strategy detailing a scheme for cycle parking provisions for the development site. The details of which shall be compliant and laid out in accordance with the Standards for Cycle Parking and associated Cycling Facilities for New Developments (2018) (and be also compliant with relevant guidance documents, as per above) and shall include, but not be limited to: - Dimensions demonstrating adequate access to all bicycle parking spaces/locations - Dimensions demonstrating adequate aisle widths/ distances (e.g. between, beside, etc.) all types of stands proposed (e.g. two-tier stacked storage, Sheffield stands, cargo bike stands, etc.) - Car park ramp details, including gradients, width, and/or alternative step-free access arrangements (i.e., cycle lift or wheeling ramp staircase) and the associated vertical height clearance dimensions for basement ramp access. - Demonstration of a mixture of cycle parking types per communal cycle parking store; - Details of cycle parking allocation by use (i.e., residential, temporary creche, etc.) - Details of cycle parking stands, including manufacturer specifications; c.) Prior to commencement of development, the applicant shall resolve the clash of the proposed bike/bin store located between Duplex Blocks 1 and 2 and the proposed Stormtech Attenuation system proposed in the same general location - also refer to condition 6 h) above (regarding surface water drainage). REASON To ensure suitable cycle access to basement level bicycle parking for the development which can easily and safely cater for cyclists of all abilities and bicycles of all types; To accord with the provisions of Dun Laoghaire Rathdown County Council's County Development Plan 2022- 2028, Dun Laoghaire Rathdown County Council's Standards for Cycle Parking and associated Cycling Facilities for New Developments (2018), the Greater Dublin Area Transport Strategy 2022-2042 and the Cycle Design Manual; In the interests of consistency with Section 4.2.7, PI 13and PI 20of the Cherrywood Planning Scheme; and in the interests of orderly and sustainable development. 14. Prior to the commencement of the development, the applicant shall be required to provide for the written approval of the local authority, a combined services drawing illustrating the Mechanical, Electrical, watermain and drainage external site services together in one drawing. REASON: In the interest of Proper planning and sustainable development and for consistency with Planning Scheme objective PI 26. GREEN INFRASTRUCTURE, ECOLOGY & LANDSCAPING 15. All privately managed pedestrian and cycle links, Pocket Parks and Public Realm areas as defined within the application shall be made publicly accessible at all times. No gates or structures shall be erected to control access. REASON: To ensure the ongoing provision of a high-quality public realm and consistency with GI 33 of the Cherrywood Planning Scheme. 16. The proposed Pocket Parks, which do not form part of the Common Infrastructure shall be provided by the Applicant/Developer, and at the Applicant/Developer's own expense, and at no cost to the Planning Authority, and shall be publicly accessible at all times. REASON: In the interest of proper planning and sustainable development. 17.Prior to the commencement of development or as otherwise agreed in writing: a.)The Applicant/Developer shall engage the services of a qualified ecologist as an Ecological Consultant, from the commencement of development for the duration of the works. b.) The Ecological Consultant shall ensure the implementation of all the recommendations within the submitted updated Habitat Management Plan (Further Information received on 12th April 2024), as prepared for Stephen Little and Associates, as well as Section 6.6 (Mitigation Measures - Ameliorative, Remedial or Reductive Measures), Section 6.7 (Compensation), and 6.8 (Monitoring), of the submitted EIAR Addendum titled "Planning & Environmental Report" (prepared by Stephen Little & Associates, dated May 2023). Reason: To ensure consistency with Specific Objective GI 46 of the Cherrywood Planning Scheme. 18.Prior to the commencement of development, the applicant shall submit a Construction Environmental Management Plan (CEMP). The CEMP should have consistent details throughout, aligning with measures included in the various documents provided by the Applicant including the EIAR & Construction Surface Water Management Plan. This shall include an alignment of construction working hours across relevant documents. REASON: To ensure that all significant elements of the construction works with potential to cause significant environmental effects will be managed accordingly and are agreed prior to the commencement of development ENVIRONMENTAL WASTE MANAGEMENT 19.The Applicant and the developments Contractor shall develop and implement a Public Liaison Plan for the duration of the works, covering the following. -Appointment of a Liaison Officer as a single point of contact to engage with the local community and respond to concerns. -Keeping local residents informed of progress and timing of particular construction activities that may impact on them. -Provision of a notice at the site entrance identifying the proposed means for making a complaint. -Maintenance of a complaints log recording all complaints received and follow up actions REASON: In the interest of the proper planning and sustainable development of the area. FINANCIAL CONTRIBUTIONS 20. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €523.32 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Local Authority in respect of the provision of Surface Water Infrastructure benefiting development in the area of the Planning Authority, as provided for in the Development Contribution Scheme 2023-2028 made by Dún Laoghaire-Rathdown County Council on the 9th of October 2023. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index commencing from 1st January 2025. Contributions shall be payable at the index-adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Article 4.7 of the Scheme. Outstanding balances as of the 1st of January each year shall be subject to indexation and adjusted accordingly until the contribution has been paid in full. (See Article 8.3 of the Scheme). REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Infrastructure benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. Note on above Condition: Please note that with effect from 1st January 2014 Uisce Éireann are now the statutory body responsible for both water and wastewater services. Accordingly, the contribution payable has been reduced by the amount of the contribution associated with these services. Further details/clarification can be obtained from Uisce Éireann at Tel. 1800 278 278. 21. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €7,850.12 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Local Authority in respect of the provision of the Transport Infrastructure benefiting development in the area of the Planning Authority, as provided for in the Development Contribution Scheme 2023-2028 made by Dún Laoghaire-Rathdown County Council on the on the 9th of October 2023. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index commencing from 1st January 2025. Contributions shall be payable at the index-adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Article 4.7 of the Scheme. Outstanding balances as of the 1st of January each year shall be subject to indexation and adjusted accordingly until the contribution has been paid in full. (See Article 8.3 of the Scheme) REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Transport Infrastructure benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 22. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €43,960.56 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Local Authority in respect of the provision of the Community & Parks facilities & Recreational amenitiesbenefiting development in the area of the Planning Authority, as provided for in the Development Contribution Scheme 2023-2028 made by Dún Laoghaire-Rathdown County Council on the 9th of October 2023. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index commencing from 1st January 2025. Contributions shall be payable at the index-adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Article 4.7 of the Scheme. Outstanding balances as of the 1st of January each year shall be subject to indexation and adjusted accordingly until the contribution has been paid in full. (See Article 8.3 of the Scheme) REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks facilities & Recreational amenities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 23. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €68, 876.00 to the Planning Authority a contribution towards expenditure that was/or is proposed to be incurred by the Local Authority in respect of public infrastructure and facilities benefitting development in the Cherrywood Planning Scheme Area identified in Appendix III to the Development Contribution Scheme in respect of development in the Cherrywood Planning Scheme Area 2023 - 2028 made by Dún Laoghaire-Rathdown County Council on the 9th October 2023, as provided for in the said Scheme. This contribution shall be used solely to fund the public infrastructure and facilities identified in Appendix III to the Scheme: Public Infrastructure and Facilities benefitting development in the Cherrywood Planning Scheme Area. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index from 1st January, 2025. Contributions shall be payable at the index-adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Article 4.7 of the Scheme. Outstanding balances as of the 1st of January each year shall be subject to indexation and adjusted accordingly until the contribution has been paid in full. (See Article 7.3 of the Scheme) REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the public infrastructure and facilities benefitting development in the Cherrywood Planning Scheme Area and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 24.No development on foot of this permission shall commence until security for the provision and satisfactory completion of services (including roads, footpaths, open spaces, public lighting, sewers, watermains and drains) in accordance with the Plans and particulars lodged with the application, has been given by: a) Lodgement with the Council of an approved Insurance Company Bond in the sum of €11,600.00 which shall be kept in force by the Developer until such time as Roads, Open Spaces, Car Parks, Sewers, Watermains and Drains are completed to the satisfaction of the Council OR/... b) Lodgement with the Council of a Cash Sum of €7,200.00 to be applied by the Council at its absolute discretion if such services are not duly provided to its satisfaction on the provision and completion of such services to standard specifications. REASON: To ensure that a ready sanction may be available to the Council to induce the provision of services and prevent disamenity in the development. 25. This development shall not be carried out without prior agreement, in writing, between the Applicant & the Planning Authority relating to the payment of development contributions. REASON: Investment by Dún Laoghaire-Rathdown County Council in Local Authority works has facilitated and will facilitate the proposed development. It is considered appropriate and reasonable that the developer should contribute to the cost of same. NOTES 1.The proposed development shall accord with the requirements of Irish Water. 2.The attention of the applicant is drawn to Section 34(13) of the Planning and Development Act 2000, as amended, which relates as follows- 'A person shall not be entitled solely by reason of a permission under this section to carry out any development'. 3.The Applicant is advised that all/any requirements of the Environmental Health Office - Air Pollution and Noise Control Unit shall be ascertained and strictly adhered to. ## Nearby applications - [DZ23A/0354](https://cherrywoodplans.com/application/DZ23A-0354.md): Townlands of Laughanstown and Brennanstown, Dublin 18. Refused or withdrawn (23 Jun 2023). Amends a permitted Lehaunstown scheme to rearrange units and add 4 homes, taking it from 488 to 492. - [DZ23A/0812](https://cherrywoodplans.com/application/DZ23A-0812.md): Townlands of Laughanstown & Brennanstown, Dublin 18. Granted (14 Feb 2024). Amends a permitted housing scheme at L1 West to change the internal layouts of its 4-bed houses and move the site compound. - [DZ20A/0399](https://cherrywoodplans.com/application/DZ20A-0399.md): Townlands of Laughanstown and Brennanstown, Tully Development Area 8, Cherrywood, Dublin 18. Granted (22 Jan 2021). 136 new homes, mostly houses and two-level apartments, in Tully between Castle Street and the Luas, plus the Castle Street extension. - [DZ21A/1069](https://cherrywoodplans.com/application/DZ21A-1069.md): The overall site area of this application is approximately 8.7Ha. Townlands of Laughanstown and Brennanstown Dublin 18. Granted (2 Feb 2022). Minor changes to a permitted 136-home scheme in Tully so it can be built and occupied in phases. - [DZ23A/0005](https://cherrywoodplans.com/application/DZ23A-0005.md): Site in the the townlands of Laughanstown and Brennanstown, Castle Street, Barrington's Road, Dublin 18. Granted (7 Jul 2023). 89 new homes (houses and two-level apartments) and a crèche off Castle Street and Barrington's Road. - [DZ20A/0690](https://cherrywoodplans.com/application/DZ20A-0690.md): Site area of 9.77, in townlands of Laughanstown Brennanstown and Cherrywood, Dublin 18. Refused or withdrawn (3 Nov 2020). 152 new homes, mostly apartments plus houses, off Barrington's Road and Castle Street in Lehaunstown. - [DZ16A/0531](https://cherrywoodplans.com/application/DZ16A-0531.md): Glenellen, Lehaunstown Lane, Cabinteely, Dublin 18. Granted (1 Sep 2016). Demolishes the house Glenellen and its outbuildings on Lehaunstown Lane. - [DZ22A/0729](https://cherrywoodplans.com/application/DZ22A-0729.md): Townlands of, Laughanstown, Brennanstown and, Cherrywood, Dublin 18. Granted (22 Sep 2023). 57 new homes, houses and 3-bed two-level apartments, off Gun and Drum Hill Road in Tully. - [DZ21A/0664](https://cherrywoodplans.com/application/DZ21A-0664.md): Site in the Townlands of, Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (5 May 2022). 47 apartments in a 4-storey block off Castle Street in Tully. - [DZ24A/0696/WEB](https://cherrywoodplans.com/application/DZ24A-0696-WEB.md): Townlands of Laughanstown, and Brennanstown, Dublin 18. Granted (29 Oct 2024). Amends a permitted Tully scheme to add 4 apartments by raising part of Apartment Building 1 to 4 storeys. - [DZ24A/0686/WEB](https://cherrywoodplans.com/application/DZ24A-0686-WEB.md): Townlands of Laughanstown, and Brennanstown, Dublin 18. Refused or withdrawn (4 Sep 2024). Amends a permitted Tully scheme to add 4 apartments by raising part of Apartment Building 1 to 4 storeys. - [DZ23A/0028](https://cherrywoodplans.com/application/DZ23A-0028.md): Townlands of Laughanstown and Brennanstown, Dublin 18. Granted (8 Dec 2023). 56 new homes and a 3-storey childcare centre on tile T13 beside Beckett Park and Castle Street in Tully. - [DZ15A/0814](https://cherrywoodplans.com/application/DZ15A-0814.md): Laughanstown, Dublin 18, (Beckett Park). Granted (13 Jul 2016). Beckett Park: a new 5.1-hectare public park in Tully with a sports pitch, tennis courts, playground and pavilion café. - [DZ23A/0120](https://cherrywoodplans.com/application/DZ23A-0120.md): Site in the townlands of Laughanstown and Brennanstown, Castle Street, Barrington's Road, Dublin 18. Refused or withdrawn (29 Jan 2024). 240 build-to-rent apartments in 6 blocks of 2–4 storeys in Priorsland, off Castle Street. - [DZ26A/0252/WEB](https://cherrywoodplans.com/application/DZ26A-0252-WEB.md): A site in the townlands of Brennanstown and Laughanstown, Dublin 18. The main development site forms part of ‘Development Area 3. Granted (7 Oct 2026). 343 apartments in 8 blocks of up to 5 storeys off Castle Street in Priorsland. - [DZ18A/1129](https://cherrywoodplans.com/application/DZ18A-1129.md): Site (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8). Granted (4 Feb 2019). Builds a drainage basin and regrades a future school site in Laughanstown. - [DZ25A/0014/WEB](https://cherrywoodplans.com/application/DZ25A-0014-WEB.md): Townlands of Laughanstown & Brennanstown, Dublin 18. Granted (3 Mar 2025). Amends the permitted Tully village centre (plot T1) to shrink the basement, cutting car parking from 210 to 157 spaces. - [DZ23A/0106](https://cherrywoodplans.com/application/DZ23A-0106.md): Lands in the Townlands of Laughanstown and Brennanstown, Dublin 18. Granted (22 Sep 2023). A village centre at Tully with a supermarket, shops, cafés and 139 build-to-rent apartments in two blocks of 3–5 storeys. - [DZ26A/0750/WEB](https://cherrywoodplans.com/application/DZ26A-0750-WEB.md): Unit B, Mercer Way, Tully Village Centre West, Dublin 18, D18C58F. Refused or withdrawn (7 Oct 2026). Combines two permitted shop units at Tully Village Centre into one convenience store with an off-licence. - [DZ20A/0585](https://cherrywoodplans.com/application/DZ20A-0585.md): on a site in the Townlands of Laughanstown and Cherrywood, Dublin 18. Refused or withdrawn (2 Jun 2021). A temporary sales and marketing suite with 8 parking spaces for just under 5 years off Gun and Drum Hill Road. - [DZ22A/0770](https://cherrywoodplans.com/application/DZ22A-0770.md): On Lands Development Area 8 (Tully), Cherrywood SDZ, Laughanstown, Dublin 18. Granted (22 Mar 2023). 71 homes, a crèche, shops and a community room on plot T11 west of Castle Street in Tully village centre. - [DZ22A/0623](https://cherrywoodplans.com/application/DZ22A-0623.md): On Lands Development ,Plot T 11, Area 8 (Tully), Cherrywood SDZ, Laughanstown, Dublin 18. Granted (18 Jan 2023). 49 new houses on plot T11 west of Castle Street in Tully. - [DZ26A/0052/WEB](https://cherrywoodplans.com/application/DZ26A-0052-WEB.md): Townland of Laughanstown, Cherrywood, Dublin 18. Granted (24 Mar 2026). Makes minor layout and landscaping changes to a permitted Tully housing scheme, moving bin stores to the front of the two-level homes. - [DZ21A/1042](https://cherrywoodplans.com/application/DZ21A-1042.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (30 May 2022). 122 new homes, a mix of houses, two-level units and apartments, beside Tully Park and Lehaunstown Lane. - [D14A/0474](https://cherrywoodplans.com/application/D14A-0474.md): Druid Glen, Brennanstown Road, Cabinteely, Dublin 18. Granted (16 Dec 2014). Replacing a derelict two-storey house at Druid Glen, Brennanstown Road, with a new single-storey 4-bed home. - [D11A/0127](https://cherrywoodplans.com/application/D11A-0127.md): Carrickmines Substation, Barrington Tower, Brennanstown Road, Cabinteely, Dublin 18. Granted (29 Nov 2011). Seeks to keep an electrical substation built to power the Luas Green Line extension near Brennanstown Road. - [D10A/0104](https://cherrywoodplans.com/application/D10A-0104.md): Carrickmines Substation Barringtontowers, Brennanstown Road, Carrickmines, Co. Dublin. Refused or withdrawn (15 Apr 2010). Seeks to keep an electrical substation built to power the Luas Green Line extension near Brennanstown Road. - [D07A/0161](https://cherrywoodplans.com/application/D07A-0161.md): Barrington Tower, Brennanstown Road, Cabinteely, Dublin 18. Granted (23 Jan 2008). 158 homes, mostly apartments in a 5-storey building plus houses, in the grounds of Barrington Tower on Brennanstown Road. - [D07A/1723](https://cherrywoodplans.com/application/D07A-1723.md): Lehaunstown Bungalow, Lehaunstown Lane, Cabinteely, Co. Dublin. Refused or withdrawn (11 Feb 2008). Demolishes Lehaunstown Bungalow and builds a replacement house. - [DZ25A/0044/WEB](https://cherrywoodplans.com/application/DZ25A-0044-WEB.md): In the Townlands of Laughanstown, and Brennanstown, Dublin 18. Granted (10 Jul 2025). Amends a permitted Lehaunstown scheme to add a storey to two buildings, taking it from 492 to 517 homes, with fewer car spaces. - [DZ21A/0334](https://cherrywoodplans.com/application/DZ21A-0334.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (7 Apr 2022). 482 new homes, mostly apartments in five blocks up to 5 storeys, beside Barrington's Road and the Luas in Lehaunstown. - [ABP31328122](https://cherrywoodplans.com/application/ABP31328122.md): site of c.3.81 ha at Winterbrook and Barrington Tower, Brennanstown Road, Dublin 18. Refused or withdrawn (12 Sep 2024). Builds 534 build-to-rent apartments in 8 blocks of up to 10 storeys at Winterbrook and Barrington Tower, restoring the tower itself. - [DZ23A/0455](https://cherrywoodplans.com/application/DZ23A-0455.md): Area 8 (Tully) Cherrywood SDZ Lands, Laughanstown, Dublin 18. Granted (27 Oct 2023). Amends a permitted Tully housing scheme to provide 5 three-bed houses on Mercer's Road in place of 5 homes dropped by condition. ## Links - [This page on CherrywoodPlans](https://cherrywoodplans.com/application/DZ23A-0468) - [Council record, documents and conditions (DLR planning portal)](https://planning.agileapplications.ie/dunlaoghaire/application-details/96652) - [All Cherrywood applications](https://cherrywoodplans.com/applications.md) _Source: Dún Laoghaire–Rathdown County Council planning data, refreshed daily. CherrywoodPlans is an independent site, not run by the council._