# Planning application DZ24A/0291/WEB > Lands in the townland of Laughanstown, Dublin 18, located between Grand Parade and Tully Park., The application relates to development in Domville Development Area 4 of the Cherrywood Strategic Development Zone., Cherrywood, Dún Laoghaire–Rathdown. Granted (25 Mar 2025). - **Reference:** DZ24A/0291/WEB - **Address:** Lands in the townland of Laughanstown, Dublin 18, located between Grand Parade and Tully Park., The application relates to development in Domville Development Area 4 of the Cherrywood Strategic Development Zone. - **Status:** Granted (25 Mar 2025) - **Decision:** GRANT PERMISSION - **Application type:** Permission (SDZ) - **Applicant:** William Neville and Sons - **Lodged:** 26 Feb 2025 - **Decided:** 25 Mar 2025 - **Location (lat, lng):** 53.247433, -6.14931 ## Proposal Significant modifications and changes to the permission granted under planning Reg. Ref. DZ17A/0714 as extended under Reg. Ref. DZ17A/0714/E and as modified under Reg. Ref. DZ21A/0806. The modifications relate to the permitted 4-storey Blocks A1, A2, B and E fronting to Grand Parade. The permitted blocks accommodate 100 no. apartments comprising 32 no. 1-bedroom, 59 no. 2-bedroom and 9 no. 3-bedroom units and a creche. The proposed blocks will accommodate 158 no. apartments (a net increase of 58) comprising 49 no. 1-bedroom, 97 no. 2-bedroom and 12 no. 3-bedroom units and a creche. The development will consist of: Construction of new Block A, a 6-storey building to accommodate 62 no. apartments comprising 21 no. 1-bedroom and 41 no. 2-bedroom units and creche. The new Block A will be developed in lieu of the permitted 4-storey Blocks A1 & A2; Upward extension of 4-storey Block B to 6 storeys to accommodate 48 no. apartments comprising 20 no. 1-bedroom, 16 no. 2-bedroom and 12 no. 3-bedroom units; Upward extension of 4-storey Block E to 6 storeys to accommodate 48 no. apartments comprising 8 no. 1-bedroom and 40 no. 2-bedroom units; Reconfiguration and provision of 4 additional car parking spaces adjacent to Block A; Reconfiguration of the northern basement car park to provide 137 no. car parking spaces (a reduction of 5 spaces) and 208 no. cycle parking spaces (an increase of 78 spaces); Allocation of reduced car parking ratios to Blocks A, B and E; Landscaping and all associated site works and services. ## In plain English Amends the Domville permission to raise four blocks on Grand Parade from 4 to 6 storeys, adding 58 apartments. - **158** apartments - **58** extra apartments - **6** storeys - **208** cycle spaces ### What's planned An amendment to an earlier permission (DZ17A/0714) for the blocks fronting Grand Parade, which go from **100** to **158** apartments. ### Residential Blocks A1 and A2 become a single **6**-storey Block A with **62** apartments and a crèche. Blocks B and E rise to **6** storeys with **48** apartments each. New mix: **49** one-beds, **97** two-beds, **12** three-beds. ### Transport The northern basement drops to **137** car spaces (**5** fewer) and rises to **208** cycle spaces (**78** more). **4** extra car spaces by Block A, with less parking per home. _This summary was written by AI from the proposal text. Check the council record before relying on it._ ## Conditions ### Condition 2 FIRST SCHEDULE Reasons and Considerations Having regard to the 'Residential' zoning of the site as set out in the Cherrywood SDZ Planning Scheme 2014, as amended, and Dún Laoghaire - Rathdown County Development Plan 2022 - 2028, it is considered that subject to compliance with the conditions below, the proposed development would not seriously injure the amenities of the area and would not contravene materially the zoning of the application site or that of adjoining sites, subject to conditions and accords with the Planning Scheme. Appropriate Assessment Screening Having regard to the nature and scale of the proposed development, as clarified by way of Further Information received on 26/02/2025, it has been determined that the proposed development would not significantly impact upon a Natura 2000 Site. Environmental Impact Assessment Screening Having regard to the nature and scale of the proposed development, as clarified by way of Further Information received on 26/02/2025, which comprises an amendment to previously permitted development in a fully serviced urban location, it is considered that there is no real likelihood of significant effects on the environment arising from the proposed development. The need for environmental impact assessment can, therefore, be excluded at the preliminary examination and as such a screening determination is not required. SECOND SCHEDULE Conditions MISCELLANEOUS / GENERAL 1 a) The development shall be carried out in its entirety in accordance with the plans, particulars and specifications lodged with the application, save as may be required by the other conditions attached hereto. b) Save for amendments granted on foot of this permission and other conditions attached hereto, the development shall otherwise be carried out in strict accordance with the plans, particulars and conditions of Planning Permissions Reg. Ref. DZ17A/0714 and DZ21A/0806. REASON: In the interest of clarity, the proper planning and sustainable development of the area, to ensure that the proposed development is consistent with the Cherrywood Planning Scheme (2014, as amended) and to ensure that that effective control can be maintained. 2. Prior to commencement of development the Applicant/Developer shall submit for the written agreement of the Planning Authority, detailed design drawings prescribed below in digital format (CAD / GIS) and projected to ITM (Irish Transverse Mercator). This information should include the following with regard to the subject development: Overall site plans in DWG format (ITM projection in metres) Ground floor plans of buildings in DWG format (ITM projection in metres) Site sections and elevations in PDF format. REASON: To ensure consistency with Section 7.4 of the Cherrywood Planning Scheme (2014, as amended) SEQUENCING AND PHASING 3. Roads Phase 1, namely Junction A and roads: I1-A-A1-B-L-P2-C-D-D1-K1-K-F1-J-A2-A1 and road B-A2, shall be completed in full to a taking in charge standard and made available for public use prior to the occupation of all new residential development permitted under this application DZ24A/0291, i.e. the 55 no. additional apartment units to those previously permitted under the parent permission DZ17A/0714, as extended under DZ17A/0714/E and as modified under DZ21A/0806. REASON: To ensure consistency with the Phasing and Sequencing requirements of the Cherrywood Planning Scheme Table 7.3 Transportation Infrastructure and in the interests of the proper planning and sustainable development of the area. URBAN FORM AND DEVELOPMENT OBJECTIVES 4. Apartment 510 (at fifth floor of Block A) and E502 (at fifth floor of Block A), as detailed on drawings numbers P24-122K-02-00-XXX-DR-KDS-AR-1011 and P24-122K-02-00-ZZZ-DR-KDS-AR-1013 submitted by way of further information on 26/02/2025, shall both be omitted from the proposed development and the applicant shall submit the following for the written agreement of the planning authority prior to commencement of development: a) Revised plans and elevations that omit both residential units and revised proposals regarding external finishes in place of said units, which shall include for the addition of fenestration to apartment numbers E 503 (Block E) and 509 (Block A) along the north-east/Grand Parade elevations of both buildings and a continuation of the proposed cladding panels. b) Further to Condition 11 of DZ17A/0714 relating to finishes, this shall include for details of external finishes to Block A as well as to the third, fourth and fifth floors of Blocks B and E, inclusive of on-site mock ups with regards to brick finishes, cladding, render, balconies, roof materials, windows and doors. c) Revised elevations for Block E that matches the fifth floor plan (drawing no. P24-122K-02-00-XXX-DR-KDS-AR-2003 lodged by Further Information on 26/02/25) with regard to the nature and dimension of balconies that would serve units E508 and E501. d) Unless otherwise agreed by the Planning Authority, no changes to the layout or design of any apartment unit is permitted unless specified under (b) and (c) above. REASON: In the interest of visual amenity and to ensure consistency with PD 13 (Massing and Scale), PD 14 (Materials and Detailing), Section 2.8 (Urban Form), Section 2.8.2 (Skyline), Section 2.9.1 (Building Height) and Section 2.11 (Views and Prospects) of the Cherrywood Planning Scheme (2014, as amended). 5. Prior to the commencement of development, the Applicant/Developer shall submit the following for the written agreement of the planning authority: a) An updated wind microclimate assessment that predicts airflow patterns and models wind comfort levels around and between Blocks A, B and E at ground level and above ground level with regard to all newly proposed balconies and terraces. b) Details of mitigating measures for any newly proposed balconies and terraces that would not achieve appropriate levels of wind comfort. Unless otherwise agreed by the Planning Authority, such details shall be in the form of plans, elevations, sections and sample photographs and shall include for, where necessary and appropriate, half-height or full-height solid balustrade elements. REASON: In the interest of residential amenity and to ensure consistency with Specific Objective PD12 of the Cherrywood Planning Scheme (2014, as amended). 6. Prior to the commencement development, the applicant/developer shall submit for the written agreement of the Planning Authority, revised drawings (including elevations, sections and roof plans) that clearly detail the height, finish and visual appearance of all roof plant and roof structures including any screening. Such details shall seek to demonstrate and ensure that roof plant and structures are sufficiently designed and screened to minimise visual prominence. REASON: To ensure consistency with PD19 of the Cherrywood Planning Scheme (2014, as amended) and to prevent a proliferation of roof structures in the context of protected views from Tully Church and Environs. 7. Prior to the installation of any signage, awnings, canopies, banners, flags, projecting elements, promotional signage or window displays associated with the childcare facility at the ground floor level of Block A, the Applicant/Developer shall submit for the written agreement of the Planning Authority full details of their location, design and content including colour, materials, scale, lettering typeface, logos, illumination and finishes.With regard to the proposed illumination of any signage, all such signage shall be backlit and shall not be internally illuminated. REASON: In the interests of visual amenity and to ensure consistency with Section 2.12 Signage and Advertising and PD 31 of the Cherrywood Planning Scheme (2014, as amended). 8. All glazing, wall construction and room ventilation elements for the proposed development shall be designed, selected and specified to meet or exceed the acoustic sound insulation performance levels modelled in the Noise Impact Assessment (AWN, 2014) submitted to the Planning Authority by way of Further Information on 26/02/25. REASON: In the interest of residential amenity and to ensure consistency with PD33 of the Cherrywood Planning Scheme (2014, as amended). PHYSICAL INFRASTRUCTURE SURFACE WATER 9. Prior to commencement on site the applicant is requested to adhere to the following: a) Street trees shall be placed at intervals of not more than five perpendicular or two parallel car parking spaces (as per 4.2.7 of the Cherrywood Planning Scheme) b) The proposed conveyance/attenuation swale located west of Block A, as proposed under the subject application (DZ24A/0291) shall be constructed in full as part of the development's surface water network. c) Discharge from the subject development shall be limited to 1 l/s/ha unless otherwise agreed with Dun Laoghaire Rathdown County Council. REASON: In the interest of sustainable development, to ensure long term optimum operation of the surface water management system and to comply with the requirements of PI 6 of the Cherrywood Planning Scheme. 10. Prior to the commencement of development, the Applicant/ Developer shall submit the following details for the written agreement with the Planning Authority: a) The Applicant/ developer shall provide a catchment overview drawing to incorporate all hardstanding areas within the proposed subject development. In this regard the Applicant/ Developer shall provide fully detailed surface water and SuDS proposals including landscape and engineering detailed design drawings outlining proposals to intercept, treat and control runoff to a rate of 1 l/s/ha for all hardstanding areas within the red line boundary. The SuDS measures shall be consistent with any detailed design measures required by the Hydrogeological Risk Assessment (HRA) for the subject apartment blocks of the Domville Development. b) The Applicant/ developer shall provide a breakdown of areas to confirm that the proposals for interception (deemed to satisfy contributing areas) are in compliance with table 24.6 of CIRIA 753. Interception storage proposals shall satisfy suitable SuDS measures as outlined in table 24.6 of CIRIA 753. The designer shall demonstrate by way of providing calculations that there are sufficient SuDS surfaces to meet interception loss requirements (no runoff from site for rainfall depths up to 5mm for the majority of rainfall events). c) A detailed operations and maintenance plan for all proposed SuDS components within the subject development. d) A detailed Construction Stage Surface Water Management Plan. e) The Applicant/ developer shall submit drainage details for the proposed basement prior to commencement of the subject development. Basement drainage must be discharged to the foul system via petrol/ oil interceptors in accordance with the requirements of the GDSDS. REASON: In the interest of sustainable development, to ensure long term optimum operation of the surface water management system and to comply with the requirements of PI 6 of the Cherrywood Planning Scheme. TRAVEL PLAN 11. The Applicant/Developer shall update the Travel Plan for this development to include the additional 55 no. Apartments under this permission and shall ensure that suitable measures are implemented by the nominated Travel Plan Coordinator to enable the sustainable targets as set out in Table 4.1 of the Cherrywood Planning Scheme to be achieved for the subject development. REASON: To ensure that the future sustainable targets as set out in Table 4.1 of the Cherrywood Planning Scheme are achieved, and in the interest of consistency with Planning Scheme objective PI 13. CARPARKING 12. Prior to the commencement of development on site, the Applicant/Developer shall submit the following for the written agreement with the Planning Authority: a) A revised Car Parking Management Strategy which shall address the following: Proposals for implementation of usage charging for residential car parking spaces for 1 and 2 bed dwelling units, proposals for visitor parking, consideration of SMART parking measures, locations of residential car parking spaces allocated to 3 bed units. b) Revised carparking layouts (for basement and surface level) with the correct number of required car parking spaces: 148 no. spaces (including 140 no. residential spaces, plus 4no. carsharing spaces and 4 no. for the creche), which shall take the following into account: carparking shall be reduced - preferably at surface level - to enhance public realm and provide missing pedestrian link along desire lines across from communal green area across the road from the creche to the footpath along the creche. surplus basement car parking spaces shall be used to improve active travel infrastructure (e.g. provide a bike repair facility), increase no. of cargo bike parking space provision. Clearly indicating allocation of 1 no. carparking space per 3-bed unit. REASON: To ensure consistency with Objective PI 21 of the Cherrywood Planning Scheme, as amended under Amendment No. 9 (Nov. 2024). BICYCLE PARKING 13. Access for Cyclists Prior to the commencement of development, The Applicant/Developer shall submit for the written agreement of the Planning Authority, revised design proposals for access to the long term bicycle parking locations demonstrating cycle access to bicycle parking at basement level can easily and safely cater for cyclists of all abilities and bicycles of all types, including cargo bikes and e-bikes, in accordance with the requirements of the Planning Scheme, Dun Laoghaire Rathdown County Council's County Development Plan 2022- 2028, Dun Laoghaire Rathdown County Council's Standards for Cycle Parking and associated Cycling Facilities for New Developments (2018), and the NTA's Cycle Design Manual. In the interest of clarity, the applicant is advised that the submitted proposals sub-standard in this regard and are not acceptable. As part of these revised cycle access design proposals, the Applicant/Developer shall consider the following: a revised design proposal for the vehicular basement access ramp that includes cyclist segregation and an appropriate gradient and transition design for cyclists, and warning signs alerting vehicles of the presence of cyclists. The provision of additional basement access options including cycle friendly lifts (dimensioned to accommodate cargo/ oversized bikes) and stairs that incorporate wheel wells. Revised access door arrangement at basement level, (as the current access to the basement bike stores in Block A and B is unsuitable for cyclists) The applicant shall submit revised design proposals and relevant drawings accordingly. REASON: To ensure suitable cycle access to basement level bicycle parking in accordance with Section 4.2.7, PI 13 PI 20 and PI22 of the Cherrywood Planning Scheme; and in the interests of orderly and sustainable development. 14. Prior to the occupation of the subject development the Applicant /Developer shall submit a Cycle Parking Management Strategy (CPMS) and revised layout drawings for the written agreement of the Planning Authority. This strategy and revised layout drawings shall include details of the exact provision and location of both long-term and short-term cycle parking for the subject development (for residential units and the proposed creche), details for a provision of cycle parking that will cater for future demand, details of cycle parking facilities, that accord with the Dún Laoghaire Rathdown County Council's 'Standards for Cycle Parking and Associated Cycling Facilities for New Developments' (2018) and details concerning the operation and maintenance arrangements for the cycle parking facilities associated with this development. The Cycle Parking Management Strategy and revised drawings shall address the following: Provision of short-stay Cargo bike parking for the creche, at surface level Provision of long-stay spaces for creche staff Additional cargo bike parking for the apartments at basement level (note: overall recommended provision of 1 per 20 spaces, as per Cycle Design Manual) Provision of a bicycle parking allocation map, ensuring that 'all proposed long-stay bicycle parking spaces are located as close as possible to the principal destination (including entry and exit doors, lifts etc.)' - i.e. as close as possible to the relevant apartment core/ the creche. (This might require a revised design of the basement layout, as some bike stores do not appear to provide sufficient no. of bike parking spaces, per apartment block.) Detailed drawing clearly indicating the allocation of short-stay bike spaces, ensuring that at least 50% are covered spaces. REASON: To ensure consistency with Objective PI 22 of the Cherrywood Planning Scheme and with Dún Laoghaire Rathdown County Council's 'Standards for Cycle Parking and Associated Cycling Facilities for New Developments' (2018). WASTE MANAGEMENT 15. Prior to commencement on site the applicant/ developer shall submit a final Operational Waste Management Plan (OWMP), which includes full detail of waste storage provision for each apartment block and the creche, for the written agreement with the Local Authority. GREEN INFRASTRUCTURE 16. Prior to the commencement of landscape works, the Applicant/Developer shall submit for the written agreement of the Planning Authority revised landscape drawings showing: a) Continuation of native woodland tree and native hedgerow planting along the landscape strip between the Greenway and the creche car parking to ensure ecological connectivity and creation of a coherent buffer. b) Revisions to public realm/open space/green infrastructure as required by separate condition under this planning permission with regards to Specific Objective PI 21 of the Cherrywood Planning Scheme. c) The location, type and integration of all lighting types clearly shown on the planting plan for all amended public realm areas ensuring no conflict with proposed trees. Should lighting be required along the Greenway it shall be low level e.g. bollard style. REASON: To ensure consistency with Objective GI 65 and Section 5.5 of the Cherrywood Planning Scheme. 17. a) Prior to the commencement of development the applicant shall submit, for the written agreement of the Planning Authority, detailed foundation and construction designs for Blocks A, B and E together with an accompanying report from a suitably qualified hydrogeologist. b) The construction of agreed foundation designs shall be closely monitored and reported on by a suitably qualified hydrogeologist and a suitably qualified engineer. A joint report (from both disciplines) confirming the construction of foundations in accordance with the agreed designs, which shall robustly demonstrate a foundation design that would not interrupt groundwater flow and would not significantly impact groundwater recharge to Tufa Spring No. 5 as defined in the Cherrywood Planning Scheme (2014, as amended), shall be submitted for the record of the Planning Authority prior to the occupation of any residential units in Blocks A, B and E. REASON: To ensure for the protection of a priority EU Annex Habitat and to ensure consistency with Objective GI 61 of the Cherrywood Panning Scheme (2014, as amended). CONSTRUCTION MANAGEMENT PLAN 18. The Applicant and the developments Contractor shall implement the measures detailed within the submitted Outline Construction Environmental Management Plan (CEMP) prepared by Muir Associates Limited. The CEMP shall include the following not already detailed in the plan: - a) Confirmation that deliveries should not occur before 07:00 nor should vehicles be allowed to queue in advance of this time. b) Methods to ensure that vehicles leaving the site are clean with commitment to install a wheel wash equivalent method for cleaning down vehicle prior to leaving the site during construction. c) Measures to reduce any adverse impacts of the construction phase upon the environment. d) Measures to control temporary noise, dust and airborne pollutant emissions during the construction phase. e) Measures to prevent nuisance or adverse health effects. f) Dust Minimisation and Monitoring Plan should be provided as a compliance submission with details dust mitigation levels and dust monitoring commitments. g) Measures should align with and reflect the mitigation measures described in the Resource and Waste Management Plan submitted as a separate report. h) Measures should align with and reflect the mitigation measures described in the Noise impact assessment submitted as a separate report. i) Construction Noise Management Plan to include the following: A suitable qualified specialist company consultant should be appointed prior to the commencement of the works. All noise levels to be assessed by said consultant and limits submitted to DLRCC for approval. Limits should be determined using BS 5228-1:2009+A1:2014 Code of practice for noise and vibration control on construction and open sites - Noise. These monitoring stations must be supplied installed and maintained by a suitably qualified, suitable qualified specialist company for the duration of the works. Noise monitoring to demonstrate compliance with the limits established BS5228 shall be installed, monitored and reported on at weekly intervals (or as otherwise agreed in writing by DLRCC) by a suitable qualified specialist company for the duration of the contract. All monitoring data is to be compiled into a weekly technical monitoring report which shall identify remedial measures where levels exceed relevant limit values. j) Resource & Waste Management Plan The Applicant and the developments Contractor shall implement the measures detailed within the submitted Outline Resource & Waste Management Plan (RWMP) prepared by Muir Associates Limited. The RWMP shall include the following not already detailed in the plan: - The plan should identify the type of materials/proportion of re-use/recycled materials and future maintenance to support the implementation of Government and EU circular economy policy. In terms of Construction Waste, records shall be maintained and made available for inspection on site demonstrating tracking of all waste generated to final destination. The RWMP should be developed in accordance with 2021 Best practice guidelines for the preparation of resource & waste management plans for construction & demolition projects (EPA 2021). j) Pest Control Plan The Applicant and the developments Contractor shall develop and implement a Rodent/Pest Control Plan for the duration of the works on site. k) Public Liaison Plan The Applicant and the developments Contractor shall develop and implement a Public Liaison Plan for the duration of the works, covering the following. Appointment of a Liaison Officer as a single point of contact to engage with the local community and respond to concerns. Keeping local residents informed of progress and timing of particular construction activities that may impact on them. Provision of a notice at the site entrance identifying the proposed means for making a complaint. Maintenance of a complaints log recording all complaints received and follow up actions. REASON: In the interest of the proper planning and sustainable development of the area and to in order the safeguard the health, safety and amenities of properties and owners in the vicinity. CONTRIBUTIONS Countywide Surface Water 19. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €7,832.39 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Local Authority in respect of the provision of Surface Water Infrastructure benefiting development in the area of the Planning Authority, as provided for in the Development Contribution Scheme 2023-2028 made by Dún Laoghaire-Rathdown County Council on the 9th of October 2023. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index commencing from 1st January 2025. Contributions shall be payable at the index-adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Article 4.7 of the Scheme. Outstanding balances as of the 1st of January each year shall be subject to indexation and adjusted accordingly until the contribution has been paid in full. (See Article 8.3 of the Scheme). REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Infrastructure benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. Note on above Condition: Please note that with effect from 1st January 2014 Uisce Éireann are now the statutory body responsible for both water and wastewater services. Accordingly, the contribution payable has been reduced by the amount of the contribution associated with these services. Further details/clarification can be obtained from Uisce Éireann at Tel. 1800 278 278. Countywide Transport Infrastructure 20. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €117,510.99 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Local Authority in respect of the provision of the Transport Infrastructure benefiting development in the area of the Planning Authority, as provided for in the Development Contribution Scheme 2023-2028 made by Dún Laoghaire-Rathdown County Council on the on the 9th of October 2023. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index commencing from 1st January 2025. Contributions shall be payable at the index-adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Article 4.7 of the Scheme. Outstanding balances as of the 1st of January each year shall be subject to indexation and adjusted accordingly until the contribution has been paid in full. (See Article 8.3 of the Scheme). REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Transport Infrastructure benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. Countywide Community & Parks facilities & Recreational amenities 21. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €658,048.11 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Local Authority in respect of the provision of the Community & Parks facilities & Recreational amenities benefiting development in the area of the Planning Authority, as provided for in the Development Contribution Scheme 2023-2028 made by Dún Laoghaire-Rathdown County Council on the 9th of October 2023. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index commencing from 1st January 2025. Contributions shall be payable at the index-adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Article 4.7 of the Scheme. Outstanding balances as of the 1st of January each year shall be subject to indexation and adjusted accordingly until the contribution has been paid in full. (See Article 8.3 of the Scheme). REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks facilities & Recreational amenities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 22. This development shall not be carried out without prior agreement, in writing, between the Applicant and the Planning Authority relating to the payment of development contributions. REASON: Investment by Dún Laoghaire-Rathdown County Council in Local Authority works has facilitated and will facilitate the proposed development. It is considered appropriate and reasonable that the developer should contribute to the cost of same. 23. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €1,009,632.39 to the Planning Authority a contribution towards expenditure that was/or is proposed to be incurred by the Local Authority in respect of public infrastructure and facilities benefitting development in the Cherrywood Planning Scheme Area identified in Appendix III to the Development Contribution Scheme in respect of development in the Cherrywood Planning Scheme Area 2023 - 2028 made by Dún Laoghaire-Rathdown County Council on the 9th October 2023, as provided for in the said Scheme. This contribution shall be used solely to fund the public infrastructure and facilities identified in Appendix III to the Scheme: Public Infrastructure and Facilities benefitting development in the Cherrywood Planning Scheme Area. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index from 1st January, 2025. Contributions shall be payable at the index-adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Article 4.7 of the Scheme. Outstanding balances as of the 1st of January each year shall be subject to indexation and adjusted accordingly until the contribution has been paid in full. (See Article 7.3 of the Scheme) REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the public infrastructure and facilities benefitting development in the Cherrywood Planning Scheme Area and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. Bond Condition 24. No development on foot of this permission shall commence until security for the provision and satisfactory completion of services (including roads, footpaths, open spaces, public lighting, sewers, watermains and drains) in accordance with the Plans and particulars lodged with the application, has been given by:- a) Lodgement with the Council of an approved Insurance Company Bond in the sum of €279,900.00 which shall be renewed by the developer from time to time as required during the course of the development and kept in force by him until such time as Roads, Open Spaces, Car Parks, Sewers, Watermains and Drains are completed to the satisfaction of the Council OR/... b) Lodgement with the Council of a Cash Sum of €173,000.00 to be applied by the Council at its absolute discretion if such services are not duly provided to its satisfaction on the provision and completion of such services to standard specifications. OR/... c) Lodgement with the Planning Authority of a Letter of Guarantee by any body approved by the Planning Authority for the purpose in respect of the proposed development in accordance with the guarantee scheme agreed with the Planning Authority and such lodgement in any case has been acknowledged in writing by the Council. REASON: To ensure that a ready sanction may be available to the Council to induce the provision of services and prevent disamenity in the development. 25. The Developer shall pay all Financial Contributions on foot of Reg. Ref DZ17A/0714E and DZ21A/0806. This development shall not be carried out without prior agreement, in writing, between the Applicant and the Planning Authority relating to the payment of development contributions. REASON: Investment by Dún Laoghaire-Rathdown County Council in Local Authority works has facilitated and will facilitate the proposed development. It is considered appropriate and reasonable that the developer should contribute to the cost of same NOTE: The attention of the applicant is drawn to Section 34(13) of the Planning and Development Act 2000, which relates as follows- ''A person shall not be entitled solely by reason of a permission under this section to carry out any development''. NOTE: This permission does not imply any consent or approval for the structural stability and / or habitability of the works carried out and does not imply that the structure complies with the Building Regulations. NOTE: Any alterations to the drainage systems within the site are a matter for compliance with the Building Regulation. NOTE: The proposed development shall accord with the requirements of Uisce Éireann. NOTE: The Applicant is advised that all / any requirements of the Environmental Health Office - Air Pollution and Noise Control Unit shall be ascertained and strictly adhered to. ## Nearby applications - [DZ21A/0806](https://cherrywoodplans.com/application/DZ21A-0806.md): Lands in the townland of, Laughanstown, Dublin 18, located between Grand Parade and Tully Park. Granted (12 Aug 2022). Amends a permitted scheme between Grand Parade and Tully Park to add 60 apartments in three new 4-storey blocks. - [DZ24A/0236/WEB](https://cherrywoodplans.com/application/DZ24A-0236-WEB.md): Lands in the townland of Laughanstown, between Grand Parade and Tully Park, in Domville Development Area 4, Cherrywood, Dublin 18. Refused or withdrawn (15 Apr 2024). Amends the Domville permission to raise four blocks on Grand Parade from 4 to 6 storeys, adding 58 apartments. - [DZ17A/0714](https://cherrywoodplans.com/application/DZ17A-0714.md): Lands in the townlands of Lehaunstown and Cherrywood, Dublin 18. The application relates to development in the Cherrywood Strategic Development Zone.(Domville site). Granted (7 Aug 2018). Builds 322 new homes, 242 apartments and 80 houses, plus a crèche on the Domville site in Cherrywood. - [DZ25A/0489/WEB](https://cherrywoodplans.com/application/DZ25A-0489-WEB.md): 20, Domville Court, Tullyvale, Cherrywood, Dublin 18, D18VN3A. Granted (11 Aug 2025). Permission to keep a glass conservatory permanently at the back of a house on Domville Court. - [DZ25A/0480/WEB](https://cherrywoodplans.com/application/DZ25A-0480-WEB.md): 20, Domville Court, Tullyvale, Cherrywood, Dublin 18, D18VN3A. Refused or withdrawn (19 Jun 2025). Permission to keep a glass conservatory at the back of a house on Domville Court. - [DZ25A/0161/WEB](https://cherrywoodplans.com/application/DZ25A-0161-WEB.md): Lands in the townlands of Laughanstown, Dublin 18. The application relates to development in Cherrywood Strategic Development Zone. Granted (23 Apr 2025). Completion of a 145-metre stretch of Grand Parade from Tully Vale Road towards Bishop Street. - [DZ26B/0030/WEB](https://cherrywoodplans.com/application/DZ26B-0030-WEB.md): 17 Domville Court, Tullyvale, Cherrywood, Dublin 18, D18 WEK6. Refused or withdrawn (28 Jan 2026). Permission to keep a glass conservatory built in the back garden of a house on Domville Court. - [D03A/0735](https://cherrywoodplans.com/application/D03A-0735.md): Tullyvale, Druid Valley, Cherrywood, Loughlinstown, Co. Dublin.. Granted (22 Sep 2003). Changes the approved Tullyvale housing development by realigning its access road and adding a signalised pedestrian crossing. - [DZ26B/0241/WEB](https://cherrywoodplans.com/application/DZ26B-0241-WEB.md): 17 Domville Court, Cherrywood, Dublin 18, D18WEK6. Granted (10 Jun 2026). Permission to keep a glass conservatory permanently in the back garden of a house on Domville Court. - [DZ26B/0073/WEB](https://cherrywoodplans.com/application/DZ26B-0073-WEB.md): 17 Domville Court, Cherrywood, Dublin 18, D18WEK6. Refused or withdrawn (13 Mar 2026). Permission to keep a glass conservatory built in the back garden of a house on Domville Court. - [DZ15A/0758](https://cherrywoodplans.com/application/DZ15A-0758.md): in the townlands of Cherrywood, Laughanstown, Brennanstown, Loughlinstown and Glebe, Dublin 18. Granted (16 Aug 2016). Phase 1 roads for Cherrywood: about 5.4km of new and upgraded roads including Grand Parade, Castle Street and Bishop Street. - [DZ26B/0366/WEB](https://cherrywoodplans.com/application/DZ26B-0366-WEB.md): 10 Domville Square, Cherrywood, Dun Laoghaire, Dublin 18, D18H7WA. Granted (14 Aug 2026). Adds a small glass conservatory to the rear of a house at Domville Square. - [DZ26B/0360/WEB](https://cherrywoodplans.com/application/DZ26B-0360-WEB.md): 10, Domville Square, Cherrywood, Dun Laoghaire, Dublin 18, D18H7WA. Refused or withdrawn (24 Jun 2026). A small glass conservatory added to the back of a house on Domville Square. - [D05A/1658](https://cherrywoodplans.com/application/D05A-1658.md): Tullyvale, Druids Valley, Cherrywood, Loughlinstown, Co. Dublin. Refused or withdrawn (22 Feb 2006). 396 homes in 9 buildings of 3 to 8 storeys, with a childcare facility, at Tullyvale, Druids Valley. - [DZ26A/0148/WEB](https://cherrywoodplans.com/application/DZ26A-0148-WEB.md): Townland of Laughanstown, Dublin 18, The site is bounded by Grand Parade and Western Courtyard roads. Granted (20 Jul 2026). 311 new homes and a crèche in buildings of 3 to 6 storeys between Grand Parade and Western Courtyard. - [DZ26A/0151/WEB](https://cherrywoodplans.com/application/DZ26A-0151-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18.. Granted (24 Jun 2026). 188 new homes, a mix of apartments, two-level units and houses, beside Tully Park off Bishop Street. - [DZ22A/0133](https://cherrywoodplans.com/application/DZ22A-0133.md): Townlands of Laughanstown and Cherrywood, Dublin 18. Granted (22 Nov 2022). Builds 163 homes, a mix of apartments, triplexes, maisonettes and houses, beside Tully Park. - [DZ18A/0499](https://cherrywoodplans.com/application/DZ18A-0499.md): Lands (c.1.22ha) in the townlands of Cherrywood & Laughanstown, Dublin 18. Granted (11 Jan 2019). 146 apartments in four 4-storey blocks off Grand Parade on plot TC5. - [DZ15A/0813](https://cherrywoodplans.com/application/DZ15A-0813.md): Laughanstown, Dublin 18, (Tully Park). Granted (13 Jul 2016). Creates Tully Park, a 12.9-hectare public park with a playground, café kiosk and nature trails. - [DZ20A/0946](https://cherrywoodplans.com/application/DZ20A-0946.md): Lands known as Tully Park (c12.9HA), Laughanstown, Dublin 18. Granted (18 Feb 2021). Revises part of the permitted Tully Park, moving the café kiosk, redesigning the playground and adding a raised boardwalk. - [DZ24A/1030/WEB](https://cherrywoodplans.com/application/DZ24A-1030-WEB.md): In the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18. Granted (11 Jun 2025). Amends a permitted scheme off Tully Vale Road to add 59 apartments by raising four blocks by one or two storeys. - [D05A/0162](https://cherrywoodplans.com/application/D05A-0162.md): Druid Valley, Cherrywood, Loughlinstown, Co, Dublin.. Refused or withdrawn (7 Apr 2005). Builds 805 apartments and homes plus a crèche across 50 buildings at Druid Valley, Cherrywood. - [DZ20A/0877](https://cherrywoodplans.com/application/DZ20A-0877.md): Bishop Street, Cherrywood, Dublin 18, Co Dublin. Granted (29 Jan 2021). Installs a small gas regulator building on Bishop Street near the Luas line. - [ABP30342919](https://cherrywoodplans.com/application/ABP30342919.md): Site (c.3.06ha) in the townlands of Laughanstown, Dublin 18 (lands generally bounded by Bishop Street to the south, the Luas green line to the east and Tully park to the north. Granted (18 Apr 2019). Builds 184 homes, a mix of apartments, two-level units and houses, between Bishop Street, the Luas line and Tully Park. - [DZ25A/0152/WEB](https://cherrywoodplans.com/application/DZ25A-0152-WEB.md): Land in the townland of Laughanstown, Dublin 18, located north-west of the Tullyvale residential development.The application relates to development in. Granted (11 Jul 2025). Amends an earlier housing permission to shrink the planned basement car park to 13 spaces. - [DZ21A/0414](https://cherrywoodplans.com/application/DZ21A-0414.md): Townland of Laughanstown, Dublin 18. Granted (5 May 2022). 107 new homes, a mix of apartments and houses, north-west of Tullyvale. - [DZ22A/0093](https://cherrywoodplans.com/application/DZ22A-0093.md): Townland of Laughanstown, Dublin 18. Granted (1 Apr 2022). Seeks to keep two advertising signs for Cherrywood housing for 3 more years. - [DZ26A/0032/WEB](https://cherrywoodplans.com/application/DZ26A-0032-WEB.md): Block A1, The Tully Building, Civic Street, Cherrywood Town Centre, Dublin 18, D18WDK0. Granted (13 Mar 2026). Revised plan for 24 mobile phone antennas and 9 dishes on Block A1, The Tully Building, after an earlier compliance submission was rejected. - [DZ25A/0485/WEB](https://cherrywoodplans.com/application/DZ25A-0485-WEB.md): Block A1, Tully Buildings, Cherrywood, Dublin 18. Granted (1 Aug 2025). 24 mobile phone antennas and 9 dishes on the facade and roof of Block A1, Tully Buildings. - [DZ22A/0952](https://cherrywoodplans.com/application/DZ22A-0952.md): The Hunt Building, Grand Parade, Cherrywood Town Centre, Dublin 18. Refused or withdrawn (1 Feb 2023). 6 mobile phone antennas and 2 dishes on the roof of The Hunt Building, Grand Parade. - [DZ22A/0796](https://cherrywoodplans.com/application/DZ22A-0796.md): The Hunt Building, Grand Parade, Cherrywood Town Centre, Dublin 18. Refused or withdrawn (23 Nov 2022). 6 mobile phone antennas and 2 dishes, finished to look like brick, on the roof of The Hunt Building, Grand Parade. - [D04A/1013](https://cherrywoodplans.com/application/D04A-1013.md): Laughanstown/Cherrywood, With Access From N11, Wyattville Road, Co. Dublin.. Refused or withdrawn (9 May 2005). Seeks to keep modified land shaping and drainage works on a 36-hectare site at Laughanstown/Cherrywood and further alter them. - [D15A/0355](https://cherrywoodplans.com/application/D15A-0355.md): Site located in the green area at the entrance to, Druid Valley Estate, Cabinteely, Dublin 18. Refused or withdrawn (9 Jul 2015). Installs a small gas safety regulator unit on the green at the entrance to Druid Valley. - [DZ21A/1042](https://cherrywoodplans.com/application/DZ21A-1042.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (30 May 2022). 122 new homes, a mix of houses, two-level units and apartments, beside Tully Park and Lehaunstown Lane. - [DZ25A/0197/WEB](https://cherrywoodplans.com/application/DZ25A-0197-WEB.md): Located to the north end of the Valley Drive public road, which is a cul-de-sac, opposite the corner apartment building 97-106 E. Refused or withdrawn (18 Mar 2025). Provides a paved bin collection area at the end of Valley Drive for the Tullyvale apartments. - [DZ25A/0325/WEB](https://cherrywoodplans.com/application/DZ25A-0325-WEB.md): In the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18. Granted (15 Jan 2026). 121 apartments in two blocks of 3 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ25A/0102/WEB](https://cherrywoodplans.com/application/DZ25A-0102-WEB.md): In the Townlands of Laughanstown, in Cherrywood, Dublin 18. Granted (26 May 2025). Amends a permitted 200-apartment scheme in Macnebury to drop its basement and cut car parking from 241 to 160 spaces. - [DZ24A/1024/WEB](https://cherrywoodplans.com/application/DZ24A-1024-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood,, Dublin 18. Granted (1 May 2025). Amends a permitted Macnebury apartment scheme to cut car parking from 312 to 213 spaces and add bike, bin and storage buildings, with no change to the homes. - [DZ25A/0008/WEB](https://cherrywoodplans.com/application/DZ25A-0008-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18. Refused or withdrawn (6 Feb 2025). Amends a permitted 200-apartment scheme in Macnebury to drop its basement and cut car parking from 241 to 160 spaces. - [DZ24A/1016/WEB](https://cherrywoodplans.com/application/DZ24A-1016-WEB.md): In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18. Refused or withdrawn (3 Jan 2025). Amends a permitted Macnebury development by removing its basement and cutting car parking from 241 to 160 spaces. - [DZ24A/0017](https://cherrywoodplans.com/application/DZ24A-0017.md): Townlands of Laughanstown and Cherrywood, Macnebury - Development Area 7 - Cherrywood, Dublin 18. Granted (11 Jun 2024). 200 apartments in three blocks of 4 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ23A/0811](https://cherrywoodplans.com/application/DZ23A-0811.md): In the Townlands of Laughanstown and Cherrywood. Macnebury, Development Area 7 , Cherrywood, Dublin 18. Refused or withdrawn (4 Jan 2024). 200 apartments in three blocks of 4 to 5 storeys off Cherrywood Avenue in Macnebury. - [DZ22A/1021](https://cherrywoodplans.com/application/DZ22A-1021.md): Lands within Development Area 7 - Macnebury, including part of the Res 3 plot known as M1 located south of Bishop Street, west of Cherrywood Avenue, east and north of the proposed Beckett Road, Laughanstown, Dublin 18. Granted (27 Jun 2023). 283 new homes, mostly apartments in four blocks of 4–5 storeys, plus a crèche, south of Bishop Street in Macnebury. - [DZ18A/0458](https://cherrywoodplans.com/application/DZ18A-0458.md): on lands (c.0.74 HA) in the townland of Laughanstown, Dublin 18 (Development Area 8 - Tully). Granted (11 Jul 2018). Builds a new primary school with 24 classrooms plus a special needs unit, south-west of Tully Park. - [DZ21A/1038](https://cherrywoodplans.com/application/DZ21A-1038.md): site 1.85 ha at Castle Street and Bishop Street, Cherrywood, Dublin 18. Granted (8 Nov 2022). Builds a new 1,000-pupil secondary school at Castle Street and Bishop Street, Cherrywood. - [DZ18A/1178](https://cherrywoodplans.com/application/DZ18A-1178.md): 2.2 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (17 Apr 2019). Amends Town Centre plot TC2 to add one apartment, expand retail and resident amenity space, and move the crèche. - [DZ23A/0423](https://cherrywoodplans.com/application/DZ23A-0423.md): On lands (c.17.03 a) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (Also Co. Dublin). Granted (10 Aug 2023). Amends the Cherrywood Town Centre permission to add two 2-bed apartments to Block A1. - [DZ22A/0690](https://cherrywoodplans.com/application/DZ22A-0690.md): Townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (12 May 2023). Facade and balcony design changes to Cherrywood Town Centre apartment Blocks A1, A2 and A3. - [DZ22A/0747](https://cherrywoodplans.com/application/DZ22A-0747.md): Townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (30 Mar 2023). Changes of use and merging of units in Town Centre Blocks C1 and C2 to create a larger 723 sq.m shop with off-licence. - [DZ22A/0846](https://cherrywoodplans.com/application/DZ22A-0846.md): Lands (c. 17.03 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (22 Dec 2022). Removes a planned viewing platform at Block F1 in Cherrywood Town Centre, replacing it with a glass balustrade. - [DZ22A/0138](https://cherrywoodplans.com/application/DZ22A-0138.md): (c. 17.03ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (30 Aug 2022). Minor changes of use between shop and restaurant-type units in Town Centre Blocks C1 and C2, and a slightly larger crèche. - [DZ21A/0807](https://cherrywoodplans.com/application/DZ21A-0807.md): Lands (c. 17.03 ha), in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (8 Jul 2022). Amends the Cherrywood Town Centre permission to cut residential parking from 1,363 to 1,169 spaces and add 41 car-sharing spaces. - [DZ21A/0713](https://cherrywoodplans.com/application/DZ21A-0713.md): Lands (c. 17.01 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (3 Oct 2021). Design changes to the three apartment blocks A1–A3 in Cherrywood Town Centre, including taller windows and smaller roof terrace. - [DZ19A/1024](https://cherrywoodplans.com/application/DZ19A-1024.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (9 Sep 2020). Amends the Cherrywood Town Centre plan to shrink the basement under Blocks A1–A3 and reassign parking. - [DZ20A/0002](https://cherrywoodplans.com/application/DZ20A-0002.md): Lands (c.17.01ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (9 Sep 2020). Makes minor changes to electrical rooms and landscaping in Town Centre Blocks F1 and F3. - [DZ19A/0458](https://cherrywoodplans.com/application/DZ19A-0458.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (19 Jun 2020). Major redesign of Cherrywood Town Centre plot TC1, adding two supermarkets, an 11-screen cinema and much more retail space. - [DZ20A/0824](https://cherrywoodplans.com/application/DZ20A-0824.md): Lands (c. 17.01 ha), in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (11 Jan 2021). Changes the windows, balconies and frontage of Town Centre Block F2 on Cherrywood Avenue and Central Avenue. - [DZ19A/0148](https://cherrywoodplans.com/application/DZ19A-0148.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (24 Apr 2019). Amends Town Centre plot TC2 to add 47 apartments, taking Blocks C1 and C2 from 384 to 431 homes. - [DZ23A/0573](https://cherrywoodplans.com/application/DZ23A-0573.md): Lands (c. 17.03 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (19 Oct 2023). Amends the Cherrywood Town Centre permission to add 4 apartments in Blocks F2 and F3, bringing plot TC4 to 524 homes. - [DZ26A/0052/WEB](https://cherrywoodplans.com/application/DZ26A-0052-WEB.md): Townland of Laughanstown, Cherrywood, Dublin 18. Granted (24 Mar 2026). Makes minor layout and landscaping changes to a permitted Tully housing scheme, moving bin stores to the front of the two-level homes. - [DZ25A/0044/WEB](https://cherrywoodplans.com/application/DZ25A-0044-WEB.md): In the Townlands of Laughanstown, and Brennanstown, Dublin 18. Granted (10 Jul 2025). Amends a permitted Lehaunstown scheme to add a storey to two buildings, taking it from 492 to 517 homes, with fewer car spaces. - [DZ21A/0334](https://cherrywoodplans.com/application/DZ21A-0334.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (7 Apr 2022). 482 new homes, mostly apartments in five blocks up to 5 storeys, beside Barrington's Road and the Luas in Lehaunstown. - [DZ17A/0862](https://cherrywoodplans.com/application/DZ17A-0862.md): Lands (17.01ha) in the townlands of Cherrywood, Dublin 18. Granted (29 May 2018). The original Cherrywood Town Centre permission: 15 blocks with 1,269 homes, shops, offices, two hotels and a library, plus Grand Parade. - [DZ17A/0161](https://cherrywoodplans.com/application/DZ17A-0161.md): Lands (site area c.0.95ha) in the townland of Laughanstown, Dublin 18. Granted (12 Dec 2017). Sets up a temporary concrete plant for 7 years to supply the building of Cherrywood. - [PC/CSDZ/005/2021](https://cherrywoodplans.com/application/PC-CSDZ-005-2021.md): Cherrywood Strategic Development Zone, Townland of Laughanstown, County Dublin. Granted (5 Jul 2021). A council plan for a regional storm water pond (Pond 2A) in Laughanstown, draining to the Cabinteely River. - [D07A/1723](https://cherrywoodplans.com/application/D07A-1723.md): Lehaunstown Bungalow, Lehaunstown Lane, Cabinteely, Co. Dublin. Refused or withdrawn (11 Feb 2008). Demolishes Lehaunstown Bungalow and builds a replacement house. - [DZ22A/0820](https://cherrywoodplans.com/application/DZ22A-0820.md): Townlands of Laughanstown, Brennanstown and Cherrywood,, Dublin 18. Granted (12 Dec 2022). Makes minor changes to the already-permitted 168-home scheme in Tully, swapping the designs of 12 houses and altering some roofs. - [DZ22A/0403](https://cherrywoodplans.com/application/DZ22A-0403.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Refused or withdrawn (22 Jul 2022). Makes minor changes to the already-permitted 168-home scheme in Tully, swapping the designs of 12 houses and altering some roofs. - [DZ21A/0699](https://cherrywoodplans.com/application/DZ21A-0699.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (23 Sep 2021). Smaller first-floor bathroom windows on 33 permitted houses in Tully. - [DZ20A/0552](https://cherrywoodplans.com/application/DZ20A-0552.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18,. Granted (11 Mar 2021). 163 new homes, mostly houses, between Castle Street and Tully Park. ## Links - [This page on CherrywoodPlans](https://cherrywoodplans.com/application/DZ24A-0291-WEB) - [Council record, documents and conditions (DLR planning portal)](https://planning.agileapplications.ie/dunlaoghaire/application-details/98905) - [All Cherrywood applications](https://cherrywoodplans.com/applications.md) _Source: Dún Laoghaire–Rathdown County Council planning data, refreshed daily. CherrywoodPlans is an independent site, not run by the council._