# Planning application DZ24A/0485/WEB > Site Known as Block G3, Cherrywood Business Park, Cherrywood, Loughlinstown, Co. Dublin, Cherrywood, Dún Laoghaire–Rathdown. Granted (19 Dec 2024). - **Reference:** DZ24A/0485/WEB - **Address:** Site Known as Block G3, Cherrywood Business Park, Cherrywood, Loughlinstown, Co. Dublin - **Status:** Granted (19 Dec 2024) - **Decision:** GRANT PERMISSION - **Application type:** Permission (SDZ) - **Applicant:** DLR Properties - **Lodged:** 22 Nov 2024 - **Decided:** 19 Dec 2024 - **Location (lat, lng):** 53.24118, -6.141644 ## Proposal , green roof, hard and soft landscaping, vehicular set-down area, boundary treatment works, 30 No. Surface bicycle parking spaces, lighting, attenuation and drainage works (including amendment of permitted attenuation pond granted under Reg. Ref. DZ22A/0681), and all ancillary site development works including the realignment of the existing access road, works to public road including removal of car parking space. The application relates to development within the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014 (as amended). ## In plain English A 4-storey science and technology office building with labs on Block G3, Cherrywood Business Park. - **5,818** sq.m floor area - **4** storeys - **27** car parking spaces - **64** bicycle spaces ### What's planned A new office and research laboratory building over a basement, linked by a bridge to the existing Building 11. ### Commercial About **5,818** sq.m of offices and research and development labs over **4** storeys, with an ESB substation and rooftop plant behind screens. ### Transport **27** car spaces and **34** bicycle spaces in the basement, plus **30** surface bicycle spaces and a drop-off area. The access road is realigned and a car space on the public road removed. ### Environment A green roof, landscaping, and drainage works including changes to a permitted attenuation pond. _This summary was written by AI from the proposal text. Check the council record before relying on it._ ## Conditions ### Condition 2 First Schedule Reasons and Considerations Having regard to the land use zoning of the site as set out in the Cherrywood Planning Scheme, as amended, and the 2022-2028 Dún Laoghaire - Rathdown County Development Plan, it is considered that subject to compliance with the conditions below, the proposed development would not seriously injure the amenities of the area and would not contravene materially the zoning of the application site or that of adjoining sites, subject to conditions. Appropriate Assessment (AA) Screening The proposed development has been screened for AA (report on file) and it has been determined that the proposed development would not significantly impact upon a Natura 2000 Site. Environmental Impact Assessment (EIA) Screening Having regard to the nature and scale of the proposed development as clarified by way of Further Information dated 22.11.2024, which comprises HIE science and technology building and ancillary uses located in a Strategic Development Zone, it is considered that there is no real likelihood of significant effects on the environment arising from the proposed development. The need for environmental impact assessment can, therefore, be excluded at preliminary examination and as such a screening determination is not required. Second Schedule Conditions MISCELLANEOUS / GENERAL 1. The development shall be carried out in its entirety in accordance with the plans, particulars and specifications lodged with the application, as amended by Further Information received on 22.11.2024, save as may be required by the other conditions attached hereto. REASON: To ensure that the development shall be in accordance with the permission and that effective control be maintained. 2. Prior to the completion occupation of development, the Applicant/Developer shall submit for the written agreement of the Planning Authority, all detailed design drawings as per below in digital format (CAD/GIS) projected to ITM (Irish Transverse Mercator). This information should include the following: Overall site plans in DWG format (ITM projection in metres) Ground floor plans of buildings in DWG format (ITM projection in metres) Site sections and elevations in PDF format. REASON: To ensure consistency with Section 7.4 of the Cherrywood Planning Scheme URBAN DESIGN 3. Prior to the commencement of development, the applicant/developer shall provide, for the written agreement of the Planning Authority: Detailed drawings of the proposed external design/finishes for the building including; façade materials, glazing and doors, roof services/plant including flues, roof structures and associated screening, ESB substations, entrances to basement car parks, balconies/terraces, pergolas, car park vents; and On-site mock-ups for inspection with regard to all the elements identified in (a) above, and (unless otherwise agreed by the Planning Authority) samples in the format of sample boards. With regard to detailed drawings and on-site mock-ups, the external finishes of the building shall include materials that are: of high quality, durable, sustainable and attractive, with the avoidance of render where feasible; and ensure harmony and visual coherence in the built environment yet articulating interest to avoid monolithic and bulky facades, with particular attention to the upper floors. REASON: In the interest of visual amenity and to ensure consistency with Objectives PD 9, PD12, PD 14 and PD 19 of the Cherrywood Planning Scheme. 4. a. Prior to the commencement development, the applicant/developer shall submit for the written agreement of the Planning Authority, revised drawings (including elevations, sections and roof plans) and computer generated photomontages, which clearly show the design detail, including height finish and visual appearance of all roof plant and roof structures (first floor and roof level) including screening. Such details shall seek to demonstrate and ensure that roof plant and structures are sufficiently designed and screened to minimise visual prominence. b. Notwithstanding the provisions of Part 1 of Schedule 2 of the Planning & Development Regulations 2001 (as amended), or any superseding regulations, no additional services or installations shall be located on the roofs of the subject building without a prior grant of planning permission unless otherwise agreed by the Planning Authority. REASON: To ensure consistency with PD19 of the Cherrywood Planning Scheme (2014, as amended) and in the interest of visual amenity. SIGNAGE 5. a) Prior to the installation of any signage, awnings, canopies, banners, flags, other projecting elements, wayfinding & directional signage, promotional signage and window displays, the Applicant/Developer shall submit for the written agreement of the Planning Authority full details of their location, design and content including colour, materials, scale, lettering typeface, logos, illumination and finishes. All wayfinding and directional signage shall also be consistent with the Cherrywood Wayfinding & Directional Signage Strategy 2021 (as amended) and shall be at street level. b) Notwithstanding the provisions of the Planning & Development Regulations 2001 (as amended) or any superseding regulations, additional advertisement signs outside those agreed under (a) above (including any signs installed to be visible through windows) as well as advertisement structures, banners, canopies, flags or other projecting element shall not be displayed or erected on the building or within the curtilage, or attached to the glazing, without the prior grant of planning permission unless otherwise agreed by the Planning Authority. REASON: In the interests of visual amenity and to ensure consistency with Section 2.12 Signage and Advertising and Specific Objectives PD 30, PD 31 and PD32 of the Cherrywood Planning Scheme (2014, as amended). CONSTRUCTION MANAGEMENT 6. The Applicant/Developer shall comply with the following requirements: (a) Prior to commencement of development, the applicant/developer shall submit a final detailed construction Management Plan (CMP) for the written agreement of the Planning Authority, that shall include full details, including engineering layouts as appropriate for the site compound, details of the proposed programme and methodology, working hours, and any proposals for construction phasing. The CMP shall also include full details of the following: A CEMP (Construction Environmental Management Plan), that fully outlines environmental management measures to be implemented during the construction stage. A RWMP (Construction and Demolition Resource Waste Management Plan), that details how the RWMP will be measured and monitored throughout the construction stage, as set out in the Best Practice Guidelines for the Preparation of Resource and Waste Management Plans for C&D Projects (2021). A SWMP (Surface Water Management Plan), that details appropriate surface water management procedures/measures for the construction stage of the development, in accordance with the requirements of the Planning Authority. A CTMP (Construction Traffic Management Plan), that details all traffic management measures and signage for the permitted construction access route, as necessary, and details of construction vehicle parking and queueing proposals, noting parking for construction vehicles shall be provided within the site boundary. The CTMP shall ensure the narrow strip of land across the Luas Reservation between the proposed development and permitted park/greenway is NOT used for construction access. A CLP (Community Liaison Plan), including a nominated Project Liaison Officer (PLO) to manage all public relations issues relating to the construction works. Vibration, Dust & Noise Management Proposals, that demonstrate compliance with industry standards. (b) Prior to commencement of development, a mechanism and structure for on-site monitoring, and reporting on, progress and quality control in relation to construction standards, materials, as-built drawings, and records shall be agreed in writing with the Planning Authority. (c) For the duration of this development, from commencement of construction works (inclusive of enabling works) to completion of construction works, the Developer shall undertake continuous monitoring of the road network to be utilised for construction access to this development, to demonstrate how the existing road network is to be maintained to an acceptable standard throughout the construction phase. In this regard and at a minimum, an independent condition survey of the roads constructed under DZ15A/0758 and as extended by DZ15A/0758E, and DZ17A/0862 that are to be utilised for construction access to this development shall be undertaken by suitably qualified engineers/ surveyors appointed by the Developer, at the Developer's expense, both (i) prior to commencement of development and (ii) prior to occupation of the final phase of the development. The appointment of the engineers/surveyors shall be agreed in advance and in writing with the Planning Authority and they shall be independent of the Developer and the Developer's design and construction teams. The condition survey(s) produced are to be submitted for the written agreement of the Planning Authority. Damage, including structural defects, damage to the wearing course, footpaths, kerbs, road markings etc, to the road network that is identified in the condition survey(s) shall be rectified/replaced by the Developer, at the Developer's expense and to a taking in charge standard which is to the satisfaction of the Planning Authority. REASON: To ensure consistency with Section 2.14 of the Cherrywood Planning Scheme, and in the interests of orderly development, proper planning and sustainable development. WATER AND DRAINAGE 7. The Applicant / Developer shall comply with the following: a. All water supply and wastewater infrastructure required to service the subject development shall align with Uisce Éireann's masterplan for the Cherrywood area. All necessary agreements with Uisce Éireann shall be in place as and when required by Uisce Éireann and shall be constructed in accordance with Uisce Éireann's standards. b. All works on Cherrywood Avenue to facilitate new connections to Uisce Éireann infrastructure shall be undertaken at the Applicant/Developer's sole expense. c. The Applicant / Developer shall ensure that access to Uisce Éireann's infrastructure assets for maintenance shall not be inhibited and that the structural or functional integrity of the assets are maintained both during and post construction of the subject development d. The Applicant/Developer shall facilitate the delivery of the Bride's Glen watermain upgrade works in agreement withUisce Éireann. REASON: In the interests of sustainable development and in the interests of consistency with PI 4, PI 5 and PI 12 of the Planning Scheme. To ensure agreement with Uisce Éireann for the applicant's design proposals and to ensure the adequate provision of water and wastewater. 8. Prior to commencement of construction the applicant shall submit the following for the written agreement of the Planning Authority: (a) Hydraulic calculations and engineering drawings for the proposed surface water network, representative of the final detailed design and inclusive of the following: The full surface water network calculations and storm simulations for the 1 in 30 and 1 in 100 year event (incorporating climate change and urban creep) inclusive of the full contributing catchment area, which are fully commensurate with the detailed surface water design drawings. The Applicant/Developer shall include design drawings showing the volume and invert level of all attenuation structures referenced for full clarity. Calculations for the attenuation storage requirements for the 1 in 100 year event (incorporating climate change and urban creep) and locations of attenuation storage for the full site area. Proposed hydrobrake flow restriction control rates, including for any phased construction and commissioning of the surface water network. (b) Detailed design drawings for all SuDS measures proposed. Drawings shall include plans, cross sections and specifications, and shall accord in full with the landscaping design for the development. With reference to GDSDS requirements, the applicant shall provide detailed design calculations that clearly demonstrate how the various proposed interception measures on site provide the required interception volume. (c) A detailed operations and maintenance plan for all the proposed SuDS components, including green roofs. Proprietary systems, such as petrol interceptors,shall also be included in this plan. (d) Fully dimensioned engineering and landscaping layouts, which shall include in their detailed design information in tabular format comparing overall roof areas with green roof coverage areas (including green roof type) and a demonstration that green roof coverage has been maximised for the subject development. (e) Detailed and fully dimensioned drawings of the proposed bioretention tree pit in the south-eastern corner, which include details regarding the structural soil and growing medium proposed. The applicant shall also provide details of the proposed tree pit/ street tree on Cherrywood Avenue and how it is proposed to be connected to the surface water network, as required under PI 10. Refer to assessment under GI 65 also. REASON: In the interests of sustainable development and to comply with the requirements ofPI 6 ofthe Cherrywood Planning Scheme. 9. Prior to commencement of construction the applicant shall submit the following for the written agreement of the Planning Authority: A Stormwater Audit shall be carried out at Stage 2 for the detailed design stage in accordance with PI 7 of the Cherrywood Planning scheme. The audit shall be carried out at theDeveloper's expense. An independent audit team shall beused,and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 2 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the commencement of development, unless otherwise agreed.The Stage 2 Stormwater Audit reports shall address any and all phased construction and occupation proposals for the development and shall outline how the applicant/developer will maintain the runoff rate to 1 l/s/ha for each phase of construction and commissioning of the surface water network. For any proposed partial commissioning of surface water infrastructure associated with any phased construction /occupation of the development, interim Stage 3 Stormwater Audits shall be carried out for the post construction / prior to commissioning phases, in accordance with PI 7 of the Cherrywood Planning Scheme and at phases Pré-agreed with the Planning Authority as part of the Stage 2 Audit process. These audits shall be carried out at the Developer's expense. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. A Stormwater Audit shall be carried out at Stage 3 for the post construction / prior to commissioning stage in accordance with PI 7 of the Cherrywood Planning scheme. The audit shall be carried out at the Developer's expense. An independent audit team shall be used, and all measures recommended by the Auditor shall be undertaken unless the Planning Authority approves a departure in writing. The Stage 3 Stormwater Audit reports and feedback forms shall be submitted for the written agreement of the Planning Authority prior to the final commissioning of the full surface water network for the development. REASON: In the interests of sustainable development and to comply with the requirements of PI 7 of the Cherrywood Planning Scheme. TRANSPORTATION 10.The Applicant / Developer shall comply with the following: To ensure that the future sustainable targets as set out in Table 4.1 of the Cherrywood Planning Scheme are achieved, the Travel Plan for this development is to be reviewed on an Annual Basis. This review should include updated annual travel surveys of residential and commercial mode share, a review of available sustainable infrastructure to inform the mode share targets and to develop SMART measures for the development on site. This updated report should be submitted to the Area Wide Travel Plan Coordinator for review and comments and any actions arising from the review are to be then implemented by the nominated Travel Plan Coordinator. This shall be undertaken until such time as the Road Requirements listed in Table 6.6.2 of the Planning Scheme have been completed and are operation, or as otherwise agreed with the Planning Authority. REASON: To ensure that the proposed development is consistent with the Planning Scheme and in the interest of the proper planning and sustainable development of the area. 11.Prior to commencement of development the applicant is to provide the following, for the written agreement with the Planning Authority: (a) The applicant shall provide detailed design of all proposed road markings, kerbing, warning signage and deliveries safety railing for the loading area to the south of the subject G3 site. (b) Provide full details of all footpaths (including kerbing details, ensuring dished kerbs are provided at the proposed accessible parking space), including engineering drawings and landscaping drawings, inclusive of dimensions. The applicant is advised that the Planning Scheme requires that a minimum unobstructed width of 2m is maintained for pedestrians. REASON: In order to ensure that the proposed development is consistent with the Cherrywood Planning Scheme (PI 14 and chapter 4.2.7), to ensure the loading area to the south of the site is not used for parking, and in the interest of the proper planning and sustainable development of the area. 12.The Applicant / Developer shall comply with the following: All works to construct the access road that involve excavation and subsequent reinstatement of Cherrywood Avenue shall be carried out to the standards of DLRCC as Roads Authority, and that any such works will be solely at the applicant's/ developer's expense. REASON:In the interests of orderly development and proper planning, and the sustainable development of the area, and for consistency with the Cherrywood Planning Scheme. 13. The Applicant / Developer shall comply with the following: The subject development shall not encroach on the land to the west and south of the site which is reserved for the extension to the Luas Line B2 south of Brides Glen Luas Stop. REASON: In the interests of orderly development and proper planning, and the sustainable development of the area, and for consistency with the Cherrywood Planning Scheme PI 16. 14. Prior to the commencement of development, the Applicant/Developer shall submit a Car Parking Operation and Management Plan for the written agreement of the Planning Authority. REASON: To ensure that permitted car parking spaces are utilised for the subject development only and that no unauthorised car parking for other nearby destinations takes place, and to ensure compliance with Planning Scheme PI 21. 15. Prior to the commencement of development, the Applicant / Developer shall submit the following, for the written agreement of the Planning Authority: A revised cycle parking design, including detailed layouts, that clearly outlines a minimum provision of 29 no. short term cycle parking spaces at ground level, and 29 no. long-term cycle parking spaces for the subject development, in accordance with DLR's Standards for Cycle Parking. (DAPT recommend that an additional 4 no. short-stay cycle parking spaces at ground level may be facilitated by implementing 2 no. of the suggested future-demand Sheffield stands at the initial project delivery stage.) The applicant / developer shall ensure that cycle parking does not encroach on vehicular traffic lanes, and cycle parking design drawings shall include information regarding: dimensions at pinch points, ground markings in the basement, and details of safety and wayfinding signage as it relates to bicycle users. All drawings should align across all disciplines (e.g. architect's/engineer's/landscape architect's) and accurate bicycle parking provisions to be demonstrated throughout. A cycle parking management strategy, which shall include a comprehensive cycle parking operation and monitoring regime clearly showing how the operation and maintenance for the development's cycle parking will be implemented and managed, how the access arrangements to the basement parking will be facilitated/controlled, and how demand for cycle parking will be monitored. This cycle parking management strategy shall also outline in detail how additional provisions, if required for future demand, will be implemented by the Applicant/ Developer /Operator. REASON: In the interests of orderly development and proper planning, and the sustainable development of the area, and for consistency with the Cherrywood Planning Scheme PI 22. UTILITIES & TELECOMS 16. The Applicant / Developer shall comply with the following: The detailed design of the electricity supply network shall be in accordance with the requirements of ESB Networks/ESBI. The detailed design of the telecoms network shall be in accordance with the requirements of the telecoms provider. The Applicant/Developer shall ensure that adequate separation distances are provided within the development between utility service ducts and surface water, water and foul infrastructure to ensure access for future operation and maintenance activities as may be required. REASON: In the interests of orderly development; to ensure that designs shall meet with the current and future requirements of ESB Networks/ESBI/telecoms providers; to ensure the inclusion of infrastructure and connections would avoid subsequent excavation of newly constructed roadway; and to ensure consistency with Section 4.3.1 and PI 26 of the Planning Scheme. GREEN INFRASTRUCTURE, BIODIVERSITY AND AMENITY SPACE 17. The Applicant/Developer shall provide the following for the written agreement of the Planning Authority: a) The Applicant/Developer shall retain the services of a qualified Landscape Architect, as his/her Landscape Consultant, throughout the course of the development works, and shall notify the Planning Authority of that appointment in writing prior to the commencement of development. b) The Applicant/Developer shall engage the Landscape Consultant to procure, oversee and supervise the landscape contract for the implementation of the permitted landscape proposals. When all landscape works are inspected and completed to the satisfaction of the Landscape Consultant, he/she shall prepare, sign and submit a Practical Completion Certificate (PCC) to the Planning Authority, as verification that approved landscape plans and specifications have been fully implemented. REASON: To ensure a high-quality public realm and consistency with Objective GI 7 of the Cherrywood Planning Scheme and in the interest of proper planning and sustainable development of the area. 18. Prior to commencement of development of the landscape/public realm areas, the Applicant/Developer shall provide the following for the written agreement of the Planning Authority: a) Hard landscape plans, construction details and maintenance plans for all hard-standing pedestrian, surface cycling and vehicular areas (including adjoining footpath and road interfaces, steps, kerbs, walls, plinths and planters, heel proof grates,) detailing the specifications of all surface/finish materials. In this regard, samples, data sheets and on-site mock-ups of all materials shall be provided for the written agreement of the Planning Authority by way of compliance. The Planning Authority shall be notified when the materials are available for inspection. Approved control samples must be held, on-site. at all times. b) All surfaces and finishes shall include materials that are consistent with PD 14. In particular, the finishes shall comprise of durable, easily sourced and high-quality materials, comprising of natural stone (or other materials as agreed with the Planning Authority) that harmonise and complement those on the adjoining boundaries. The rationale for the provision of grass reinforcement matting at a rear entrance to Building 11 or proposals for a suitable high quality replacement material to integrate with the landscape proposals should be included. REASON: To ensure consistency with the Cherrywood Planning Scheme and Objectives PD 14, GI 7 and GI 8. 19. The Applicant / Developer shall comply with the following: a. Prior to the submission of the Commencement Notice within the meaning of Part II of the Building Control Regulations 1997 and prior to the commencement of any works on site, the developer shall appoint a qualified arborist as an arboricultural consultant for the entire period of construction. The Applicant/Developer shall inform the Planning Authority in writing, of the appointment and name of the Consultant, prior to commencement of development. b. Prior to the commencement of construction activity and for the entire period of construction, the Arboricultural Consultant shall visit the site at regular intervals, as appropriate, to ensure the implementation of all the recommendations in the submitted Tree Report. The applicant shall implement all the recommendations pertaining to tree retention, tree protection and tree works, as detailed in the Arboricultural Assessment and Tree Protection Plan. The arborist shall confirm in writing that fencing for retained trees meets BS5837:2012 ‘Trees in Relation to Design, Demolition and Construction - Recommendations’, prior to the commencement of construction activity. c. At Practical Completion of the development, the Arboricultural Consultant shall carry out a Post-construction Arboricultural Assessment of all retained trees and submit to the Planning Authority - a signed Arboricultural Completion Certificate stating that all Tree Works have been satisfactorily completed in accordance with his/her recommendations, highlighting any residual concerns arising from the Post-construction Assessment. REASON: To ensure consistency with Section 5.4.7 of the Cherrywood Planning Scheme and give practical effect to the retention, protection and sustainability of trees during and after construction of the permitted development. 20. The Applicant / Developer shall comply with the following: a) Prior to the commencement of development, the Applicant/Developer shall engage the services of a qualified ecologist as an ecological consultant, for the duration of the works. The Applicant/Developer shall inform the Planning Authority in writing, of this appointment and the name of the Consultant. b) The Consultant shall ensure the implementation of the mitigation measures, as outlined in Table 7 of the submitted Ecological Impact Assessment, dated 02/07/24, prepared by Altemar Marine and Environmental Consultancy. REASON: To ensure consistency with Specific Objective GI 46 of the Cherrywood Planning Scheme. 21. Prior to the commencement of landscape works the following shall be submitted for the written agreement of the Planning Authority: Details of Soft Landscape Design to include detailed Planting Plan and Planting Schedule - stating species/varieties, approximate quantities, sizes, rootball presentation and spacings. Planting mixes should specify a diverse range of species/varieties/cultivars and a diversity of forms and plant sizes (multi-stems, feathered, semi-matures, etc.) using both native and exotic species and pollinator-friendly native species (in accordance with the All-Ireland Pollinator Plan 2021-2025), all designed to provide vegetation that is visually appealing, bio-diverse, and easily managed. This should include management programmes for all proposed trees, shrubs and other vegetation demonstrating long-term continuity and consistency. Soft landscape details to include all tree pit types including the SUDS street tree pit proposed on Cherrywood Avenue and tree root protection barrier for services. Management programmes to include roof beam and louvre planting. REASON: To ensure consistency with Specific Objective GI 65 and Section 5.5 of the Cherrywood Planning Scheme. 22. Prior to the commencement of development, the following shall be submitted for the written agreement of the Planning Authority: • The Applicant/Developer shall commission and implement an Invasive Species Eradication Plan, prepared by a qualified Invasive Species Specialist, to prevent the spread of established Invasive Species identified onsite (a legal requirement) in accordance with best practice. REASON: To ensure consistency with Objective GI 68 of the Cherrywood Planning Scheme. 23. Prior to the commencement of landscape development, the Applicant/Developer shall submit the following for the written agreement of the Planning Authority: a) Details, specifications and samples for all boundaries, interfaces and transitions between private space and public space having regard to the need to ensure a coherent and complementary palette of materials and finishes across the application site, and with adjoining permitted developments including the proposed future Luas extension as indicated on Map 6.6 of the Cherrywood Planning Scheme (2014, as amended), Cherrywood Avenue and the adjacent G2 plot permitted under D06A/1497; and b) Evidence of consultation for the purpose of agreement with TII regarding detailed designs regarding the boundary interface between the development and the alignment for the adjacent future Luas Line Extension. REASON: To ensure consistency with GI objectives of the Cherrywood Planning Scheme. NOISE 24. The noise level generated by the development hereby permitted shall not exceed 55 dB(A) rated sound level (that is, corrected sound level for a tonal or impulsive component), from the nearest zoned Res 2 site to the west of the application site and the nearest zoned Town Centre site to the north of the application site, between 07:00 and 19:00 hours, Monday to Friday inclusive, and shall not exceed 50 dB(A) at any other time. REASON: In the interest of residential amenity and to ensure consistency with PD33 of the Cherrywood Planning Scheme (2014, as amended). TAKING IN CHARGE 25. Any and all areas within the development that are proposed to be Taking-In-Charge shall comply with Dún Laoghaire- Rathdown County Council 's(DLRCC) requirements and which shall include compliance with the following document(s): • Taking In Charge Development Standards Guidance Document June 2022 The DLRCC Service Departments, i.e. Road Maintenance/Public Lighting/Parks/Water Services Departments, shall be consulted on the detailed design and surface reinstatements in relation to the road network on Cherrywood Avenue South that is in the maintenance remit of DLRCC and within the scope of works referred to in Granted Planning Permission DZ24A/0485/WEB (and that these same lands shall revert to the maintenance remit of DLRCC in due course following the works). REASON: To ensure adherence to DLRCC Standards for Taking-in-Charge and to provide for the satisfactory completion and maintenance of the development. TII 26.The proposed development shall be undertaken strictly in accordance with the following requirements: Works are proposed to be carried out in close proximity to Luas infrastructure. The applicant, developer or contractor shall be required to apply for a works permit from the Luas Operator by virtue of the Light Railway (Regulation of Works) Bye-laws 2004 (S.I. number 101 of 2004) which regulates works occurring close to the Luas infrastructure in accordance with TII's ‘Code of engineering practice for works on, near, or adjacent the Luas light rail system’. The developer shall be liable for all of TII's costs associated with the removal and reinstatement of Luas related building fixings and infrastructure. The permit application will require prior consultation, facilitated by the Luas operator, Transdev. (a) Prior to commencement of development, a Construction Traffic Management Plan including access to services, shall be submitted for the written agreement of the planning authority subject to the written agreement of TII. The Construction Traffic Management Plan shall identify mitigation measures to protect operational Luas infrastructure. (b) Prior to commencement of development, a Demolition and/or Construction Method Statement shall be submitted for the written agreement of the planning authority subject to the written agreement of TII. The method statement shall resolve all Luas interface issues and shall (i) identify all Luas alignment interfaces, (ii) contain a risk assessment for works associated with the interfaces, and (iii) contain mitigation measures for unacceptably high risks, including vibration and settlement monitoring regime if necessary. The method statement shall be in accordance with TII's ‘Code of engineering practice for works on, near, or adjacent the Luas light rail system.’ Lighting design for the scheme shall not create glare onto the Luas alignment. Prior to commencement of development, details of lighting design shall be submitted for the written agreement of the planning authority subject to the written agreement of TII. (c) The Luas operator/TII will require 24hr access to Luas infrastructure. Prior to the commencement of development, the developer shall enter into an access and maintenance agreement with TII. (d) All deliveries made to the development site, including during the construction phase, shall be made to limit interference with Luas operations. (e) Future Luas, Metro and BRT alignments are a matter for the NTA. REASON: In the interests of orderly development, proper planning, and sustainable development and to ensure no adverse impact on Luas passengers, the operation and safety of the Luas, to minimise any reduction in public transport services and in the interests of public safety and amenity. DEVELOPMENT CONTRIBUTIONS 27. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €6,574.34 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Local Authority in respect of the provision of Surface Water Infrastructure benefiting development in the area of the Planning Authority, as provided for in the Development Contribution Scheme 2023-2028 made by Dún Laoghaire-Rathdown County Council on the 9th of October 2023. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index commencing from 1st January 2025. Contributions shall be payable at the index-adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Article 4.7 of the Scheme. Outstanding balances as of the 1st of January each year shall be subject to indexation and adjusted accordingly until the contribution has been paid in full. (See Article 8.3 of the Scheme). REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Infrastructure benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. Note on above Condition: Please note that with effect from 1st January 2014 Uisce Éireann are now the statutory body responsible for both water and wastewater services. Accordingly, the contribution payable has been reduced by the amount of the contribution associated with these services. Further details/clarification can be obtained from Uisce Éireann at Tel. 1800 278 278. 28. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €98,615.10 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Local Authority in respect of the provision of the Transport Infrastructure benefiting development in the area of the Planning Authority, as provided for in the Development Contribution Scheme 2023-2028 made by Dún Laoghaire-Rathdown County Council on the on the 9th of October 2023. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index commencing from 1st January 2025. Contributions shall be payable at the index-adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Article 4.7 of the Scheme. Outstanding balances as of the 1st of January each year shall be subject to indexation and adjusted accordingly until the contribution has been paid in full. (See Article 8.3 of the Scheme) REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Transport Infrastructure benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 29. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €552,186.38 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Local Authority in respect of the provision of the Community & Parks facilities & Recreational amenitiesbenefiting development in the area of the Planning Authority, as provided for in the Development Contribution Scheme 2023-2028 made by Dún Laoghaire-Rathdown County Council on the 9th of October 2023. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index commencing from 1st January 2025. Contributions shall be payable at the index-adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Article 4.7 of the Scheme. Outstanding balances as of the 1st of January each year shall be subject to indexation and adjusted accordingly until the contribution has been paid in full. (See Article 8.3 of the Scheme) REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks facilities & Recreational amenities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 30. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €715,672.18 to the Planning Authority a contribution towards expenditure that was/or is proposed to be incurred by the Local Authority in respect of public infrastructure and facilities benefitting development in the Cherrywood Planning Scheme Area identified in Appendix III to the Development Contribution Scheme in respect of development in the Cherrywood Planning Scheme Area 2023 - 2028 made by Dún Laoghaire-Rathdown County Council on the 9th October 2023, as provided for in the said Scheme. This contribution shall be used solely to fund the public infrastructure and facilities identified in Appendix III to the Scheme: Public Infrastructure and Facilities benefitting development in the Cherrywood Planning Scheme Area. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index from 1st January, 2025. Contributions shall be payable at the index-adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Article 4.7 of the Scheme. Outstanding balances as of the 1st of January each year shall be subject to indexation and adjusted accordingly until the contribution has been paid in full. (See Article 7.3 of the Scheme) REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the public infrastructure and facilities benefitting development in the Cherrywood Planning Scheme Area and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 31. A financial contribution shall be paid by the proposer to the Council towards the cost of the extension of Luas Line B from the Sandyford Depot to Cherrywood, namely Luas Line B1. This contribution shall be paid prior to the commencement of the development or in such other manner as may otherwise be agreed with the Planning Authority. The rate of contribution payable shall be that pertaining to the particular year in which implementation of the Planning Permission is commenced. The Supplementary Development Contribution Scheme provides for an annual increase in the levels of contribution payable, as outlined in the scheme, by a factor of 5% compound interest per annum. The levels of contribution will be reviewed annually on the 13th of January of each year during which the scheme is in force to take account of the aforementioned increase. The rate of contribution payable in respect of this development, at current contribution rates, is €1,034,640.63 and is subject to increase as outlined above. It should be noted that contributions assessed in accordance with the Supplementary Development Contribution Scheme cannot be appealed to An Bord Pleanala unless the applicant considers the levy referred to in this condition has not been properly applied in accordance with the terms of the Scheme. REASON: To part finance the extension of the Luas Line B1 from Sandyford Depot to Cherrywood, as provided for in the Supplementary Development Contribution Scheme adopted by the Council of Dún laoghaire-Rathdown on the 13th of January 2003. 32. This development shall not be carried out without prior agreement, in writing, between the Applicant and the Planning Authority relating to the payment of development contributions. REASON: Investment by Dún Laoghaire-Rathdown County Council in Local Authority works has facilitated and will facilitate the proposed development. It is considered appropriate and reasonable that the developer should contribute to the cost of same. 33. To ensure adequate financial provision is on hand to rectify any damaged caused to the road network associated with DZ15A/0758 and as extended by permission DZ15A/0758/E, as part of the condition survey that shall be submitted to the Planning Authority prior to commencement (inclusive of enabling works) under above condition shall include a detailed map that shows all routes that will be utilised for construction traffic associated with this development from commencement (inclusive of enabling works) to occupation of this development. This detailed map shall include the area of roadway in meters square to be utilised for construction traffic, this measurement will be used to calculate the value of a cash security or insurance bond for the value of €30/m2 of roadway utilised, to be lodged with the Planning Authority. No works shall take place (inclusive of enabling works) until this bond or cash security has been agreed and accepted by the Planning Authority. This bond will be refunded on satisfactory completion and certification by the Developer of any works identified in the condition survey, to be completed after occupation of all units within the development, and with written agreement from the Planning Authority that those works are carried out to Taking in Charge Standard. Failure to comply with the above condition may lead to the insurance bond/cash security being sequestered by the Planning Authority to complete any outstanding works REASON: To ensure that a ready sanction may be available to the County Council to induce the provision of services and prevent disamenity in the development. 34. The applicant shall enter into a Connection Agreement(s) with Uisce Éireann to provide for a service connection(s) to the public water supply and/or wastewater collection network and adhere to the standards and conditions set out in that agreement. All development shall be carried out in compliance with Uisce Éireann's Standard Details and Codes of Practice. Reason: To provide adequate water and wastewater facilities. NOTE 1: The proposed development shall accord with the requirements of Irish Water. NOTE 2:The Applicant is advised that all/any requirements of the Environmental Health Office shall be ascertained and strictly adhered to. NOTE 3:The Applicant is advised that all/any requirements of the Inland Fisheries Ireland shall be ascertained and strictly adhered to NOTE 4: The attention of the applicant is drawn to Section 34(13) of the Planning and Development Act 2000, as amended, which relates as follows- 'A person shall not be entitled solely by reason of a permission under this section to carry out any development'. Note 5: The Applicant is advised that in the event of encroachment or oversailing of the adjoining property, the consent of the adjoining property owner is required. If this written agreement is not obtained, the proposed development shall be modified only insofar as is required to do this. NOTE 6: Any alterations to the drainage systems within the site are a matter for compliance with the Building Regulations. ## Nearby applications - [DZ17A/0731](https://cherrywoodplans.com/application/DZ17A-0731.md): G3 (west of Block G2), Cherrywood Business Park, Cherrywood, Loughlinstown, Co Dublin (within the Cherrywood Strategic Development Zone (SDZ) and subject to the Cherrywood Planning Scheme 2014). Granted (26 Jan 2018). Builds a new four-storey office building, G3, on Cherrywood Avenue in Cherrywood Business Park. - [D06A/1497](https://cherrywoodplans.com/application/D06A-1497.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (14 Dec 2006). Builds a new four-storey office building, Block G2, over a two-level car park at Cherrywood Business Park. - [DZ20A/0611](https://cherrywoodplans.com/application/DZ20A-0611.md): Site of approximately 4,730 sq m at Building 11, (formerly known as Block G2), Cherrywood Business Park, Cherrywood, Co. Dublin, D18 DH50. Granted (19 Oct 2020). Expands the day hospital in Building 11, Cherrywood Business Park, to 1,220 sq.m. - [DZ18A/1131](https://cherrywoodplans.com/application/DZ18A-1131.md): Site of approx. 4,730 sqm at Building 11 (formerly known as Block G2), Cherrywood Business Park, Cherrywood, Dublin D18 DH50. Granted (5 Feb 2019). Turns part of the ground floor of Building 11 at Cherrywood Business Park into a 922 sq.m day hospital. - [DZ16A/0935](https://cherrywoodplans.com/application/DZ16A-0935.md): Block G2, Cherrywood Business Park, Cherrywood, Co. Dublin. Granted (17 Feb 2017). Adds landscaping, a drop-off area and a sign at Block G2, Cherrywood Business Park, and keeps three glass canopies. - [D03A/0479](https://cherrywoodplans.com/application/D03A-0479.md): ESB, Plot M, Cherrywood Science And Technology Park, Wyatville Link Road. Granted (14 Jul 2003). Seeks to keep an ESB 38 kV line mast already installed at Cherrywood Business Park. - [DZ17A/0649](https://cherrywoodplans.com/application/DZ17A-0649.md): Block G2, Cherrywood Business Park, Cherrywood, Co Dublin. Granted (8 Sep 2017). Adds louvred screening around rooftop plant on Block G2, Cherrywood Business Park. - [D10A/0701](https://cherrywoodplans.com/application/D10A-0701.md): Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (24 May 2011). A 197-space surface park and ride car park beside the Brides Glen Luas stop. - [DZ18A/0854](https://cherrywoodplans.com/application/DZ18A-0854.md): site (c.2.62 HA) at Cherrywood Business Park, Cherrywood Avenue, Cherrywood, Co. Dublin (also Dublin 18) (lands to the south and west of Blocks G and G2, south of Cherrywood Avenue). Granted (31 Oct 2018). Builds a three-pond drainage system with a walking and cycling route south of Cherrywood Avenue. - [D07A/1243](https://cherrywoodplans.com/application/D07A-1243.md): Glencarrig, Rathmichael, Co. Dublin. Granted (25 Oct 2007). Amends an earlier permission at Glencarrig to redesign one house and add a tenth five-bedroom house. - [DZ16A/0124](https://cherrywoodplans.com/application/DZ16A-0124.md): Cherrywood Business Park (to west of Block G2 and south of Block G and G2), Cherrywood, Loughlinstown, Co Dublin. Granted (21 Apr 2016). Seeks to keep a temporary access road to the Blocks G and G2 car park at Cherrywood Business Park for 7 years. - [D09A/0804](https://cherrywoodplans.com/application/D09A-0804.md): Cherrywood Science & Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (14 Jan 2010). Permission to keep changes at Blocks G and G2, Cherrywood Science & Technology Park, including a larger basement car park. - [DZ19A/0577](https://cherrywoodplans.com/application/DZ19A-0577.md): Cherrywood Avenue South adjacent to Building 11, formally known as Building G2, Cherrywood Business Park, Loughlinstown, Dublin, D18 DH50. Granted (23 Jan 2020). A new loading bay on Cherrywood Avenue South beside Building 11 in Cherrywood Business Park. - [D07A/0229](https://cherrywoodplans.com/application/D07A-0229.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.. Granted (28 May 2007). Adds a temporary vehicle ramp to the basement car park serving Blocks G and G2 at Cherrywood Business Park. - [D06A/0116](https://cherrywoodplans.com/application/D06A-0116.md): Glencarraig, Rathmichael, Co. Dublin. Granted (18 Aug 2006). 19 homes and a new access road linking Brides Glen Road to Cherrywood Science & Technology Park at Glencarraig. - [D05A/1083](https://cherrywoodplans.com/application/D05A-1083.md): Glencarrig (site At), Rathmichael, Co. Dublin. Refused or withdrawn (12 Oct 2005). Builds 73 apartments in two blocks at Glencarrig, with a new road and cycle route from Brides Glen Road to Cherrywood Business Park. - [DZ22A/0681](https://cherrywoodplans.com/application/DZ22A-0681.md): Cherrywood Avenue, (Adjoining Cherrywood Business Park), Cherrywood, Dublin 18. Granted (28 Jun 2023). A 5-storey block of 70 apartments on Cherrywood Avenue, beside Cherrywood Business Park. - [D13A/0292](https://cherrywoodplans.com/application/D13A-0292.md): Site at Glencarrig, Brides Glen Road, Rathmichael, Co. Dublin. Granted (1 Aug 2013). Amends the earlier Glencarrig permission with a revised design for 10 five-bedroom detached houses. - [DZ23A/0242](https://cherrywoodplans.com/application/DZ23A-0242.md): Townland of Cherrywood Dublin 18 The site is located in the Cherrywood Planning Scheme and forms part of the south eastern porti. Granted (7 Jun 2023). Changes to the permitted basement at Town Centre 3 so it can later connect to the wider TC3 basement. - [DZ21A/0785](https://cherrywoodplans.com/application/DZ21A-0785.md): c.0.95 ha townland, Cherrywood, Dublin 18 (also Co. Dublin). Granted (30 Mar 2022). An office building of up to 8 storeys with ground-floor cafés at the corner of Town Centre 3, beside the Bride's Glen Luas stop. - [D22A/0964](https://cherrywoodplans.com/application/D22A-0964.md): The Old Glebe, Brides Glen Road, Dublin 18, D18Y7H7. Granted (4 Apr 2023). Alters Old Glebe House, a protected structure, and extends its coach house from one to three bedrooms. - [D22A/1019](https://cherrywoodplans.com/application/D22A-1019.md): Old Glebe House, Brides Glen Road, Shankill, Dublin 18, D18Y7H7. Refused or withdrawn (22 Feb 2023). Builds two four-bedroom houses in the lower grounds of the Old Glebe on Brides Glen Road. - [DZ21A/0818](https://cherrywoodplans.com/application/DZ21A-0818.md): Site of approximately 0.43 ha at Building 10 (formerly known as Block G), Cherrywood Business Park, Cherrywood, Co. Dublin, D18 T3Y1. Granted (24 Feb 2022). New plant enclosures, flue stacks and doors at Building 10 in Cherrywood Business Park. - [D13A/0534](https://cherrywoodplans.com/application/D13A-0534.md): Old Glebe House, Brides Glen Road, Townland Glebe (Rathmichael),Dublin 18. Granted (11 Feb 2014). Replaces a single-storey annex on Old Glebe House, a protected structure, with a new single-storey extension. - [D19A/0277](https://cherrywoodplans.com/application/D19A-0277.md): Old Glebe House, Brides Glen Road, Rathmichael, Dublin 18. Refused or withdrawn (19 Jun 2019). Builds three detached three-storey houses within the grounds of Old Glebe House, a protected structure, on Brides Glen Road. - [D24A/0037](https://cherrywoodplans.com/application/D24A-0037.md): The Old Glebe House, Brides Glen Road, Shankill, Dublin 18, D18Y7H7. Granted (11 Mar 2024). Changes to an approved extension at The Old Glebe House, Brides Glen Road, enlarging the ground floor from 83 to 103 sq.m. - [D23A/0820](https://cherrywoodplans.com/application/D23A-0820.md): The Old Glebe House, Brides Glen Road, Shankill, Dublin 18, D18Y7H7. Refused or withdrawn (15 Jan 2024). Changes to an approved extension at The Old Glebe House, Brides Glen Road, enlarging the ground floor from 83 to 103 sq.m. - [DZ26A/0001/WEB](https://cherrywoodplans.com/application/DZ26A-0001-WEB.md): Cherrywood Avenue, (Adjoining Cherrywood Business Park), Cherrywood, Dublin 18. Granted (29 Jun 2026). Amends a permitted apartment scheme on Cherrywood Avenue to go from 67 to 70 apartments, with more parking. - [DZ25A/0983/WEB](https://cherrywoodplans.com/application/DZ25A-0983-WEB.md): Cherrywood Avenue ( adjoining Cherrywood Business Park), Cherrywood, Dublin 18. Refused or withdrawn (22 Dec 2025). Amends a permitted apartment scheme on Cherrywood Avenue to go from 67 to 70 apartments, with more parking. - [D23A/0392](https://cherrywoodplans.com/application/D23A-0392.md): The Old Glebe House, Brides Glen Road, Shankill, Dublin 18, D18Y7H7--a protected structure.. Granted (1 Nov 2023). Two new 4-bedroom, two-storey houses in the lower grounds of The Old Glebe House, Brides Glen Road. - [D04A/0232](https://cherrywoodplans.com/application/D04A-0232.md): Block H, Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (23 Apr 2004). Puts up a lit corporate logo sign at Block H, Cherrywood Business Park. - [D08B/0452](https://cherrywoodplans.com/application/D08B-0452.md): Heather Hill, Cherrywood Road, Loughlinstown, Co. Dublin. Granted (7 Aug 2008). Extends a house at Heather Hill, Cherrywood Road, with single and two-storey additions. - [D06A/1475](https://cherrywoodplans.com/application/D06A-1475.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (20 Dec 2006). Enlarges the approved Block G office building by filling in a front recess and extending the penthouse, adding 502 sq.m. - [D06A/0015](https://cherrywoodplans.com/application/D06A-0015.md): Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (1 Mar 2006). Adds an extra floor to the approved Block G office building at Cherrywood Business Park, taking it from three to four storeys. - [D05A/0219](https://cherrywoodplans.com/application/D05A-0219.md): Cherrywood Science & Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (9 Nov 2005). Changes the approved Block G office building with a two-level underground car park and a larger floor area. - [D02A/0430](https://cherrywoodplans.com/application/D02A-0430.md): Cherrywood Science & Technology Park,, Cherrywood, Loughlinstown, Co. Dublin.. Granted (10 Jul 2002). Allows five permitted science and technology buildings at Cherrywood Business Park to be used instead for office-based industry. - [D02A/0508](https://cherrywoodplans.com/application/D02A-0508.md): Building H, Cherrywood Science & Technology Park,, Cherrywood, Loughlinstown, Co. Dublin.. Granted (22 Jul 2002). Adds 15 parking spaces to the car park serving Building H at Cherrywood Business Park. - [D22A/0079](https://cherrywoodplans.com/application/D22A-0079.md): Cherrywood Lodge, Brides Glen Road, Shankill, Dublin 18. Granted (30 Mar 2022). Converting and extending an outbuilding at Cherrywood Lodge, Brides Glen Road, into a new single-storey home. - [DZ20A/0052](https://cherrywoodplans.com/application/DZ20A-0052.md): 1.86 ha in the townlands of Cherrywood, Dublin 18 (also Co. Dublin)--TC3. Granted (13 Apr 2021). A mixed-use block at Town Centre 3 with an 8-storey office building and 198 build-to-rent apartments. - [DZ22A/1025](https://cherrywoodplans.com/application/DZ22A-1025.md): Cherrywood Avenue, Lands within the townlands of Glebe and Cherrywood, Dublin 18. Granted (2 Nov 2023). Builds 44 homes, houses and two-level units, off Cherrywood Avenue. - [D07A/1770](https://cherrywoodplans.com/application/D07A-1770.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin.. Refused or withdrawn (28 Jan 2008). Builds a multi-storey car park with 1,081 spaces and 10 ground-floor shops at Cherrywood Business Park. - [D22A/0353](https://cherrywoodplans.com/application/D22A-0353.md): Cherrywood House, Cherrywood Road, Shankill, Dublin 18 (A Protected Structure). Granted (15 Sep 2022). Restores and upgrades Cherrywood House, a protected structure, replacing its 20th-century flat-roofed extensions. - [D07A/0597](https://cherrywoodplans.com/application/D07A-0597.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.(Blocks F and G),. Refused or withdrawn (12 Jun 2007). Three office buildings of 4 to 7 storeys at Cherrywood Science & Technology Park, with a 612-space basement car park. - [D16A/0361](https://cherrywoodplans.com/application/D16A-0361.md): The Orchard, Cherrywood Road, Loughlinstown, Co. Dublin. Granted (12 Sep 2016). Builds two new two-storey houses beside an existing home at The Orchard, Cherrywood Road. - [D08A/0035](https://cherrywoodplans.com/application/D08A-0035.md): Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (26 Jun 2008). A 4–5 storey office building (Building F) and new road at Cherrywood Science & Technology Park, with 289 basement car spaces. - [D02A/0660](https://cherrywoodplans.com/application/D02A-0660.md): Clanart, Cherrywoood Road, Loughlinstown, Dublin 18.. Granted (20 Aug 2002). Seeks permission to keep part of an existing single-storey bungalow on Cherrywood Road. - [DZ19A/1021](https://cherrywoodplans.com/application/DZ19A-1021.md): Blocks F1, F2 and F3 (3no. office blocks under construction) at Cherrywood Business Park, Cherrywood, Co Dublin (also Dublin 18). Refused or withdrawn (5 Feb 2020). Allows up to 229 spaces in the basement car park of office Blocks F1–F3 to be used for temporary parking for 7 years. - [DZ18A/1104](https://cherrywoodplans.com/application/DZ18A-1104.md): Lands (c.2.57ha) Cherrywood Business Park (lands including & adjoining former Block F, part of existing Block G (basement level -1 only) & lands to rear Blocks G & G2, Cherrywood, Co Dublin (also Dublin 18). Site is within Development Area 6A Brides Glen. Granted (29 Jan 2019). Builds office Block F3 and expands the shared basement car park to 658 spaces, with a new linear park, at Cherrywood Business Park. - [D15B/0171](https://cherrywoodplans.com/application/D15B-0171.md): Clanart, Cherrywood Road, Loughlinstown, Dublin 18. Granted (10 Jul 2015). Rebuilds and extends a single-storey house at Clanart, Cherrywood Road, with a new raised roof. - [DZ19A/0186](https://cherrywoodplans.com/application/DZ19A-0186.md): c. 1.676 ha at Cherrywood Business Park (lands including former Block F), Cherrywood, Co. Dublin (also Dublin 18). Granted (9 May 2019). Adds landscaped roof terraces to permitted office Blocks F1 and F2 at Cherrywood Business Park. - [DZ17A/0122](https://cherrywoodplans.com/application/DZ17A-0122.md): Lands (c.1.6284 ha) at Cherrywood Business Park (lands including former Block F), Cherrywood, Co Dublin (also Dublin 18). Granted (7 Feb 2018). Builds two five-storey office blocks, F1 and F2, over an existing basement car park at Cherrywood Business Park. - [DZ22A/0591](https://cherrywoodplans.com/application/DZ22A-0591.md): C. 3.71 in the Townland of Cherrywood, Block Town Centre 3 (TC3), Dublin 18. Granted (20 Jun 2023). 418 build-to-rent apartments in four blocks of up to 5 storeys at Town Centre 3, with shops, cafés and community space. - [D09A/0501](https://cherrywoodplans.com/application/D09A-0501.md): Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Refused or withdrawn (3 Sep 2009). 112 apartments, offices and shops in three buildings of 5–6 storeys at Cherrywood Science & Technology Park. - [DZ21A/0029](https://cherrywoodplans.com/application/DZ21A-0029.md): Site of approximately 1,094 sq m at Building 8 (formerly known as Block E), Cherrywood Business Park, Cherrywood, Co. Dublin, c. Granted (29 Apr 2021). Rebuilds the front entrance of Building 8 at Cherrywood Business Park with a slightly larger lobby. - [DZ24A/0366/WEB](https://cherrywoodplans.com/application/DZ24A-0366-WEB.md): Building 8, Cherrywood Business Park, Dublin 18, D18W319. Granted (17 Jul 2024). Adds tenant signage and a wayfinding totem at Building 8, Cherrywood Business Park. - [DZ23A/0283](https://cherrywoodplans.com/application/DZ23A-0283.md): Building 8, Cherrywood Business Park, Cherrywood, Loughlinstown, Co. Dublin, D18 W319. Granted (11 Aug 2023). Turns Building 8 at Cherrywood Business Park from offices into a private medical clinic. - [DZ24A/1007/WEB](https://cherrywoodplans.com/application/DZ24A-1007-WEB.md): ‘Red Zone’ temporary surface car park, and Blocks F1-F3, ‘The Campus’, Cherrywood Avenue,, Cherrywood (Glebe Townland), Co. Dublin, Dublin 18. Granted (18 Feb 2025). Shrinking the temporary Red Zone car park on Cherrywood Avenue to about 398 spaces for another 5 years, and opening 226 basement spaces at The Campus. - [DZ22A/0728](https://cherrywoodplans.com/application/DZ22A-0728.md): Red Zone car park, Cherrywood Avenue, Cherrywood (Glebe Townland), Co Dublin/Dublin 18. Granted (14 Mar 2023). Keeping the temporary Red Zone surface car park for about 740 cars on Cherrywood Avenue for another 5 years. - [DZ17A/0171](https://cherrywoodplans.com/application/DZ17A-0171.md): Cherrywood Business Park, Cherrywood, Dublin 18. Granted (21 Apr 2017). Seeks to keep the existing entrance and wayfinding signs at Cherrywood Business Park. - [DZ20A/0477](https://cherrywoodplans.com/application/DZ20A-0477.md): Blocks F1,F2 & F3 (3no. office blocks under construction), Cherrywood Business Park, Cherrywood, Co. Dublin (also Dublin 18) & at the temporary surface car park at Cherrywood (Glebe Townland) Co. Dublin (also Dublin 18). Granted (28 Aug 2020). Allows up to 229 spaces in the basement car park of office Blocks F1–F3 to be used for temporary parking for 7 years. - [DZ17A/0417](https://cherrywoodplans.com/application/DZ17A-0417.md): Cherrywood Glebe Townland, Co Dublin ( Dublin 18) (Lands within Dev Area 6-Bride's Glen-bounded by M50 west, Cherrywood Ave & undeveloped lands to north undeveloped lands & Glencarrig res. estate east & res prop. & undev. lands off Brides Glen to south. Granted (7 Nov 2017). Uses land off Cherrywood Avenue as a temporary car park for about 740 cars for 5 years. - [DZ17A/0326](https://cherrywoodplans.com/application/DZ17A-0326.md): Cherrywood, Glebe Townland, Co Dublin (Also Dublin 18) (Lands within Dev Area 7-Macnebury-bounded by M50 to west, Cherrywood Ave & undeveloped lands to north, undeveloped lands & Glencarrig res. estate to east & undeveloped lands off Brides Glen to south. Refused or withdrawn (26 Apr 2017). Uses land off Cherrywood Avenue as a temporary car park for about 740 cars for 5 years. - [DZ19A/0808](https://cherrywoodplans.com/application/DZ19A-0808.md): Cherrywood Business Park, Cherrywood & Loughlinstown, Co. Dublin, (Also Dublin 18). Granted (17 Dec 2019). Installs a small gas pressure regulator building in Cherrywood Business Park. - [DZ19A/0647](https://cherrywoodplans.com/application/DZ19A-0647.md): Cherrywood Business Park, Cherrywood & Loughlinstown, Co. Dublin, (Also Dublin 18). Refused or withdrawn (18 Sep 2019). Installs a small gas pressure regulator building in Cherrywood Business Park. - [DZ19A/0523](https://cherrywoodplans.com/application/DZ19A-0523.md): Cherrywood Business Park, Cherrywood & Loughlinstown, Co. Dublin, (Also Dublin 18). Refused or withdrawn (23 Aug 2019). Installs a small gas pressure regulator building in Cherrywood Business Park. - [D06A/0911](https://cherrywoodplans.com/application/D06A-0911.md): Block D, Cherrywood Science & Technology Park, Cherrywood, Loughlinstown, Co. Dublin. Granted (23 Aug 2006). Makes internal changes to the Block D office building, enclosing its entrance and adding a fire escape stairs. - [D08A/0687](https://cherrywoodplans.com/application/D08A-0687.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Refused or withdrawn (7 Aug 2008). Replacing Block D with a 5-storey office building with a large ground-floor shop at Cherrywood Science & Technology Park. - [DZ16A/0530](https://cherrywoodplans.com/application/DZ16A-0530.md): Units 2 & 4 Building 7 (previously 'Block D'), Cherrywood Business Park, Cherrywood, Loughlinstown, Co Dublin. Granted (9 Sep 2016). Changes two vacant units in Building 7, Cherrywood Business Park, into medical and dental use. - [D06A/0630](https://cherrywoodplans.com/application/D06A-0630.md): Spar Retail Unit, Block D, Cherrywood Science & Technology Park, Loughlinstown, Dublin 18. Granted (12 Jul 2006). An off-licence counter added to the Spar shop in Block D of Cherrywood Science & Technology Park. - [D05A/1672](https://cherrywoodplans.com/application/D05A-1672.md): Block D, Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (13 Feb 2006). Makes small changes to Block D, enlarging a ground-floor shop and trimming the offices. - [DZ25A/0066/WEB](https://cherrywoodplans.com/application/DZ25A-0066-WEB.md): Building 7 The Campus, Cherrywood Avenue, Cherrywood (Glebe Townland), Co Dublin, Dublin 18, D18T8Y6. Granted (20 Mar 2025). Part of Building 7 at The Campus changes from offices to medical and dental use. - [D05A/0419](https://cherrywoodplans.com/application/D05A-0419.md): Block D, Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (26 Oct 2005). Extends the existing Block D building at Cherrywood Business Park, adding 790 sq.m of shop and office space. - [D04A/1012](https://cherrywoodplans.com/application/D04A-1012.md): Cherrywood/Glebe, (ED Rathmichael), Wyvattville Link Road, Co. Dublin.. Refused or withdrawn (9 May 2005). Reshapes and drains an 8.6-hectare site at Cherrywood/Glebe and stores topsoil on a further 5.1 hectares at Laughanstown. - [D07A/0604](https://cherrywoodplans.com/application/D07A-0604.md): Cherrywood Science Technology Park,(Block D1), Loughlinstown, Co. Dublin.. Granted (2 Apr 2008). Replacing a crèche with a 4-storey office building and restaurant (Block D1) at Cherrywood Science & Technology Park. - [D21B/0118](https://cherrywoodplans.com/application/D21B-0118.md): Saint Michael's Lodge, Cherrywod Road, Shankill, Dublin 18, D18F7AR. Granted (16 Jul 2021). Seeks to keep a rear dormer window at Saint Michael's Lodge, Cherrywood Road. - [D08A/0952](https://cherrywoodplans.com/application/D08A-0952.md): Cherrywood Science & Technology Park,(Block D1), Cherrywood, Loughlinstown, Co. Dublin. Refused or withdrawn (15 Oct 2008). Design changes to the approved Block D1 office building at Cherrywood Science & Technology Park. - [D08A/1062](https://cherrywoodplans.com/application/D08A-1062.md): Unit 6, Block C, The Facilities Building, Cherrywood, Co. Dublin. Granted (13 Nov 2008). Adds lit signage to the front of Unit 6, Block C, at Cherrywood Business Park. - [D08A/0762](https://cherrywoodplans.com/application/D08A-0762.md): Unit 6, Block C, The Facilities Building, Cherrywood, Co. Dublin. Refused or withdrawn (25 Aug 2008). Adds lit signage to the front of Unit 6, Block C, at Cherrywood Business Park. - [D07A/0233](https://cherrywoodplans.com/application/D07A-0233.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.. Granted (27 Aug 2007). Extends and reworks the approved Block C leisure building, adding a double-height swimming pool hall. - [D06A/0268](https://cherrywoodplans.com/application/D06A-0268.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Granted (16 Jun 2006). Builds a four-storey leisure and retail building (Block C) with a fitness centre and 25-metre pool at Cherrywood Business Park. - [D05A/1715](https://cherrywoodplans.com/application/D05A-1715.md): Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin. Refused or withdrawn (12 Jan 2006). Builds a four-storey leisure and retail building (Block C) with a fitness centre and 20-metre pool at Cherrywood Business Park. - [DZ16A/0816](https://cherrywoodplans.com/application/DZ16A-0816.md): Unit 4 Building 5 (previously Block C), Cherrywood Business Park, Cherrywood, Dublin 18. Granted (10 Jan 2017). Changes a vacant shop unit in Cherrywood Business Park into a bank with an ATM. - [D11B/0364](https://cherrywoodplans.com/application/D11B-0364.md): 105, Cherrywood Road, Loughlinstown, Co. Dublin. Granted (12 Jan 2012). Adds a single-storey extension to the rear and side of a house at 105 Cherrywood Road. - [D08A/0121](https://cherrywoodplans.com/application/D08A-0121.md): Block C, Cherrywood Science And Technology Park, Cherrywood, Loughlinstown, Co. Dublin. Granted (24 Jun 2008). Seeks to keep an extension to the Block C facilities building and sets out options for a front loading bay. - [D07A/1607](https://cherrywoodplans.com/application/D07A-1607.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.. Refused or withdrawn (24 Jan 2008). The top floor of Block C at Cherrywood Science & Technology Park changes from recreation use to offices. - [D07A/1503](https://cherrywoodplans.com/application/D07A-1503.md): Block C, Cherrywood Science And Technology Park, Cherrywood, Loughlinstown, Co. Dublin. Refused or withdrawn (18 Dec 2007). Keeping a 52 sq.m ground-floor extension and shopfronts at Block C, Cherrywood Science & Technology Park. - [D06A/1660](https://cherrywoodplans.com/application/D06A-1660.md): Park One, Cherrywood Science And Technology Park, Loughlinstown, Co. Dublin.. Granted (6 Mar 2007). Completes the distributor road through Park One at Cherrywood Business Park, letting overhead power lines go underground. - [DZ23A/0508](https://cherrywoodplans.com/application/DZ23A-0508.md): Unit 3 and Unit 1, Building 5, Cherrywood Business Park, Cherrywood, Loughlinstown, Co Dublin. Granted (22 Sep 2023). Two units in Building 5, Cherrywood Business Park, become a dental clinic and a café. - [DZ16A/0123](https://cherrywoodplans.com/application/DZ16A-0123.md): Units 1 & 2 Block C, Cherrywood Business Park, Cherrywood, Loughlinstown, Co Dublin. Granted (21 Apr 2016). Reconfigures two ground-floor shop units in Block C and turns one into a café/restaurant. - [DZ16A/0535](https://cherrywoodplans.com/application/DZ16A-0535.md): Hibernia House, Cherrywood Business Park, Loughlinstown, Dublin 18. Granted (9 Sep 2016). Puts up two high-level lit 'evros' signs on Hibernia House, Cherrywood Business Park. - [D09A/0146](https://cherrywoodplans.com/application/D09A-0146.md): Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (23 Apr 2009). Fills in atrium spaces in Building AA at Cherrywood Business Park, adding 269 sq.m and 5 parking spaces. - [D02A/0424](https://cherrywoodplans.com/application/D02A-0424.md): Cherrywood Science & Technology Park,, Cherrywood, Loughlinstown, Co. Dublin.. Granted (10 Jul 2002). Allows two permitted three-storey science and technology buildings, AA and AB, to be used instead for office-based industry. - [DZ14A/0596](https://cherrywoodplans.com/application/DZ14A-0596.md): Unit 1 , Block C, Cherrywood Science and Technology Park, Cherrywood, Loughlinstown, Co Dublin. Granted (11 Dec 2014). Changes Shop Unit 1 in Block C, Cherrywood Business Park, into a dental clinic. - [DZ25A/0543/WEB](https://cherrywoodplans.com/application/DZ25A-0543-WEB.md): Dlr Properties Limited, Hibernia House, Cherrywood Business Park, Dublin 18, D18E440. Granted (28 Aug 2025). Hibernia House in Cherrywood Business Park changes from offices to a medical centre with a pharmacy. - [DZ17A/0862](https://cherrywoodplans.com/application/DZ17A-0862.md): Lands (17.01ha) in the townlands of Cherrywood, Dublin 18. Granted (29 May 2018). The original Cherrywood Town Centre permission: 15 blocks with 1,269 homes, shops, offices, two hotels and a library, plus Grand Parade. - [DZ19A/0255](https://cherrywoodplans.com/application/DZ19A-0255.md): Cherrywood Business Park (lands including & adjoining Bldgs 2-5 & 7 & basement level under Buildings 3, 4 & 5, Pond 4 & part of the linear park), Cherrywood, Co Dublin .. Granted (3 Dec 2019). Upgrades the public spaces of Cherrywood Business Park with raised meeting pods, a large canopy, a sunken garden and linear park improvements. - [DZ23A/0573](https://cherrywoodplans.com/application/DZ23A-0573.md): Lands (c. 17.03 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (19 Oct 2023). Amends the Cherrywood Town Centre permission to add 4 apartments in Blocks F2 and F3, bringing plot TC4 to 524 homes. - [DZ20A/0824](https://cherrywoodplans.com/application/DZ20A-0824.md): Lands (c. 17.01 ha), in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (11 Jan 2021). Changes the windows, balconies and frontage of Town Centre Block F2 on Cherrywood Avenue and Central Avenue. - [DZ19A/0148](https://cherrywoodplans.com/application/DZ19A-0148.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (24 Apr 2019). Amends Town Centre plot TC2 to add 47 apartments, taking Blocks C1 and C2 from 384 to 431 homes. - [D06A/0289](https://cherrywoodplans.com/application/D06A-0289.md): 107, Cherrywood Road, Loughlinstown, Dublin 18. Granted (26 Sep 2006). Builds a new five-bedroom, two-storey detached house beside 107 Cherrywood Road. - [D06A/0065](https://cherrywoodplans.com/application/D06A-0065.md): 107 Cherrywood Road, Cherrywood, Loughlinstown, Co. Dublin.. Refused or withdrawn (23 Feb 2006). Builds a new five-bedroom, two-storey detached house beside 107 Cherrywood Road. - [D07A/0654](https://cherrywoodplans.com/application/D07A-0654.md): Block AD, Cherrywood Science & Technology Park, Loughlinstown, Co. Dublin.. Granted (6 Jul 2007). Signs and a refuse store for the crèche in Block AD, Cherrywood Science & Technology Park. - [D06A/1722](https://cherrywoodplans.com/application/D06A-1722.md): Block AD, Cherrywood Science & Technology, Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (26 Jan 2007). Part of Block AD in Cherrywood Science & Technology Park changes from offices to a 952 sq.m crèche. - [DZ17A/0061](https://cherrywoodplans.com/application/DZ17A-0061.md): Building 4 (previously Block AD), Cherrywood Business Park, Cherrywood, Dublin 18. Granted (16 Mar 2017). Turns 1,035 sq.m of vacant office space in Building 4, Cherrywood Business Park, into a medical research laboratory. - [DZ19A/1022](https://cherrywoodplans.com/application/DZ19A-1022.md): On a site of 0.625ha, Dell Technologies, Block AB, Cherrywood Business Park, Cherrywood, Dublin 18. Granted (25 Feb 2020). Replaces two lit signs on the Dell Technologies building, Block AB, Cherrywood Business Park. - [DZ17A/0466](https://cherrywoodplans.com/application/DZ17A-0466.md): Block AB of CHerrywood, Science and Technology Park, Loughlinstown, Dublin 18. Granted (13 Jul 2017). Replaces signs at Block AB, Cherrywood Business Park, with two lit wall signs and a totem sign. - [DZ19A/1024](https://cherrywoodplans.com/application/DZ19A-1024.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (9 Sep 2020). Amends the Cherrywood Town Centre plan to shrink the basement under Blocks A1–A3 and reassign parking. - [DZ20A/0002](https://cherrywoodplans.com/application/DZ20A-0002.md): Lands (c.17.01ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (9 Sep 2020). Makes minor changes to electrical rooms and landscaping in Town Centre Blocks F1 and F3. - [DZ19A/0458](https://cherrywoodplans.com/application/DZ19A-0458.md): 17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (19 Jun 2020). Major redesign of Cherrywood Town Centre plot TC1, adding two supermarkets, an 11-screen cinema and much more retail space. - [DZ23A/0423](https://cherrywoodplans.com/application/DZ23A-0423.md): On lands (c.17.03 a) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (Also Co. Dublin). Granted (10 Aug 2023). Amends the Cherrywood Town Centre permission to add two 2-bed apartments to Block A1. - [DZ22A/0690](https://cherrywoodplans.com/application/DZ22A-0690.md): Townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (12 May 2023). Facade and balcony design changes to Cherrywood Town Centre apartment Blocks A1, A2 and A3. - [DZ22A/0747](https://cherrywoodplans.com/application/DZ22A-0747.md): Townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (30 Mar 2023). Changes of use and merging of units in Town Centre Blocks C1 and C2 to create a larger 723 sq.m shop with off-licence. - [DZ22A/0846](https://cherrywoodplans.com/application/DZ22A-0846.md): Lands (c. 17.03 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (22 Dec 2022). Removes a planned viewing platform at Block F1 in Cherrywood Town Centre, replacing it with a glass balustrade. - [DZ22A/0138](https://cherrywoodplans.com/application/DZ22A-0138.md): (c. 17.03ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (30 Aug 2022). Minor changes of use between shop and restaurant-type units in Town Centre Blocks C1 and C2, and a slightly larger crèche. - [DZ21A/0807](https://cherrywoodplans.com/application/DZ21A-0807.md): Lands (c. 17.03 ha), in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (8 Jul 2022). Amends the Cherrywood Town Centre permission to cut residential parking from 1,363 to 1,169 spaces and add 41 car-sharing spaces. - [DZ21A/0713](https://cherrywoodplans.com/application/DZ21A-0713.md): Lands (c. 17.01 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin). Granted (3 Oct 2021). Design changes to the three apartment blocks A1–A3 in Cherrywood Town Centre, including taller windows and smaller roof terrace. - [D03A/0626](https://cherrywoodplans.com/application/D03A-0626.md): Cherrywood Science & Technology Park, Cherrywood Business Park 1, Cherrywood, Loughlinstown, Co. Dublin. Granted (22 Sep 2003). A new office building of three storeys plus penthouse at Cherrywood Science & Technology Park, with 350 basement car spaces. - [D05A/0232](https://cherrywoodplans.com/application/D05A-0232.md): Cherrywood Science Technology Park, Loughlinstown, Co. Dublin.. Granted (20 Apr 2005). Adds two windows to the west side of the approved third floor of the Block AC office building. - [D04A/1361](https://cherrywoodplans.com/application/D04A-1361.md): Cherrywood Science & Technology Park, Cherrywood, Loughlinstown, Co. Dublin.. Granted (12 Jan 2005). Extends the approved third floor of the Block AC office building over two terraces and moves all rooftop plant onto the roof. - [D04A/0335](https://cherrywoodplans.com/application/D04A-0335.md): Cherrywood Science & Technology Park,, Cherrywood, Loughlinstown, Co. Dublin.. Granted (26 May 2004). Builds a new office building of three storeys plus a penthouse over a basement car park at Cherrywood Business Park. - [D04A/0915](https://cherrywoodplans.com/application/D04A-0915.md): Block AC, Cherrywood Business Park, Loughlinstown, Co. Dublin.. Granted (10 Nov 2004). Enlarges the approved link between office Blocks AC and AB, adding 990 sq.m of floor space. - [DZ18A/1178](https://cherrywoodplans.com/application/DZ18A-1178.md): 2.2 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin). Granted (17 Apr 2019). Amends Town Centre plot TC2 to add one apartment, expand retail and resident amenity space, and move the crèche. - [D05A/1057](https://cherrywoodplans.com/application/D05A-1057.md): Blocks AB/AC, Cherrywood Science & Technology Park, Cherrywood, Co. Dublin. Granted (10 Oct 2005). Adds emergency exit doors and a screened rooftop plant room to office Blocks AB and AC. - [D13A/0117](https://cherrywoodplans.com/application/D13A-0117.md): Block AB Cherrywood Science & Technology Park, Loughlinstown, Dublin 18. Granted (8 May 2013). Puts up two lit Dell logo signs on Block AB at Cherrywood Business Park. ## Links - [This page on CherrywoodPlans](https://cherrywoodplans.com/application/DZ24A-0485-WEB) - [Council record, documents and conditions (DLR planning portal)](https://planning.agileapplications.ie/dunlaoghaire/application-details/99476) - [All Cherrywood applications](https://cherrywoodplans.com/applications.md) _Source: Dún Laoghaire–Rathdown County Council planning data, refreshed daily. CherrywoodPlans is an independent site, not run by the council._