# Planning application DZ24A/0621/WEB > Lands within the Townland of Brennanstown, Brennanstown, Dublin 18, Cherrywood, Dún Laoghaire–Rathdown. Granted (21 Jan 2025). - **Reference:** DZ24A/0621/WEB - **Address:** Lands within the Townland of Brennanstown, Brennanstown, Dublin 18 - **Status:** Granted (21 Jan 2025) - **Decision:** GRANT PERMISSION - **Application type:** Permission (SDZ) - **Applicant:** Manciano Limited - **Lodged:** 17 Dec 2024 - **Decided:** 21 Jan 2025 - **Location (lat, lng):** 53.254298, -6.148742 ## Proposal Ing of amendments to the development permitted under Reg. Ref.: DZ19A/0863, as extended under Reg. Ref.: DZ19A/0863/E, on lands within the townland of Brennanstown, Dublin 18. The application site is bound by Brennanstown Square to the north, Lehaunstown Lane to the west, Carrickmines Stream (partly) to the south, Cabinteely Stream (partly) and Beech Park to the east. The lands are located in the Cherrywood Strategic Development Zone Planning Scheme area and forms part of the Development Area 5 (known as Druid’s Glen) within Cherrywood SDZ. Phase 01 of the permitted development is located to the north of the Cherrywood SDZ Planning Scheme’s Druid’s Glen Distributor Road (also known as P* to P3), currently substantially constructed and opened as a public road. This application relates to development in the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme 2014 (as amended). The proposed amendments, which relate to the Phase 01 area of the permitted development, consist of the following: • Provision of an additional 3 no. 2 storey, 3 bed terraced houses (House Type B1) and associated reconfiguration of the permitted surface parking area (including a reduction from 16 no. to 14 no. spaces); • Replacement of 4 no. 2 storey, 4 bed semi-detached houses and 1 no. 2 storey, 4 bed detached house, with 6 no. 4 bed terraced houses (new house types A1 & A2). This results in 1 no. additional house; • Reconfiguration of Block A, a 3 no. storey duplex building, to provide for 8 no. 3 bed duplex units, in place of 4 no. 3 bed and 4 no. 2 bed duplex units, and associated external alterations to fenestration and balconies; • All associated development, including car parking changes, cycle and bin storage, landscaping and site development works. The permitted development (under Reg. Ref.: DZ19A/0863, as extended under Reg. Ref.: DZ19A/0863/E) provides 342 no. residential units and the proposed amendments would result in an increase to 346 no. residential units. ## In plain English Amends Phase 1 of a permitted Druid's Glen scheme, adding 4 homes to bring the total from 342 to 346. - **346** homes - **4** extra homes ### What's planned Changes to the Phase 1 area of the development permitted under DZ19A/0863, north of the Druid's Glen road. ### Residential **3** extra 3-bed terraced houses; five 4-bed semi-detached and detached houses replaced by **6** 4-bed terraced houses; and a 3-storey block changed to **8** three-bed two-level units instead of four 3-bed and four 2-bed. The scheme rises from **342** to **346** homes. ### Transport A surface car park is redesigned, dropping from **16** to **14** spaces. _This summary was written by AI from the proposal text. Check the council record before relying on it._ ## Conditions ### Condition 2 First Schedule Reasons and Considerations Having regard to the 'Residential' zoning of the site as set out in the Cherrywood SDZ Planning Scheme 2014, as amended, and Dún Laoghaire - Rathdown County Development Plan 2022 - 2028, it is considered that subject to compliance with the conditions below, the proposed development would not seriously injure the amenities of the area and would not contravene materially the zoning of the application site or that of adjoining sites, subject to conditions and accords with the Planning Scheme. Appropriate Assessment Screening Having regard to the nature and scale of the proposed development, as clarified by way of Further Information received on 17/12/2024, it has been determined that the proposed development would not significantly impact upon a Natura 2000 Site. Environmental Impact Assessment Screening Having regard to the nature and scale of the proposed development, as clarified by way of Further Information received on 17/12/2024, which comprises an amendment to previously permitted development in a fully serviced urban location, it is considered that there is no real likelihood of significant effects on the environment arising from the proposed development. The need for environmental impact assessment can, therefore, be excluded at the preliminary examination and as such a screening determination is not required. Second Schedule Conditions General & Miscellaneous 1. (a) The development shall be carried out in its entirety in accordance with the plans, particulars and specifications lodged with the application, as amended by Further Information received on 17/12/2024. (b) Save for amendments granted on foot of this permission, the development shall otherwise be carried out in strict accordance with the terms and conditions of Planning Permission Reg. Ref. DZ19A/0863 (as extended by DZ19A/0863/E), save as may be required by the other conditions attached hereto. REASON: To ensure that the development shall be in accordance with the permission and that effective control be maintained 2. Prior to the commencement of development, the Applicant, or any other person with an interest in the land to which the application relates, shall comply with requirements of Part V, Section 96 of the Planning and Development Act 2000, as amended, and in accordance with agreement to be reached with the County Council's Housing Department, unless the Applicant shall have applied for and been granted an exemption certificate under Section 97 of the Planning & Development Act, 2000, as amended. In this regard, the Applicant shall submit a detailed submission to include, inter alia, existing and development use land values, construction, development and any attributable costs associated with the development. REASON: To comply with Part V of the Planning and Development Act, 2000, as amended. 3. With regard to the area subject to the amended development, prior to the occupation of development the developer shall submit, for the written agreement of the Planning Authority, detailed drawings in digital format (CAD/GIS) projected to ITM (Irish Transverse Mercator). This information shall include the following: • Overall site plans in DWG format (ITM projection in metres) • Ground floor plans of buildings in DWG format (ITM projection in metres) • Site sections and elevations in PDF format. REASON: To ensure consistency with Section 7.4 of the Cherrywood Planning Scheme. Urban Design and Built Form 4. The building materials, including those for ancillary structures such as ESB substations, shall match that as agreed by way of compliance with Condition 3 of Planning Permission Reg. Ref. DZ19A/0863 (as extended by DZ19A/0863/E). Any changes from this agreed palette of materials shall be done so by way of a further compliance with Condition 3 of Planning Permission Reg. Ref. DZ19A/0863 (as extended by DZ19A/0863/E), as amended by this permission, only. REASON: To ensure consistency with Objective PD 14, PD 15 of the Cherrywood Planning Scheme and to ensure harmony and visual coherence in the built form. 5. With regard to the area subject to the amended development, prior to commencement of development, or as otherwise agreed, the developer shall submit, for the written agreement of the Planning Authority, full details of any roof top services or structures, including solar panels, for the proposed and amended Duplex Block A. REASON: In the interests of visual amenity and to ensure consistency with Specific Objective PD 7, PD 19 and PD 21 of the Cherrywood Planning Scheme. Signage 6. Prior to the installation of any signage associated with the proposed development, the Applicant/Developer shall submit for the written agreement of the Planning Authority a Signage and Wayfinding Strategy including: • Details of all signage, including all external signage, way-finding and directional signage in accordance with the Cherrywood SDZ Wayfinding and Directional Signage Guidance 2021. • Street name and numbering in accordance with Objectives H6 and GI 10 and with the Cherrywood SDZ Wayfinding and Directional Signage Guidance 2021. • Full details of the location and content including background colour, lettering typeface, logos and colour. • Materials that are high quality, modern and durable, and that respect the proportions and design of the building and its surroundings. REASON: In the interests of visual amenity and in order to comply with Specific Objectives PD 30 and PD 32 of the Cherrywood Planning Scheme and the Cherrywood SDZ Wayfinding and Directional Signage Guidance 2021. Car Parking 7. The Applicant / Developer shall comply with the following: (a) All residential car parking spaces under this permission, i.e. 15 no. spaces for houses and 8 no. spaces for duplexes, shall be allocated to houses / units with no usage charge applying. Every unit shall have at least one parking space allocated. (b) The Applicant / Developer shall submit a revised Car Parking Management Strategy to the Planning Authority for written agreement prior to the commencement of development. (c) EV charging facilities shall be installed at locations that ensure footpaths adjacent to fully functional EV charging spaces maintain a 2m unobstructed width for pedestrian movement. REASON: For consistency with Section 4.2.10, Table 4.4 and PI 21 of the Cherrywood Planning Scheme. Green Infrastructure 8. With regard to the area subject to the amended development, prior to commencement of development of landscape / public realm areas, the developer shall provide the following for the written agreement of the Planning Authority: (a) Hard landscape plans and construction details for all hard standing pedestrian, cycling, vehicular / maintenance areas and proposed street furniture (including bicycle and bin storage) detailing the specifications of all furniture and surface/finish materials. In this regard, samples, data sheets and or / on site mock ups of all materials shall be provided for the agreement of the written Planning Authority and approved control samples must be held on site at all times. All surfaces and finishes shall include materials that are consistent with the requirements of Objective PD 14. In particular the finishes shall comprise of durable, easily sourced and high quality materials (materials as agreed with the Planning Authority) that harmonise with and complement those within adjoining developments. (b) Details of all of public façade block walls demonstrating high quality, durable materials such as brick/stone or clad or other durable material. Render to public facades shall be avoided. (c) Details of all boundary treatments including railings and access gates/doors to rear gardens, ensuring appropriate levels of passive surveillance, privacy and permeability. Boundary height to rear gardens along the western lane (House Type A) to be 1400mm. Boundary height of concrete post and panel fences between rear gardens along the western lane to be 1400mm. Boundary height of concrete post and panel fences between rear gardens elsewhere (Houses Type B) to be 1800mm. (d) All landscape drawings shall be consistent with approved architectural and engineering layouts including lighting and other services (ESB etc). REASON: To ensure consistency with Specific Objectives PD 14, GI 7, GI 8 and GI 16 and other relevant objectives of the Cherrywood Planning Scheme. 9. Any future application, on lands within the blue line boundary, to the west of the subject site, shall include street trees along the western boundary of the proposed access road. REASON: To ensure consistency with Objective GI8 and GI 44 of the Cherrywood Planning Scheme. Taking in Charge / Owners Management Company 10. Prior to commencement of development the applicant shall submit full details of a properly constituted Owners' Management Company for the written agreement of the Planning Authority. This shall include a layout map of the permitted development showing the areas to be taken in charge and those areas to be maintained by the Owners' Management Company. Membership of this Company shall be compulsory for all purchasers of property in the development. Confirmation that this Company has been set up shall be submitted to the Planning Authority prior to the occupation of the first residential unit. REASON: To provide for the satisfactory completion and maintenance of the development in the interest of residential amenity. Construction Management 11. For the duration of this development, from commencement of construction works (inclusive of enabling works) to completion of construction works, the Developer shall undertake continuous monitoring of the road network to be utilised for construction access to this development. In this regard and at a minimum, an independent condition survey of the roads constructed under Planning Permission Reg. Ref. DZ19A/0863 (as extended by DZ19A/0863/E).that are to be utilised for construction access to this development shall be undertaken by suitably qualified engineers/ surveyors appointed by the Developer, at the Developer's expense, both: i. prior to commencement of development and ii. prior to occupation of the final phase of the development. The appointment of the engineers/surveyors shall be agreed in advance and in writing with the Planning Authority and they shall be independent of the Developer and the Developer's design and construction teams. The condition survey(s) produced are to be submitted for the written agreement of the Planning Authority. Damage, including structural defects, damage to the wearing course, footpaths, kerbs, road markings etc, to the road network that is identified in the condition survey(s) shall be rectified/replaced by the Developer, at the Developer's expense and to a taking in charge standard of development which is to the satisfaction of the Planning Authority. Reason: To ensure consistency with Section 2.14 of the Cherrywood Planning Scheme and in the interests of orderly development, proper planning and sustainable development Financial Contributions 12. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €6,987.84 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Local Authority in respect of the provision of Surface Water Infrastructure benefiting development in the area of the Planning Authority, as provided for in the Development Contribution Scheme 2023-2028 made by Dún Laoghaire-Rathdown County Council on the 9th of October 2023. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index commencing from 1st January 2025. Contributions shall be payable at the index-adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Article 4.7 of the Scheme. Outstanding balances as of the 1st of January each year shall be subject to indexation and adjusted accordingly until the contribution has been paid in full. (See Article 8.3 of the Scheme). REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Surface Water Infrastructure benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. Note on above Condition: Please note that with effect from 1st January 2014 Uisce Éireann are now the statutory body responsible for both water and wastewater services. Accordingly, the contribution payable has been reduced by the amount of the contribution associated with these services. Further details/clarification can be obtained from Uisce Éireann at Tel. 1800 278 278. 13. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €57,345.72 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Local Authority in respect of the provision of the Transport Infrastructure benefiting development in the area of the Planning Authority, as provided for in the Development Contribution Scheme 2023-2028 made by Dún Laoghaire-Rathdown County Council on the on the 9th of October 2023. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index commencing from 1st January 2025. Contributions shall be payable at the index-adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Article 4.7 of the Scheme. Outstanding balances as of the 1st of January each year shall be subject to indexation and adjusted accordingly until the contribution has been paid in full. (See Article 8.3 of the Scheme) REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Transport Infrastructure benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 14. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €60,488.48 to the Planning Authority as a contribution towards expenditure that was/or is proposed to be incurred by the Local Authority in respect of the provision of the Community & Parks facilities & Recreational amenities benefiting development in the area of the Planning Authority, as provided for in the Development Contribution Scheme 2023-2028 made by Dún Laoghaire-Rathdown County Council on the 9th of October 2023. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index commencing from 1st January 2025. Contributions shall be payable at the index-adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Article 4.7 of the Scheme. Outstanding balances as of the 1st of January each year shall be subject to indexation and adjusted accordingly until the contribution has been paid in full. (See Article 8.3 of the Scheme) REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the Community & Parks facilities & Recreational amenities benefiting development in the area of the Planning Authority and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 15. The Developer shall, prior to commencement or as otherwise agreed in writing with the Planning Authority, pay the sum of €70,928.48 to the Planning Authority a contribution towards expenditure that was/or is proposed to be incurred by the Local Authority in respect of public infrastructure and facilities benefitting development in the Cherrywood Planning Scheme Area identified in Appendix III to the Development Contribution Scheme in respect of development in the Cherrywood Planning Scheme Area 2023 - 2028 made by Dún Laoghaire-Rathdown County Council on the 9th October 2023, as provided for in the said Scheme. This contribution shall be used solely to fund the public infrastructure and facilities identified in Appendix III to the Scheme: Public Infrastructure and Facilities benefitting development in the Cherrywood Planning Scheme Area. These rates of contribution shall be updated effective from 1 January each year during the life of the Scheme in accordance with the SCSI Tender Price Index from 1st January, 2025. Contributions shall be payable at the index-adjusted rate pertaining to the year in which implementation of the planning permission is commenced, as provided for in Article 4.7 of the Scheme. Outstanding balances as of the 1st of January each year shall be subject to indexation and adjusted accordingly until the contribution has been paid in full. (See Article 7.3 of the Scheme) REASON: It is considered reasonable that the payment of a contribution be required in respect of the provision of the public infrastructure and facilities benefitting development in the Cherrywood Planning Scheme Area and that is provided, or that is intended will be provided, by or on behalf of the Local Authority. 16. No development on foot of this permission shall commence until security for the provision and satisfactory completion of services (including roads, footpaths, open spaces, public lighting, sewers, watermains and drains) in accordance with the Plans and particulars lodged with the application, has been given by:- a) Lodgement with the Council of an approved Insurance Company Bond in the sum of €11,600 which shall be kept in force by the Developer until such time as Roads, Open Spaces, Car Parks, Sewers, Watermains and Drains are completed to the satisfaction of the Council OR/... b) Lodgement with the Council of a Cash Sum of €7,200 to be applied by the Council at its absolute discretion if such services are not duly provided to its satisfaction on the provision and completion of such services to standard specifications. REASON: To ensure that a ready sanction may be available to the Council to induce the provision of services and prevent disamenity in the development. 17. This development shall not be carried out without prior agreement, in writing, between the Applicant & the Planning Authority relating to the payment of development contributions. REASON: Investment by Dún Laoghaire-Rathdown County Council in Local Authority works has facilitated and will facilitate the proposed development. It is considered appropriate and reasonable that the developer should contribute to the cost of same. NOTES 1. The attention of the applicant is drawn to Section 34(13) of the Planning and Development Act 2000, as amended, which relates as follows- 'A person shall not be entitled solely by reason of a permission under this section to carry out any development'. 2. The proposed development shall accord with the requirements of Irish Water. 3. Any alterations to the drainage systems within the site are a matter for compliance with the Building Regulation 4. The Applicant is advised that all/any requirements of the Environmental Health Office - Air Pollution and Noise Control Unit shall be ascertained and strictly adhered to. ## Nearby applications - [DZ26A/0245/WEB](https://cherrywoodplans.com/application/DZ26A-0245-WEB.md): Lands within the Townland of, Brennanstown, Dublin 18. Granted (30 Jul 2026). Amends a permitted Druid's Glen scheme, adding 18 apartments and enlarging the childcare facility. - [DZ25A/0515/WEB](https://cherrywoodplans.com/application/DZ25A-0515-WEB.md): Lands within the Townland of, Brennanstown, Dublin 18. Granted (4 Dec 2025). Amends Phases 2 and 3 of a permitted Druid's Glen scheme, swapping unit types and adding 7 homes (346 to 353). - [DZ24A/0585/WEB](https://cherrywoodplans.com/application/DZ24A-0585-WEB.md): Lands within the Townland of Brennanstown, Brennanstown, Dublin 18. Refused or withdrawn (8 Aug 2024). Amends Phase 1 of a permitted Druid's Glen scheme, adding 4 homes to bring the total from 342 to 346. - [DZ19A/0863](https://cherrywoodplans.com/application/DZ19A-0863.md): Site is generally bounded by Lehaunstown Lane to the west, Carrickmines Stream (partly) to the south and, Cabinteely Stream (partly) to the east and is located within the townland of, Brennanstown, Dublin 18. Granted (14 Jan 2020). 342 new homes in Druid's Glen, Brennanstown, with a crèche and part of the Druid's Glen road and bridge. - [D04A/0988](https://cherrywoodplans.com/application/D04A-0988.md): BRENNANSTOWN, CABINTEELY, DUBLIN 18.. Refused or withdrawn (22 Oct 2004). A large Brennanstown development of 702 homes in 26 buildings of 3 to 8 storeys, with a school building, shop and community hall. - [DZ18A/0208](https://cherrywoodplans.com/application/DZ18A-0208.md): Site approx. 6.57ha in area and generally bounded by, Lehaunstown Lane to the west, Carrickmines Stream (partly) to the south, and Cabinteely Stream, (partly) to the east that is, located within the townland of, Brennanstown, Dublin 18. Granted (4 Feb 2020). Builds 367 homes, a mix of apartments, two-level units and houses, plus a childcare facility in Brennanstown. - [D08A/1293](https://cherrywoodplans.com/application/D08A-1293.md): Lehaunstown House, Lehaunstown, Cabinteely, Dublin 18. Refused or withdrawn (30 Jan 2009). Extensions to Lehaunstown House, Cabinteely, making it a 5-bedroom home with a sunroom and pool. - [D08A/0728](https://cherrywoodplans.com/application/D08A-0728.md): Lahaunstown House, Lahaunstown, Cabinteely, Dublin 18.. Refused or withdrawn (31 Jul 2008). A new 4-bedroom, two-storey house beside Lahaunstown House, Cabinteely. - [DZ16A/0587](https://cherrywoodplans.com/application/DZ16A-0587.md): Site of 2.79 ha approx. at Beech Park, Bray Road, Cabinteely, Dublin 18/Loughlinstown, Co Dublin. Granted (21 Dec 2016). 34 houses at Beech Park, Bray Road, replacing six homes, plus part of the Druid's Glen Road and bridge. - [DZ25A/0318/WEB](https://cherrywoodplans.com/application/DZ25A-0318-WEB.md): Lands within the townland of Brennanstown, Dublin 18. Granted (20 Aug 2025). 24 new two-storey houses off the Druid's Glen road in Brennanstown. - [DZ23A/0083](https://cherrywoodplans.com/application/DZ23A-0083.md): Druid House & Glendruid House (protected structure), Lehaunestown Lane, Brennanstown Road, Brennanstown, Dublin 18. Granted (20 Oct 2023). Rebuilding a boundary wall on Lehaunstown Lane and a new access road to prepare for the permitted Druid's Glen Road. - [D18A/0590](https://cherrywoodplans.com/application/D18A-0590.md): The Pines, Lehaunstown Lane, Cabinteely, Dublin 18, D18 E3X7. Granted (11 Sep 2018). Replaces a septic tank with a modern wastewater treatment system at The Pines, Lehaunstown Lane. - [DZ20A/0491](https://cherrywoodplans.com/application/DZ20A-0491.md): Site of c. 5.295 hectares, located at Beech Park (also known as Beechpark), Bray Road, Cabinteely, Dublin 18/Loughlinstown, County Dublin. Granted (19 Oct 2020). Amends a permitted Beech Park apartment block, raising it from 65 to 70 homes with no change in parking. - [DZ20A/0362](https://cherrywoodplans.com/application/DZ20A-0362.md): On a site of c. 5.295 hectares, Beech Park (also known as Beechpark), Bray Road, Cabinteely, Dublin 18, Loughlinstown, County Dublin. Granted (31 Aug 2020). Amends the Beech Park scheme on Bray Road to add 3 apartments to Block F, a gym and a pet room, and more bike parking. - [DZ20A/0056](https://cherrywoodplans.com/application/DZ20A-0056.md): Beech Park (also known as Beechpark), Bray Road, Cabinteely, Dublin 18/Loughlinstown, County Dublin. Granted (18 Mar 2020). Amends the permitted Beech Park scheme to reconfigure 78 apartments in Blocks D, E and F. - [DZ19A/0768](https://cherrywoodplans.com/application/DZ19A-0768.md): Beech Park, Bray Road, Cabinteely, Dublin 18, Loughlinstown, Co. Dublin. Granted (29 Nov 2019). Amends the permitted Beech Park scheme to reconfigure 78 apartments in Blocks D, E and F and add a residents' gym. - [DZ19A/0622](https://cherrywoodplans.com/application/DZ19A-0622.md): Beech Park, Bray Road, Cabinteely, Dublin 18 / Loughlinstown, County Dublin. Granted (17 Oct 2019). Amends the permitted Beech Park scheme to reconfigure 78 apartments and split off land taken by the Council for a new road. - [D15A/0385](https://cherrywoodplans.com/application/D15A-0385.md): Site of 5.295 ha approximately at Beech Park, Cabinteely, Dublin 18 / Loughlinstown, Co Dublin and its connection with the N11.. Granted (18 Oct 2017). 164 homes, mostly houses and two-level apartments, at Beech Park, Cabinteely, plus the first stretch of the Druid's Glen Road. - [DZ20A/0073](https://cherrywoodplans.com/application/DZ20A-0073.md): At a site of c. 5.295 hectares, Beech Park, Bray Road, Cabinteely, Dublin 18, Loughlinstown, Co. Dublin. Granted (30 Jun 2020). Redesign of three permitted apartment blocks at Beech Park, Bray Road, changing the unit mix but keeping 65 apartments. - [D02A/0317](https://cherrywoodplans.com/application/D02A-0317.md): Site (walled garden) Glendruid, Brennanstown Road,, Cabinteely, Dublin 18.. Granted (10 Jun 2002). Builds a two-storey, four-bedroom house with a garage and stables in the walled garden at Glendruid, a protected structure. - [D13A/0545](https://cherrywoodplans.com/application/D13A-0545.md): Tablick, Lehaunstown, Cabinteely, Co Dublin. Granted (24 Jan 2014). Extends and alters a dormer bungalow at Tablick, Lehaunstown, adding a larger kitchen and an ensuite. - [D10A/0262](https://cherrywoodplans.com/application/D10A-0262.md): Talblich, Lehaunstown Lane, Cabinteely, Dublin 18. Refused or withdrawn (8 Jul 2010). 13 new houses replacing a house at Talblich, Lehaunstown Lane. - [D15A/0716](https://cherrywoodplans.com/application/D15A-0716.md): Cartref and Ards, Old Bray Road, Cabinteely, Dublin 18. Refused or withdrawn (19 Jan 2016). 51 homes, apartments and houses, at Cartref and Ards on the Old Bray Road. - [D06A/0557](https://cherrywoodplans.com/application/D06A-0557.md): Grounds and Dwellings Ards & Cartref, Old Bray Road, Cabinteely, Dublin 18. Granted (9 Nov 2006). 77 apartments and two-level homes in 3 blocks of 2 to 5 storeys at Ards and Cartref, Old Bray Road. - [D18A/0551](https://cherrywoodplans.com/application/D18A-0551.md): Site (c.1.46ha) at Ards, Cartref and lands to the rear of Foxley, Old Bray Road, Cabinteely, Dublin 18. Granted (23 Jan 2019). 72 homes, apartments and houses, at Ards, Cartref and behind Foxley on the Old Bray Road. - [D08A/0717](https://cherrywoodplans.com/application/D08A-0717.md): Ards, Cartref and Foxley, Old Bray Road, Cabinteely, Dublin 18.. Refused or withdrawn (14 Aug 2008). 127 apartments, penthouses and two-level homes in 4 buildings at Ards, Cartref and Foxley, Old Bray Road. - [D22A/0350](https://cherrywoodplans.com/application/D22A-0350.md): Circle K Centenary Service Station, Bray Road, Dublin 18, D18AK58. Granted (25 Aug 2022). Shop revamp at the Circle K service station on Bray Road, adding a deli and enlarging the retail area. - [D06A/0452](https://cherrywoodplans.com/application/D06A-0452.md): Centenary Service Station, Bray Road, Cabinteely, Dublin 18.. Granted (26 May 2006). Lets part of the approved shop at Centenary Service Station, Cabinteely, operate as an off-licence. - [D05A/0567](https://cherrywoodplans.com/application/D05A-0567.md): Centenary Service Station, Bray Road, Cabinteely, Dublin 18.. Granted (20 Jan 2006). Upgrades the shop and car wash at Centenary Service Station, Cabinteely, adding a hot food deli. - [D05A/0322](https://cherrywoodplans.com/application/D05A-0322.md): Centenary Service Station, Bray Road, Cabinteely, Dublin 18.. Refused or withdrawn (19 Apr 2005). Upgrades the shop and car wash at Centenary Service Station, Cabinteely, adding a hot food deli. - [PC/IC/02/16](https://cherrywoodplans.com/application/PC-IC-02-16.md): N11, Cabinteely, Dublin 18. Granted (12 Jun 2017). Builds a new signalised junction on the N11 at Cabinteely with crossings, bus stops and landscaping. - [D06A/1367](https://cherrywoodplans.com/application/D06A-1367.md): Navarone & Tablick, Brennanstown Road / Lehaunstown Lane, Cabinteely, Dublin 18.. Granted (7 Feb 2008). 76 apartments and townhouses in two blocks of up to 5 storeys at Navarone and Tablick, Brennanstown Road. - [D15A/0228](https://cherrywoodplans.com/application/D15A-0228.md): Navarone, Brennanstown Road, Cabinteely, Dublin 18. Refused or withdrawn (28 May 2015). Either 7 or 9 new large houses in the grounds of Navarone, Brennanstown Road. - [D04A/0926](https://cherrywoodplans.com/application/D04A-0926.md): Brennanstown Avenue, Brennanstown, Cabinteely, Co. Dublin. Granted (11 Oct 2004). Adds a 26 sq.m single-storey rear extension to each of 11 approved houses on Brennanstown Avenue. - [D15A/0667](https://cherrywoodplans.com/application/D15A-0667.md): Glendruid Mews, Brennanstown Road, Cabinteely, Dublin 18 (corner with Lehaunstown Lane). Granted (23 Mar 2016). Refurbishes an outbuilding at Glendruid Mews to add living space to the existing house. - [D15A/0187](https://cherrywoodplans.com/application/D15A-0187.md): Glendruid Mews, Brennanstown Road, Cabinteely, Dublin 18 (corner with Lehaunstown Lane). Refused or withdrawn (13 May 2015). Replaces a storage shed with a two-storey extension to a house at Glendruid Mews. - [D16A/0852](https://cherrywoodplans.com/application/D16A-0852.md): Navarone, Brennanstown Road, Cabinteely, Dublin 18. Granted (12 Apr 2017). A new 5-bedroom detached house beside Navarone on Brennanstown Road. - [D06A/0330](https://cherrywoodplans.com/application/D06A-0330.md): Glendruid and Knockenree, Brennanstown Road and Druid House, Lehaunstown Lane, Cabinteely, Dublin 18. Refused or withdrawn (7 Apr 2006). Builds 191 homes, a mix of apartments and houses, at Glendruid and Knockenree off Brennanstown Road. - [PC/CSDZ/005/2021](https://cherrywoodplans.com/application/PC-CSDZ-005-2021.md): Cherrywood Strategic Development Zone, Townland of Laughanstown, County Dublin. Granted (5 Jul 2021). A council plan for a regional storm water pond (Pond 2A) in Laughanstown, draining to the Cabinteely River. - [D06A/0713](https://cherrywoodplans.com/application/D06A-0713.md): Glendruid & Knockenree, Brennanstown Road, Lehaunstown Lane, Cabinteely, Dublin 18. Refused or withdrawn (22 Jun 2006). 173 homes, apartments in blocks of up to 8 storeys plus houses, at Glendruid and Knockenree on Brennanstown Road. - [D07A/1723](https://cherrywoodplans.com/application/D07A-1723.md): Lehaunstown Bungalow, Lehaunstown Lane, Cabinteely, Co. Dublin. Refused or withdrawn (11 Feb 2008). Demolishes Lehaunstown Bungalow and builds a replacement house. ## Links - [This page on CherrywoodPlans](https://cherrywoodplans.com/application/DZ24A-0621-WEB) - [Council record, documents and conditions (DLR planning portal)](https://planning.agileapplications.ie/dunlaoghaire/application-details/99838) - [All Cherrywood applications](https://cherrywoodplans.com/applications.md) _Source: Dún Laoghaire–Rathdown County Council planning data, refreshed daily. CherrywoodPlans is an independent site, not run by the council._