# Planning application DZ24A/0686/WEB > Townlands of Laughanstown, and Brennanstown, Dublin 18, Cherrywood, Dún Laoghaire–Rathdown. Refused or withdrawn (4 Sep 2024). - **Reference:** DZ24A/0686/WEB - **Address:** Townlands of Laughanstown, and Brennanstown, Dublin 18 - **Status:** Refused or withdrawn (4 Sep 2024) - **Decision:** DECLARE APPLICATION INVALID - **Application type:** Permission (SDZ) - **Applicant:** LSREF V Eden T13 Limited - **Lodged:** 3 Sep 2024 - **Decided:** 4 Sep 2024 - **Location (lat, lng):** 53.248917, -6.161262 ## Proposal Amendments to development permitted under Reg. Ref. DZ23A/0028 consisting of development comprising: the addition of 4no. apartment units (2no. 1 bed and 2 no. 2 bed units) at Level 03 of Apartment Building 1, together with an increase in parapet height (c.800mm) for a section of the Apartment Block to provide a stepped building profile (Apartment Building 1 now 4 storeys overall); 4no. additional car parking spaces, 5no. additional bicycle parking spaces and 1no. additional motorcycle parking space; repositioning of a portion of the attenuation area, together with all ancillary and associated site development works; all on a development tile (T13) of approximately 0.8ha. ## In plain English Amends a permitted Tully scheme to add 4 apartments by raising part of Apartment Building 1 to 4 storeys. - **4** extra apartments - **4** storeys - **0.8** hectare site ### What's planned Changes to the development permitted under DZ23A/0028 on tile T13, beside Beckett Park and Castle Street, on about **0.8** hectares. ### Residential **4** extra apartments (**2** one-bed, **2** two-bed) on a new third-floor level, making Apartment Building 1 **4** storeys, with a stepped roofline. ### Transport **4** more car spaces, **5** more bicycle spaces and **1** more motorcycle space. ### Environment Part of the storm water storage area is moved. _This summary was written by AI from the proposal text. Check the council record before relying on it._ ## Nearby applications - [DZ23A/0028](https://cherrywoodplans.com/application/DZ23A-0028.md): Townlands of Laughanstown and Brennanstown, Dublin 18. Granted (8 Dec 2023). 56 new homes and a 3-storey childcare centre on tile T13 beside Beckett Park and Castle Street in Tully. - [DZ15A/0814](https://cherrywoodplans.com/application/DZ15A-0814.md): Laughanstown, Dublin 18, (Beckett Park). Granted (13 Jul 2016). Beckett Park: a new 5.1-hectare public park in Tully with a sports pitch, tennis courts, playground and pavilion café. - [DZ24A/0696/WEB](https://cherrywoodplans.com/application/DZ24A-0696-WEB.md): Townlands of Laughanstown, and Brennanstown, Dublin 18. Granted (29 Oct 2024). Amends a permitted Tully scheme to add 4 apartments by raising part of Apartment Building 1 to 4 storeys. - [DZ21A/0664](https://cherrywoodplans.com/application/DZ21A-0664.md): Site in the Townlands of, Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (5 May 2022). 47 apartments in a 4-storey block off Castle Street in Tully. - [DZ20A/0399](https://cherrywoodplans.com/application/DZ20A-0399.md): Townlands of Laughanstown and Brennanstown, Tully Development Area 8, Cherrywood, Dublin 18. Granted (22 Jan 2021). 136 new homes, mostly houses and two-level apartments, in Tully between Castle Street and the Luas, plus the Castle Street extension. - [DZ18A/1129](https://cherrywoodplans.com/application/DZ18A-1129.md): Site (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8). Granted (4 Feb 2019). Builds a drainage basin and regrades a future school site in Laughanstown. - [DZ21A/1069](https://cherrywoodplans.com/application/DZ21A-1069.md): The overall site area of this application is approximately 8.7Ha. Townlands of Laughanstown and Brennanstown Dublin 18. Granted (2 Feb 2022). Minor changes to a permitted 136-home scheme in Tully so it can be built and occupied in phases. - [DZ22A/0729](https://cherrywoodplans.com/application/DZ22A-0729.md): Townlands of, Laughanstown, Brennanstown and, Cherrywood, Dublin 18. Granted (22 Sep 2023). 57 new homes, houses and 3-bed two-level apartments, off Gun and Drum Hill Road in Tully. - [DZ22A/0623](https://cherrywoodplans.com/application/DZ22A-0623.md): On Lands Development ,Plot T 11, Area 8 (Tully), Cherrywood SDZ, Laughanstown, Dublin 18. Granted (18 Jan 2023). 49 new houses on plot T11 west of Castle Street in Tully. - [DZ26A/0750/WEB](https://cherrywoodplans.com/application/DZ26A-0750-WEB.md): Unit B, Mercer Way, Tully Village Centre West, Dublin 18, D18C58F. Refused or withdrawn (7 Oct 2026). Combines two permitted shop units at Tully Village Centre into one convenience store with an off-licence. - [DZ22A/0770](https://cherrywoodplans.com/application/DZ22A-0770.md): On Lands Development Area 8 (Tully), Cherrywood SDZ, Laughanstown, Dublin 18. Granted (22 Mar 2023). 71 homes, a crèche, shops and a community room on plot T11 west of Castle Street in Tully village centre. - [DZ23A/0468](https://cherrywoodplans.com/application/DZ23A-0468.md): Townlands of Laughanstown and Brennanstown, Dublin 18. Granted (9 May 2024). Amends a permitted Lehaunstown scheme to rearrange units, add 4 homes (488 to 492) and move a temporary crèche. - [DZ23A/0354](https://cherrywoodplans.com/application/DZ23A-0354.md): Townlands of Laughanstown and Brennanstown, Dublin 18. Refused or withdrawn (23 Jun 2023). Amends a permitted Lehaunstown scheme to rearrange units and add 4 homes, taking it from 488 to 492. - [DZ23A/0812](https://cherrywoodplans.com/application/DZ23A-0812.md): Townlands of Laughanstown & Brennanstown, Dublin 18. Granted (14 Feb 2024). Amends a permitted housing scheme at L1 West to change the internal layouts of its 4-bed houses and move the site compound. - [DZ23A/0005](https://cherrywoodplans.com/application/DZ23A-0005.md): Site in the the townlands of Laughanstown and Brennanstown, Castle Street, Barrington's Road, Dublin 18. Granted (7 Jul 2023). 89 new homes (houses and two-level apartments) and a crèche off Castle Street and Barrington's Road. - [DZ25A/0014/WEB](https://cherrywoodplans.com/application/DZ25A-0014-WEB.md): Townlands of Laughanstown & Brennanstown, Dublin 18. Granted (3 Mar 2025). Amends the permitted Tully village centre (plot T1) to shrink the basement, cutting car parking from 210 to 157 spaces. - [DZ23A/0106](https://cherrywoodplans.com/application/DZ23A-0106.md): Lands in the Townlands of Laughanstown and Brennanstown, Dublin 18. Granted (22 Sep 2023). A village centre at Tully with a supermarket, shops, cafés and 139 build-to-rent apartments in two blocks of 3–5 storeys. - [DZ20A/0585](https://cherrywoodplans.com/application/DZ20A-0585.md): on a site in the Townlands of Laughanstown and Cherrywood, Dublin 18. Refused or withdrawn (2 Jun 2021). A temporary sales and marketing suite with 8 parking spaces for just under 5 years off Gun and Drum Hill Road. - [DZ23A/0455](https://cherrywoodplans.com/application/DZ23A-0455.md): Area 8 (Tully) Cherrywood SDZ Lands, Laughanstown, Dublin 18. Granted (27 Oct 2023). Amends a permitted Tully housing scheme to provide 5 three-bed houses on Mercer's Road in place of 5 homes dropped by condition. - [DZ20A/0690](https://cherrywoodplans.com/application/DZ20A-0690.md): Site area of 9.77, in townlands of Laughanstown Brennanstown and Cherrywood, Dublin 18. Refused or withdrawn (3 Nov 2020). 152 new homes, mostly apartments plus houses, off Barrington's Road and Castle Street in Lehaunstown. - [DZ23A/0120](https://cherrywoodplans.com/application/DZ23A-0120.md): Site in the townlands of Laughanstown and Brennanstown, Castle Street, Barrington's Road, Dublin 18. Refused or withdrawn (29 Jan 2024). 240 build-to-rent apartments in 6 blocks of 2–4 storeys in Priorsland, off Castle Street. - [DZ26B/0186/WEB](https://cherrywoodplans.com/application/DZ26B-0186-WEB.md): 4 Mercer Row,Laughanstown, Dublin 18, D18XH7P. Granted (25 May 2026). Three new roof windows added to the front of a house on Mercer Row. - [DZ26B/0153/WEB](https://cherrywoodplans.com/application/DZ26B-0153-WEB.md): 4 Mercer Row, Laughanstown, Dublin, D18XH7P. Refused or withdrawn (19 Mar 2026). Three new roof windows added to the front of a house on Mercer Row. - [DZ26A/0252/WEB](https://cherrywoodplans.com/application/DZ26A-0252-WEB.md): A site in the townlands of Brennanstown and Laughanstown, Dublin 18. The main development site forms part of ‘Development Area 3. Granted (7 Oct 2026). 343 apartments in 8 blocks of up to 5 storeys off Castle Street in Priorsland. - [DZ16A/0531](https://cherrywoodplans.com/application/DZ16A-0531.md): Glenellen, Lehaunstown Lane, Cabinteely, Dublin 18. Granted (1 Sep 2016). Demolishes the house Glenellen and its outbuildings on Lehaunstown Lane. - [DZ26A/0052/WEB](https://cherrywoodplans.com/application/DZ26A-0052-WEB.md): Townland of Laughanstown, Cherrywood, Dublin 18. Granted (24 Mar 2026). Makes minor layout and landscaping changes to a permitted Tully housing scheme, moving bin stores to the front of the two-level homes. - [DZ19A/0597](https://cherrywoodplans.com/application/DZ19A-0597.md): Development Area 8 -Tully, Cherrywood SDZ, Includes the Res 2 plots ''T9'' and ''T10''. Granted (11 Mar 2020). 184 new homes, mainly houses plus two small apartment blocks, on plots T9 and T10 in Tully. - [DZ25A/0044/WEB](https://cherrywoodplans.com/application/DZ25A-0044-WEB.md): In the Townlands of Laughanstown, and Brennanstown, Dublin 18. Granted (10 Jul 2025). Amends a permitted Lehaunstown scheme to add a storey to two buildings, taking it from 492 to 517 homes, with fewer car spaces. - [DZ21A/0334](https://cherrywoodplans.com/application/DZ21A-0334.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (7 Apr 2022). 482 new homes, mostly apartments in five blocks up to 5 storeys, beside Barrington's Road and the Luas in Lehaunstown. - [DZ21A/1042](https://cherrywoodplans.com/application/DZ21A-1042.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (30 May 2022). 122 new homes, a mix of houses, two-level units and apartments, beside Tully Park and Lehaunstown Lane. - [DZ22A/0820](https://cherrywoodplans.com/application/DZ22A-0820.md): Townlands of Laughanstown, Brennanstown and Cherrywood,, Dublin 18. Granted (12 Dec 2022). Makes minor changes to the already-permitted 168-home scheme in Tully, swapping the designs of 12 houses and altering some roofs. - [DZ22A/0403](https://cherrywoodplans.com/application/DZ22A-0403.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Refused or withdrawn (22 Jul 2022). Makes minor changes to the already-permitted 168-home scheme in Tully, swapping the designs of 12 houses and altering some roofs. - [DZ21A/0699](https://cherrywoodplans.com/application/DZ21A-0699.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18. Granted (23 Sep 2021). Smaller first-floor bathroom windows on 33 permitted houses in Tully. - [DZ20A/0552](https://cherrywoodplans.com/application/DZ20A-0552.md): Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18,. Granted (11 Mar 2021). 163 new homes, mostly houses, between Castle Street and Tully Park. - [D10A/0104](https://cherrywoodplans.com/application/D10A-0104.md): Carrickmines Substation Barringtontowers, Brennanstown Road, Carrickmines, Co. Dublin. Refused or withdrawn (15 Apr 2010). Seeks to keep an electrical substation built to power the Luas Green Line extension near Brennanstown Road. - [ABP31332222](https://cherrywoodplans.com/application/ABP31332222.md): Priorsland, Within the Townsland of Carrickmines Great and Brennanstown, Dublin 18. Refused or withdrawn (20 Nov 2024). A new village centre at Priorsland with 443 homes, a supermarket, shops, crèche and the first phase of a public park. - [DZ21A/0677](https://cherrywoodplans.com/application/DZ21A-0677.md): site of c.8.751 ha located at Priorsland, located within the townlnds of Carrickmines Great and, Brennanstown, Dublin 18. The site comprises lands north and south of the carrickmines Stream and, adjacent Carrickmines Luas Park & Ride.. Refused or withdrawn (15 Sep 2021). Builds a new village centre at Priorsland with 445 homes, a supermarket, shops, crèche and offices beside Carrickmines Luas. - [D11A/0127](https://cherrywoodplans.com/application/D11A-0127.md): Carrickmines Substation, Barrington Tower, Brennanstown Road, Cabinteely, Dublin 18. Granted (29 Nov 2011). Seeks to keep an electrical substation built to power the Luas Green Line extension near Brennanstown Road. ## Links - [This page on CherrywoodPlans](https://cherrywoodplans.com/application/DZ24A-0686-WEB) - [Council record, documents and conditions (DLR planning portal)](https://planning.agileapplications.ie/dunlaoghaire/application-details/100057) - [All Cherrywood applications](https://cherrywoodplans.com/applications.md) _Source: Dún Laoghaire–Rathdown County Council planning data, refreshed daily. CherrywoodPlans is an independent site, not run by the council._